﻿_id	id	date	transmission_line	circuit_type	sector	executing_agency	line_length	voltage_level
1	0	2014-01-31	Meerut - Bhiwani line	Single Circuit	Central Sector	PGCIL	174.0	765.0
2	1	2014-01-31	Raigarh Pooling Station (Near Kotra) - Raipur Pooling Station line	Double Circuit	Central Sector	PGCIL	480.0	765.0
3	2	2014-01-31	LILO of Bangalore - Salam at Hosur	Double Circuit	Central Sector	PGCIL	25.0	400.0
4	3	2014-01-31	Ranchi (New) -Ranchi line -I	Double Circuit	Central Sector	PGCIL	162.0	400.0
5	4	2014-01-31	Shifting of Ankola -Aurangabad (MSETCL) to Aurangabad (PG)	Double Circuit	Central Sector	PGCIL	102.0	400.0
6	5	2014-01-31	Anta - Phagi (Jaipur South Ckt-2)(Charged at 400 kV)	Single Circuit	State Sector	RVPNL	214.0	765.0
7	6	2014-01-31	Alamathy -Sunguvarchatram (1st Ckt)	Double Circuit	State Sector	TANTRANSCO	98.0	400.0
8	7	2014-01-31	Kawai - Anta (Baran)	Double Circuit	State Sector	RVPNL	101.0	400.0
9	8	2014-01-31	Paricha - Mainpuri 2nd Ckt.)	Double Circuit	State Sector	UPPTCL	259.0	400.0
10	9	2014-01-31	Raigarh - Saraipalli	Double Circuit	State Sector	CSPTCL	222.0	400.0
11	10	2014-01-31	Vadinar - Amreli (Part line)	Double Circuit	State Sector	GETCO	117.0	400.0
12	11	2014-01-31	Churk - Robertsganj	Double Circuit	State Sector	UPPTCL	13.0	220.0
13	12	2014-01-31	LILO of 2nd Ckt of GHTP - Mansa at Dhanaula	Double Circuit	State Sector	PSTCL	78.0	220.0
14	13	2014-01-31	LILO of GGSSTP - Sahnewal at Ghulal	Double Circuit	State Sector	PSTCL	11.0	220.0
15	14	2014-01-31	LILO of Manubolu - Renigunta at Ranchagunneri S/S	Double Circuit	State Sector	APTRANSCO	2.0	220.0
16	15	2014-01-31	LILO of one ckt of Jamsher - Sultanpur at Badshahpur	Double Circuit	State Sector	PSTCL	14.0	220.0
17	16	2014-01-31	LILO of Tadikanda - Ongole at Podili (Lot I & II)	Double Circuit	State Sector	APTRANSCO	143.0	220.0
18	17	2014-01-31	Pune (PG) - Aurangabad (MSETCL)	Multiple Circuits with Double Circuit	Private Sector	RPTL	476.0	400.0
19	18	2014-02-28	Satna - Gwalior line (Ckt-I)	Single Circuit	Central Sector	PGCIL	337.0	765.0
20	19	2014-02-28	LILO of Nathpa Jhakri - Nalagarh at Rampur (Loop in portion)	Double Circuit	Central Sector	PGCIL	5.0	400.0
21	20	2014-02-28	Khedamara - Raipur	Double Circuit	State Sector	CSPTCL	90.0	400.0
22	21	2014-02-28	Kolaghat TPS - Kharagpur	Single Circuit	State Sector	WBSETCL	91.0	400.0
23	22	2014-02-28	Kotputli - Manoharpur	Double Circuit	State Sector	RVPNL	99.0	220.0
24	23	2014-02-28	Latehar- Daltonganj	Double Circuit	State Sector	JUSNL	130.0	220.0
25	24	2014-02-28	Tiroda - Akola-II	Single Circuit	Private Sector	APL	361.0	765.0
26	25	2014-02-28	Akola- I - Akola-II	Double Circuit	Private Sector	APL	61.0	400.0
27	26	2014-03-31	LILO of Ranchi - WR Pooling Station at Dharamjaygarh / near Korba.	Double Circuit	Central Sector	PGCIL	10.0	765.0
28	27	2014-03-31	Lucknow - Bareilly line	Single Circuit	Central Sector	PGCIL	252.0	765.0
29	28	2014-03-31	Ranchi - WR Pooling Station	Single Circuit	Central Sector	PGCIL	381.0	765.0
30	29	2014-03-31	Bareilly (New) - Bareilly (Exist) line (Quad)	Double Circuit	Central Sector	PGCIL	2.0	400.0
31	30	2014-03-31	Kurnool (new) - Kurnool line	Double Circuit	Central Sector	PGCIL	20.0	400.0
32	31	2014-03-31	LILO of Bhiwadi - Bassi at Kotputli	Double Circuit	Central Sector	PGCIL	17.0	400.0
33	32	2014-03-31	LILO of Kahalgaon - Biharshariff line (Ist line) at Lakhisarai	Double Circuit	Central Sector	PGCIL	56.0	400.0
34	33	2014-03-31	LILO of Kolar - Sriperumbdure at Thiruvalam	Double Circuit	Central Sector	PGCIL	42.0	400.0
35	34	2014-03-31	LILO of Nagarjunsagar - Gooty at Kurnool	Double Circuit	Central Sector	PGCIL	70.0	400.0
36	35	2014-03-31	LILO of One Ckt of Talchar - Meramundali at Angul Pooling Station	Double Circuit	Central Sector	PGCIL	34.0	400.0
37	36	2014-03-31	LILO of Vapi - Navi Mumbai at Kala	Double Circuit	Central Sector	PGCIL	18.0	400.0
38	37	2014-03-31	Ranchi (New) -Ranchi line -II	Double Circuit	Central Sector	PGCIL	158.0	400.0
39	38	2014-03-31	Tiruvelam (PG) - Chitoor	Double Circuit	Central Sector	PGCIL	42.0	400.0
40	39	2014-03-31	Vadodara - Pirana (Quad)	Double Circuit	Central Sector	PGCIL	274.0	400.0
41	40	2014-03-31	Vadodra - Asoj line	Double Circuit	Central Sector	PGCIL	24.0	400.0
42	41	2014-03-31	Vapi - Kala (Part of Vapi-Navimumbai)	Double Circuit	Central Sector	PGCIL	61.0	400.0
43	42	2014-03-31	Anta - Phagi (Jaipur South Ckt-1)	Single Circuit	State Sector	RVPNL	212.0	765.0
44	43	2014-03-31	Alamathy -Sunguvarchatram (2nd Ckt)	Double Circuit	State Sector	TANTRANSCO	100.0	400.0
45	44	2014-03-31	Chandrapur switching Stn. - Chandrapur II S/S	Single Circuit	State Sector	MSETCL	4.0	400.0
46	45	2014-03-31	Kalisndh TPS - Anta (Baran) Pooling Station (Quad)	Double Circuit	State Sector	RVPNL	159.0	400.0
47	46	2014-03-31	Pithampur-Indore	Double Circuit	State Sector	MPPTCL	128.0	400.0
48	47	2014-03-31	LILO of Kundha PH III - PUSHEP at Karamadai	Double Circuit	State Sector	TANTRANSCO	2.0	230.0
49	48	2014-03-31	BAAP - Bhadla	Double Circuit	State Sector	RVPNL	104.0	220.0
50	49	2014-03-31	BECL (Padva)- Sagapara line	Double Circuit	State Sector	GETCO	83.0	220.0
51	50	2014-03-31	Dhuri-Bangan	Double Circuit	State Sector	PSTCL	101.0	220.0
52	51	2014-03-31	Diversion of Koradi - Kalwa Ckt-I (Bhusawal - Aurangabad ) at Jalgaon	Single Circuit	State Sector	MSETCL	2.0	220.0
53	52	2014-03-31	Diversion of Koradi - Kalwa Ckt-I (Bhusawal - BBLR ) at Jalgaon	Single Circuit	State Sector	MSETCL	2.0	220.0
54	53	2014-03-31	Diversion of Sarni - Pandhurna	Double Circuit	State Sector	MPPTCL	4.0	220.0
55	54	2014-03-31	Extn. of Hajipur - Muzaffarpur (Kanti) to Muzaffarpur (PG)	Double Circuit	State Sector	BSPTCL	14.0	220.0
56	55	2014-03-31	LILO of 2nd Ckt Vita -Pandhrapur line at Hiwarwadi S/S	Double Circuit	State Sector	MSETCL	6.0	220.0
57	56	2014-03-31	LILO of Bharthana - Manipuri at Saifai	Double Circuit	State Sector	UPPTCL	2.0	220.0
58	57	2014-03-31	LILO of both ckts of Hadala - Halvad at Sartanpar	Double Circuit	State Sector	GETCO	51.0	220.0
59	58	2014-03-31	LILO of Chorania-Gondal at Sadla	Double Circuit	State Sector	GETCO	59.0	220.0
60	59	2014-03-31	LILO of Domjur - Howrah at Foundry Park	Double Circuit	State Sector	WBSETCL	60.0	220.0
61	60	2014-03-31	LILO of Gachibowli - Thandur at Yeddumailaram	Double Circuit	State Sector	APTRANSCO	20.0	220.0
62	61	2014-03-31	LILO of Halvad - Bhimasar at Halvad	Double Circuit	State Sector	GETCO	18.0	220.0
63	62	2014-03-31	LILO of Jeerat - KLC at NTAA-III	Double Circuit	State Sector	WBSEDCL	4.0	220.0
64	63	2014-03-31	LILO of Khaparkheda - Wardha at New Buttibori-III	Double Circuit	State Sector	MSETCL	3.0	220.0
65	64	2014-03-31	LILO of Korba- Amarkantak I & II at Churri	Double Circuit	State Sector	CSPTCL	2.0	220.0
66	65	2014-03-31	LILO of Navsari - Vav line at Popada	Double Circuit	State Sector	GETCO	18.0	220.0
67	66	2014-03-31	LILO of one ckt Wanakbori-Asoj line at Jarod	Double Circuit	State Sector	GETCO	28.0	220.0
68	67	2014-03-31	LILO of Pusad - Nanded at Ghatodi	Double Circuit	State Sector	MSETCL	33.0	220.0
69	68	2014-03-31	LILO of Ratangarh - Reengus at Laxmangarh	Double Circuit	State Sector	RVPNL	6.0	220.0
70	69	2014-03-31	LILO of Tappar - Shivlakha at PS 3 (Bhachau)	Double Circuit	State Sector	GETCO	3.0	220.0
71	70	2014-03-31	LILO of Waluj Bahaleshwar at Deogaon Rangari S/S	Double Circuit	State Sector	MSETCL	26.0	220.0
72	71	2014-03-31	Modification/Shifting of Jabalpur - Amarkantak	Double Circuit	State Sector	MPPTCL	16.0	220.0
73	72	2014-03-31	Modification / Shifting of Sukha - Birsinghpur / Amarkantak	Double Circuit	State Sector	MPPTCL	13.0	220.0
74	73	2014-03-31	Ratlam - Daloda line	Double Circuit	State Sector	MPPTCL	74.0	220.0
75	74	2014-03-31	Ridge Valley - Trauma Centre/ AIIMS	Double Circuit	State Sector	DTL	12.0	220.0
76	75	2014-03-31	Sattenapalli (Narsaraopet) - Narsaraopet	Double Circuit	State Sector	APTRANSCO	40.0	220.0
77	76	2014-03-31	Tap on Babhaleshwar - Chalisgaon at Kopergaon	Double Circuit	State Sector	MSETCL	11.0	220.0
78	77	2014-03-31	Tap on Vita - Comboti at Mahali S/S	Double Circuit	State Sector	MSETCL	2.0	220.0
79	78	2014-03-31	Yeddumailaram - Sadasivpet	Double Circuit	State Sector	APTRANSCO	74.0	220.0
80	79	2014-03-31	LILO of Rourkela - Raigarh at Sterlite TPP ( 2nd LILO)	Double Circuit	Private Sector	VEDANTA	60.0	400.0
81	80	2014-03-31	Nasik-Bableshwar (1st Ckt)	Double Circuit	Private Sector	IBPL	57.0	400.0
82	81	2014-03-31	Subhasgram (PGCIL) - CESC 220 KV S/S	Double Circuit	Private Sector	CESC	48.0	220.0
83	82	2014-04-30	Aurangabad (PG)-Aurangabad (MSETCL)	Double Circuit	Central Sector	PGCIL	118.0	400.0
84	83	2014-04-30	LILO of Teesta-V Siliguri line at Rangpo (1 D/C & 1.5 M/C)	Double Circuit	Central Sector	PGCIL	7.0	400.0
85	84	2014-04-30	Nellor - Thiruvalam (Quad) line	Double Circuit	Central Sector	PGCIL	352.0	400.0
86	85	2014-04-30	Moga- Nakodar	Double Circuit	State Sector	PSTCL	128.0	400.0
87	86	2014-04-30	LILO of Arasur-Ingur at Karamadai S/S	Double Circuit	State Sector	TANTRANSCO	5.0	220.0
88	87	2014-04-30	LILO of Debari - Banswara at Madri (Udaipur)	Double Circuit	State Sector	RVPNL	34.0	220.0
89	88	2014-04-30	LILO of Moga - Ferozepur at Talwandi Bhai	Double Circuit	State Sector	PSTCL	4.0	220.0
90	89	2014-04-30	LILO of Muradnagar - Modipuram at Faridnagar	Single Circuit	State Sector	UPPTCL	31.0	220.0
91	90	2014-05-31	Bina - Gwalior line (3rd Ckt)	Single Circuit	Central Sector	PGCIL	231.0	765.0
92	91	2014-05-31	Champa Pooling Station - Dharamjaygarh / Near Korba Switching Station line	Single Circuit	Central Sector	PGCIL	62.0	765.0
93	92	2014-05-31	Champa Pooling Station - Raipur Pooling Station line	Double Circuit	Central Sector	PGCIL	298.0	765.0
94	93	2014-05-31	Indore - Vadodara	Single Circuit	Central Sector	PGCIL	320.0	765.0
95	94	2014-05-31	Gola - Ramgarh	Double Circuit	Central Sector	DVC	74.0	220.0
96	95	2014-05-31	LILO of Waluj - Bhusawal at Thaptitanda	Double Circuit	State Sector	MSETCL	154.0	400.0
97	96	2014-05-31	Nakodar - Makhu line	Double Circuit	State Sector	PSTCL	105.0	400.0
98	97	2014-05-31	Rajpura Thermal - Nakodar	Double Circuit	State Sector	PSTCL	279.0	400.0
99	98	2014-05-31	Thaptitanda (Aurangabad -II) - Ektuni	Double Circuit	State Sector	MSETCL	9.0	400.0
100	99	2014-05-31	Ajari - Bhadla line	Double Circuit	State Sector	RVPNL	48.0	220.0
101	100	2014-05-31	Bap-Ajari line	Double Circuit	State Sector	RVPNL	57.0	220.0
102	101	2014-05-31	Dhuri (Bhalwan) - Dhanaula	Double Circuit	State Sector	PSTCL	75.0	220.0
103	102	2014-05-31	LILO of Dhuri - Bangan at Chhajali (Loop out)	Single Circuit	State Sector	PSTCL	27.0	220.0
104	103	2014-05-31	LILO of Ratangarh -Bikaner at Bandnu	Double Circuit	State Sector	RVPNL	42.0	220.0
105	104	2014-05-31	Nakodar - Nurmehal	Double Circuit	State Sector	PSTCL	30.0	220.0
106	105	2014-06-30	Kurnool - Raichur (IInd Ckt)	Single Circuit	Central Sector	PGCIL	118.0	765.0
107	106	2014-06-30	Rihand - Vindhyachal Pooling Station (1st Ckt)	Single Circuit	Central Sector	PGCIL	31.0	765.0
108	107	2014-06-30	LILO of 2nd Ckt of Lucknow - Bareliiy line (PG) at Shahjahanpur	Double Circuit	Central Sector	PGCIL	25.0	400.0
109	108	2014-06-30	LILO of Neyveli - Trichy at Nagapattnam Pooling station	Single Circuit	Central Sector	PGCIL	46.0	400.0
110	109	2014-06-30	Anpara C - Anpara D	Single Circuit	State Sector	UPPTCL	3.0	765.0
111	110	2014-06-30	Lalitpur TPS - Jhansi	Double Circuit	State Sector	UPPTCL	185.0	220.0
112	111	2014-06-30	LILO of Khodri - Rishikesh at Dehradun	Double Circuit	State Sector	PTCUL	5.0	220.0
113	112	2014-06-30	Makhu - Dharam kot	Double Circuit	State Sector	PSTCL	42.0	220.0
114	113	2014-06-30	Narasaraopet - Parchur	Double Circuit	State Sector	APTRANSCO	106.0	220.0
115	114	2014-06-30	Patti - Algon (2nd Ckt)	Single Circuit	State Sector	PSTCL	20.0	220.0
116	115	2014-06-30	Raichur - Sholapur line (RSTL - TBCB)	Single Circuit	Private Sector	RSTCL	208.0	765.0
117	116	2014-06-30	LILO of ACBIL-Baraari (Bilaspur) PS at Bandakhar (Maruti Clean Coal)	Double Circuit	Private Sector	MCCPL	6.0	400.0
118	117	2014-07-31	Jharsuguda Pooling Station Dharamjaygarh line.	Double Circuit	Central Sector	PGCIL	300.0	765.0
119	118	2014-07-31	Wardha - Aurangabad-I	Double Circuit	Central Sector	PGCIL	690.0	765.0
120	119	2014-07-31	Thiruvalam - Sholinganallur line	Double Circuit	Central Sector	PGCIL	228.0	400.0
121	120	2014-07-31	Babhaleshwar - Aurangabad II	Double Circuit	State Sector	MSETCL	254.0	400.0
122	121	2014-07-31	Karaikudi - Kayathar	Double Circuit	State Sector	TANTRANSCO	390.0	400.0
123	122	2014-07-31	Mukatsar -Makhu	Double Circuit	State Sector	PSTCL	191.0	400.0
124	123	2014-07-31	Pugalur - Ottiyambakkam - Kalivanthapattu (Melakottaiyur)	Double Circuit	State Sector	TANTRANSCO	727.0	400.0
125	124	2014-07-31	LILO of Kayathar - Anuppankulam at Kayathar	Double Circuit	State Sector	TANTRANSCO	4.0	230.0
126	125	2014-07-31	LILO of Kayathar - Pasumalai at Kayathar	Double Circuit	State Sector	TANTRANSCO	4.0	230.0
127	126	2014-07-31	LILO of Thudiyalur - Othakalmandapam at Coimbatore	Double Circuit	State Sector	TANTRANSCO	10.0	230.0
128	127	2014-07-31	Kashipur - Mahuakheraganj	Double Circuit	State Sector	PTCUL	34.0	220.0
129	128	2014-07-31	LILO of Baja khana - Mukatsar at Kotkapura	Double Circuit	State Sector	PSTCL	3.0	220.0
130	129	2014-07-31	Terminating tower point - HSR Layout (Cable work)	Underground Cable	State Sector	KPTCL	3.0	220.0
131	130	2014-07-31	Bhopal - Bhopal (BDTCL - TBCB)	Double Circuit	Private Sector	SGL	17.0	400.0
132	131	2014-07-31	Byrnihat - Azara (2nd Ckt) (Part of Silchar - Azara)	Single Circuit	Private Sector	NETC	42.0	400.0
133	132	2014-08-31	Satna - Gwalior line (60 Km D/C Portion) Ckt-II	Double Circuit+Single Circuit	Central Sector	PGCIL	300.0	765.0
134	133	2014-08-31	Anuppur (Moser Baer) - Jabalpur Pooling Station	Double Circuit	Central Sector	PGCIL	492.0	400.0
135	134	2014-08-31	Kosamba-Chorania line	Double Circuit	State Sector	GETCO	460.0	400.0
136	135	2014-08-31	Hura - Raghunathpur	Double Circuit	State Sector	WBSETCL	67.0	220.0
137	136	2014-08-31	Korba -Vishrampur	Single Circuit	State Sector	CSPTCL	153.0	220.0
138	137	2014-08-31	LILO of Dausa -Alwar at Alwar	Double Circuit	State Sector	RVPNL	9.0	220.0
139	138	2014-08-31	LILO of GAVASAD - SLPP at Karjan	Double Circuit	State Sector	GETCO	23.0	220.0
140	139	2014-08-31	LILO of Harduagani - Hathras at Khair	Double Circuit	State Sector	UPPTCL	75.0	220.0
141	140	2014-08-31	LILO of Karamsad-Vartej at Dhuvaran CCPP-III	Double Circuit	State Sector	GETCO	78.0	220.0
142	141	2014-08-31	LILO of Mandawar-Alwar (MIA) at Alwar	Double Circuit	State Sector	RVPNL	1.0	220.0
143	142	2014-08-31	LILO of Raigarh - Jindal (Tamnar) at Girwani	Double Circuit	State Sector	CSPTCL	15.0	220.0
144	143	2014-08-31	LILO of Rewan Road - Fatehpur at Sirathu	Single Circuit	State Sector	UPPTCL	6.0	220.0
145	144	2014-08-31	LILO of Thiruvalam - Kanchipuram SP Koil at Thiruvalam	Double Circuit	State Sector	TANTRANSCO	10.0	220.0
146	145	2014-08-31	Shalimar bagh - Wazirpur, U/G,1000 mm, 200 MW	Double Circuit	State Sector	DTL	8.0	220.0
147	146	2014-08-31	Akola - Aurangabad line ckt-I	Single Circuit	Private Sector	APL	219.0	765.0
148	147	2014-08-31	DB Power (Baradarha) - Raigarh (Kotra) Pooling Station	Double Circuit	Private Sector	DBPCL	36.0	400.0
149	148	2014-08-31	Derang - Angul Pooling Station	Multiple Circuits with Double Circuit	Private Sector	JPL	154.0	400.0
150	149	2014-08-31	LILO of one ckt of Bhadravati (PG) - Parli at Dhariwal	Double Circuit	Private Sector	DIL	31.0	400.0
151	150	2014-09-30	Dadr-Loni (Harsh Vihar)	Single Circuit	Central Sector	NTPC Ltd.	108.0	400.0
152	151	2014-09-30	Koderma - Gaya (Balance part)	Double Circuit	Central Sector	PGCIL	152.0	400.0
153	152	2014-09-30	Maithon -Gaya line (Balance part)	Double Circuit	Central Sector	PGCIL	130.0	400.0
154	153	2014-09-30	Talwandi Sabo-Mukatsar	Double Circuit	State Sector	PSTCL	201.0	400.0
155	154	2014-09-30	Bhawad - Bhopalgarh	Double Circuit	State Sector	RVPNL	93.0	220.0
156	155	2014-09-30	BTPS-Agia-Sarusajai (2nd Circuit, Balance portion)	Single Circuit	State Sector	AEGCL	65.0	220.0
157	156	2014-09-30	Ghazipur - Rasra	Single Circuit	State Sector	UPPTCL	59.0	220.0
158	157	2014-09-30	Kanti - Darbhanga (2nd Ckt)	Single Circuit	State Sector	BSPTCL	68.0	220.0
159	158	2014-09-30	Khaperkheda - Butibori -I	Double Circuit	State Sector	MSETCL	126.0	220.0
160	159	2014-09-30	LILO of Bawana-Najafgarh at Kanjhawla	Double Circuit	State Sector	DTL	6.0	220.0
161	160	2014-09-30	LILO of Budidampad - Bhongiri at Weddekothapally	Double Circuit	State Sector	APTRANSCO	14.0	220.0
162	161	2014-09-30	LILO of New Pallom- Kayamkulam at Punnapra	Double Circuit	State Sector	KPCL	36.0	220.0
163	162	2014-09-30	LILO of Obra - Allahabad II Ckt at Mizrapur	Double Circuit	State Sector	UPPTCL	8.0	220.0
164	163	2014-09-30	Maharani Bagh- Gazipur (0.5kM cable on Maharani Bagh side & 8.5kM OH line)	Double Circuit	State Sector	DTL	19.0	220.0
165	164	2014-09-30	Purti - Butibori - III	Double Circuit	State Sector	MSETCL	78.0	220.0
166	165	2014-09-30	Dhule (IPTC) - Dhule (MSETCL) (BDTCL - TBCB)	Double Circuit	Private Sector	SGL	35.0	400.0
167	166	2014-09-30	GEPL -MIDC S/S	Double Circuit	Private Sector	GEPL	20.0	220.0
168	167	2014-09-30	Koldam - Ludhinana (JV Portion)	Double Circuit	Joint Sector	PKTCL	301.0	400.0
169	168	2014-09-30	Parbati -II- Koldam line -II	Single Circuit	Joint Sector	PKTCL	76.0	400.0
170	169	2014-10-31	Kurnool - Nellore	Double Circuit	Central Sector	PGCIL	602.0	765.0
171	170	2014-10-31	Balipara - Bongaigaon	Double Circuit	Central Sector	PGCIL	609.0	400.0
172	171	2014-10-31	LILO of Both Ckt Jamshedpur - Rourkela line at Chaibasa	Double Circuit	Central Sector	PGCIL	56.0	400.0
173	172	2014-10-31	LILO of Nathpa Jhakri - Nalagarh at Rampur (2nd Ckt balance)	Double Circuit	Central Sector	PGCIL	2.0	400.0
174	173	2014-10-31	LILO of Teesta-V Siliguri line at Rangpo (2nd ckt balance)	Double Circuit	Central Sector	PGCIL	5.0	400.0
175	174	2014-10-31	LILO of Moradabad - CB Ganj at Rampur	Double Circuit	State Sector	UPPTCL	24.0	220.0
176	175	2014-10-31	LILO of Muzaffarngr - Nara -II ckt at Jansath	Double Circuit	State Sector	UPPTCL	20.0	220.0
177	176	2014-10-31	LILO of Thiruvalam - Singarapet at Thiruvalam	Double Circuit	State Sector	TANTRANSCO	20.0	220.0
178	177	2014-10-31	Puricha - Jhansi	Double Circuit	State Sector	UPPTCL	14.0	220.0
179	178	2014-10-31	Aurangabad - Dhule (BDTCL - TBCB)	Single Circuit	Private Sector	SGL	192.0	765.0
180	179	2014-10-31	Bhopal - Indore (BDTCL - TBCB)	Single Circuit	Private Sector	SGL	176.0	765.0
181	180	2014-10-31	Parbati- II - Koldam line-I	Single Circuit	Joint Sector	PKTCL	81.0	400.0
182	181	2014-11-30	LILO of Bhilwara -Bali at Bamantukda	Double Circuit	State Sector	RVPNL	26.0	220.0
183	182	2014-11-30	LILO of Duni - SEZ(220 KV GSS) line at Jaipur (south)(PG)	Double Circuit	State Sector	RVPNL	55.0	220.0
184	183	2014-11-30	LILO of Jabalpur (Sukha) - Birsinghpur / Amarkantak at Panagar	Double Circuit	State Sector	MPPTCL	7.0	220.0
185	184	2014-11-30	LILO of Jeur - Karkambh at Shinde SKS	Double Circuit	State Sector	MSETCL	5.0	220.0
186	185	2014-11-30	LILO of one ckt of Badshahpur - Bhiwadi at HSIIDC Bawal	Double Circuit	State Sector	HVPNL	36.0	220.0
187	186	2014-11-30	LILO of Tanda - Sultanpur at Tanda(New)	Double Circuit	State Sector	UPPTCL	8.0	220.0
188	187	2014-11-30	Manubolu - Sullurpeta	Double Circuit	State Sector	APTRANSCO	136.0	220.0
189	188	2014-11-30	Ramgarh (GTPP) - Chandan	Double Circuit	State Sector	RVPNL	194.0	220.0
190	189	2014-11-30	Bongaigoan - Siliguri Line (ENICL - TBCB)	Double Circuit	Private Sector	SGL	443.0	400.0
191	190	2014-11-30	Kurnool - Thiruvalam line	Double Circuit	Central Sector	PGCIL	710.0	765.0
192	191	2014-11-30	Raipur Pooling Station - Wardha line	Double Circuit	Central Sector	PGCIL	736.0	765.0
193	192	2014-11-30	LILO of Navsai - Boisar at Magarwada	Double Circuit	Central Sector	PGCIL	16.0	400.0
194	193	2014-11-30	Chhegaon - Julwania	Double Circuit	State Sector	MPPTCL	225.0	400.0
195	194	2014-11-30	LILO of Muzaffarnagar -Vishnuprayag at Srinagar	Double Circuit	State Sector	UPPTCL	7.0	400.0
196	195	2014-11-30	Aau-Baithwasia	Double Circuit	State Sector	RVPNL	93.0	220.0
197	196	2014-11-30	Bhawad-Baithwasia	Double Circuit	State Sector	RVPNL	66.0	220.0
198	197	2014-11-30	Daloda - Mandsaur	Double Circuit	State Sector	MPPTCL	14.0	220.0
199	198	2014-11-30	Harduaganj - Jahangirabad	Double Circuit	State Sector	UPPTCL	99.0	220.0
200	199	2014-11-30	Jaipur (South -PG) - Vatika line	Double Circuit	State Sector	RVPNL	56.0	220.0
201	200	2014-11-30	LILO of Ajmer -Beawer line at Ajmer	Double Circuit	State Sector	RVPNL	38.0	220.0
202	201	2014-12-31	Bokaro TPS Extn.- Koderma TPS	Double Circuit	Central Sector	PGCIL	200.0	400.0
203	202	2014-12-31	Sagardighi - Baharampur	Double Circuit	Central Sector	PGCIL	52.0	400.0
204	203	2014-12-31	220 kV Apta - Kalwa line at Loc. No 647& 652 & 220 kV Kalwa - Taloja at Loc. No. 652 to 654 for Metra Rail Depot	Single Circuit	State Sector	MSETCL	4.0	220.0
205	204	2014-12-31	Chandan - Dechu	Double Circuit	State Sector	RVPNL	202.0	220.0
206	205	2014-12-31	Khadaki (VSNL - Dighi) - Theur-II line from Lonikand -I to Lonikand-II S/S	Single Circuit	State Sector	MSETCL	1.0	220.0
207	206	2014-12-31	LILO of 2nd Ckt of Patiala - Patran at Rajla	Double Circuit	State Sector	PSTCL	12.0	220.0
208	207	2014-12-31	LILO of Hinjewadi - Infosys line at Pegasus	Double Circuit	State Sector	MSETCL	6.0	220.0
209	208	2014-12-31	LILO of Kolhapur II - Mumewadi at Ghorpade	Double Circuit	State Sector	MSETCL	7.0	220.0
210	209	2014-12-31	LILO of Morbi - Lalpar at Sartanpar	Double Circuit on Multiple Circuits	State Sector	GETCO	17.0	220.0
211	210	2014-12-31	LILO of Tappar - Nani Khakhar at Mokha	Double Circuit	State Sector	GETCO	21.0	220.0
212	211	2014-12-31	Mendhasal-Bidanasi	Double Circuit	State Sector	OPTCL	62.0	220.0
213	212	2014-12-31	Sarna - Sujanpur line	Double Circuit	State Sector	PSTCL	9.0	220.0
214	213	2014-12-31	Shifting & height raising of 220 kV Kalwa - Taloja & 220 kV Kalwa - Apta line Loc. 652-653-654 for Metro rail Depot and Loc. No 647 to 652 metro rail at Panchananda	Single Circuit	State Sector	MSETCL	4.0	220.0
215	214	2014-12-31	Tap on 220 kV Bhigwan-Kurkumbh at 220 kV Shirsuphal	Single Circuit	State Sector	MSETCL	5.0	220.0
216	215	2014-12-31	Tarapur - Boisar line	Single Circuit	State Sector	MSETCL	1.0	220.0
217	216	2014-12-31	Tarapur - Borivali line	Single Circuit	State Sector	MSETCL	1.0	220.0
218	217	2014-12-31	Kamalanga (GMR) - Angul pooling station	Double Circuit	Private Sector	GMR ENERG	60.0	400.0
219	218	2015-01-31	Bachou - Varsana line	Double Circuit	Central Sector	PGCIL	20.0	400.0
220	219	2015-01-31	LILO of both ckts of Tuticorin JV - Maduri at Tuticorin Pooling station	Double Circuit	Central Sector	PGCIL	9.0	400.0
221	220	2015-01-31	Sikar - Ratnagarh line	Double Circuit	Central Sector	PGCIL	156.0	400.0
222	221	2015-01-31	Chhabra TPS - Anta (Baran)	Double Circuit	State Sector	RVPNL	179.0	400.0
223	222	2015-01-31	LILO of Palatana - Bongaigaon at Azara S/S	Double Circuit	State Sector	AEGCL	7.0	400.0
224	223	2015-01-31	LILO of Panki - Muradnagar at Aligarh	Double Circuit	State Sector	UPPTCL	66.0	400.0
225	224	2015-01-31	MTPS Stage-III - Thiruvalam	Double Circuit	State Sector	TANTRANSCO	204.0	400.0
226	225	2015-01-31	Gonda - Basti	Single Circuit	State Sector	UPPTCL	105.0	220.0
227	226	2015-01-31	Gurgaon Sector-72- Gurgaon Sector-20	Double Circuit	State Sector	HVPNL	24.0	220.0
228	227	2015-01-31	Kadaperi - Kalivanthapattu line	Single Circuit	State Sector	TANTRANSCO	38.0	220.0
229	228	2015-01-31	LILO of Badod - Kota line & Badod - Modak line at Bhanpura	Double Circuit	State Sector	MPPTCL	4.0	220.0
230	229	2015-01-31	LILO of Bina - Bhopal line at Ganjbasoda	Double Circuit	State Sector	MPPTCL	11.0	220.0
231	230	2015-01-31	LILO of Both ckt Viramgam - Bhat at Sanand	Double Circuit	State Sector	GETCO	22.0	220.0
232	231	2015-01-31	LILO of K.R.Thoppur-Deviakurichi at Singapuram	Double Circuit	State Sector	TANTRANSCO	14.0	220.0
233	232	2015-01-31	LILO of Narsinghpur - Itarsi at Pipariya	Double Circuit	State Sector	MPPTCL	9.0	220.0
234	233	2015-01-31	Azara - Bongaigaon (2nd Ckt)	Double Circuit	Private Sector	NETC	159.0	400.0
235	234	2015-01-31	Bina TPS - Suitable location (along Bina (PG) - Bina (MPPTCL)	Double Circuit	Private Sector	JV(PG&JP)	40.0	400.0
236	235	2015-01-31	Dhariwal TPS -Channdrapur II (2nd Ckt)	Single Circuit	Private Sector	DIL	10.0	400.0
237	236	2015-01-31	Haldia - Subhasgram line	Double Circuit	Private Sector	CESC	178.0	400.0
238	237	2015-01-31	Tamnar TPP - Raigarh (Tamnar) Pooling Station	2xDouble Circuit	Private Sector	JPL	44.0	400.0
239	238	2015-02-28	Sholapur - Pune	Single Circuit	Central Sector	PGCIL	268.0	765.0
240	239	2015-02-28	LILO of Parli - Pune at Pune	Double Circuit	Central Sector	PGCIL	39.0	400.0
241	240	2015-02-28	LILO of Ckt-II Jullandhur - Hamirpur at Hamirpur (PG)	Double Circuit	Central Sector	PGCIL	19.0	220.0
242	241	2015-02-28	Bonapally - Chittoor (Quad)	Double Circuit	State Sector	APTRANSCO	196.0	400.0
243	242	2015-02-28	LILO of Mundra - Chorania at Halvad S/S	Double Circuit	State Sector	GETCO	4.0	400.0
244	243	2015-02-28	CBE - Mandapam	Double Circuit	State Sector	TANTRANSCO	10.0	230.0
245	244	2015-02-28	LILO of Kundha PH III - PUSHEP at Karamadai	Double Circuit	State Sector	TANTRANSCO	1.0	230.0
246	245	2015-02-28	Ashta - Berchha (2nd Ckt)	Double Circuit	State Sector	MPPTCL	45.0	220.0
247	246	2015-02-28	Ashta - Indore - II (Jetpura)	Single Circuit on Double Circuit	State Sector	MPPTCL	199.0	220.0
248	247	2015-02-28	Berchha - Shajapur -I	Double Circuit	State Sector	MPPTCL	20.0	220.0
249	248	2015-02-28	Gurgaon Sector-72- Gurgaon Sector-20 (2nd Ckt)	Double Circuit	State Sector	HVPNL	24.0	220.0
250	249	2015-02-28	LILO of Botad - Vartej at Vallabhipur	Double Circuit	State Sector	GETCO	2.0	220.0
251	250	2015-02-28	LILO of Pandharpur - Malinagar at karkambh	Double Circuit	State Sector	MSETCL	3.0	220.0
252	251	2015-02-28	LILO of Ras - Merta line at Jethana	Double Circuit	State Sector	RVPNL	39.0	220.0
253	252	2015-02-28	Dhule - Vadodara (BDTCL - TBCB)	Single Circuit	Private Sector	SGL	263.0	765.0
254	253	2015-03-31	Angul Pooling Station - Jharsuguda Pooling Station line-I	Single Circuit	Central Sector	PGCIL	274.0	765.0
255	254	2015-03-31	Vindhyachal Pooling Station - Satna line (2 Km D/C Portion) Ckt-I	Double Circuit+Single Circuit	Central Sector	PGCIL	271.0	765.0
256	255	2015-03-31	Wardha - Aurangabad -II	Double Circuit	Central Sector	PGCIL	701.0	765.0
257	256	2015-03-31	LILO of Dehar - Panipat at Panchkula	Double Circuit	Central Sector	PGCIL	18.0	400.0
258	257	2015-03-31	Silchar - Imphal (New) line (to be charged at 132KV)	Double Circuit	Central Sector	PGCIL	334.0	400.0
259	258	2015-03-31	a) Jujjuru - Sattenapalli (b) LILO of VTS - Srisailam line at Sattenapalli	Double Circuit	State Sector	APTRANSCO	134.0	400.0
260	259	2015-03-31	Bara - Meza line	Double Circuit	State Sector	UPPTCL	65.0	400.0
261	260	2015-03-31	LILO of Panki - Obra at Rewa Road	Double Circuit	State Sector	UPPTCL	1.0	400.0
262	261	2015-03-31	Mundra - Zerda line (Terminated at Varsana)	Double Circuit	State Sector	GETCO	161.0	400.0
263	262	2015-03-31	Rewa Road - Meza line	Double Circuit	State Sector	UPPTCL	68.0	400.0
264	263	2015-03-31	Amravati - Badnera line (2 Ckt)	Single Circuit	State Sector	MSETCL	30.0	220.0
265	264	2015-03-31	Barmer - M/s Carins	Single Circuit	State Sector	RVPNL	23.0	220.0
266	265	2015-03-31	Berchha - Shajapur -II	Double Circuit	State Sector	MPPTCL	20.0	220.0
267	266	2015-03-31	Gwalior (PGCIL) - Gwalior-II	Double Circuit	State Sector	MPPTCL	3.0	220.0
268	267	2015-03-31	Heerapura -Nala Power House (Upgradation)	Double Circuit	State Sector	RVPNL	12.0	220.0
269	268	2015-03-31	Hiriyur - Gowribidanur	Double Circuit	State Sector	KPTCL	241.0	220.0
270	269	2015-03-31	Lalitpur TPS - Lalitpur TPS S/S (Ckt-I)	Double Circuit	State Sector	UPPTCL	19.0	220.0
271	270	2015-03-31	LILO of Dhanki - Veramgam at Dhanki	Double Circuit	State Sector	GETCO	1.0	220.0
272	271	2015-03-31	LILO of Gangapur - Malegaon (Satana) at Sakri (Shivajinagar)	Double Circuit	State Sector	MSETCL	55.0	220.0
273	272	2015-03-31	LILO of Halvad - Bhimasar at Chardava	Double Circuit	State Sector	GETCO	2.0	220.0
274	273	2015-03-31	LILO of Kadana - Dhansura at Modasa	2xDouble Circuit	State Sector	GETCO	22.0	220.0
275	274	2015-03-31	LILO of Lucknow - Sitapur at BKT	Double Circuit	State Sector	UPPTCL	3.0	220.0
276	275	2015-03-31	LILO of Monga - Jagron at Himatpura	Double Circuit	State Sector	PSTCL	56.0	220.0
277	276	2015-03-31	LILO of Navsari -Bhilad at Atul S/s	Double Circuit	State Sector	GETCO	9.0	220.0
278	277	2015-03-31	LILO of one ckt Kosamba-Mobha line at Suva	Double Circuit	State Sector	GETCO	115.0	220.0
279	278	2015-03-31	LILO of one ckt of Bapp - Bhadla at Badisid	Double Circuit	State Sector	RVPNL	29.0	220.0
280	279	2015-03-31	Mukatsar - Ghubaya	Double Circuit	State Sector	PSTCL	81.0	220.0
281	280	2015-03-31	Nakodar - Kartarpur	Double Circuit	State Sector	PSTCL	55.0	220.0
282	281	2015-03-31	Sujangarh - Tehendesar (GSS)	Single Circuit	State Sector	RVPNL	53.0	220.0
283	282	2015-03-31	Tiroda - Koradi - Akola - Aurangabad line ckt-II	Single Circuit	Private Sector	APL	575.0	765.0
284	283	2015-03-31	Amravati - Akola (Bableshwar) - I	Double Circuit	Private Sector	IBPL	207.0	400.0
285	284	2015-03-31	Azara - Bongaigaon	Double Circuit	Private Sector	NETC	201.0	400.0
286	285	2015-03-31	Satpura - Ashta	Double Circuit	Private Sector	KPTL	482.0	400.0
287	286	2015-04-30	Sasan - Vindhyachal (PS)	Single Circuit	Central Sector	PGCIL	6.0	765.0
288	287	2015-04-30	400 kV D/C trans. Line for swapping of Kahalgaon #1 bay with Sasaram# 1 bay at Biharshariff S/Stn.	Double Circuit	Central Sector	PGCIL	20.0	400.0
289	288	2015-04-30	Bareilly - Kashipur line (Quad)	Double Circuit	Central Sector	PGCIL	202.0	400.0
290	289	2015-04-30	Sholapur STPP - Sholapur line-I	Double Circuit	Central Sector	PGCIL	22.0	400.0
291	290	2015-04-30	Kadapperi - Guindy (UG Cable)	Single Circuit	State Sector	TANTRANSCO	14.0	230.0
292	291	2015-04-30	Ahmednagar - Jeur (Kaudgaon)	Single Circuit	State Sector	MSETCL	53.0	220.0
293	292	2015-04-30	Babhaleshwar - Jeur (Kaudgaon)	Single Circuit	State Sector	MSETCL	87.0	220.0
294	293	2015-04-30	Gurgaon Sector 72 (PGCIL) - Gurgaon Sector 33 (HVPNL)	Double Circuit	State Sector	HVPNL	7.0	220.0
295	294	2015-04-30	Gurgaon Sector 72 (PGCIL) - Gurgaon Sector 72 (HVPNL)	Double Circuit	State Sector	HVPNL	1.0	220.0
296	295	2015-04-30	Lalitpur - Lalitpur TPS (Ckt-II)	Double Circuit	State Sector	UPPTCL	19.0	220.0
297	296	2015-04-30	LILO of 1st ckt of Shapurnagar - Gachibowlly line at Miyapur	Double Circuit	State Sector	TSTRANSCO	2.0	220.0
298	297	2015-04-30	LILO of Asoj - Karamsad at Mogar S/S	Double Circuit	State Sector	GETCO	15.0	220.0
299	298	2015-04-30	LILO of Badshahpur - Bhiwadi - Mau line at Panchgaon	Double Circuit	State Sector	HVPNL	3.0	220.0
300	299	2015-04-30	LILO of Bina - Gwalior at Datia	Double Circuit	State Sector	MPPTCL	2.0	220.0
301	300	2015-04-30	LILO of Both Ckt Malerkotla - Barnala at Sandhaur	Double Circuit	State Sector	PSTCL	12.0	220.0
302	301	2015-04-30	LILO of Both Ckt Malerkotla - Pakhowal at Sandhaur	Double Circuit	State Sector	PSTCL	13.0	220.0
303	302	2015-04-30	LILO of Korba - Vishrampur at Churri	Double Circuit	State Sector	CSPTCL	30.0	220.0
304	303	2015-04-30	LILO of Muzaffarnagar - Nara II at Jansath Ckt-II	Double Circuit	State Sector	UPPTCL	20.0	220.0
305	304	2015-04-30	LILO of Shivlakha - Deodhar line at PS-2	Double Circuit	State Sector	GETCO	56.0	220.0
306	305	2015-04-30	LILO of Waluj Bahaleshwar - Deogaon Rangari S/S	Double Circuit	State Sector	MSETCL	26.0	220.0
307	306	2015-04-30	Mamidipally - Fab city	Double Circuit	State Sector	TSTRANSCO	6.0	220.0
308	307	2015-04-30	Mundka -Peeragarhi U/G 200 mm, 250 MW	Double Circuit	State Sector	DTL	26.0	220.0
309	308	2015-04-30	Muzaffarnagar - Nara Ckt-II	Double Circuit	State Sector	UPPTCL	12.0	220.0
310	309	2015-04-30	Sanganer- Sitapura (Upgradation) Ckt-II	Double Circuit	State Sector	RVPNL	11.0	220.0
311	310	2015-04-30	Tapping on Lonand Kandalgaon for Lonand MIDC	Single Circuit	State Sector	MSETCL	1.0	220.0
312	311	2015-05-31	Meerut - Moga line	Single Circuit	Central Sector	PGCIL	337.0	765.0
313	312	2015-05-31	Raigarh Pooling Station (Near Kotra) - Champa Pooling Station line	Single Circuit	Central Sector	PGCIL	96.0	765.0
314	313	2015-05-31	Barh-II - Gorakhpur	Double Circuit	Central Sector	PGCIL	698.0	400.0
315	314	2015-05-31	Rangpo - New Melli line (Twin Moose) (20.5 D/C & 1.5 M/C)	Multiple Circuits with Double Circuit	Central Sector	PGCIL	54.0	220.0
316	315	2015-05-31	Aurangabad (Ektuni - III) - Aurangabad -II (Thaptitanda) Ckt-II	Single Circuit	State Sector	MSETCL	5.0	400.0
317	316	2015-05-31	LILO of One ckt of Korba (W) - Khedamara at Marwa	Double Circuit	State Sector	CSPTCL	116.0	400.0
318	317	2015-05-31	LILO of one ckt Palatana - Bongaigaon at Byrnihat line	Double Circuit	State Sector	MeECL	4.0	400.0
319	318	2015-05-31	LILO point of IEPL to LILO point of Warora-Wardha line	Double Circuit	State Sector	MSETCL	97.0	400.0
320	319	2015-05-31	MTPS Stage-III - Thiruvalam (Ckt-II) (Balance)	Double Circuit	State Sector	TANTRANSCO	338.0	400.0
321	320	2015-05-31	Bhatinda - Mukatsar (2nd CKt)	Double Circuit	State Sector	PSTCL	23.0	220.0
322	321	2015-05-31	LILO of one ckt Kotputli -Manoharpur at Kotputli (PG)	Double Circuit	State Sector	RVPNL	12.0	220.0
323	322	2015-05-31	LILO of one ckt Neemrana -Kotputli at Behror	Double Circuit	State Sector	RVPNL	31.0	220.0
324	323	2015-05-31	LILO of Shapur Nagar - Gachilbowli feeder at GIS Erragadda SS	Direct Current Underground Cable	State Sector	TSTRANSCO	19.0	220.0
325	324	2015-05-31	Masudpur-Samain line	Double Circuit	State Sector	HVPNL	91.0	220.0
326	325	2015-05-31	Binjkote - Raigarh (Kotra) Pooling Station	Double Circuit	Private Sector	SKS	55.0	400.0
327	326	2015-05-31	Jhabua Power TPS - Jabalpur Pooling Station.	Double Circuit	Private Sector	JHAPL	131.0	400.0
328	327	2015-06-30	LILO of Moga - Bhiwani at Hissar line	Double Circuit	Central Sector	PGCIL	4.0	400.0
329	328	2015-06-30	Mariani (New) - Mokikchung (PG)	Double Circuit	Central Sector	PGCIL	97.0	220.0
330	329	2015-06-30	Karaikudi-Pugalur	Double Circuit	State Sector	TANTRANSCO	320.0	400.0
331	330	2015-06-30	LILO of RTPS - Btps at YTPS	Double Circuit	State Sector	KPTCL	33.0	400.0
332	331	2015-06-30	Arasur 400 kV S/S - Karamadai 230 kV S/S	Single Circuit	State Sector	TANTRANSCO	39.0	230.0
333	332	2015-06-30	Atri - Pandiabil	Double Circuit	State Sector	OPTCL	45.0	220.0
334	333	2015-06-30	Charanka - Jangral	Double Circuit	State Sector	GETCO	193.0	220.0
335	334	2015-06-30	Chinchwad - Apta	Multiple Circuits	State Sector	MSETCL	30.0	220.0
336	335	2015-06-30	Damoh - Tikamgarh (2nd Ckt)	Double Circuit	State Sector	MPPTCL	158.0	220.0
337	336	2015-06-30	Dumka - Rupnarayanpur	Double Circuit	State Sector	JUSNL	147.0	220.0
338	337	2015-06-30	LILO of Ajmer -Kishangarh line at Ajmer	Double Circuit	State Sector	RVPNL	11.0	220.0
339	338	2015-06-30	LILO of Khetri - Heerapura line at Babai	Double Circuit	State Sector	RVPNL	5.0	220.0
340	339	2015-06-30	LILO of Kuchamancity -Dhod at Deedwana	Double Circuit	State Sector	RVPNL	88.0	220.0
341	340	2015-06-30	LILO of Rewa - Ton at Sirmour	Double Circuit	State Sector	MPPTCL	10.0	220.0
342	341	2015-06-30	LILO (Tapping) of Dhule - Malegaon at Sayne	Single Circuit	State Sector	MSETCL	5.0	220.0
343	342	2015-06-30	Shedyal - Jath line	Double Circuit	State Sector	MSETCL	37.0	220.0
344	343	2015-06-30	Shivajinagar - Malegaon	Single Circuit	State Sector	MSETCL	114.0	220.0
345	344	2015-06-30	Shivajinagar - Satana	Single Circuit	State Sector	MSETCL	96.0	220.0
346	345	2015-06-30	SSNNL PS-I - PS-2 (ACSR Zebra conductor)	Double Circuit	State Sector	GETCO	22.0	220.0
347	346	2015-06-30	Talwandi - Dharamkot	Double Circuit	State Sector	PSTCL	63.0	220.0
348	347	2015-06-30	Jabalpur - Bhopal (BDTCL - TBCB)	Single Circuit	Private Sector	SGL	274.0	765.0
349	348	2015-06-30	Jabalpur - Bina (JTCL - TBCB)	Single Circuit	Private Sector	SGL	245.0	765.0
350	349	2015-07-31	LILO of Dehar - Bhiwani at Rajpura (PSTCL)	Single Circuit	Central Sector	PGCIL	29.0	400.0
351	350	2015-07-31	LILO of One Ckt of Baripada - Mendhasal line at Dubri (OPTCL)	Double Circuit	Central Sector	PGCIL	32.0	400.0
352	351	2015-07-31	Silchar - Purba Kanchan Bari line (charged at 132KV)	Double Circuit	Central Sector	PGCIL	254.0	400.0
353	352	2015-07-31	Vijayawada - Nellore line	Double Circuit	Central Sector	PGCIL	661.0	400.0
354	353	2015-07-31	Krishnapatnam TPS- Chittoor(Balance)	Double Circuit	State Sector	APTRANSCO	180.0	400.0
355	354	2015-07-31	Vizag TPP - Kalpaka	Double Circuit	State Sector	APTRANSCO	14.0	400.0
356	355	2015-07-31	LILO of Neyveli Zero unit - Neyveli - TS-II at Ulundurpet	Single Circuit	State Sector	TANTRANSCO	52.0	230.0
357	356	2015-07-31	LILO of AD Hydro-Nalagarh at Fozal	Double Circuit	State Sector	HPPTCL	13.0	220.0
358	357	2015-07-31	LILO of Alamathy - Koyembedut Thiruverkkadu	Double Circuit	State Sector	TANTRANSCO	2.0	220.0
359	358	2015-07-31	LILO of both ckt Dindi - Chandrayangutta at Bonguloor	Double Circuit	State Sector	TSTRANSCO	2.0	220.0
360	359	2015-07-31	LILO of Dhuri - Bangan at Chhajali (Loop in)	Double Circuit	State Sector	PSTCL	29.0	220.0
361	360	2015-07-31	LILO of Kalivanthapattu - Veerapuram at OMEGA	Double Circuit	State Sector	TANTRANSCO	39.0	220.0
362	361	2015-07-31	LILO of Kandalgaon - Lonand at Lonand MIDC	Double Circuit	State Sector	MSETCL	8.0	220.0
363	362	2015-07-31	LILO of Kanjhawala - Najafgarh at Mundka 400 kV S/S	Double Circuit	State Sector	DTL	11.0	220.0
364	363	2015-07-31	LILO of Mandawar -Nadbai- Bharatpur at Chonkarwada	Double Circuit	State Sector	RVPNL	5.0	220.0
365	364	2015-07-31	LILO of Shoolagiri - Singarapet at Gurabarapally	Double Circuit	State Sector	TANTRANSCO	2.0	220.0
366	365	2015-07-31	LILO of Ulundurpet - STCMS at Ulundurpet	Double Circuit	State Sector	TANTRANSCO	68.0	220.0
367	366	2015-07-31	Mau - Balwal	Double Circuit	State Sector	HVPNL	37.0	220.0
368	367	2015-07-31	Puri (Samangra) - Pandiabil	Double Circuit	State Sector	OPTCL	92.0	220.0
369	368	2015-07-31	Raikheda (GMR) - Raipur Pooling Station	Double Circuit	Private Sector	GMR ENERG	131.0	400.0
370	369	2015-07-31	Rosa - Shahjehanpur (PG)	Double Circuit	Private Sector	RPTL	16.0	400.0
371	370	2015-08-31	Gwalior - Jaipur (Ckt 1)	Single Circuit	Central Sector	PGCIL	305.0	765.0
372	371	2015-08-31	Gwalior - Jaipur line (Ckt 2)	Single Circuit	Central Sector	PGCIL	311.0	765.0
373	372	2015-08-31	Jaipur - Bhiwani line	Single Circuit	Central Sector	PGCIL	272.0	765.0
374	373	2015-08-31	Rihand - Vindhyachal Pooling Station (2nd Ckt)	Double Circuit	Central Sector	PGCIL	31.0	765.0
375	374	2015-08-31	Vindhyachal Pooling Station - Satna Ckt-II	Single Circuit	Central Sector	PGCIL	271.0	765.0
376	375	2015-08-31	LILO of 2nd ckt of Neyveli - Trichy at Nagapattnam	Double Circuit	Central Sector	PGCIL	46.0	400.0
377	376	2015-08-31	Salem Pooling Station - Salem	Double Circuit	Central Sector	PGCIL	120.0	400.0
378	377	2015-08-31	Kodarma-Giridih	Double Circuit	Central Sector	DVC	212.0	220.0
379	378	2015-08-31	LILO of Moga-Hisar line at RGTPS Khedar	Double Circuit	State Sector	HVPNL	2.0	400.0
380	379	2015-08-31	Meramundali-Duburi (1st Ckt)	Double Circuit	State Sector	OPTCL	192.0	400.0
381	380	2015-08-31	Thiruvalam - Almathy	Double Circuit	State Sector	TANTRANSCO	143.0	400.0
382	381	2015-08-31	LILO of Manali - Basin Bridge (BBGTP) at Vyasarpadi	Double Circuit	State Sector	TANTRANSCO	1.0	230.0
383	382	2015-08-31	Kotputli (PG) - Bansur	Double Circuit	State Sector	RVPNL	84.0	220.0
384	383	2015-08-31	LILO of Chinchwad - Phursungi at Kondhwa	Double Circuit	State Sector	MSETCL	1.0	220.0
385	384	2015-08-31	LILO of Kangasiyali - Nyara at Hadala	Double Circuit	State Sector	GETCO	33.0	220.0
386	385	2015-08-31	LILO of Korattur - Koyambedu at Alamathy	Double Circuit	State Sector	TANTRANSCO	6.0	220.0
387	386	2015-08-31	LILO of KTPS - Sanganer line at Vatika	Double Circuit	State Sector	RVPNL	11.0	220.0
388	387	2015-08-31	LILO of Mhaisal - Jath at Mendhegiri S/S (Ckt-I)	Double Circuit	State Sector	MSETCL	20.0	220.0
389	388	2015-08-31	LILO of one ckt Halvad - Morbi line to Bhimasar (PG) at Charadava S/S	Double Circuit	State Sector	GETCO	2.0	220.0
390	389	2015-08-31	LILO of One Ckt Langpi - Sarusajai at Sonapur	Double Circuit	State Sector	AEGCL	2.0	220.0
391	390	2015-08-31	LILO of Pusouli (PG) - Ara (PG) at Pusouli (New)	Double Circuit	State Sector	BSPTCL	5.0	220.0
392	391	2015-08-31	LILO of Raigarh - Budipadar line at Raigarh (PG)	Double Circuit	State Sector	CSPTCL	18.0	220.0
393	392	2015-08-31	Mukatsar - Abohar	Double Circuit	State Sector	PSTCL	87.0	220.0
394	393	2015-08-31	Nanded - Waghala	Double Circuit	State Sector	MSETCL	30.0	220.0
395	394	2015-08-31	Sikka - Moti Paneli line	Double Circuit	State Sector	GETCO	157.0	220.0
396	395	2015-08-31	Kudgi STPS - Narendra (KTL - TBCB)	2xDouble Circuit	Private Sector	KTCL	36.0	400.0
397	396	2015-08-31	Nasik - Bobleshwar (2nd Ckt)	Double Circuit	Private Sector	IBPL	57.0	400.0
398	397	2015-09-30	+/- 800KV HVDC Biswanath Chariyali - Agra Bi-pole line	BIPOLE	Central Sector	PGCIL	3506.0	800.0
399	398	2015-09-30	Aurangabad - Solapur line	Double Circuit	Central Sector	PGCIL	556.0	765.0
400	399	2015-09-30	Dharamjaygarh - Jabalpur Pooling Station line	Double Circuit	Central Sector	PGCIL	848.0	765.0
401	400	2015-09-30	Balipara - Biswanath Chariyali	Double Circuit	Central Sector	PGCIL	114.0	400.0
402	401	2015-09-30	Mysore - Kozhikode	Double Circuit	Central Sector	PGCIL	420.0	400.0
403	402	2015-09-30	220 kV LOC 49 of Roza-Hardoi to 220 Shahjehanpur	Double Circuit	State Sector	UPPTCL	20.0	220.0
404	403	2015-09-30	Debari - Salumber (2nd Ckt)	Double Circuit	State Sector	RVPNL	64.0	220.0
405	404	2015-09-30	Gurgaon Sector 72 - Nuh - Rangla Raipur (Ckt-I & II)	Double Circuit	State Sector	HVPNL	146.0	220.0
406	405	2015-09-30	LILO of Harduaganj- Khair (Aligarh) line at Boner	Double Circuit	State Sector	UPPTCL	6.0	220.0
407	406	2015-09-30	LILO of khurja-NAPP-I line at Debai	Double Circuit	State Sector	UPPTCL	1.0	220.0
408	407	2015-09-30	LILO of Korattur - Koyambedu at Alamathy (Balance Portion)	Double Circuit	State Sector	TANTRANSCO	23.0	220.0
409	408	2015-09-30	Sawangi - Bhokardhan	Double Circuit	State Sector	MSETCL	134.0	220.0
410	409	2015-09-30	Thimmapuram- Yellanur	Double Circuit	State Sector	APTRANSCO	8.0	220.0
411	410	2015-09-30	Dhramjaygarh - Jabalpur (JTCL - TBCB)	Double Circuit	Private Sector	SGL	758.0	765.0
412	411	2015-10-31	Bhiwani - Hissar line	Double Circuit	Central Sector	PGCIL	113.0	400.0
413	412	2015-10-31	LILO of Ranganadi - Balipara 400KV D/C line at Biswanath Chariyali (Pooling Point)	Double Circuit	Central Sector	PGCIL	114.0	400.0
414	413	2015-10-31	LILO of Kalapaka (Vizag) - Khammam at Asupaka	Double Circuit	State Sector	TSTRANSCO	34.0	400.0
415	414	2015-10-31	Purushottapatnam (Nunna) - Jujjuru	Double Circuit	State Sector	APTRANSCO	112.0	400.0
416	415	2015-10-31	Yemmiganur - Uravakonda	Double Circuit	State Sector	APTRANSCO	205.0	400.0
417	416	2015-10-31	Amreli - Sukhpar line	Double Circuit	State Sector	GETCO	80.0	220.0
418	417	2015-10-31	Chharodi - Ford line	Double Circuit	State Sector	GETCO	38.0	220.0
419	418	2015-10-31	Ghatodi - Hingoli line	Single Circuit	State Sector	MSETCL	86.0	220.0
420	419	2015-10-31	Jalore - Sayla	Single Circuit	State Sector	RVPNL	54.0	220.0
421	420	2015-10-31	Khanapur length tap to Vita - Lamboti line	Double Circuit	State Sector	MSETCL	47.0	220.0
422	421	2015-10-31	Kharagpur - Vidyasagar Park	Double Circuit	State Sector	WBSETCL	92.0	220.0
423	422	2015-10-31	LILO of Alamathy - CMRL Koyembedu at Thiruverkkadu	Double Circuit	State Sector	TANTRANSCO	9.0	220.0
424	423	2015-10-31	LILO on one ckt of Jamanwada - Varsana line at Ukheda S/s	Double Circuit	State Sector	GETCO	10.0	220.0
425	424	2015-10-31	Neemrana-(PG)-Behror	Double Circuit	State Sector	RVPNL	54.0	220.0
426	425	2015-10-31	Tehandesar(proposed)-Badnu	Single Circuit	State Sector	RVPNL	32.0	220.0
427	426	2015-10-31	Varsana - Jamanwada line	Double Circuit	State Sector	GETCO	348.0	220.0
428	427	2015-10-31	LILO of one ckt Karcham wangto - Abdullapur at Sorang HEP	Double Circuit	Private Sector	HSPPL	7.0	400.0
429	428	2015-11-30	Narendra (New, Kudgi) - Kolhapur (new)	Double Circuit	Central Sector	PGCIL	374.0	765.0
430	429	2015-11-30	Gooty - Madhugiri	Double Circuit	Central Sector	PGCIL	418.0	400.0
431	430	2015-11-30	Kurukshetra - Jallandhar (Ckt-I)	Double Circuit	Central Sector	PGCIL	266.0	400.0
432	431	2015-11-30	LILO of Abdullapur - Sonepat at Kurukshetra (Tripal)	Double Circuit	Central Sector	PGCIL	30.0	400.0
433	432	2015-11-30	LILO of both ckt of Kolhapur - Mapusa at Kolhapur (new)	Double Circuit	Central Sector	PGCIL	90.0	400.0
434	433	2015-11-30	Narendra (New, Kudgi) - Narendra (Existing)	Double Circuit	Central Sector	PGCIL	354.0	400.0
435	434	2015-11-30	Bikaner- Merta	Single Circuit	State Sector	RVPNL	172.0	400.0
436	435	2015-11-30	LILO of Srisailam - Hyderabad (Ckt-I) atYeddumailaram (Shankarapally)	Double Circuit	State Sector	TSTRANSCO	158.0	400.0
437	436	2015-11-30	Singareni TPS (Jaipur TPP) - Gajwel	Double Circuit	State Sector	TSTRANSCO	325.0	400.0
438	437	2015-11-30	Appannadorapalem - Bobbili (Ckt-I)	Double Circuit	State Sector	APTRANSCO	84.0	220.0
439	438	2015-11-30	Badaun - Sambhal	Single Circuit	State Sector	UPPTCL	90.0	220.0
440	439	2015-11-30	Bhadreshwar - Varsana line	Double Circuit	State Sector	GETCO	104.0	220.0
441	440	2015-11-30	Chhuri - Mopka (Bilaspur)	Double Circuit	State Sector	CSPTCL	189.0	220.0
442	441	2015-11-30	Gokarna - Krishnanagar	Double Circuit	State Sector	WBSETCL	210.0	220.0
443	442	2015-11-30	Hindaun -Chonkarwada	Double Circuit	State Sector	RVPNL	72.0	220.0
444	443	2015-11-30	LILO of Alwar -Kotputli at Bansur	Double Circuit	State Sector	RVPNL	2.0	220.0
445	444	2015-11-30	LILO of Sawangi - Bhokardan at Phulambri	Double Circuit	State Sector	MSETCL	11.0	220.0
446	445	2015-11-30	New Bhusawal - Chalisgaon	Double Circuit	State Sector	MSETCL	258.0	220.0
447	446	2015-11-30	Sanganer-Chaksu (Upgradation)	Double Circuit	State Sector	RVPNL	66.0	220.0
448	447	2015-11-30	Varsana - Mokha	Double Circuit	State Sector	GETCO	109.0	220.0
449	448	2015-12-31	LILO of one ckt Badshahpur - Mau - Bhiwadi at HSIIDC Bawal	Double Circuit	State Sector	HVPNL	39.0	220.0
450	449	2015-12-31	LILO of Peenya - Hoody at Chikkabettahalli	Multiple Circuits	State Sector	KPTCL	11.0	220.0
451	450	2015-12-31	LILO of Sarnath (400) - Azamgarh at Harhua	Single Circuit	State Sector	UPPTCL	42.0	220.0
452	451	2015-12-31	MTPS Stage-III - Thingalur	Single Circuit	State Sector	TANTRANSCO	92.0	220.0
453	452	2015-12-31	Rajgarh (PG) - Karamsad (GETCO)	Double Circuit	Private Sector	RPTL	486.0	400.0
454	453	2015-12-31	Kurnool (New) - Raichur line	Double Circuit	Central Sector	PGCIL	120.0	765.0
455	454	2015-12-31	Ranchi (New) - Dharamjaygarh /Near Korba	Single Circuit	Central Sector	PGCIL	341.0	765.0
456	455	2015-12-31	Kashipur - Roorkee line	Single Circuit	Central Sector	PGCIL	302.0	400.0
457	456	2015-12-31	Ib-Meramundali (Loc No. 122/0 to Meramundali)	Double Circuit	State Sector	OPTCL	418.0	400.0
458	457	2015-12-31	Jammalamadugu - Narnur (Kurnool)	Double Circuit	State Sector	APTRANSCO	202.0	400.0
459	458	2015-12-31	LILO of Bhiwani - Bahadurgarh (PGCIL) at Kaboolpur S/S	Double Circuit	State Sector	HVPNL	13.0	400.0
460	459	2015-12-31	LILO of Koradi II- Wardh(PG) at Bela TPP	Double Circuit	State Sector	MSETCL	49.0	400.0
461	460	2015-12-31	A5(Faridabad) - A4(Faridabad) (Ckt-II)	Double Circuit	State Sector	HVPNL	8.0	220.0
462	461	2015-12-31	Bagalkot - Gadag	Double Circuit	State Sector	KPTCL	193.0	220.0
463	462	2015-12-31	Goindwal Sahib - Chola Sahib	Double Circuit	State Sector	PSTCL	55.0	220.0
464	463	2015-12-31	Hinjewadi -II (400 kV) - Hinjewadi-II (220 kV) S/S	Double Circuit	State Sector	MSETCL	8.0	220.0
465	464	2015-12-31	LILO of 220 kV of Shamshabad - Firozabad at Agra (400 kV)	Double Circuit	State Sector	UPPTCL	6.0	220.0
466	465	2015-12-31	LILO of Amravati - Badnera line at Nandgaon Peth.	Double Circuit	State Sector	MSETCL	62.0	220.0
467	466	2015-12-31	LILO of Arasikere -Kanthenahalli at Arasikere S/S	Double Circuit	State Sector	KPTCL	8.0	220.0
468	467	2015-12-31	LILO of existing Kalikiri - C.K.Palli at Thimmapuram S/S	Double Circuit	State Sector	APTRANSCO	2.0	220.0
469	468	2015-12-31	LILO of Hubli - Lingapur 2nd Ckt at Gadag	Double Circuit on Multiple Circuits	State Sector	KPTCL	15.0	220.0
470	469	2015-12-31	LILO of Nagaur -Merta at Kuchera	Double Circuit	State Sector	RVPNL	17.0	220.0
471	470	2016-01-31	Angul Pooling Station - Jharsuguda Pooling Station line-II	Single Circuit	Central Sector	PGCIL	284.0	765.0
472	471	2016-01-31	Khamam - Nagarjunasagar line (PVTL-TBCB))	Double Circuit	Central Sector	PGCIL	290.0	400.0
473	472	2016-01-31	Kurukshetra - Jallandhar (Ckt-II)	Double Circuit	Central Sector	PGCIL	265.0	400.0
474	473	2016-01-31	Surjamaninagar (Tripura) - Indo-Bangladesh Border line (operated at 132 kV)	Double Circuit	Central Sector	PGCIL	35.0	400.0
475	474	2016-01-31	Koradi TPS - Wardha	Double Circuit	State Sector	MSETCL	144.0	400.0
476	475	2016-01-31	Chikkodi-Kudachi	Double Circuit	State Sector	KPTCL	70.0	220.0
477	476	2016-01-31	Kapnoor - Humnabad line	Double Circuit	State Sector	KPTCL	106.0	220.0
478	477	2016-01-31	Kasor - Herang line	Double Circuit	State Sector	GETCO	39.0	220.0
479	478	2016-01-31	LILO of 220 kV Lonikand - Kathapur line at Lonikand-II	Double Circuit	State Sector	MSETCL	2.0	220.0
480	479	2016-01-31	LILO of both ckt of Balipara (PG) Samaguri at Sonabil	2xDouble Circuit	State Sector	AEGCL	6.0	220.0
481	480	2016-01-31	LILO of RSS - Warangal at Manthani	Double Circuit	State Sector	TSTRANSCO	60.0	220.0
482	481	2016-01-31	LILO of Sultanpur - Phoolpur at Pratapgarh	Double Circuit	State Sector	UPPTCL	46.0	220.0
483	482	2016-01-31	Namrup - Mariani	Single Circuit	State Sector	AEGCL	145.0	220.0
484	483	2016-01-31	TRN (TPP) - Raigarh PS (Tamnar)	Double Circuit	Private Sector	TRNE	30.0	400.0
485	484	2016-02-29	LILO of Chandrapur - Parli ckt-II at Kumbhargaon (Nanded) S/S	Double Circuit	State Sector	MSETCL	88.0	400.0
486	485	2016-02-29	Mundra (Adani) - Zerda line 2	Double Circuit	State Sector	GETCO	671.0	400.0
487	486	2016-02-29	LILO of Narendrapur - Mendhasal at Attri (Old Karadagadia)	Double Circuit	State Sector	OPTCL	5.0	220.0
488	487	2016-02-29	Peeragarhi-Wazirpur U/G 1000 mm, 200 MW	Double Circuit	State Sector	DTL	17.0	220.0
489	488	2016-02-29	Pulivendula-Hindupur	Double Circuit	State Sector	APTRANSCO	250.0	220.0
490	489	2016-02-29	Teesta LDP - IV - New Jalpaiguri (NJP)	Double Circuit	State Sector	WBSETCL	145.0	220.0
491	490	2016-03-31	Balia - Varanasi	Single Circuit	Central Sector	PGCIL	165.0	765.0
492	491	2016-03-31	LILO of Gaya - Fatehpur at Varanasi S/S	Single Circuit	Central Sector	PGCIL	7.0	765.0
493	492	2016-03-31	Ext. of one ckt Biharshariff - Sasaram at Varanasi (Q)	Double Circuit	Central Sector	PGCIL	251.0	400.0
494	493	2016-03-31	Kishanganj - Patna line (Quad)	Double Circuit	Central Sector	PGCIL	692.0	400.0
495	494	2016-03-31	LILO of Meerut - Kaithal at Bagpat (Ckt-I)	Double Circuit	Central Sector	PGCIL	61.0	400.0
496	495	2016-03-31	LILO of Sasaram - Allabhadad at Varanasi (Q)	Double Circuit	Central Sector	PGCIL	24.0	400.0
497	496	2016-03-31	LILO of Siliguri (Existing) - Purnea at Kishanganj	Double Circuit	Central Sector	PGCIL	16.0	400.0
498	497	2016-03-31	NCC gen Sw Yd. - Nellore PS line (Q)	Double Circuit	Central Sector	PGCIL	66.0	400.0
499	498	2016-03-31	LILO of Siliguri - Dalkhola line at New Pooling Station Kishanganj	Double Circuit	Central Sector	PGCIL	36.0	220.0
500	499	2016-03-31	Anpara B-Anpara D (Ckt-I)	Double Circuit	State Sector	UPPTCL	5.0	400.0
501	500	2016-03-31	LILO of VTS - Malkaram (Ckt-I) at Suryapet	Double Circuit	State Sector	TSTRANSCO	7.0	400.0
502	501	2016-03-31	Avadi-Ayappakkam line	Single Circuit	State Sector	TANTRANSCO	3.0	230.0
503	502	2016-03-31	LILO of K.R. Thoppur - Ingur at Thingalur	Double Circuit	State Sector	TANTRANSCO	44.0	230.0
504	503	2016-03-31	Balchak - Naraingarh	Double Circuit	State Sector	PSTCL	33.0	220.0
505	504	2016-03-31	Bhigwan - Walchandnagar	Double Circuit	State Sector	MSETCL	54.0	220.0
506	505	2016-03-31	Bridgestone-II - Chakan-II	Double Circuit	State Sector	MSETCL	10.0	220.0
507	506	2016-03-31	Chaibasa - Chaibasa line	Double Circuit	State Sector	JUSNL	1.0	220.0
508	507	2016-03-31	Diversion of Bhusawal - Chalisgaon along with existing Bhusawal - Chalisgaon line	Double Circuit	State Sector	MSETCL	1.0	220.0
509	508	2016-03-31	Gajokhar-Jaunpur	Single Circuit on Double Circuit	State Sector	UPPTCL	37.0	220.0
510	509	2016-03-31	Kanti - Gopalganj (2nd Ckt.)	Single Circuit	State Sector	BSPTCL	101.0	220.0
511	510	2016-03-31	Koradi TPS-New Khaparhkeda	Double Circuit	State Sector	MSETCL	28.0	220.0
512	511	2016-03-31	Kumbhargaon - Waghala	Double Circuit	State Sector	MSETCL	31.0	220.0
513	512	2016-03-31	Lamboti - Tuljapur	Double Circuit	State Sector	MSETCL	77.0	220.0
514	513	2016-03-31	LILO of Arasur (PG) - Karamadai at Karuvalur	Double Circuit	State Sector	TANTRANSCO	1.0	220.0
515	514	2016-03-31	LILO of Beed - Patoda at Manjarsumbha	Double Circuit	State Sector	MSETCL	9.0	220.0
516	515	2016-03-31	LILO of Chitegaon - Shendra at Chitepimpalgaon (PG)	Double Circuit	State Sector	MSETCL	2.0	220.0
517	516	2016-03-31	LILO of Harduagani - Hathras at Aligarh	Double Circuit	State Sector	UPPTCL	43.0	220.0
518	517	2016-03-31	LILO of Heerapura - Babai at Niwana	Double Circuit	State Sector	RVPNL	1.0	220.0
519	518	2016-03-31	LILO of Kanhan - Bhandara at M/s Ultratech cement	Double Circuit	State Sector	MSETCL	1.0	220.0
520	519	2016-03-31	LILO of One ckt of Bina - Guna at Ashoknagar	Single Circuit	State Sector	MPPTCL	8.0	220.0
521	520	2016-03-31	LILO of one ckt of Jeerat - Rishra at Dharampur	Single Circuit	State Sector	WBSETCL	4.0	220.0
522	521	2016-03-31	LILO of One Ckt of Kolhapur - Sawantwadi at Mudhaltitta (Bidri Ckt-I)	Double Circuit	State Sector	MSETCL	13.0	220.0
523	522	2016-03-31	LILO of Vita - Pandharpur at Bhalwani	Double Circuit	State Sector	MSETCL	26.0	220.0
524	523	2016-03-31	Lonikand-I - Lonikand -II	Double Circuit	State Sector	MSETCL	3.0	220.0
525	524	2016-03-31	Nanded - Bhokar	Double Circuit	State Sector	MSETCL	74.0	220.0
526	525	2016-03-31	Renwal -Danta Ramgarh	Single Circuit	State Sector	RVPNL	33.0	220.0
527	526	2016-03-31	Shahjahanpur - Nighasan	Single Circuit	State Sector	UPPTCL	155.0	220.0
528	527	2016-03-31	Subhasgram- Saintala	Double Circuit	State Sector	WBSETCL	25.0	220.0
529	528	2016-03-31	Varahi -Khemar- Kavoor in the existing 110 kV corridor(balance portion)	Double Circuit on Multiple Circuits	State Sector	KPTCL	245.0	220.0
530	529	2016-04-30	Gaya - Varanasi	Single Circuit	Central Sector	PGCIL	273.0	765.0
531	530	2016-04-30	Lara STPS - Raigarh (Kotra) line	Double Circuit	Central Sector	PGCIL	36.0	400.0
532	531	2016-04-30	LILO of Kadapa (Cuddapah) - Kolar at N.P. Kunta Pooling Station	Double Circuit	Central Sector	PGCIL	21.0	400.0
533	532	2016-04-30	LILO of Pune - Aurangabad at Pune (GIS)	2xDouble Circuit	Central Sector	PGCIL	58.0	400.0
534	533	2016-04-30	Panchkula - Patiala	Double Circuit	Central Sector	PGCIL	131.0	400.0
535	534	2016-04-30	Interconnection of one ckt of Jhanor - Navsari line with one ckt of Ukai - Kosamba line	Double Circuit	State Sector	GETCO	1.0	400.0
536	535	2016-04-30	LILO of Chabra TPS - Anta line at Supercritical Chhabta TPS	Double Circuit	State Sector	RVPNL	3.0	400.0
537	536	2016-04-30	LILO of one ckt Raj west -Jodhpur at Jodhpur (New)	Double Circuit	State Sector	RVPNL	102.0	400.0
538	537	2016-04-30	Aau - Badisid	Double Circuit	State Sector	RVPNL	118.0	220.0
539	538	2016-04-30	Kashang - Bhaba (2nd Ckt)	Double Circuit	State Sector	HPPTCL	39.0	220.0
540	539	2016-04-30	LILO of 220 kV Katni - Satna at PGCIL Satna	Double Circuit	State Sector	MPPTCL	1.0	220.0
541	540	2016-04-30	LILO of Gummidipoondi - M/s Michelin Tyres line at Thervoykandigai 400 kV S/S	Double Circuit	State Sector	TANTRANSCO	2.0	220.0
542	541	2016-04-30	LILO of Jodhpur (GSS) - Jodhpur at Barli	Double Circuit	State Sector	RVPNL	1.0	220.0
543	542	2016-04-30	LILO of Kasor-Botad at Dhuvaran CCPP-III	Double Circuit	State Sector	GETCO	81.0	220.0
544	543	2016-04-30	LILO of Kota (PG) -Bhilwara at Mandalgarh	Double Circuit	State Sector	RVPNL	40.0	220.0
545	544	2016-04-30	N P Kunta PS - 400 kV N P Kunta (PGCIL) S/S	Double Circuit	State Sector	APTRANSCO	4.0	220.0
546	545	2016-04-30	Parigi 220 kV S/S - Shankarpally 400 kV S/S	Double Circuit	State Sector	TSTRANSCO	90.0	220.0
547	546	2016-04-30	Ramagundam - Mandamarri (Bellampally) (2nd Ckt)	Double Circuit	State Sector	TSTRANSCO	34.0	220.0
548	547	2016-04-30	LILO of Agra - Meerut line at Greater Noida	2xSingle Circuit	Private Sector	WUPPTCL	11.0	765.0
549	548	2016-04-30	Greater Noida-Sikandrabad	Double Circuit	Private Sector	WUPPTCL	34.0	400.0
550	549	2016-05-31	LILO of Meerut - Kaithal at Bagpat (Ckt-II)	Double Circuit	Central Sector	PGCIL	61.0	400.0
551	550	2016-05-31	Roorkee - Saharanpur line (Quad) (Ckt-I)	Double Circuit	Central Sector	PGCIL	37.0	400.0
552	551	2016-05-31	400 kV Aurangabad II (Thaptitanda) - 765 kV Aurangabad III (Ektuni) (Ckt 3 & 4)	Double Circuit	State Sector	MSETCL	10.0	400.0
553	552	2016-05-31	Baghpat - Baghpat (PG)	Single Circuit	State Sector	UPPTCL	15.0	220.0
554	553	2016-05-31	Kharagpur - Egra	Double Circuit	State Sector	WBSETCL	107.0	220.0
555	554	2016-05-31	LILO of 2nd Ckt Shahbad - Pehowa at Durala	Double Circuit	State Sector	HVPNL	6.0	220.0
556	555	2016-05-31	LILO of Ferozepur - Talwandi Bhai line at Sadiq	Double Circuit	State Sector	PSTCL	48.0	220.0
557	556	2016-05-31	LILO of Kolhapur - Sawantwadi at Mudhaltitta (Bidri)S/S (Tap line, Ckt-II)	Double Circuit	State Sector	MSETCL	13.0	220.0
558	557	2016-05-31	LILO of Ranasan - Karamsad at Barejadi S/S	Double Circuit	State Sector	GETCO	15.0	220.0
559	558	2016-05-31	Sahupuri-Bhelupur	Double Circuit	State Sector	UPPTCL	29.0	220.0
560	559	2016-05-31	Tap on Babhaleshwar - Chalisgaon for Kopergaon S/S (Ckt-II)	Double Circuit	State Sector	MSETCL	11.0	220.0
561	560	2016-05-31	Athena Singhitarai - Raigarh Pooling Station (near Kotra)	Double Circuit	Private Sector	ACPLT	50.0	400.0
562	561	2016-06-30	Kanpur - Jhatikara	Single Circuit	Central Sector	PGCIL	466.0	765.0
563	562	2016-06-30	Varanasi - Kanpur	Double Circuit	Central Sector	PGCIL	652.0	765.0
564	563	2016-06-30	Jharkhand Pool (Chandwa) - Gaya (Quad) line	Double Circuit	Central Sector	PGCIL	234.0	400.0
565	564	2016-06-30	Kanpur (new) - Kanpur (exit)	Double Circuit	Central Sector	PGCIL	41.0	400.0
566	565	2016-06-30	LILO of 400 kV D/C Baripada - Mendhasal at Pindiabil	2xDouble Circuit	Central Sector	PGCIL	112.0	400.0
567	566	2016-06-30	Ranchi - Jharkhand Pool line (Chandwa)	Double Circuit	Central Sector	PGCIL	138.0	400.0
568	567	2016-06-30	Roorkee - Saharanpur line (Ckt-II)	Double Circuit	Central Sector	PGCIL	37.0	400.0
569	568	2016-06-30	LILO of Gladni - Hiranagar at Samba (PG)	Double Circuit	Central Sector	PGCIL	28.0	220.0
570	569	2016-06-30	Jammalamadugu - Uravakonda	Double Circuit	State Sector	APTRANSCO	255.0	400.0
571	570	2016-06-30	LILO of Jodhpur - Merta line at Jodhpur (New)	Double Circuit	State Sector	RVPNL	99.0	400.0
572	571	2016-06-30	Rasipalayam - Anaikadavu	Double Circuit	State Sector	TANTRANSCO	77.0	400.0
573	572	2016-06-30	Thappakundu - Anaikadavu	Double Circuit	State Sector	TANTRANSCO	358.0	400.0
574	573	2016-06-30	400 kV Gonda - 220 kV Gonda Interconnector (one ckt)	Double Circuit	State Sector	UPPTCL	14.0	220.0
575	574	2016-06-30	A5(Faridabad) - A4(Faridabad) (Ckt-I)	Double Circuit	State Sector	HVPNL	8.0	220.0
576	575	2016-06-30	Bahraich - 400 kv Gonda line (one ckt.)	Double Circuit	State Sector	UPPTCL	74.0	220.0
577	576	2016-06-30	Bhadla-Kanasar	Double Circuit	State Sector	RVPNL	63.0	220.0
578	577	2016-06-30	Kanjali - Science city line (Jalandhar)	Double Circuit	State Sector	PSTCL	30.0	220.0
579	578	2016-06-30	LILO of 220 kV Parichha - Banda line at Mahoba	Double Circuit	State Sector	UPPTCL	10.0	220.0
580	579	2016-06-30	LILO of Both ckt of 220 KV Jamanwada - Varsana at Bhachunda (AL-59) M/C	2xDouble Circuit	State Sector	GETCO	83.0	220.0
581	580	2016-06-30	LILO of Deviakurichy - Pudhansanthai at Valayapatty	Double Circuit	State Sector	TANTRANSCO	52.0	220.0
582	581	2016-06-30	LILO of Existing SP Koil - Thiruvalam at Kanchipuram S/S	Double Circuit	State Sector	TANTRANSCO	1.0	220.0
583	582	2016-06-30	LILO of Existing Sunguvarchatram - Arni at Kanchipuram S/S	Double Circuit	State Sector	TANTRANSCO	16.0	220.0
584	583	2016-06-30	LILO of Ganguwal - Mohali at Majra	Double Circuit	State Sector	PSTCL	21.0	220.0
585	584	2016-06-30	LILO of GGSSTP - Jamsher at Jadla	Double Circuit	State Sector	PSTCL	21.0	220.0
586	585	2016-06-30	LILO of Harduaganj - Mainpuri S/C line at Sikandra Rau	Double Circuit	State Sector	UPPTCL	3.0	220.0
587	586	2016-06-30	LILO of Kalpakkam - Arani at Purisai	Double Circuit	State Sector	TANTRANSCO	24.0	220.0
588	587	2016-06-30	LILO of Malout - GNDTP Bhatinda at Badal	Double Circuit	State Sector	PSTCL	50.0	220.0
589	588	2016-06-30	LILO of one ckt of 220kV Bhopal - Ashta line at Mungaliyachhap s/s	Double Circuit	State Sector	MPPTCL	52.0	220.0
590	589	2016-06-30	LILO of Pithampur - Indore line at 220kV Pithampur-II s/s	Double Circuit	State Sector	MPPTCL	15.0	220.0
591	590	2016-06-30	LILO of Siruseri - Taramani (Kids park) line at 400 kV Ottiyambakkam S/S	Double Circuit	State Sector	TANTRANSCO	5.0	220.0
592	591	2016-06-30	LILO of Tuticorin Sipcot - Checkanurani line at Savasapuram S/s	Double Circuit	State Sector	TANTRANSCO	13.0	220.0
593	592	2016-06-30	LILO on 220 kV Kandalgaon Topworth for M/s Pioneer Gas Power Ltd.	Double Circuit	State Sector	MSETCL	1.0	220.0
594	593	2016-06-30	Rajpura - Lalru	Double Circuit	State Sector	PSTCL	59.0	220.0
595	594	2016-06-30	RTPP (Muddanur) - Chinakampalli	Double Circuit	State Sector	APTRANSCO	121.0	220.0
596	595	2016-06-30	Uravakonda - Vajrakarur	Double Circuit	State Sector	APTRANSCO	32.0	220.0
597	596	2016-06-30	Jullandhar - Samba line (NRSS-XXIX TL - TBCB)	Double Circuit	Private Sector	SGL	270.0	400.0
598	597	2016-06-30	Kharagpur (WBSETCL) - Chaibasa (PG) (P&KTCL - TBCB)	Double Circuit	Private Sector	SGL	323.0	400.0
599	598	2016-06-30	LILO of both ckt of Patiala - Kaithal at Patran (PTL - TBCB)	Double Circuit	Private Sector	PATRANTCL	1.0	400.0
600	599	2016-06-30	RAPP - Shujalpur line (RAPPTCL - TBCB)	Double Circuit	Private Sector	SGL	402.0	400.0
601	600	2016-07-31	LILO IN of Both Ckt Teesta-III - Kishanganj at Rangpo	Multiple Circuits with Double Circuit	Central Sector	PGCIL	21.0	400.0
602	601	2016-07-31	Line for swapping of Purnea bay with Sasaram bay at Biharshariff s/s	Double Circuit	Central Sector	PGCIL	10.0	400.0
603	602	2016-07-31	Srinagar HEP - Sringar 400 kV S/S.	Double Circuit	State Sector	PTCUL	28.0	400.0
604	603	2016-07-31	400 KV Karamadai S/S - 230 KV Thudiyalur S/S (Part of line from Loc. 1 to 81)	Single Circuit on Double Circuit	State Sector	APTRANSCO	21.0	220.0
605	604	2016-07-31	Bawana-Rohini -II (Sec -29) line	Double Circuit	State Sector	DTL	12.0	220.0
606	605	2016-07-31	Bhinmal - Sayla line	Double Circuit	State Sector	RVPNL	78.0	220.0
607	606	2016-07-31	Gaya (PG) - Sonenagar (New)	Double Circuit	State Sector	BSPTCL	183.0	220.0
608	607	2016-07-31	GPPC (Pipavav)- Dhokadva	Double Circuit	State Sector	GETCO	94.0	220.0
609	608	2016-08-31	Betul - Khandwa (Quad) line	Double Circuit	Central Sector	PGCIL	338.0	400.0
610	609	2016-08-31	Khandwa - Indore line	Double Circuit	Central Sector	PGCIL	344.0	400.0
611	610	2016-08-31	Meja - Allahabad line	Double Circuit	Central Sector	PGCIL	56.0	400.0
612	611	2016-08-31	Sasaram - Allahabad line (1 ckt shifted from NR bus to ER bus) Addition	Double Circuit	Central Sector	PGCIL	6.0	400.0
613	612	2016-08-31	LILO of both ckt of MTPS stage III - Arasur (PGCIL) at Karamadai	Multiple Circuits	State Sector	TANTRANSCO	124.0	400.0
614	613	2016-08-31	Suryapet - Nandiwanaparthi (part of Suryapet- Shankarpally line)	Double Circuit	State Sector	TSTRANSCO	240.0	400.0
615	614	2016-08-31	Bajakhana - Bagha Purana	Double Circuit	State Sector	PSTCL	71.0	220.0
616	615	2016-08-31	Boisar II-Borivali	Multiple Circuits	State Sector	MSETCL	331.0	220.0
617	616	2016-08-31	Budidampadu - Bhongiri (2nd Ckt)	Double Circuit	State Sector	TSTRANSCO	14.0	220.0
618	617	2016-08-31	Chatrail-Ramgarh	Double Circuit	State Sector	RVPNL	90.0	220.0
619	618	2016-08-31	Chittorgarh - Sawa	Double Circuit	State Sector	RVPNL	53.0	220.0
620	619	2016-08-31	Garividi - Tekkali (2nd Ckt) line	Single Circuit	State Sector	APTRANSCO	92.0	220.0
621	620	2016-08-31	Hardoi - Shahjahanpur (PG) line	Double Circuit	State Sector	UPPTCL	60.0	220.0
622	621	2016-08-31	Kasor - Herang (DFCC) line	Double Circuit	State Sector	GETCO	39.0	220.0
623	622	2016-08-31	LILO of 220 kV Jodhpur (220 kV GSS) - Pali at 400 kV GSS Jodhpur (New)	Double Circuit	State Sector	RVPNL	10.0	220.0
624	623	2016-08-31	LILO of Bhugaon - Pusad at Wardha (PG)	Double Circuit	State Sector	MSETCL	14.0	220.0
625	624	2016-08-31	LILO of Kankroli (PG) -Debari at Amberi	Double Circuit	State Sector	RVPNL	30.0	220.0
626	625	2016-08-31	LILO of one ckt of Ganguwal - Gobindgarh-II at Bhari	Double Circuit	State Sector	PSTCL	6.0	220.0
627	626	2016-08-31	LILO of Patiala - Mandi Gobindgarh at Rajpura	Double Circuit	State Sector	PSTCL	68.0	220.0
628	627	2016-08-31	LILO of Radhanpur - Mehsana at Sankhari	Double Circuit	State Sector	GETCO	62.0	220.0
629	628	2016-08-31	Lower Jurala HEP - Upper Jurala	Double Circuit	State Sector	TSTRANSCO	21.0	220.0
630	629	2016-08-31	Lucknow PG (400) - Kursi Road	Double Circuit	State Sector	UPPTCL	30.0	220.0
631	630	2016-08-31	Palwal (Meghpur) - Meerpur Kurali	Double Circuit	State Sector	HVPNL	53.0	220.0
632	631	2016-08-31	Parigi - Kosigi line	Double Circuit	State Sector	TSTRANSCO	40.0	220.0
633	632	2016-08-31	Roza - Dohna	Double Circuit	State Sector	UPPTCL	216.0	220.0
634	633	2016-08-31	Visavadar - Timbdi	Double Circuit	State Sector	GETCO	180.0	220.0
635	634	2016-08-31	Mainpuri-Greater Noida	Single Circuit	Private Sector	WUPPTCL	181.0	765.0
636	635	2016-08-31	Cuddalore - Naggapattinam	Double Circuit	Private Sector	ITPCL	95.0	400.0
637	636	2016-08-31	LILO of Moradabad-Muzzafarnagar at Hapur	Double Circuit	Private Sector	WUPPTCL	2.0	400.0
638	637	2016-08-31	Madhugiri - Bidadi (KTL - TBCB)	Double Circuit	Private Sector	KTCL	185.0	400.0
639	638	2016-09-30	Champa Pooling Station - Kurukshetra (HVDC) BIPOLE Line	BIPOLE	Central Sector	PGCIL	2574.0	800.0
640	639	2016-09-30	Jaipur (RVPNL) - Bhiwani (IInd Ckt) line	Single Circuit	Central Sector	PGCIL	277.0	765.0
641	640	2016-09-30	Srikakulam PP - Vemagiri - II PS (PVTL-TBCB)	Double Circuit	Central Sector	PGCIL	668.0	765.0
642	641	2016-09-30	Essar Gujarat TPS - Bachau (Tripal)	Double Circuit	Central Sector	PGCIL	446.0	400.0
643	642	2016-09-30	LILO of One ckt RAPP - Kankroli at Chittorgarh	Double Circuit	Central Sector	PGCIL	28.0	400.0
644	643	2016-09-30	Unchahar - Fatehpur line (PUTL-TBCB)	Double Circuit	Central Sector	PGCIL	107.0	400.0
645	644	2016-09-30	Lalitpur TPS - Agra (UP) Ckt-I	Single Circuit	State Sector	UPPTCL	337.0	765.0
646	645	2016-09-30	Anpara B - Anpara D (2nd ckt)	Double Circuit	State Sector	UPPTCL	5.0	400.0
647	646	2016-09-30	LILO of 400 kV Agra (UP) - Muradnagar 400 kV S/C line at Agra (UP) 765/400 kV S/S	Double Circuit	State Sector	UPPTCL	156.0	400.0
648	647	2016-09-30	LILO of Kayathar - Karaikudi line at 400 kV Kamudhi s/s	Double Circuit	State Sector	TANTRANSCO	223.0	400.0
649	648	2016-09-30	LILO of one ckt of 400 kV Agra (UP) - Agra (PG) 400 kV D/C line at Agra (UP) 765/400 kV S/S	Double Circuit	State Sector	UPPTCL	73.0	400.0
650	649	2016-09-30	Chandrapur MIDC - Ballarshah (Ckt- I )	Double Circuit	State Sector	MSETCL	21.0	220.0
651	650	2016-09-30	LILO 220 kV of Muradnagar - Shamli at Baghpat	Single Circuit	State Sector	UPPTCL	1.0	220.0
652	651	2016-09-30	LILO of 220 kV Mainpuri (PG) - Mainpuri line at Sirsaganj	Double Circuit	State Sector	UPPTCL	68.0	220.0
653	652	2016-09-30	LILO of 220 kV Orai - Mainpuri line at Bah S/S	Double Circuit	State Sector	UPPTCL	157.0	220.0
654	653	2016-09-30	LILO of 230 kV Chekkanurani - TTPS (feeder-I) at 230 kV Kinnimangalam	Double Circuit	State Sector	TANTRANSCO	1.0	220.0
655	654	2016-09-30	Narendra (New) - Madhugiri (KTL - TBCB)	Double Circuit	Private Sector	KTCL	758.0	765.0
656	655	2016-10-31	Nagapattinam PS - Salem (PNMTL-TBCB)	Double Circuit	Central Sector	PGCIL	406.0	765.0
657	656	2016-10-31	Varanasi - Sarnath (Q)	Double Circuit	Central Sector	PGCIL	213.0	400.0
658	657	2016-10-31	Kamavarapukota - Surypet ( Chinnakorukondi - Suryapet)	Double Circuit	State Sector	TSTRANSCO	170.0	400.0
659	658	2016-10-31	Kamavarapukota - Surypet (Kamavarrapukota - Chinnakorukondi)	Double Circuit	State Sector	APTRANSCO	179.0	400.0
660	659	2016-10-31	Bhandup - Borivali line on M/C tower (from loc. no. 20 to 48)	Single Circuit on Multiple Circuits	State Sector	MSETCL	9.0	220.0
661	660	2016-10-31	Kalwa - Borivali line M/C tower (from loc no. 20 to 48)	Single Circuit on Multiple Circuits	State Sector	MSETCL	9.0	220.0
662	661	2016-10-31	Kishanganj (PG) - Kishanganj (New)	2xDouble Circuit	State Sector	BSPTCL	16.0	220.0
663	662	2016-10-31	LILO of Begusarai - Kanti at Samastipur	2xDouble Circuit	State Sector	BSPTCL	24.0	220.0
664	663	2016-10-31	LILO of one ckt Jaipur (South) to Chaksu at Goner	Double Circuit	State Sector	RVPNL	58.0	220.0
665	664	2016-10-31	LILO on 220kV Shivajinagar-Satana line (From loc.No.211) at 220kV Gangapur S/s	Double Circuit	State Sector	MSETCL	96.0	220.0
666	665	2016-10-31	Mutiara TPP(Coastal Energen Gen. Switchyard) - Tuticorin Pooling Station (Balance portion)	Double Circuit	Private Sector	CEPL	24.0	400.0
667	666	2016-10-31	Uchpinda (RKM Powergen Private Ltd.) - Kotra s/s (Raigarh) line	Double Circuit	Private Sector	RKMPPL	53.0	400.0
668	667	2016-11-30	Tuticorin Pooling Station - Salem Pooling Station	Double Circuit	Central Sector	PGCIL	731.0	765.0
669	668	2016-11-30	Tungabhadra river - Yemmiganur	Double Circuit	State Sector	APTRANSCO	43.0	400.0
670	669	2016-11-30	Veltoor - Thungabhadra River (Q) line	Double Circuit	State Sector	TSTRANSCO	147.0	400.0
671	670	2016-11-30	Bidanasi -Cuttack	Double Circuit	State Sector	OPTCL	20.0	220.0
672	671	2016-11-30	LILO on 220 KV Pandharpur - Malinagar line for M/s Vittal SSK Co-generation Plant	Double Circuit	State Sector	MSETCL	2.0	220.0
673	672	2016-11-30	Pulichintala HEP - Huzurnagar line	Double Circuit	State Sector	TSTRANSCO	74.0	220.0
674	673	2016-11-30	Samatipur (New) s/s - Samastipur s/s (initially charged at 132 KV)	Double Circuit	State Sector	BSPTCL	25.0	220.0
675	674	2016-11-30	Thallak - M/s BARC	Double Circuit	State Sector	KPTCL	22.0	220.0
676	675	2016-11-30	Jorethang HEP - New Melli	Double Circuit	Private Sector	DEPL	20.0	220.0
677	676	2016-12-31	Srikakulam Pooling Station - Angul line	Double Circuit	Central Sector	PGCIL	552.0	765.0
678	677	2016-12-31	LILO of Gazuwaka - Vijayawada 400KV S/C line at Vemagiri PS	Double Circuit	Central Sector	PGCIL	38.0	400.0
679	678	2016-12-31	Navsari - Boisor line (Balance portion )	Double Circuit	Central Sector	PGCIL	161.0	400.0
680	679	2016-12-31	Karaikudi - Kamudhi	Double Circuit	State Sector	TANTRANSCO	220.0	400.0
681	680	2016-12-31	Koradi-II - Koradi-III (Ckt-I)	Double Circuit	State Sector	MSETCL	38.0	400.0
682	681	2016-12-31	LILO of Vizag - Khammam (Ckt-I) at Asupaka	Double Circuit	State Sector	TSTRANSCO	34.0	400.0
683	682	2016-12-31	Phagi GSS (Jaipur) - Heerpura line	Double Circuit	State Sector	RVPNL	104.0	400.0
684	683	2016-12-31	Raita - Jagadalpur line	Double Circuit	State Sector	CSPTCL	657.0	400.0
685	684	2016-12-31	Tirunelveli (Abishekapatty) - Kanarpatty	Single Circuit	State Sector	TANTRANSCO	15.0	400.0
686	685	2016-12-31	ACC Limited - LMEL Ghugus	Single Circuit	State Sector	MSETCL	2.0	220.0
687	686	2016-12-31	Bina s/s - M/s Bharat Oman Refinaries Ltd. Agasod, Bina	Double Circuit	State Sector	MPPTCL	36.0	220.0
688	687	2016-12-31	Deepalpur-Sonepat HSIIDC Rai ( terminated at Rajiv Gandhi s/s)	Multiple Circuits	State Sector	HVPNL	41.0	220.0
689	688	2016-12-31	Deepalpur - Sonipat (Sector- 6)	Double Circuit	State Sector	HVPNL	11.0	220.0
690	689	2016-12-31	Extension of Bikaner- Barsinghsar at Barsinghsar TPS	Single Circuit	State Sector	RVPNL	3.0	220.0
691	690	2016-12-31	Gaddamvaripalli- Goddumari	Double Circuit	State Sector	APTRANSCO	9.0	220.0
692	691	2016-12-31	Ghanapur - Marripally - Nagole (Uppal)	Double Circuit	State Sector	TSTRANSCO	36.0	220.0
693	692	2016-12-31	Kalwa - Borivali (under Mumbai Strengthening)	Single Circuit on Multiple Circuits	State Sector	MSETCL	3.0	220.0
694	693	2016-12-31	Karamadai - Common Point	Single Circuit	State Sector	TANTRANSCO	21.0	220.0
695	694	2016-12-31	LILO of 220KV Jodhpur -400KV Jodhpur interconnector at 220KV Jhalamand	Double Circuit	State Sector	RVPNL	1.0	220.0
696	695	2016-12-31	LILO of both Ckt of Cheeka - Durala at Sonta s/s	Double Circuit	State Sector	HVPNL	78.0	220.0
697	696	2016-12-31	LILO of both ckts Ramgarh GTPS -Dechu at Ramgarh	Double Circuit	State Sector	RVPNL	1.0	220.0
698	697	2016-12-31	LILO of Darbhanga - Kanti at Musahari	Double Circuit	State Sector	BSPTCL	90.0	220.0
699	698	2016-12-31	LILO of (Existing) Budhipadar-Burla at Lapanga	Double Circuit	State Sector	OPTCL	7.0	220.0
700	699	2016-12-31	LILO of Existing Ingur - Palladam at Kurukathi S/S	Double Circuit	State Sector	TANTRANSCO	62.0	220.0
701	700	2016-12-31	LILO of Existing Trichy - Perambalur at Jambunathapuram S/S	Double Circuit	State Sector	TANTRANSCO	54.0	220.0
702	701	2016-12-31	LILO of Korattur - Koyembedu at Ambattur (3rd Main Road)	Double Circuit	State Sector	TANTRANSCO	1.0	220.0
703	702	2016-12-31	LILO of Rengali - Tarkera at Bonai	Double Circuit	State Sector	OPTCL	6.0	220.0
704	703	2016-12-31	LILO of Siruseri - Tharamani at Sholinganallur	Double Circuit	State Sector	TANTRANSCO	5.0	220.0
705	704	2016-12-31	Moulali - Osmania University	Direct Current Underground Cable	State Sector	TSTRANSCO	9.0	220.0
706	705	2016-12-31	Neyveli - Eachengadu S/S	Single Circuit	State Sector	TANTRANSCO	34.0	220.0
707	706	2016-12-31	Sitapura- Sitapura (Existing) (Upgradation)	Double Circuit	State Sector	RVPNL	1.0	220.0
708	707	2016-12-31	Thudiyalur s/s - Common point at loc. 81 to 148 (Associated line of Karamadai 400 KV s/s -single ckt only)	Single Circuit	State Sector	TANTRANSCO	19.0	220.0
709	708	2016-12-31	Mainpuri - Bara Ckt-II	Single Circuit	Private Sector	SEUPPTCL	377.0	765.0
710	709	2016-12-31	Avantha Bhandar TPS (Korba West) - Raigarh (Kotra)	Double Circuit	Private Sector	KWPCL	37.0	400.0
711	710	2016-12-31	Balco - Dharamjaygar Pooling Station	Double Circuit	Private Sector	BALCO	46.0	400.0
712	711	2016-12-31	LILO of Orai - Mainpuri line at Mainpuri	2xDouble Circuit	Private Sector	SEUPPTCL	93.0	400.0
713	712	2016-12-31	Mainpuri - Aligarh	Double Circuit	Private Sector	SEUPPTCL	186.0	400.0
714	713	2017-01-31	Dgen TPS- Navsari line	Double Circuit	Private Sector	TOR. POW. (UNOSUGEN)	210.0	400.0
715	714	2017-01-31	Kurukshetra - Malerkotla line (NRSS-XXXITL (B) - TBCB)	Double Circuit	Private Sector	ESSEL	278.0	400.0
716	715	2017-01-31	Purulia - Ranchi (PG) (P&KTCL - TBCB)	Double Circuit	Private Sector	SGL	223.0	400.0
717	716	2017-01-31	LILO of existing Seoni-Bina at Gadarwara STPP	Double Circuit	Central Sector	PGCIL	16.0	765.0
718	717	2017-01-31	Dehradun - Bagpat line (Q)	Double Circuit	Central Sector	PGCIL	330.0	400.0
719	718	2017-01-31	Sikar - Jaipur line	Double Circuit	Central Sector	PGCIL	339.0	400.0
720	719	2017-01-31	LILO of 400 kV Solapur - Kolhapur PGCIL line for 400 kV Alkud S/S	Double Circuit	State Sector	MSETCL	25.0	400.0
721	720	2017-01-31	Naranoor - Ghani line	Double Circuit	State Sector	APTRANSCO	33.0	400.0
722	721	2017-01-31	Hathras-Gokul line	Single Circuit	State Sector	UPPTCL	41.0	220.0
723	722	2017-01-31	LILO of 220kV Orai - Bhauti at Orai	Double Circuit	State Sector	UPPTCL	8.0	220.0
724	723	2017-01-31	Mulund - Bhandup line	Single Circuit on Multiple Circuits	State Sector	MSETCL	3.0	220.0
725	724	2017-02-28	LILO of One Ckt Parbati Pooling Station - Amritsar at Jalandhar	Double Circuit	Central Sector	PGCIL	34.0	400.0
726	725	2017-02-28	Koradi II to Koradi -III line (ckt.II)	Double Circuit	State Sector	MSETCL	38.0	400.0
727	726	2017-02-28	LILO of Jeerat - KTPS 400 kV S/C at N. Chanditala	Double Circuit+Single Circuit	State Sector	WBSETCL	7.0	400.0
728	727	2017-02-28	Kamudhi s/s - Tiruchulis/s (Muthuramlingapuram) - Ckt-I	Double Circuit	State Sector	TANTRANSCO	69.0	230.0
729	728	2017-02-28	Bechraji - Maruti Suzuki line	Double Circuit	State Sector	GETCO	2.0	220.0
730	729	2017-02-28	Chandrayanagutta - 220KV Imlibun GIS (UG Cable)	Double Circuit	State Sector	TSTRANSCO	10.0	220.0
731	730	2017-02-28	Durshed - Siricilla line	Double Circuit	State Sector	TSTRANSCO	134.0	220.0
732	731	2017-02-28	Harsh Vihar - Patparganj line (U/G cable link)	Double Circuit	State Sector	DTL	29.0	220.0
733	732	2017-02-28	HSR Layout - Nimhans S/S (UG Cable)	Underground Cable	State Sector	KPTCL	11.0	220.0
734	733	2017-02-28	Interconnection of one ckt. of GSEG - Kosamba line with Essar - Ichhapore line	Double Circuit	State Sector	GETCO	1.0	220.0
735	734	2017-02-28	Koyna PSS - Karad(Loc. 8 - 144) line	Single Circuit on Double Circuit	State Sector	MSETCL	44.0	220.0
736	735	2017-02-28	LILO of Bakreswar - Gokarna at Sadaipur	Double Circuit	State Sector	WBSETCL	13.0	220.0
737	736	2017-02-28	LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet S/S	Double Circuit	State Sector	TSTRANSCO	48.0	220.0
738	737	2017-02-28	LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet S/S	Double Circuit	State Sector	TSTRANSCO	42.0	220.0
739	738	2017-02-28	LILO of Ghanapur - Malkaram at Moulali	Double Circuit	State Sector	TSTRANSCO	9.0	220.0
740	739	2017-02-28	LILO of one Ckt of Chilakallu - Narkatpally at Suryapet S/S	Double Circuit	State Sector	TSTRANSCO	24.0	220.0
741	740	2017-02-28	LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar	Double Circuit	State Sector	RVPNL	33.0	220.0
742	741	2017-02-28	LILO of Wanaparthy - Ragimanagadda at Singotam X Road SS	Double Circuit	State Sector	TSTRANSCO	10.0	220.0
743	742	2017-02-28	LILO on one ckt of Nelamangala - Anchepalya line at Magadi	Double Circuit	State Sector	KPTCL	31.0	220.0
744	743	2017-02-28	RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing)	Double Circuit	State Sector	TSTRANSCO	140.0	220.0
745	744	2017-02-28	Ajmer - Deedwana	Single Circuit	Private Sector	APL	111.0	400.0
746	745	2017-02-28	Bikaner - Deedwana	Single Circuit	Private Sector	APL	129.0	400.0
747	746	2017-02-28	Hindaun - Alwar	Single Circuit	Private Sector	APL	97.0	400.0
748	747	2017-02-28	JP Nigri TPP - Satna (PG)	Double Circuit	Private Sector	JAL	322.0	400.0
749	748	2017-02-28	Sujangarh - Deedwana	Double Circuit	Private Sector	APL	60.0	220.0
750	749	2017-03-31	LILO of Bishwanath Chariali - Agra at Alipurduar	High-Voltage Direct Current	Central Sector	PGCIL	44.0	800.0
751	750	2017-03-31	Raipur Pooling station - Wardha line -II	Double Circuit	Central Sector	PGCIL	714.0	765.0
752	751	2017-03-31	Wardha - Nizamabad line (Part of Wardha - Hyderabad line)	Double Circuit	Central Sector	PGCIL	576.0	765.0
753	752	2017-03-31	Farakka-Gokarna Portion of Raharhat-Purnea Lin, alongwith LILO at Farakka & Gokarna to form Farakka - Gokarna line	Double Circuit	Central Sector	PGCIL	238.0	400.0
754	753	2017-03-31	LILO of Bongaigaon - Siliguri at Alipurduar	Double Circuit	Central Sector	PGCIL	13.0	400.0
755	754	2017-03-31	LILO of Dadri - Malerkotla at Kaithal	Double Circuit	Central Sector	PGCIL	50.0	400.0
756	755	2017-03-31	Nizamabad - Dichpalli line -Ckt-I	Double Circuit	Central Sector	PGCIL	9.0	400.0
757	756	2017-03-31	LILO of Birpara - Salakati line at Alipurduar (New Pooling Station)	Double Circuit	Central Sector	PGCIL	5.0	220.0
758	757	2017-03-31	Alachi - Khalsi S/S	Single Circuit	State Sector	JKPDD	31.0	66.0
759	758	2017-03-31	Chutak HEP-Gramthong -II	Single Circuit	State Sector	JKPDD	5.0	66.0
760	759	2017-03-31	Chutak HEP-Kargil-I	Single Circuit	State Sector	JKPDD	10.0	66.0
761	760	2017-03-31	Gramthong -II - Sankoo	Single Circuit	State Sector	JKPDD	27.0	66.0
762	761	2017-03-31	Khangral - Mulbek -II	Single Circuit	State Sector	JKPDD	23.0	66.0
763	762	2017-03-31	Leh (C.P.) - Kharu S/S	Single Circuit	State Sector	JKPDD	25.0	66.0
764	763	2017-03-31	Mulbek-II - Kargil -I	Single Circuit	State Sector	JKPDD	28.0	66.0
765	764	2017-03-31	Charanka - Veloda Line	Double Circuit	State Sector	GETCO	199.0	400.0
766	765	2017-03-31	Kirori - Jind line (Ckt-II)	Double Circuit	State Sector	HVPNL	50.0	400.0
767	766	2017-03-31	LILO of 400kV Gajwel - Yeddumailaram (Shankarpally) ckt-I at 400 kV Narsapur SS.	Double Circuit	State Sector	TSTRANSCO	6.0	400.0
768	767	2017-03-31	LILO of Chandrapur-Parli S/C line for 400KV Nanded (Khumbhargaon)	Double Circuit	State Sector	MSETCL	80.0	400.0
769	768	2017-03-31	LILO of Eachangadu - Thatchankurichi at Poiyur 230 KV SS	Double Circuit	State Sector	TANTRANSCO	22.0	230.0
770	769	2017-03-31	LILO of Korattur- Alamathy line at Ambattur 3rd Main Road 230 KV SS	Double Circuit	State Sector	TANTRANSCO	1.0	230.0
771	770	2017-03-31	Palladam - Kurukathi Line	Single Circuit	State Sector	TANTRANSCO	78.0	230.0
772	771	2017-03-31	Balimela - Malkangiri line	Single Circuit	State Sector	OPTCL	22.0	220.0
773	772	2017-03-31	Botad - Parabadi (Ajmer) line (Ckt-1)	Double Circuit	State Sector	GETCO	64.0	220.0
774	773	2017-03-31	Dehradun (PTCUL) - Dehradun (PGCIL) line	Double Circuit	State Sector	PTCUL	12.0	220.0
775	774	2017-03-31	Gwalior (Malanpur) - Morena line	Double Circuit	State Sector	MPPTCL	60.0	220.0
776	775	2017-03-31	Kharghar- Boriwali line	Double Circuit	State Sector	MSETCL	76.0	220.0
777	776	2017-03-31	Lamboti -Vairag line (by making tap arrangement on 220kV Tuljapur- Vairag line for Vairag SS)	Single Circuit on Double Circuit	State Sector	MSETCL	64.0	220.0
778	777	2017-03-31	LILO of 220 kV Sambhal-Badaun Line at Chandausi S/s	Double Circuit	State Sector	UPPTCL	33.0	220.0
779	778	2017-03-31	LILO of I-Ckt. of Panki - Bhauti PG(400) line at Rania s/s	Double Circuit	State Sector	UPPTCL	33.0	220.0
780	779	2017-03-31	LILO of Jeerat - Rishra 220 kV S/C Line at Dharampur	Double Circuit	State Sector	WBSETCL	2.0	220.0
781	780	2017-03-31	LILO of Jodhpur(400 kV)-Jodhpur 220 kV interconnector-II line for 220 kV GSS Barli	Double Circuit	State Sector	RVPNL	3.0	220.0
782	781	2017-03-31	LILO of one ckt Bhigwan-Walchandnagar at Loni Deokar s/s (Ckt-1)	Single Circuit on Double Circuit	State Sector	MSETCL	19.0	220.0
783	782	2017-03-31	LILO of one ckt of 220KV Indore II(Jaitpura) to Indore 400KV at 220KV S/s NZ Indore	Double Circuit	State Sector	MPPTCL	20.0	220.0
784	783	2017-03-31	LILO of Somanahalli - Malur at Vikas Tech Park	Double Circuit	State Sector	KPTCL	16.0	220.0
785	784	2017-03-31	LILO point to Phojal	Double Circuit	State Sector	HPPTCL	20.0	220.0
786	785	2017-03-31	Morak - Bhawanimandi line	Single Circuit	State Sector	RVPNL	40.0	220.0
787	786	2017-03-31	Sadla - Maruti wind park line	Single Circuit	State Sector	GETCO	1.0	220.0
788	787	2017-03-31	Sohawal - Faizabad PG (400)	Double Circuit	State Sector	UPPTCL	47.0	220.0
789	788	2017-03-31	Visavadar - Amreli line	Double Circuit	State Sector	GETCO	132.0	220.0
790	789	2017-04-30	Darlipalli TPS - Jharsuguda (Sundergarh) PS line	Double Circuit	Central Sector	PGCIL	41.0	765.0
791	790	2017-04-30	Lalitpur TPS - Fatehabad (Agra (UP)) Ckt-II	Single Circuit	State Sector	UPPTCL	335.0	765.0
792	791	2017-04-30	Bhadla-Bikaner	Double Circuit	State Sector	RVPNL	379.0	400.0
793	792	2017-04-30	Bhilwara TPS -Ajmer	Double Circuit	State Sector	RVPNL	320.0	400.0
794	793	2017-04-30	Fatehabad (Agra (UP)) - Maath ( Mathura) line	Single Circuit	State Sector	UPPTCL	142.0	400.0
795	794	2017-04-30	LILO of both ckt of Mamidipally - Srisailam at Dindi S/s	Double Circuit	State Sector	TSTRANSCO	5.0	400.0
796	795	2017-04-30	LILO of Atri-puri at Pandiabil S/s	Double Circuit	State Sector	OPTCL	3.0	220.0
797	796	2017-04-30	LILO of Mettur - Karimangalam at Dharmapuri S/s	Double Circuit	State Sector	TANTRANSCO	6.0	220.0
798	797	2017-04-30	Maath (Mathura) -Chhata line	Double Circuit	State Sector	UPPTCL	68.0	220.0
799	798	2017-04-30	Mylapore - Tharamani (UG Cable)	Double Circuit	State Sector	TANTRANSCO	25.0	220.0
800	799	2017-04-30	Sikandrabad (WUPPTCL) - Sikandrabad (ckt-I&II)	Double Circuit	State Sector	UPPTCL	50.0	220.0
801	800	2017-04-30	Malerkotla - Amritsar line (NRSS-XXXI TL(B) - TBCB)	Double Circuit	Private Sector	ESSEL	299.0	400.0
802	801	2017-04-30	Muzaffarpur - Darbhanga line (DMTCL - TBCB)	Double Circuit	Private Sector	ESSEL	126.0	400.0
803	802	2017-05-31	Gadarwara - Jabalpor Pool line (Balance Portion from LILO of Seoni - Bina to Jabalpur) (PWTL-TBCB)	Double Circuit	Central Sector	PGCIL	187.0	765.0
804	803	2017-05-31	Kakarapar APP - Navsari line	Double Circuit	Central Sector	PGCIL	77.0	400.0
805	804	2017-05-31	Kakrapar APP - Vapi line	Double Circuit	Central Sector	PGCIL	234.0	400.0
806	805	2017-05-31	Lucknow - Kanpur line	Double Circuit	Central Sector	PGCIL	320.0	400.0
807	806	2017-05-31	Aligarh - Sikandarabad line	Double Circuit	State Sector	UPPTCL	190.0	400.0
808	807	2017-05-31	Allahabad - Banda Line	Double Circuit	State Sector	UPPTCL	355.0	400.0
809	808	2017-05-31	LILO of Patran - Rajla at Patran (PGCIL) s/s	Double Circuit	State Sector	PSTCL	3.0	400.0
810	809	2017-05-31	Nandiwanaparthi - Shankarpally (part of Suryapet- Shankarpally line)	Double Circuit	State Sector	TSTRANSCO	222.0	400.0
811	810	2017-05-31	PH Road - Koyambedu (UG Cable)	Double Circuit	State Sector	TANTRANSCO	3.0	230.0
812	811	2017-05-31	LILO of 2nd ckt Bhigwan - Walchandnagar at Loni Deokar s/s (Ckt. -II)	Single Circuit on Double Circuit	State Sector	MSETCL	19.0	220.0
813	812	2017-05-31	LILO of Patran - Kakrala at Patran (PGCIL) s/s	Double Circuit	State Sector	PSTCL	24.0	220.0
814	813	2017-05-31	LILO on Both circuits of Waluj - Jalna at Taptitanda s/s	2xDouble Circuit	State Sector	MSETCL	32.0	220.0
815	814	2017-05-31	Warora - Wardha - II (Bhugaon)	Double Circuit	State Sector	MSETCL	165.0	220.0
816	815	2017-05-31	Hapur-Greater Noida line	Single Circuit	Private Sector	WUPPTCL	66.0	765.0
817	816	2017-05-31	Mainpuri-Hapur line	Single Circuit	Private Sector	WUPPTCL	217.0	765.0
818	817	2017-05-31	Greater Noida-Noida Sec -148 line	Double Circuit	Private Sector	WUPPTCL	94.0	400.0
819	818	2017-05-31	LILO of Rishikesh -Kashipur line at Nehtaur s/s	Double Circuit	Private Sector	WUPPTCL	15.0	400.0
820	819	2017-05-31	Haldia TPP (IPCL) - New Haldia (WBSETCL)	Double Circuit	Private Sector	IPCHL	5.0	220.0
821	820	2017-06-30	Lara STPS - Champa Pooling Station line (Q)	Double Circuit	Central Sector	PGCIL	224.0	400.0
822	821	2017-06-30	Agra(UP) - Agra (South)	Double Circuit	State Sector	UPPTCL	139.0	400.0
823	822	2017-06-30	Bellary (PS) - New Madhugiri (near Tumakur)	Double Circuit	State Sector	KPTCL	450.0	400.0
824	823	2017-06-30	Kanarpatti - Kayathar line	Double Circuit	State Sector	TANTRANSCO	25.0	400.0
825	824	2017-06-30	Kirori - Jind line (Ckt-I)	Double Circuit	State Sector	HVPNL	50.0	400.0
826	825	2017-06-30	LILO of Agra - Muradnagar at Mathura	Double Circuit	State Sector	UPPTCL	64.0	400.0
827	826	2017-06-30	Maheshwaram (PGCIL) - Maheshwaram (TSTRANSCO)	Double Circuit	State Sector	TSTRANSCO	3.0	400.0
828	827	2017-06-30	Maheshwaram - Shankarpally S/s	Double Circuit	State Sector	TSTRANSCO	12.0	400.0
829	828	2017-06-30	Rayalaseema TPP - Chittoor line	Double Circuit	State Sector	APTRANSCO	429.0	400.0
830	829	2017-06-30	Vizag TPP(HNPCL) - Kamavarapukota	Double Circuit	State Sector	APTRANSCO	486.0	400.0
831	830	2017-06-30	Kamudhi - Kavanoor	Double Circuit	State Sector	TANTRANSCO	56.0	230.0
832	831	2017-06-30	LILO of Alandur - Alagarkoil at Mondipatti 230 Kv S/S	Double Circuit	State Sector	TANTRANSCO	25.0	230.0
833	832	2017-06-30	Rohini theatre take off structure to CMRL Koyambedu 230kV GIS S/s (230 kV UG cable )	Single Circuit	State Sector	TANTRANSCO	1.0	230.0
834	833	2017-06-30	Chandrapur MIDC - Ballarshah (Ckt- II)	Double Circuit	State Sector	MSETCL	21.0	220.0
835	834	2017-06-30	Hapur (765) - Hapur	Single Circuit	State Sector	UPPTCL	8.0	220.0
836	835	2017-06-30	Indira Gandhi Nagar -Sitapur (Upgradation)	Double Circuit	State Sector	RVPNL	8.0	220.0
837	836	2017-06-30	LILO of 1st ckt. Darbhanga-MTPS(Kanti) at Motipur	Double Circuit	State Sector	BSPTCL	72.0	220.0
838	837	2017-06-30	LILO of 2nd ckt. Darbhanga-MTPS(Kanti) at Motipur	Double Circuit	State Sector	BSPTCL	56.0	220.0
839	838	2017-06-30	LILO of 2nd ckt Pusouli (PG) - Ara (PG) at Pusouli (New).	Double Circuit	State Sector	BSPTCL	5.0	220.0
840	839	2017-06-30	LILO of Arasur - Palladam at Tiruppur	Double Circuit	State Sector	TANTRANSCO	20.0	220.0
841	840	2017-06-30	LILO of Chillakallu S/S - Narketpally line at Huzurnagar S/S	Double Circuit	State Sector	TSTRANSCO	24.0	220.0
842	841	2017-06-30	LILO of Chorania - Salejada at Bagodara S/s	Double Circuit	State Sector	GETCO	4.0	220.0
843	842	2017-06-30	LILO of Moradabad - Nehtaur at Amroha	Double Circuit	State Sector	UPPTCL	45.0	220.0
844	843	2017-06-30	LILO of Motipur - Darbhanga ckt-II at Musahari	Double Circuit	State Sector	BSPTCL	41.0	220.0
845	844	2017-06-30	LILO of Shadnagar - Yeddumailaram at Yeddumailaram	Double Circuit	State Sector	TSTRANSCO	12.0	220.0
846	845	2017-06-30	Mamidipally S/s-M/s K.S.K. Photo Voltaic near Fabcity Ravirala (V)	Double Circuit	State Sector	TSTRANSCO	11.0	220.0
847	846	2017-06-30	Nimbahera - Pratapgarh (Part of Pratapgarh -Chittorgarh line)	Double Circuit	State Sector	RVPNL	181.0	220.0
848	847	2017-06-30	Patna (PG) - Gourichak	Double Circuit	State Sector	BSPTCL	1.0	220.0
849	848	2017-06-30	Uravakonda - Borampalli	Double Circuit	State Sector	APTRANSCO	72.0	220.0
850	849	2017-06-30	Veltur-Thimmajipet	Double Circuit	State Sector	TSTRANSCO	80.0	220.0
851	850	2017-06-30	Hapur-Ataur	Double Circuit	Private Sector	WUPPTCL	106.0	400.0
852	851	2017-06-30	Hapur-dasna	Double Circuit	Private Sector	WUPPTCL	29.0	400.0
853	852	2017-06-30	JSW TPS - Bellary (PS)	Double Circuit	Private Sector	JPL	19.0	400.0
854	853	2017-06-30	LILO of Moradabad - Muradnagar TL at Ataur s/s	Double Circuit	Private Sector	WUPPTCL	30.0	400.0
855	854	2017-06-30	LILO of Moradabad - Muradnagar TL at Hapur s/s	Double Circuit	Private Sector	WUPPTCL	4.0	400.0
856	855	2017-06-30	LILO of Rishikesh - Kashipur line at Nehtaur (Balance portion)	Double Circuit	Private Sector	WUPPTCL	15.0	400.0
857	856	2017-07-31	Nizamabad - Hyderabad line (Part of Wardha - Hyderabad line)	Double Circuit	Central Sector	PGCIL	486.0	765.0
858	857	2017-07-31	Kishenpur - New Wanpoh line (132 KM D/C + 7 KM Multi Ckt)	Multiple Circuits with Double Circuit	Central Sector	PGCIL	279.0	400.0
859	858	2017-07-31	Loop out (Kurnool - Maheshwaram portion of LILO of Hyderabad - Kurnool at Maheshwaram	Single Circuit	Central Sector	PGCIL	4.0	400.0
860	859	2017-07-31	Mauda-II - Betul (Quad) line	Double Circuit	Central Sector	PGCIL	393.0	400.0
861	860	2017-07-31	RAPP - Kota line	Double Circuit	Central Sector	PGCIL	90.0	400.0
862	861	2017-07-31	Gr. Noida - Noida (Quad)	Double Circuit	State Sector	UPPTCL	91.0	400.0
863	862	2017-07-31	LILO of NCTPS Stage-II - Alamathy line at Manali GIS	Double Circuit	State Sector	TANTRANSCO	66.0	400.0
864	863	2017-07-31	Koladi - PH Road (Alamathy - Koyembedu)	Double Circuit	State Sector	TANTRANSCO	27.0	230.0
865	864	2017-07-31	400 kV Betul s/s - 220 kV Betul s/s	Double Circuit	State Sector	MPPTCL	4.0	220.0
866	865	2017-07-31	Morti (220kV) - Ataur (400kV)	Double Circuit	State Sector	UPPTCL	13.0	220.0
867	866	2017-07-31	Tondiarpet - Basin Bridge (UG Cable)	Double Circuit	State Sector	TANTRANSCO	4.0	220.0
868	867	2017-07-31	Mainpuri (765kV) - Aligarh line (Balance portion)	Double Circuit	Private Sector	SEUPPTCL	54.0	400.0
869	868	2017-08-31	Jabalpur PS - Orai Substation	Double Circuit	Central Sector	PGCIL	714.0	765.0
870	869	2017-08-31	LILO of Karcham Wangtoo - Abdullapur at Kala Amb (PKATL-TBCB)	Double Circuit	Central Sector	PGCIL	2.0	400.0
871	870	2017-08-31	D/C LILO of PPSP - Arambagh 400 kV D/C line at New PPSP 400 kV GIS	Double Circuit	State Sector	WBSETCL	1.0	400.0
872	871	2017-08-31	LILO of one ckt. of 400kV Khammam -Gajwel Line at 400kV Asupaka S/s	Double Circuit	State Sector	TSTRANSCO	34.0	400.0
873	872	2017-08-31	Rasipalayam - Salem (Palavady)	Double Circuit	State Sector	TANTRANSCO	388.0	400.0
874	873	2017-08-31	Thiruverkadu - Ambattur 3rd Main road S/S (UG Cable)	Double Circuit	State Sector	TANTRANSCO	10.0	230.0
875	874	2017-08-31	Vyasarpadi - Pulianthoppe (UG Cable)	Double Circuit	State Sector	TANTRANSCO	2.0	230.0
876	875	2017-08-31	Balapur - Malegaon line Ckt.-I	Double Circuit	State Sector	MSETCL	71.0	220.0
877	876	2017-08-31	LILO of 2nd Ckt. Damoh - Sagar line at Damoh S/s	Double Circuit	State Sector	MPPTCL	1.0	220.0
878	877	2017-08-31	Phaltan - Walchandnagar	Double Circuit	State Sector	MSETCL	114.0	220.0
879	878	2017-08-31	LILO of Barh - Gorakhpur 400 kV D/C Line at Motihari (DMTCL -TBCB)	2xDouble Circuit	Private Sector	ESSEL	151.0	400.0
880	879	2017-08-31	Nizamabad - Yeddumailaram (Shankarpalli) (MTL - TBCB)	Double Circuit	Private Sector	SGL	279.0	400.0
881	880	2017-08-31	OPGC - Jharsuguda (OGP-IITL - TBCB)	Double Circuit	Private Sector	SGL	103.0	400.0
882	881	2017-09-30	Allahabad - Kanpur line	Double Circuit	Central Sector	PGCIL	481.0	400.0
883	882	2017-09-30	Aurangabad - Boisar	Double Circuit	Central Sector	PGCIL	690.0	400.0
884	883	2017-09-30	Loop-In (Hyderabad-Maheshwaram) portion of LILO of Hyderabad-Kurnool 400kV S/C line at Maheswaram	Double Circuit	Central Sector	PGCIL	3.0	400.0
885	884	2017-09-30	Raghunathpur TPS -Ranchi (PG)	Double Circuit	Central Sector	DVC	311.0	400.0
886	885	2017-09-30	Solapur STPP - Solapur line - II (Q)	Double Circuit	Central Sector	PGCIL	25.0	400.0
887	886	2017-09-30	Kharagpur - N. Chanditala	Double Circuit	State Sector	WBSETCL	277.0	400.0
888	887	2017-09-30	Dharmapuri (Palavady) - Gurubarapally	Single Circuit	State Sector	TANTRANSCO	58.0	220.0
889	888	2017-09-30	Jethana - Ajmer line	Double Circuit	State Sector	RVPNL	120.0	220.0
890	889	2017-09-30	Jodhpur (New) - Jhalamand (TK)	Double Circuit	State Sector	RVPNL	40.0	220.0
891	890	2017-09-30	Kalisindh TPS - Bhawanimandi	Single Circuit	State Sector	RVPNL	34.0	220.0
892	891	2017-09-30	LILO of Arasur - Karamadai at Shenbagapudur S/S	Double Circuit	State Sector	TANTRANSCO	75.0	220.0
893	892	2017-09-30	LILO of Sankhari-Jangral at Veloda (Sankhari)	Multiple Circuits with Double Circuit	State Sector	GETCO	61.0	220.0
894	893	2017-09-30	LILO of Tappar-Hadala line at Vondh S/s	Double Circuit	State Sector	GETCO	4.0	220.0
895	894	2017-09-30	LILO of Thiruvarur - Kadalangudi at Kumbakonam	Double Circuit	State Sector	TANTRANSCO	46.0	220.0
896	895	2017-09-30	LILO of Orai-Mainpuri at Mainpuri (Balance Portion)	Double Circuit	Private Sector	SEUPPTCL	90.0	400.0
897	896	2017-10-31	LILO of Both ckt. of Mundra UMPP - Limbdi at Bachau (Triple)	Double Circuit	Central Sector	PGCIL	45.0	400.0
898	897	2017-10-31	LILO of one ckt. Gooty - Tumkur (Vasantnarsapur) at Tumkur line (Q) at Tumkur Pool	Double Circuit	Central Sector	PGCIL	1.0	400.0
899	898	2017-10-31	Karuvalur - Shenbagapudur line	Single Circuit	State Sector	TANTRANSCO	33.0	230.0
900	899	2017-10-31	LILO of Ulundurpet - Villupuram line at Cuddalore	Double Circuit	State Sector	TANTRANSCO	69.0	230.0
901	900	2017-10-31	Aligarh - Sikandra Rau line	Double Circuit	State Sector	UPPTCL	35.0	220.0
902	901	2017-10-31	Jajji - Rai line	Double Circuit	State Sector	HVPNL	102.0	220.0
903	902	2017-10-31	LILO of 2nd Ckt. of Bansagar - Satna line at Kotar	Double Circuit	State Sector	MPPTCL	11.0	220.0
904	903	2017-10-31	LILO of one ckt. of Satna (MPPTCL) - Chhaterpur line at Satna (PGCIL)	Double Circuit	State Sector	MPPTCL	4.0	220.0
905	904	2017-10-31	Shirpur Power Plant - Amalner line	Double Circuit	State Sector	MSETCL	70.0	220.0
906	905	2017-10-31	Ataur-Indirapuram line	Double Circuit	Private Sector	WUPPTCL	31.0	400.0
907	906	2017-10-31	Ind - Barath (Power Plant (Shahjbahal) - Jharsuguda (Sundargarh)line	Double Circuit	Private Sector	IBPIL	124.0	400.0
908	907	2017-10-31	LILO of one ckt. of Sikar- Neemrana line at Babai s/s (NRSS-XXXVITL - TBCB)	Double Circuit	Private Sector	ESSEL	3.0	400.0
909	908	2017-10-31	Sterlite TPP (Vedanta)- Jharsuguda (Sundergarh) (Balance portion from LILO-I point to Jharsuguda)	Double Circuit	Private Sector	VEDANTA	41.0	400.0
910	909	2017-11-30	Chittorgarh (New) - Chittorgarh (RVPN) (Q) - (GEC- I)	Double Circuit	Central Sector	PGCIL	97.0	400.0
911	910	2017-11-30	Kurukshetra - Jind line (Q)	Double Circuit	Central Sector	PGCIL	206.0	400.0
912	911	2017-11-30	Khalsti- Leh (Part of Alusteng - Drass - Kargil - Khalsti-Leh)	Single Circuit	Central Sector	PGCONSULTANCY	62.0	220.0
913	912	2017-11-30	Bareilly (400) - Pilibhit	Single Circuit	State Sector	UPPTCL	39.0	220.0
914	913	2017-11-30	Jamnagar - Hadala	Double Circuit	State Sector	GETCO	139.0	220.0
915	914	2017-11-30	LILO of both circuit Nyara-Thebda line at Kalawad S/s	Multiple Circuits	State Sector	GETCO	21.0	220.0
916	915	2017-11-30	LILO of both circuits of Madanpur - Baddi at Pinjore	Multiple Circuits	State Sector	HVPNL	23.0	220.0
917	916	2017-11-30	LILO of Haldarwa-Zaghadia Line to Jhanor	Double Circuit	State Sector	GETCO	14.0	220.0
918	917	2017-11-30	LILO of Myvadi - Othakkalmandapam feeder at Anaikadavu 400 KV SS	Double Circuit	State Sector	TANTRANSCO	1.0	220.0
919	918	2017-11-30	Malegaon-Kalwan	Double Circuit	State Sector	MSETCL	98.0	220.0
920	919	2017-12-31	Aurangabad (PG) - Padghe (PG) line	Double Circuit	Central Sector	PGCIL	570.0	765.0
921	920	2017-12-31	Chittorgarh - Ajmer line	Double Circuit	Central Sector	PGCIL	422.0	765.0
922	921	2017-12-31	Ajmer (New) - Ajmer (RVPN) (Quad) line (GEC-I)	Double Circuit	Central Sector	PGCIL	131.0	400.0
923	922	2017-12-31	Padghe (PG) - Padghe (Kudus) line (Q) line	Double Circuit	Central Sector	PGCIL	32.0	400.0
924	923	2017-12-31	Vapi (PG) - Kala - Kudus (balance Portion) line	Double Circuit	Central Sector	PGCIL	149.0	400.0
925	924	2017-12-31	Kalivanthapattu - Ottiyambakkam (Sholinganallur)	Double Circuit	State Sector	TANTRANSCO	55.0	400.0
926	925	2017-12-31	LILO of one ckt. of Vadavi-Zerda line at Veloda (Sankhari) S/s	Double Circuit	State Sector	GETCO	31.0	400.0
927	926	2017-12-31	Ramgarh (Jaisalmer)-Akal (Jaisalmer )	Double Circuit	State Sector	RVPNL	198.0	400.0
928	927	2017-12-31	Veeranam - Abishekapatty (PGCIL)	Single Circuit	State Sector	TANTRANSCO	31.0	230.0
929	928	2017-12-31	Akola - Anjangaon line	Double Circuit	State Sector	MSETCL	106.0	220.0
930	929	2017-12-31	Chaibasa -Ramchandrapur	Double Circuit	State Sector	JUSNL	80.0	220.0
931	930	2017-12-31	Darbhanga - Samastipur (New)	Double Circuit	State Sector	BSPTCL	47.0	220.0
932	931	2017-12-31	LILO of B.Bagewadi - Bijapur line at Kudgi 400kV STPP	Multiple Circuits	State Sector	KPTCL	80.0	220.0
933	932	2017-12-31	LILO of Both ckt. of Biharsharif - Begusarai at BTPS Extn.	Double Circuit	State Sector	BSPTCL	4.0	220.0
934	933	2017-12-31	LILO of one ckt of Akrimota - Nakhatrana line at Bhachunda	Double Circuit	State Sector	GETCO	53.0	220.0
935	934	2017-12-31	LILO on Babhaleshwar - Alephata at UTSL C-Gen Plant line	Double Circuit	State Sector	MSETCL	10.0	220.0
936	935	2017-12-31	LILO on existing Phaltan - Walchandnagar at CSSK Bhavaninagar line	Double Circuit	State Sector	MSETCL	2.0	220.0
937	936	2017-12-31	Motipur(BSPTCL) - Darbhanga(DMTCL)	Double Circuit	State Sector	BSPTCL	218.0	220.0
938	937	2017-12-31	Maheshwaram(PG) - Mehboob Nagar (MTL -TBCB)	Double Circuit	Private Sector	SGL	197.0	400.0
939	938	2018-01-31	Dulhasti - Kishenpur	Double Circuit	Central Sector	PGCIL	115.0	400.0
940	939	2018-01-31	LIIO of Both ckt. of Rourkela - Raigarh (2nd line) at Jharsaguda (Sundargarh)	Multiple Circuits	Central Sector	PGCIL	130.0	400.0
941	940	2018-01-31	Julurupadu (QM) - Suryapet S/s	Double Circuit	State Sector	TSTRANSCO	219.0	400.0
942	941	2018-01-31	LILO of Guddadahalli (Munirabad) - Guttur (Davangeere) at Dhoni	Double Circuit	State Sector	KPTCL	54.0	400.0
943	942	2018-01-31	LILO of one ckt. of KTPS - Khammam line at KTPS-VI	Double Circuit	State Sector	TSTRANSCO	1.0	400.0
944	943	2018-01-31	LILO of Vadinar - Hadala at Kalawad	Double Circuit	State Sector	GETCO	16.0	400.0
945	944	2018-01-31	Jaipur North (400 kV GSS) - Manoharpur (Turnkey) and extended to LILO of S/C VKIA-Kukus	Double Circuit	State Sector	RVPNL	80.0	220.0
946	945	2018-01-31	LILO of Gadag - Lingapur at Gadag (Doni)	Double Circuit	State Sector	KPTCL	11.0	220.0
947	946	2018-01-31	LILO of one ckt. 220KV Nakodar - Rehanajattan line at 220KV Hoshiarpur	Double Circuit	State Sector	PSTCL	52.0	220.0
948	947	2018-01-31	LILO of Somanahalli S/S-Yerandanahalli at Jigani 220kV s/s	Multiple Circuits with Double Circuit	State Sector	KPTCL	12.0	220.0
949	948	2018-01-31	Pratapgarh - Chittorgarh (Balance Portion)	Double Circuit	State Sector	RVPNL	61.0	220.0
950	949	2018-01-31	Sarnath - Azamgarh - II	Single Circuit	State Sector	UPPTCL	60.0	220.0
951	950	2018-02-28	Mukatsar - Malout	Double Circuit	State Sector	PSTCL	47.0	220.0
952	951	2018-02-28	Pothencode - Kattakkada	Double Circuit	State Sector	KSEB	57.0	220.0
953	952	2018-02-28	Vasanthanarasapura - Antharasanahally	Double Circuit	State Sector	KPTCL	38.0	220.0
954	953	2018-02-28	Vyankatpura - Waghodia (765kV PGCIL) line	Double Circuit	State Sector	GETCO	29.0	220.0
955	954	2018-02-28	LILO of Muradnagar -Muzzafarnagar at Ataur	Double Circuit	Private Sector	WUPPTCL	15.0	400.0
956	955	2018-02-28	LILO of one ckt. of Khandwa - Rajgarh at Khargone TPP (KTL - TBCB)	Double Circuit	Private Sector	SGL	14.0	400.0
957	956	2018-02-28	LILO of Orai - Mainpur at Bah	Double Circuit	Private Sector	SEUPPTCL	92.0	400.0
958	957	2018-02-28	Both ckts of IInd LILO D/C portion of Simhadri - Vijayawada 400kV line at Vimagiri-i (AP) shall be LILOed at Vimagiri-II (PG)	Double Circuit	Central Sector	PGCIL	28.0	400.0
959	958	2018-02-28	Both ckts of one LILO D/C portion of Simhadri - Vijayawada line at Vimagiri -I (AP) shall be LILOed at Vimagiri-II (PG) - (D/Cportion (1.8Km) and Multi Ckt. portion (13.2Km)	Double Circuit	Central Sector	PGCIL	61.0	400.0
960	959	2018-02-28	Extn. Kudankulam APP - Tirunveli (Q)	Double Circuit	Central Sector	PGCIL	132.0	400.0
961	960	2018-02-28	LILO of Bellary - Tumkur (Vasantnarsapur) line (Q) at Tumkur Pool.	Double Circuit	Central Sector	PGCIL	220.0	400.0
962	961	2018-02-28	LILO of Both Ckt Cuddapah - Hindupur line (Q) at NP Kunta S/S	Double Circuit	Central Sector	PGCIL	18.0	400.0
963	962	2018-02-28	LILO of Gooty - Tumkur (Vasantanarsapur) at Tumkur Pool (Ckt.-II)	Double Circuit	Central Sector	PGCIL	2.0	400.0
964	963	2018-02-28	LILO of Vindhyachal - Jabalpur line (Q) (II Ckt.) at Rewa PS	Double Circuit	Central Sector	PGCIL	116.0	400.0
965	964	2018-02-28	Nabinagar-II - Gaya (Q)	Double Circuit	Central Sector	PGCIL	184.0	400.0
966	965	2018-02-28	Orai - Orai line (Q)	Double Circuit	Central Sector	PGCIL	84.0	400.0
967	966	2018-02-28	Punatsangchu-I - Alipurduar	Double Circuit	Central Sector	PGCIL	128.0	400.0
968	967	2018-02-28	Sasaram - Deltonganj line	Double Circuit	Central Sector	PGCIL	392.0	400.0
969	968	2018-02-28	Kargil - Khalsti Line	Single Circuit	Central Sector	PGCIL	97.0	220.0
970	969	2018-02-28	Kishanganga - Amargarh line	Double Circuit	Central Sector	PGCIL	85.0	220.0
971	970	2018-02-28	Jaipur STPP - Nirmal SS	Double Circuit	State Sector	TSTRANSCO	289.0	400.0
972	971	2018-02-28	Julurupadu - KTPS (Stage-VII)	Double Circuit	State Sector	TSTRANSCO	78.0	400.0
973	972	2018-02-28	Aurangabad-II - Jalna MIDC (Negewadi)	Double Circuit	State Sector	MSETCL	77.0	220.0
974	973	2018-02-28	Kalwa - Borivali	Multiple Circuits	State Sector	MSETCL	63.0	220.0
975	974	2018-02-28	LILO of Bamnauli - Naraina at PPK-III	Double Circuit	State Sector	DTL	1.0	220.0
976	975	2018-02-28	LILO of GHTP - Talwandi Sabo at Maur	Double Circuit	State Sector	PSTCL	18.0	220.0
977	976	2018-02-28	LILO of Howrah - Foundry Park at N. Chanditala.	Multiple Circuits	State Sector	WBSETCL	36.0	220.0
978	977	2018-02-28	LILO of Indore - Indore - II (Jaitpura) line at Mangliya S/s	Double Circuit	State Sector	MPPTCL	1.0	220.0
979	978	2018-02-28	LILO of Jeerat - Kasba at Barasat	Multiple Circuits	State Sector	WBSETCL	10.0	220.0
980	979	2018-02-28	LILO of Katapalli - Bolangir at Bargarh (New)	Double Circuit	State Sector	OPTCL	1.0	220.0
981	980	2018-02-28	LILO of one Ckt. Malanpur - Mehgaon line at CWRTL (Adani) S/s	Double Circuit	State Sector	MPPTCL	26.0	220.0
982	981	2018-02-28	LILO of RTPS - Lingasugur at Mallat (Manvi)	Double Circuit	State Sector	KPTCL	6.0	220.0
983	982	2018-02-28	LILO Urla - Khedamara (Bhilai) at Borjhara	Multiple Circuits	State Sector	CSPTCL	1.0	220.0
984	983	2018-02-28	Mukatsar - Kotkapura Ckt.-I	Single Circuit on Double Circuit	State Sector	PSTCL	39.0	220.0
985	984	2018-03-31	LILO of Agra - Meerut at Aligarh	Single Circuit	Central Sector	PGCIL	22.0	765.0
986	985	2018-03-31	LILO of Kanpur - Jhatikara at Aligarh	Single Circuit	Central Sector	PGCIL	22.0	765.0
987	986	2018-03-31	LILO of one ckt. of Satna- Gwalior 765KV 2xS/C line at Orai	2xSingle Circuit	Central Sector	PGCIL	73.0	765.0
988	987	2018-03-31	Orai - Aligarh line	Double Circuit	Central Sector	PGCIL	664.0	765.0
989	988	2018-03-31	Dehradun - Abdullapur line (Q)	Double Circuit	Central Sector	PGCIL	179.0	400.0
990	989	2018-03-31	Kameng - Balipara line	Double Circuit	Central Sector	PGCIL	114.0	400.0
991	990	2018-03-31	LILO of Neelamangla - Hoddy 400 kV S/C LINE at Yelahanka	Double Circuit	Central Sector	PGCIL	20.0	400.0
992	991	2018-03-31	Tirunelveli PS - Tuitcorin PS (Quad) 1and2 line	Double Circuit	Central Sector	PGCIL	48.0	400.0
993	992	2018-03-31	Bikaner -Sikar (PG)	Double Circuit	State Sector	RVPNL	420.0	400.0
994	993	2018-03-31	LILO in Ist and 2nd Ckt. of MTPS - III - Thiruvalam at Dharmapuri	Double Circuit	State Sector	TANTRANSCO	2.0	400.0
995	994	2018-03-31	LILO of both ckt. 400kV RTPP - Chittoor TMDC line at 400kV Kalikiri S/S	Double Circuit	State Sector	APTRANSCO	81.0	400.0
996	995	2018-03-31	LILO of Chekkanurani - Kayather at Kinnimangalam	Double Circuit	State Sector	TANTRANSCO	12.0	400.0
997	996	2018-03-31	LILO of Meja - Rewa Road at Masuli (Allahabad)	Double Circuit	State Sector	UPPTCL	65.0	400.0
998	997	2018-03-31	LILO of Parbati - II HEP - Parbati-III Pooling station at Sainj	Double Circuit	State Sector	HPPTCL	1.0	400.0
999	998	2018-03-31	Phagi (Jaipur south-765 kV)-Ajmer (Ckt. - I)	Double Circuit	State Sector	RVPNL	106.0	400.0
1000	999	2018-03-31	Wanakbori S/y -Wanakbori S/y (existing)	Double Circuit	State Sector	GETCO	2.0	400.0
1001	1000	2018-03-31	Yermarus TPS - Bellary Pooling Station (BPS)	Double Circuit	State Sector	KPTCL	285.0	400.0
1002	1001	2018-03-31	Veeranam - Kodikurichi	Single Circuit	State Sector	TANTRANSCO	24.0	230.0
1003	1002	2018-03-31	Veeranam - Kodikurichi line at Kundah	Double Circuit	State Sector	TANTRANSCO	24.0	230.0
1004	1003	2018-03-31	Amargarh (Delina) - Zainkote (2nd Ckt.)	Single Circuit	State Sector	JKPDD	43.0	220.0
1005	1004	2018-03-31	Darbhanga(DMTCL) - Supaul/Laukahi(BSPTCL)	Double Circuit	State Sector	BSPTCL	176.0	220.0
1006	1005	2018-03-31	Gwalior (PG) - Gwalior (MP) - 2nd circuiting	Double Circuit	State Sector	MPPTCL	3.0	220.0
1007	1006	2018-03-31	Kairan-Chamera - II (PG)	Double Circuit	State Sector	HPPTCL	4.0	220.0
1008	1007	2018-03-31	Kumbhargaon (Nanded) - Krishnoor line ckt.-II	Double Circuit	State Sector	MSETCL	16.0	220.0
1009	1008	2018-03-31	LILO of 1st ckt. Saharanpur - Khodri line at Sarsawa	Double Circuit	State Sector	UPPTCL	14.0	220.0
1010	1009	2018-03-31	LILO of 1st ckt. Sarojni Nagar - Unnao at Kanpur Road	Double Circuit	State Sector	UPPTCL	9.0	220.0
1011	1010	2018-03-31	LILO of both ckt. Tebhda - Rajkot line at Kalavad S/s	Double Circuit	State Sector	GETCO	21.0	220.0
1012	1011	2018-03-31	LILO of Chinhat - Raebareli (PG) line at CG City Lko	Double Circuit	State Sector	UPPTCL	3.0	220.0
1013	1012	2018-03-31	LILO of Gorakhpur (PG) - Basti at Bansi	Double Circuit	State Sector	UPPTCL	95.0	220.0
1014	1013	2018-03-31	LILO of Gr. Noida (400) - Sec.129 at Noida Sector - 148	Double Circuit	State Sector	UPPTCL	1.0	220.0
1015	1014	2018-03-31	LILO of Jamnagar - Jetpur line-II at Sikka	Double Circuit	State Sector	GETCO	117.0	220.0
1016	1015	2018-03-31	LILO of one ckt Samaguri - Sarusajai line at Sonapur S/S	Double Circuit	State Sector	AEGCL	27.0	220.0
1017	1016	2018-03-31	LILO of one ckt. Vyankatpura - Achhalia line at Kawant	Double Circuit	State Sector	GETCO	167.0	220.0
1018	1017	2018-03-31	LILO of Zainkote - Dalina at Amargarh	2xDouble Circuit	State Sector	JKPDD	12.0	220.0
1019	1018	2018-03-31	LILO on 220 kV Deepnagar - Amalner at Viroda	Double Circuit	State Sector	MSETCL	20.0	220.0
1020	1019	2018-03-31	LILO on Vita - Pandharpur line for Varkule - Malwadi Solar (M/s. Giriraj Solar)	Double Circuit	State Sector	MSETCL	19.0	220.0
1021	1020	2018-03-31	Ludhiana - Doraha	Double Circuit	State Sector	PSTCL	28.0	220.0
1022	1021	2018-03-31	Magarwada (PG) - Magarwada	Double Circuit	State Sector	DANDD	2.0	220.0
1023	1022	2018-03-31	Magarwada - Ringanwada	Double Circuit	State Sector	DANDD	12.0	220.0
1024	1023	2018-03-31	Morena (Adani) - Morena (MP)	Double Circuit	State Sector	MPPTCL	49.0	220.0
1025	1024	2018-03-31	Nabha -Bhawanigarh	Single Circuit on Double Circuit	State Sector	PSTCL	40.0	220.0
1026	1025	2018-03-31	Nakodar - Rehana	Double Circuit	State Sector	PSTCL	71.0	220.0
1027	1026	2018-03-31	Neebkarori - Mainpuri line	Double Circuit	State Sector	UPPTCL	70.0	220.0
1028	1027	2018-03-31	Partur - Nagewadi line	Double Circuit	State Sector	MSETCL	126.0	220.0
1029	1028	2018-03-31	Sitapur - Nighasan line	Single Circuit	State Sector	UPPTCL	109.0	220.0
1030	1029	2018-03-31	LILO of Both ckt Uri - Wagoora at Amargarh (NRSS-XXIX TL - TBCB)	Multiple Circuits	Private Sector	SGL	14.0	400.0
1031	1030	2018-03-31	Vindhyachal STPS - IV and V - Vindhyachal pool (Quad.) (C-WRTL-TBCB)	Double Circuit	Private Sector	APL	57.0	400.0
1032	1031	2018-03-31	Tashiding - Legship	Double Circuit	Private Sector	SEPL	17.0	220.0
1033	1032	2018-04-30	Parli - Solapur (PPTL - TBCB)	Double Circuit	Central Sector	PGCIL	236.0	765.0
1034	1033	2018-04-30	Parli (New) - Parli (PG) (Q) (PPTL -TBCB)	Double Circuit	Central Sector	PGCIL	36.0	400.0
1035	1034	2018-04-30	Kalpaka - Maradam line	Double Circuit	State Sector	APTRANSCO	230.0	400.0
1036	1035	2018-04-30	LILO of 2nd Ckt. VTS- Malkaram to Suryapet	Double Circuit	State Sector	TSTRANSCO	4.0	400.0
1037	1036	2018-04-30	Ataur - Mandola Vihar line	Double Circuit	State Sector	UPPTCL	33.0	220.0
1038	1037	2018-04-30	LILO of 2nd Ckt. Birsinghpur - Amarkantak line at Shahdol S/s	Double Circuit	State Sector	MPPTCL	11.0	220.0
1039	1038	2018-04-30	LILO of 2nd Ckt. of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line	Double Circuit	State Sector	MPPTCL	1.0	220.0
1040	1039	2018-04-30	Sarangapur (Allahabad)PG - Phulpur line	Single Circuit	State Sector	UPPTCL	68.0	220.0
1041	1040	2018-04-30	Sohawal PG - Barabanki line	Double Circuit	State Sector	UPPTCL	138.0	220.0
1042	1041	2018-04-30	Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)	Single Circuit	Private Sector	APL	6.0	765.0
1043	1042	2018-05-31	LILO of Wardha - Parli at Warora PS (PWTL-TBCB)	Double Circuit	Central Sector	PGCIL	196.0	400.0
1044	1043	2018-05-31	Banda - Orai	Double Circuit	State Sector	UPPTCL	217.0	400.0
1045	1044	2018-05-31	LILO of one ckt. of Kishanpur - New wanpoh at Baglihar HEP	Double Circuit	State Sector	JKPDD	8.0	400.0
1046	1045	2018-05-31	Phagi (Jaipur South) - Ajmer Ckt-II	Double Circuit	State Sector	RVPNL	106.0	400.0
1047	1046	2018-05-31	Arasur - Gobi	Single Circuit	State Sector	TANTRANSCO	48.0	230.0
1048	1047	2018-05-31	Karaikudy - Sembatty	Single Circuit	State Sector	TANTRANSCO	136.0	230.0
1049	1048	2018-05-31	Koyambedu 230kV AIS - Guindy 230 kV GIS	Single Circuit	State Sector	TANTRANSCO	8.0	230.0
1050	1049	2018-05-31	Balapur - Malegaon line (Ckt-II)	Double Circuit	State Sector	MSETCL	36.0	220.0
1051	1050	2018-05-31	Fatehpur PG - Sarh	Double Circuit	State Sector	UPPTCL	150.0	220.0
1052	1051	2018-05-31	LILO of Amawan PG - Sarojni Nagar at Bachrawan	Double Circuit	State Sector	UPPTCL	49.0	220.0
1053	1052	2018-05-31	LILO of Bhauti - Orai at Sikandara	Double Circuit	State Sector	UPPTCL	62.0	220.0
1054	1053	2018-05-31	Nanded (Kumbhargaon) - Jalkot line	Double Circuit	State Sector	MSETCL	107.0	220.0
1055	1054	2018-05-31	Nanded (Kumbhargaon) - Nanded (Waghala) Ckt.-II	Double Circuit	State Sector	MSETCL	5.0	220.0
1056	1055	2018-05-31	Raipur - Doma	Double Circuit	State Sector	CSPTCL	118.0	220.0
1057	1056	2018-05-31	Yelanhanka CCPP - Yelanhanka(KPTCL)	Double Circuit	State Sector	KPTCL	1.0	220.0
1058	1057	2018-05-31	Gwalior-Morena (Quad) (C-WRTL-TBCB)	Double Circuit	Private Sector	APL	96.0	400.0
1059	1058	2018-06-30	Gadarwara - Warora PS (PWTL-TBCB)	Double Circuit	Central Sector	PGCIL	627.0	765.0
1060	1059	2018-06-30	Warora PS - Parli (PPTL-TBCB)	Double Circuit	Central Sector	PGCIL	694.0	765.0
1061	1060	2018-06-30	LILO of Exiting Neyveli TS-II - Pondycherry at NNTPS Gen. Yard	Double Circuit	Central Sector	PGCIL	7.0	400.0
1062	1061	2018-06-30	LILO of 400kV Gajwel - Yeddumallaram (Shankarpally) Ckt.-II at Narsapur S/S	Double Circuit	State Sector	TSTRANSCO	5.0	400.0
1063	1062	2018-06-30	LILO of one ckt. Kosamba - Choraina at Sanand-II GIDC	Double Circuit	State Sector	GETCO	89.0	400.0
1064	1063	2018-06-30	Barauni TPS Exte. - Hazipur	Double Circuit	State Sector	BSPTCL	214.0	220.0
1065	1064	2018-06-30	Budidampadu (PG) - Budidampadu	Single Circuit	State Sector	TSTRANSCO	1.0	220.0
1066	1065	2018-06-30	Darbhanga (Essel) - Darbhanga (BSPTCL)	Double Circuit	State Sector	BSPTCL	5.0	220.0
1067	1066	2018-06-30	Khaperkheda-II -Khaperkheda-I (Reorientation work of one ckt.)	Double Circuit	State Sector	MSETCL	1.0	220.0
1068	1067	2018-06-30	Legship - New Malli	Double Circuit	State Sector	SIKKIM	20.0	220.0
1069	1068	2018-06-30	LILO of Both ckt Badod -Kota - Modak at Suwasara S/s	Double Circuit	State Sector	MPPTCL	18.0	220.0
1070	1069	2018-06-30	LILO of Kasor - Vartej and Karamsad - Vartej at Pachchaam	Multiple Circuits	State Sector	GETCO	40.0	220.0
1071	1070	2018-06-30	LILO of Khara (HPS) - Shamli at Saharanpur (PG)	Double Circuit	State Sector	UPPTCL	8.0	220.0
1072	1071	2018-06-30	LILO of Sahibabad - Noida Sec-62 at Indirapuram	Double Circuit	State Sector	UPPTCL	7.0	220.0
1073	1072	2018-06-30	LILO of Simbhaoli - Shatabdinagar at Hapur (765)	Double Circuit	State Sector	UPPTCL	23.0	220.0
1074	1073	2018-06-30	Madhepura - Laukahi(BSPTCL)	Double Circuit	State Sector	BSPTCL	124.0	220.0
1075	1074	2018-06-30	Saharanpur (PG) -Sarsawa	Double Circuit	State Sector	UPPTCL	22.0	220.0
1076	1075	2018-07-31	LILO of Farakka - Jeerat line at Sagahdighi	Double Circuit	Central Sector	PGCIL	38.0	400.0
1077	1076	2018-07-31	Anta-Chhabra TPS	Single Circuit	State Sector	RVPNL	100.0	400.0
1078	1077	2018-07-31	Chittorgarh-Bhilwara	Double Circuit	State Sector	RVPNL	100.0	400.0
1079	1078	2018-07-31	Gani/ Panyam - Kurnool (GEC-II)	Double Circuit	State Sector	APTRANSCO	33.0	400.0
1080	1079	2018-07-31	LILO of Jaipur - Nirmal at Sundilla LI (Ckt.-I)	Double Circuit	State Sector	TSTRANSCO	28.0	400.0
1081	1080	2018-07-31	Guindy - Porur GIS (Cable)	Single Circuit	State Sector	TANTRANSCO	8.0	220.0
1082	1081	2018-07-31	Hapur (765) - Simbhaoli	Double Circuit	State Sector	UPPTCL	57.0	220.0
1083	1082	2018-07-31	Kayathar - Tuticorin	Double Circuit	State Sector	TANTRANSCO	113.0	220.0
1084	1083	2018-07-31	LILO of Amreli - Dhasa line at Botad	Double Circuit	State Sector	GETCO	100.0	220.0
1085	1084	2018-07-31	LILO of Bhugaon - Warora-I at Warora	Multiple Circuits	State Sector	MSETCL	40.0	220.0
1086	1085	2018-07-31	LILO of Harduaganj - Jahangirabad Ckt.-I at Rukhi	Double Circuit	State Sector	UPPTCL	69.0	220.0
1087	1086	2018-07-31	LILO of Loni - Muradnagar line at Ator	Double Circuit	State Sector	UPPTCL	12.0	220.0
1088	1087	2018-07-31	LILO of Narendra-Haveri at Bidnal (GEC-I)	Double Circuit	State Sector	KPTCL	31.0	220.0
1089	1088	2018-07-31	LILO of Shoolagiri - Karimanagalam at Uddanapalli	Double Circuit	State Sector	TANTRANSCO	1.0	220.0
1090	1089	2018-07-31	Mungeli - Kawardha	Double Circuit	State Sector	CSPTCL	77.0	220.0
1091	1090	2018-07-31	Veeranam-Tirunelveli (PG)(GEC-I)	Single Circuit on Double Circuit	State Sector	TANTRANSCO	31.0	220.0
1092	1091	2018-07-31	Champa (Pool) - Dharamiaygarh (Quad) (C-WRTL - TBCB)	Single Circuit	Private Sector	APL	51.0	765.0
1093	1092	2018-07-31	Suratgarh TPS- Bikaner	Double Circuit	Private Sector	APL	279.0	400.0
1094	1093	2018-08-31	Farakka - Baharampur (Twin HTLS)	Double Circuit	Central Sector	PGCIL	164.0	400.0
1095	1094	2018-08-31	LILO-In of Cuddapah - Hindupur at N.P. Kunta	Double Circuit	Central Sector	PGCIL	18.0	400.0
1096	1095	2018-08-31	Srikakulam - Garividi (QM) (PSITL - TBCB)	Double Circuit	Central Sector	PGCIL	288.0	400.0
1097	1096	2018-08-31	Akal -Jodhpur (New)	Double Circuit	State Sector	RVPNL	447.0	400.0
1098	1097	2018-08-31	Anta -Kota (PG) (Extension)	Double Circuit	State Sector	RVPNL	45.0	400.0
1099	1098	2018-08-31	LILO of Chabra TPS -Dahra at Anta (Ckt. -II)	Double Circuit	State Sector	RVPNL	1.0	400.0
1100	1099	2018-08-31	LILO of Jaipur - Nirmal at Sundilla LI (Ckt.-II)	Double Circuit	State Sector	TANTRANSCO	28.0	400.0
1101	1100	2018-08-31	Alipurduar - Alipurduar (PG)	Double Circuit	State Sector	WBSETCL	13.0	220.0
1102	1101	2018-08-31	Begusarai-Purnea line	Double Circuit	State Sector	BSPTCL	372.0	220.0
1103	1102	2018-08-31	Deepalpur - Rai Khewra at RGEC Kundli S/s	Multiple Circuits	State Sector	HVPNL	22.0	220.0
1104	1103	2018-08-31	Gavasad - Bhayali (DFCC) line	Double Circuit	State Sector	GETCO	47.0	220.0
1105	1104	2018-08-31	Gorakhpur - Hata	Double Circuit	State Sector	UPPTCL	53.0	220.0
1106	1105	2018-08-31	Hatkoti - Gumma	Double Circuit	State Sector	HPPTCL	52.0	220.0
1107	1106	2018-08-31	Jodhpur (New) - Barli (TK)	Double Circuit	State Sector	RVPNL	90.0	220.0
1108	1107	2018-08-31	Kishanganj (New) - Madhepura	Double Circuit	State Sector	BSPTCL	284.0	220.0
1109	1108	2018-08-31	Korba - Vishrampur (2nd Ckt.)	Double Circuit	State Sector	CSPTCL	155.0	220.0
1110	1109	2018-08-31	LILO of 2nd ckt. YTPP - Abdullahpur line at Rampur Kamboyan	Double Circuit	State Sector	HVPNL	100.0	220.0
1111	1110	2018-08-31	LILO of Bhanjanagar - Meramundali at Narasinghpur	Double Circuit	State Sector	OPTCL	10.0	220.0
1112	1111	2018-08-31	LILO of Rishikesh-Dehradun at Harrawala	Double Circuit	State Sector	PTCUL	1.0	220.0
1113	1112	2018-08-31	Mohangadda - Sarsawa	Double Circuit	State Sector	UPPTCL	22.0	220.0
1114	1113	2018-08-31	Radhanpur - Sankhari line	Double Circuit	State Sector	GETCO	96.0	220.0
1115	1114	2018-08-31	Stringing of 2nd Circuit of LILO of Korba - Vishrampur at Churri	Double Circuit	State Sector	CSPTCL	17.0	220.0
1116	1115	2018-08-31	Raigarh (Kotra) - Champa (Pool) (Quad) (C-WRTL-TBCB)	Single Circuit	Private Sector	APL	97.0	765.0
1117	1116	2018-08-31	Sipat STPS - Bilaspur (Quad) (STL-TBCB)	Single Circuit	Private Sector	APL	24.0	765.0
1118	1117	2018-08-31	Samba - Amargarh line (NRSS-XXIX TL - TBCB)	Double Circuit	Private Sector	SGL	547.0	400.0
1119	1118	2018-09-30	Tumkur (Pavagada) Pool - Hiriyur	Double Circuit	Central Sector	PGCIL	218.0	400.0
1120	1119	2018-09-30	(JandK) Drass - Kargil (Part of Alusteng-Drass-Kargil-Khalsti-Leh)	Single Circuit	Central Sector	PGCONSULTANCY	60.0	220.0
1121	1120	2018-09-30	IB - Lapanga	Double Circuit	State Sector	OPTCL	42.0	400.0
1122	1121	2018-09-30	Manali - Korattur	Double Circuit	State Sector	TANTRANSCO	6.0	400.0
1123	1122	2018-09-30	STPP (Jaipur) - Sundilla LI S/S	Double Circuit	State Sector	TSTRANSCO	28.0	400.0
1124	1123	2018-09-30	Construction of 220/220kV MC line for shifting of existing 220kV B1 B2 and B3 B4 lines at proposed HAL premises near Bidarehalldakaval village limits	Multiple Circuits	State Sector	KPTCL	12.0	220.0
1125	1124	2018-09-30	Domjur - N. Chanditala	Double Circuit	State Sector	WBSETCL	17.0	220.0
1126	1125	2018-09-30	Goindwal Sahib - Bottianwala	Double Circuit	State Sector	PSTCL	129.0	220.0
1127	1126	2018-09-30	Jayanagar (OPTCL) - Jayanagar (PGCIL)	Double Circuit	State Sector	OPTCL	17.0	220.0
1128	1127	2018-09-30	Karukadom - Kothamangalam	Multiple Circuits	State Sector	KSEB	14.0	220.0
1129	1128	2018-09-30	Keunjhar - Keunjhar PG	Double Circuit	State Sector	OPTCL	15.0	220.0
1130	1129	2018-09-30	LILO of Existing 220 kV Ajmer - KSG at at 400 kV GSS Ajmer	Double Circuit	State Sector	RVPNL	11.0	220.0
1131	1130	2018-09-30	LILO of one ckt. of STPS - Ratangarh at Halasar	Double Circuit	State Sector	RVPNL	7.0	220.0
1132	1131	2018-09-30	LILO of Shivalakha - Nanikhakhar at Kukma	Double Circuit	State Sector	GETCO	33.0	220.0
1133	1132	2018-09-30	LILO of SIDCUL Puhana at Pirankaliya (Imlikhera)	Double Circuit	State Sector	PTCUL	11.0	220.0
1134	1133	2018-09-30	Moga - Mehal Kalan	Double Circuit	State Sector	PSTCL	105.0	220.0
1135	1134	2018-09-30	Morena - Sabalgarh with LILO of one ckt. of line at Morena	Double Circuit	State Sector	MPPTCL	139.0	220.0
1136	1135	2018-09-30	Rajpura - Devigarh	Double Circuit	State Sector	PSTCL	74.0	220.0
1137	1136	2018-09-30	Sikandarabad - Rookhi (Siyana)	Double Circuit	State Sector	UPPTCL	116.0	220.0
1138	1137	2018-09-30	Singanayakanahalli - DG Plant Yelanhanka Station (UG Cable)	Double Circuit	State Sector	KPTCL	12.0	220.0
1139	1138	2018-09-30	Teesta LDP -III - Teesta LDP-IV	Single Circuit	State Sector	WBSETCL	21.0	220.0
1140	1139	2018-09-30	Mahan -Sipat	Double Circuit	Private Sector	EPTCL	673.0	400.0
1141	1140	2018-10-31	Jharsuguda - Dharamjaygarh line	Double Circuit	Central Sector	PGCIL	296.0	765.0
1142	1141	2018-10-31	LILO of Kurnool - Thirvualam line at Cuddapah	Double Circuit	Central Sector	PGCIL	190.0	765.0
1143	1142	2018-10-31	Salem PS - Madhugiri PS line	Single Circuit	Central Sector	PGCIL	243.0	765.0
1144	1143	2018-10-31	Cuddapah - Hindupur line (Q)	Double Circuit	Central Sector	PGCIL	338.0	400.0
1145	1144	2018-10-31	LILO of Both Ckt of Bamnauli - Samaypur at Tughlakabad	Multiple Circuits	Central Sector	PGCIL	114.0	400.0
1146	1145	2018-10-31	LILO-Out of Cuddapah - Hindupur line (Q) (Both Ckts.) at NP Kunta s/s	Double Circuit	Central Sector	PGCIL	19.0	400.0
1147	1146	2018-10-31	LILO of Sterlite - Meramundali at Lapanga 4oo kV s/s	Double Circuit	State Sector	OPTCL	14.0	400.0
1148	1147	2018-10-31	Sterlite - Lapanga line	Double Circuit	State Sector	OPTCL	37.0	400.0
1149	1148	2018-10-31	TMDC Podili - Sattapenalli line	Double Circuit	State Sector	APTRANSCO	215.0	400.0
1150	1149	2018-10-31	Neyveli 230/110 kV s/s - Eachangadu 230kV Feeder	Single Circuit	State Sector	TANTRANSCO	1.0	230.0
1151	1150	2018-10-31	NNTPS - Neyveli 230/110kV s/s	Double Circuit	State Sector	TANTRANSCO	2.0	230.0
1152	1151	2018-10-31	Ajmer (400 kV) - Bherunda (TK)	Double Circuit	State Sector	RVPNL	100.0	220.0
1153	1152	2018-10-31	Aligarh - Atrauli line	Double Circuit	State Sector	UPPTCL	77.0	220.0
1154	1153	2018-10-31	Khandwa - Chhanera line	Double Circuit	State Sector	MPPTCL	78.0	220.0
1155	1154	2018-10-31	LILO of one Ckt. of Hadala - Sartanpar line at Wankaner on M/C towers	Double Circuit	State Sector	GETCO	6.0	220.0
1156	1155	2018-10-31	LILO of one Ckt. of Vita - Miraj at Alkud s/s	Double Circuit	State Sector	MSETCL	27.0	220.0
1157	1156	2018-10-31	Mendhigiri - Alkud s/s	Double Circuit	State Sector	MSETCL	110.0	220.0
1158	1157	2018-11-30	Angul - Jharsauguda	Double Circuit	Central Sector	PGCIL	590.0	765.0
1159	1158	2018-11-30	Silchar - Melriat (New)	Double Circuit	Central Sector	PGCIL	287.0	400.0
1160	1159	2018-11-30	LILO of Jodhpur -Merta at Pooling station Badla	Double Circuit	State Sector	RVPNL	405.0	400.0
1161	1160	2018-11-30	LILO of Uravakonda-Jammalamadugu to the proposed at Talaricheruvu	Double Circuit	State Sector	APTRANSCO	2.0	400.0
1162	1161	2018-11-30	Dhod-Danta Ramgarh	Single Circuit	State Sector	RVPNL	31.0	220.0
1163	1162	2018-11-30	Madhugiri - Pavagada	Double Circuit	State Sector	KPTCL	120.0	220.0
1164	1163	2018-12-31	Vindhyachal PS - Jabalpur PS (PJTL -TBCB)	Double Circuit	Central Sector	PGCIL	749.0	765.0
1165	1164	2018-12-31	Julwaniya - Sendhwa (GEC-I)	Double Circuit	State Sector	MPPTCL	71.0	220.0
1166	1165	2018-12-31	Kheralu - Dharewada (DFCC) line	Double Circuit	State Sector	GETCO	53.0	220.0
1167	1166	2018-12-31	LILO of 220 kV Maath (400) - Meetau (Hathras ) line at Maath (220)	Double Circuit	State Sector	UPPTCL	3.0	220.0
1168	1167	2018-12-31	LILO of both Ckt. of Indore-II (Jaitpura)- Ujjain line at Indore (PGCIL)765kV S/S	Double Circuit	State Sector	MPPTCL	24.0	220.0
1169	1168	2018-12-31	LILO of Gokarna-Sagardighi line at Sagardighi 220kV GIS (ACSR Zebra)	Double Circuit	State Sector	WBSETCL	11.0	220.0
1170	1169	2018-12-31	LILO of one circuit of 220 kV D/C Kadana - Godhara line at 220 kV Zalod S/S	Double Circuit	State Sector	GETCO	124.0	220.0
1171	1170	2018-12-31	LILO of one ckt. Daultabad-IMT Manesar line at Gurgaon Sec.- 85	Double Circuit	State Sector	HVPNL	2.0	220.0
1172	1171	2018-12-31	Jharsuguda (Sundargarh) - Raipur (OGP-IITL - TBCB)	Double Circuit	Private Sector	SGL	610.0	765.0
1173	1172	2018-12-31	Neemrana (PG) - Dhanonda (HVPNL) (GPTL - TBCB)	Double Circuit	Private Sector	SGL	93.0	400.0
1174	1173	2019-01-31	Salem - Madhugiri (PNMTL-TBCB)	Single Circuit	Central Sector	PGCIL	219.0	765.0
1175	1174	2019-01-31	Biharshariff (Ckt. III and IV) - Kahalgaon (NTPC)	Double Circuit	Central Sector	PGCIL	26.0	400.0
1176	1175	2019-01-31	(JnK) Alusteng-Drass ( (Part of Alusteng - Drass -Kargil - Khalsti-Leh)	Single Circuit	Central Sector	PGCONSULTANCY	115.0	220.0
1177	1176	2019-01-31	Hindupur - Uravakonda Quad Moose line	Double Circuit	State Sector	APTRANSCO	258.0	400.0
1178	1177	2019-01-31	Jaisalmer -2 -Barmer line	Double Circuit	State Sector	RVPNL	234.0	400.0
1179	1178	2019-01-31	Teesta -III - Kishanganj line (Executing Agency -TVPTL)	Double Circuit	State Sector	SIKKIM	427.0	400.0
1180	1179	2019-01-31	LILO of Myvady - Pugalur at Kurukathi	Double Circuit	State Sector	TANTRANSCO	62.0	230.0
1181	1180	2019-01-31	LILO of one ckt. Indravati - Theruvali at Kashipur	Double Circuit	State Sector	OPTCL	6.0	220.0
1182	1181	2019-02-28	Tanda (NTPC) - Tanda (New) line	Double Circuit	State Sector	UPPTCL	42.0	220.0
1183	1182	2019-02-28	LILO of 220 kV S/C KTPS - Modak line	Double Circuit	Private Sector	APL	5.0	220.0
1184	1183	2019-02-28	LILO of Kota - Badod lineat Ranpur GSS	Double Circuit	Private Sector	APL	5.0	220.0
1185	1184	2019-02-28	Banaskanta - Chittorgarh line	Double Circuit	Central Sector	PGCIL	604.0	765.0
1186	1185	2019-02-28	Bhuj Pool - Banaskanta line	Double Circuit	Central Sector	PGCIL	578.0	765.0
1187	1186	2019-02-28	Banaskanta - Sankhari line	Double Circuit	Central Sector	PGCIL	43.0	400.0
1188	1187	2019-02-28	Cuddapah - Madhugiri (QM) (PSITL - TBCB)	Double Circuit	Central Sector	PGCIL	486.0	400.0
1189	1188	2019-02-28	LILO of Farakka - Jeerat line at Baharampur	Single Circuit	Central Sector	PGCIL	3.0	400.0
1190	1189	2019-02-28	LILO of Subhashgram - Jeerat at Rajarhat	Single Circuit	Central Sector	PGCIL	8.0	400.0
1191	1190	2019-02-28	LILO of Agra - Bharatpur at Agra line	Single Circuit	Central Sector	PGCIL	111.0	220.0
1192	1191	2019-02-28	NLC - Karaikal line	Double Circuit	Central Sector	PGCIL	190.0	220.0
1193	1192	2019-02-28	LILO of both Ckt. of Suryapet - Shankarpally(ckt-II) Kethireddypalli (Manikonda) SS	Double Circuit	State Sector	TSTRANSCO	42.0	400.0
1194	1193	2019-02-28	LILO of both Ckts of Nagda - Rajgarh at Badnawar	Double Circuit	State Sector	MPPTCL	16.0	400.0
1195	1194	2019-02-28	LILO of one ckt of 400 kV D/C Kosamba - Chorania line at 400 kV Pachchham S/s	Double Circuit	State Sector	GETCO	46.0	400.0
1196	1195	2019-02-28	LILO of one ckt. Ukai - Kosamba at Vav S/s	Double Circuit	State Sector	GETCO	62.0	400.0
1197	1196	2019-02-28	LILO of Rewa (Allahabad) - Meja lie at Masauli	Double Circuit	State Sector	UPPTCL	65.0	400.0
1198	1197	2019-02-28	Pithampur - Badnawar DCDS (Quad Moose ) line	Double Circuit	State Sector	MPPTCL	71.0	400.0
1199	1198	2019-02-28	Shri Singaji TPS - Pithampur DCDS (QM) line	Double Circuit	State Sector	MPPTCL	281.0	400.0
1200	1199	2019-02-28	Kamudhi - Kavanoor Ckt-II	Double Circuit	State Sector	TANTRANSCO	56.0	230.0
1201	1200	2019-02-28	Bahraich - Gonda (400) Ckt-II	Double Circuit	State Sector	UPPTCL	74.0	220.0
1202	1201	2019-02-28	Chandrapur-II - Chandrapur MIDC (Tadali)	Multiple Circuits	State Sector	MSETCL	80.0	220.0
1203	1202	2019-02-28	Gaurichak - Bihta (New) line	Double Circuit	State Sector	BSPTCL	82.0	220.0
1204	1203	2019-02-28	Inter-connector between Sailana - Ratlam switching (GEC-I)	Double Circuit	State Sector	MPPTCL	67.0	220.0
1205	1204	2019-02-28	LILO of Badarpur TPS - Mehrauli at Tughlakabad	Double Circuit	State Sector	DTL	3.0	220.0
1206	1205	2019-02-28	LILO of both ckts. Sec.-72 - Roj-ka-Meo line on M/C and D/C towers at Gurugram Sec.-69 S/S	Double Circuit	State Sector	HVPNL	3.0	220.0
1207	1206	2019-02-28	LILO of one Ckt. Jabalpur - Amarkantak at Gorabazar JBP	Double Circuit	State Sector	MPPTCL	12.0	220.0
1208	1207	2019-02-28	LILO of Parli - Osmanabad line at Parli (PG)	Double Circuit	State Sector	MSETCL	5.0	220.0
1209	1208	2019-02-28	Okhla - Tughlakabad	Double Circuit	State Sector	DTL	3.0	220.0
1210	1209	2019-02-28	Rewa Road Allahabad - Pahari Chitrakoot line	Double Circuit	State Sector	UPPTCL	182.0	220.0
1211	1210	2019-02-28	Sirohi-Pindwara line	Single Circuit	State Sector	RVPNL	23.0	220.0
1212	1211	2019-03-31	Dharmapuri (Salem New) - Somanahalli	Double Circuit	Central Sector	PGCIL	243.0	400.0
1213	1212	2019-03-31	Kota - Jaipur (South)	Double Circuit	Central Sector	PGCIL	360.0	400.0
1214	1213	2019-03-31	Mundra UMPP - Bhuj Pool line	Double Circuit	Central Sector	PGCIL	196.0	400.0
1215	1214	2019-03-31	Gr. Noida (765) - Noida Sec-148 line	Double Circuit	State Sector	UPPTCL	94.0	400.0
1216	1215	2019-03-31	LILO of Azamgarh - Sultanpur at Tanda TPS Extn.	Double Circuit	State Sector	UPPTCL	133.0	400.0
1217	1216	2019-03-31	LILO of Bhilai - Seoni at Balaghat / Kirnapur	Double Circuit	State Sector	MPPTCL	7.0	400.0
1218	1217	2019-03-31	LILO of both Ckts. of Mundra-Zerda at Charanka S/S (ACSR Twin Moose Conductor )	Double Circuit	State Sector	GETCO	26.0	400.0
1219	1218	2019-03-31	Badnawar - Kanwan line (GEC-I)	Double Circuit	State Sector	MPPTCL	62.0	220.0
1220	1219	2019-03-31	Gowribidnur - Mittemari Line	Double Circuit	State Sector	KPTCL	93.0	220.0
1221	1220	2019-03-31	Hata - Deoria line	Double Circuit	State Sector	UPPTCL	79.0	220.0
1222	1221	2019-03-31	LILO of 2nd ckt. Nagda - Neemuch line at Daloda s/s	Double Circuit	State Sector	MPPTCL	20.0	220.0
1223	1222	2019-03-31	LILO of Both ckt of Tebhda - Nyara line at Moti Gop S/S (M/C line AL-59)	Double Circuit	State Sector	GETCO	57.0	220.0
1224	1223	2019-03-31	LILO of Dautabad -Mau line at Hub Gurgaon S/s	Double Circuit	State Sector	HVPNL	13.0	220.0
1225	1224	2019-03-31	LILO of one ckt. Gandhinagar TPS - Chhatral line at Vadavi (AL-59)	Double Circuit	State Sector	GETCO	25.0	220.0
1226	1225	2019-03-31	LILO of one Ckt. Muradnagar - Sahibabad line at Pratap Vihar	Double Circuit	State Sector	UPPTCL	7.0	220.0
1227	1226	2019-03-31	LILO of Pehowa - Kaul at Bhadson	Double Circuit	State Sector	HVPNL	74.0	220.0
1228	1227	2019-03-31	LILO of Single ckt. of Mobha - Mangrol at Amod	Double Circuit	State Sector	GETCO	16.0	220.0
1229	1228	2019-03-31	LILO on Ambazari - Amravati at Karanja s/s	Double Circuit	State Sector	MSETCL	1.0	220.0
1230	1229	2019-03-31	LILO on Khadka-Amalner at Kekatnimbhora	Double Circuit	State Sector	MSETCL	1.0	220.0
1231	1230	2019-03-31	Mokha-Chromeni line	Single Circuit	State Sector	GETCO	6.0	220.0
1232	1231	2019-03-31	Nerul-Seawood TSS (U/G Cable Ckt -I)	Single Circuit	State Sector	MSETCL	1.0	220.0
1233	1232	2019-03-31	Bilaspur - Rajnandgaon (hexa) (STL-TBCB)	Double Circuit	Private Sector	APL	324.0	765.0
1234	1233	2019-03-31	Raipur Pool - Rajnandgaon (hexa) (RRWTL-TBCB)	Double Circuit	Private Sector	APL	80.0	765.0
1235	1234	2019-03-31	Rajnandgaon - New Pooling Station Warora (RRWTL - TBCB)	Double Circuit	Private Sector	APL	532.0	765.0
1236	1235	2019-03-31	Kishanganj(PG) - Darbhanga (DMTCL) (ATL - TBCB)	Double Circuit	Private Sector	KPTL	418.0	400.0
1237	1236	2019-04-30	Bhadla (PG) - Bhadla (RVPN) line	Double Circuit	Central Sector	PGCIL	53.0	400.0
1238	1237	2019-04-30	LILO of one ckt. Jhanor - Navsari at Vav S/s	Double Circuit	State Sector	GETCO	20.0	400.0
1239	1238	2019-04-30	Banda-Chitrakoot Line	Double Circuit	State Sector	UPPTCL	226.0	220.0
1240	1239	2019-04-30	Gorakhpur (PG)-Gola line	Double Circuit	State Sector	UPPTCL	82.0	220.0
1241	1240	2019-04-30	Hapur(765) - Faridnagar line	Single Circuit	State Sector	UPPTCL	11.0	220.0
1242	1241	2019-04-30	Kalikiri - Madanapalli line	Double Circuit	State Sector	APTRANSCO	60.0	220.0
1243	1242	2019-04-30	LILO of Gr .Noida -Noida Sec-129 at Noida Sec-148	Double Circuit	State Sector	UPPTCL	1.0	220.0
1244	1243	2019-04-30	LILO of one Ckt. of Badshahpur Pali at Sec.-65 Gurgaon	Double Circuit	State Sector	HVPNL	3.0	220.0
1245	1244	2019-04-30	Sultanpur-Sangipur LILO Section at Amethi	Double Circuit	State Sector	UPPTCL	18.0	220.0
1246	1245	2019-05-31	Barmer-Bhinmal line	Double Circuit	State Sector	RVPNL	288.0	400.0
1247	1246	2019-05-31	Jangaon - Tippapur LI	Double Circuit	State Sector	TSTRANSCO	138.0	400.0
1248	1247	2019-05-31	Kayathar - Thennampatty	Double Circuit	State Sector	TANTRANSCO	48.0	400.0
1249	1248	2019-05-31	Bareilly (400) - Pilibhit Ckt.-II	Single Circuit	State Sector	UPPTCL	39.0	220.0
1250	1249	2019-05-31	Bhanjanagar - Aska	Double Circuit	State Sector	OPTCL	57.0	220.0
1251	1250	2019-05-31	LILO of both Ckt. of 220kV Mobha - Mangrol line at 220kV Amod (Balanced portion)	Double Circuit	State Sector	GETCO	46.0	220.0
1252	1251	2019-05-31	LILO of Gr. Noida (400) - Noida Sec-148 line at R.C. Green	Double Circuit	State Sector	UPPTCL	9.0	220.0
1253	1252	2019-05-31	LILO of Hathras - Gokul at Mathura	Double Circuit	State Sector	UPPTCL	120.0	220.0
1254	1253	2019-05-31	Sohawal - Tanda	Double Circuit	State Sector	UPPTCL	232.0	220.0
1255	1254	2019-06-30	LILO of Lonikhand (MSETCL)- Kalwa at Navi Mumbai	Single Circuit	Central Sector	PGCIL	16.0	400.0
1256	1255	2019-06-30	Julurupadu - Jangaon	Double Circuit	State Sector	TSTRANSCO	349.0	400.0
1257	1256	2019-06-30	Guindy - R.A.Puram (UG Cable)	Single Circuit	State Sector	TANTRANSCO	8.0	230.0
1258	1257	2019-06-30	Bareilly - C.B. Ganj	Single Circuit	State Sector	UPPTCL	24.0	220.0
1259	1258	2019-06-30	Bareilly -Dohna	Single Circuit	State Sector	UPPTCL	10.0	220.0
1260	1259	2019-06-30	Betul - Gudgaon (GEC-I)	Double Circuit	State Sector	MPPTCL	94.0	220.0
1261	1260	2019-06-30	Hadala - Khorana	Double Circuit	State Sector	GETCO	37.0	220.0
1262	1261	2019-06-30	Kumbhari (PGCIL) - Bale	Double Circuit	State Sector	MSETCL	58.0	220.0
1263	1262	2019-06-30	LILO of Noida Sec-20-BTPS line at Botanical Garden	Double Circuit	State Sector	UPPTCL	3.0	220.0
1264	1263	2019-06-30	LILO of one Ckt. Bastara - Kaul at Bhadson	Double Circuit	State Sector	HVPNL	60.0	220.0
1265	1264	2019-07-31	Ajmer (new) - Bikaner line	Double Circuit	Central Sector	PGCIL	526.0	765.0
1266	1265	2019-07-31	Chilkaluraipeta - Narasaraopeta (QM) (PSITL - TBCB)	Double Circuit	Central Sector	PGCIL	60.0	400.0
1267	1266	2019-07-31	LILO of One ckt. of Bhadla (RVPN) - Bikaner (RVPN) line at Bikaner (New)	Double Circuit	Central Sector	PGCIL	18.0	400.0
1268	1267	2019-07-31	Nabinagar-II - Patna line (Q)	Double Circuit	Central Sector	PGCIL	282.0	400.0
1269	1268	2019-07-31	Kishanganga - Wagoora line	Double Circuit	Central Sector	PGCIL	232.0	220.0
1270	1269	2019-07-31	LILO of Arambag - Durgapur at N. Chanditala	Double Circuit	State Sector	WBSETCL	97.0	400.0
1271	1270	2019-07-31	Rampura - Jagalur (Hiremallanahole)	Double Circuit	State Sector	KPTCL	130.0	400.0
1272	1271	2019-07-31	Jagalur (Hiremallanahole) - Thallak	Double Circuit	State Sector	KPTCL	55.0	220.0
1273	1272	2019-07-31	LILO of Mainpuri- Sikandrarao at Jawarharpur TPS	Single Circuit	State Sector	UPPTCL	22.0	220.0
1274	1273	2019-07-31	LILO of Malda (PG) - Dalkhola (PG) at Gozol	Double Circuit	State Sector	WBSETCL	6.0	220.0
1275	1274	2019-07-31	LILO of one ckt of Indravati - Thervali line at Jaypatna	Double Circuit	State Sector	OPTCL	32.0	220.0
1276	1275	2019-07-31	Sahupuri -Raja ka Talab	Single Circuit	State Sector	UPPTCL	65.0	220.0
1277	1276	2019-07-31	Aligarh - Prithala (GPTL - TBCB)	Double Circuit	Private Sector	SGL	99.0	400.0
1278	1277	2019-08-31	Shoolagiri - Hosur S/s	Single Circuit	State Sector	TANTRANSCO	19.0	230.0
1279	1278	2019-08-31	Shoolagiri - Uddanapalli	Single Circuit	State Sector	TANTRANSCO	18.0	230.0
1280	1279	2019-08-31	Deoria - Rasra	Single Circuit	State Sector	UPPTCL	83.0	220.0
1281	1280	2019-08-31	LILO of 220 kV Baghpat - Muradnagar-II at Mandola Vihar	Double Circuit	State Sector	UPPTCL	20.0	220.0
1282	1281	2019-08-31	LILO of 220kV Dunara - Laitpur TPS Ckt-II at Babina	Double Circuit	State Sector	UPPTCL	15.0	220.0
1283	1282	2019-08-31	LILO of one ckt. Paras - Balapur at Malkapur s/s	Multiple Circuits	State Sector	MSETCL	144.0	220.0
1284	1283	2019-08-31	Mator PG (400) - Partapur (Jagriti Vihar) line	Single Circuit	State Sector	UPPTCL	28.0	220.0
1285	1284	2019-08-31	Moti Paneli - Open wind line with AL-59 Conductor	Double Circuit	State Sector	GETCO	28.0	220.0
1286	1285	2019-08-31	Nakodar - Ladhowal	Double Circuit	State Sector	PSTCL	70.0	220.0
1287	1286	2019-08-31	Satna - Chhatarpur (2nd ckt)	Single Circuit	State Sector	MPPTCL	160.0	220.0
1288	1287	2019-08-31	Vasanthanarasapura - Madhugiri line	Double Circuit	State Sector	KPTCL	89.0	220.0
1289	1288	2019-08-31	LILO of One Circuit of 765 kV Aurangabad - Padghe D/C (hexa) line at Pune (C-WRTL - TBCB	Double Circuit	Private Sector	APL	129.0	765.0
1290	1289	2019-09-30	Bhadla - Bikaner line	Double Circuit	Central Sector	PGCIL	340.0	765.0
1291	1290	2019-09-30	Edamon (KSEB) - Muvattupuzha (PG) Quad) line (1st Ckt.)	Double Circuit	Central Sector	PGCIL	149.0	400.0
1292	1291	2019-09-30	B3 - B4 - Brindavan Alloyas line	Double Circuit	State Sector	KPTCL	1.0	220.0
1293	1292	2019-09-30	Badnera - Ner line	Single Circuit + Double Circuit	State Sector	MSETCL	43.0	220.0
1294	1293	2019-09-30	Boksampalli - KIA Motors Switching Station and 220/33kV S/S Ammavaripalli in Anantapur District	Double Circuit	State Sector	APTRANSCO	35.0	220.0
1295	1294	2019-09-30	Charla - Meerut line	Single Circuit	State Sector	UPPTCL	5.0	220.0
1296	1295	2019-09-30	LILO of both ckts. Palla - Palli at Sector- 46 Faridabad S/S	Double Circuit	State Sector	HVPNL	9.0	220.0
1297	1296	2019-09-30	LILO of Nannur - Regumanugadda line at 220/11kV Brahmmanakokur s/s	Double Circuit	State Sector	APTRANSCO	27.0	220.0
1298	1297	2019-09-30	LILO of Tadikonda - Ongole line to 220/132kV Prathipadu	Double Circuit	State Sector	APTRANSCO	4.0	220.0
1299	1298	2019-09-30	Partapur (Jagriti Vihar) - Hapur	Double Circuit	State Sector	UPPTCL	53.0	220.0
1300	1299	2019-09-30	Sattenapalli - Guntur	Double Circuit	State Sector	APTRANSCO	96.0	220.0
1301	1300	2019-09-30	Shevgaon - Pathardi line at Amrapur S/S	Double Circuit	State Sector	MSETCL	4.0	220.0
1302	1301	2019-10-31	Singrauli - Allahabad line	Single Circuit	Central Sector	PGCIL	155.0	400.0
1303	1302	2019-10-31	LILO of Wanakbori -Soja line at Dehgam (PG) S/S	Double Circuit	State Sector	GETCO	13.0	400.0
1304	1303	2019-10-31	Charor -Banala	Double Circuit	State Sector	HPPTCL	36.0	220.0
1305	1304	2019-10-31	Govindpur - Dumka	Double Circuit	State Sector	JUSNL	203.0	220.0
1306	1305	2019-10-31	LILO of Gokarna - Krishnanagar at Rejinagar	Double Circuit	State Sector	WBSETCL	9.0	220.0
1307	1306	2019-10-31	LILO of Gurur - Barsoor at Narayanpur	Double Circuit	State Sector	CSPTCL	1.0	220.0
1308	1307	2019-10-31	LILO of Hebbal - Hoody Sc line to proposed ITI S/s	Single Circuit	State Sector	KPTCL	5.0	220.0
1309	1308	2019-10-31	LILO of Mopka - Bharatpur and Mopka - Siltara at Dherdehi 220 kV S/S (Bilaspur)(on Multi circuit tower)	Double Circuit	State Sector	CSPTCL	128.0	220.0
1310	1309	2019-10-31	LILO of one ckt. of KTPS- Manuguru - proposed Pump House-1 at B.G. Kottur line	Double Circuit	State Sector	TSTRANSCO	1.0	220.0
1311	1310	2019-10-31	LILO of Sultanpur - Sangipur First Ckt. at Amethi	Double Circuit	State Sector	UPPTCL	7.0	220.0
1312	1311	2019-10-31	Patna (PG) - Khagaul (BSPTCL)	Double Circuit	State Sector	BSPTCL	26.0	220.0
1313	1312	2019-10-31	Soja - Joumang (DFCC) line	Double Circuit	State Sector	GETCO	44.0	220.0
1314	1313	2019-10-31	Unnao - Phoolbagh (Kanpur ) line	Double Circuit	State Sector	UPPTCL	57.0	220.0
1315	1314	2019-11-30	400 kV S/C New Purnear - Gokarna line and 400 kV S/C New Purnear - Farakka line (part of Rajarhat - Purnea line)	Single Circuit	Central Sector	PGCIL	302.0	400.0
1316	1315	2019-11-30	Common point A of Thervaikandigai - Manali (8a)	Double Circuit	State Sector	TANTRANSCO	54.0	400.0
1317	1316	2019-11-30	Julurupadu - Manuguru TPP	Double Circuit	State Sector	TSTRANSCO	225.0	400.0
1318	1317	2019-11-30	NCTPS - Alamathy Common Point - B (8b1)	Double Circuit	State Sector	TANTRANSCO	4.0	400.0
1319	1318	2019-11-30	Periapanachery - Porur (UG Cable)	Single Circuit	State Sector	TANTRANSCO	7.0	230.0
1320	1319	2019-11-30	Bongaigaon TPS - Rangia (Salakati)	Double Circuit	State Sector	AEGCL	324.0	220.0
1321	1320	2019-11-30	GCR Chandrapur - Sicom line	Double Circuit	State Sector	MSETCL	13.0	220.0
1322	1321	2019-11-30	LILO of both Ckt. of Badnagar- Ratlam At Badnawar 400 kV S/S	Double Circuit	State Sector	MPPTCL	28.0	220.0
1323	1322	2019-11-30	LILO of Ratlam-Daloda line at Jaora (GEC-I) (one ckt.)	Double Circuit	State Sector	MPPTCL	4.0	220.0
1324	1323	2019-11-30	LILO of T.K. Halli - Madhuvanahally - proposed 220/66 kV SFC S/s at Shivanasamudra (Hebbani Village)	Double Circuit	State Sector	KPTCL	9.0	220.0
1325	1324	2019-11-30	LILO of Vapi - Khadoli line at Vaghchhipa s/s	Double Circuit	State Sector	DNH	5.0	220.0
1326	1325	2019-11-30	LILO on both ckt Parli - Harangul line at Parli (PG)	Double Circuit	State Sector	MSETCL	25.0	220.0
1327	1326	2019-11-30	Second circuiting of Ratlam - Daloda line (GEC-I)	Double Circuit	State Sector	MPPTCL	37.0	220.0
1328	1327	2019-11-30	Prithala - Kadarpur HTLS line (GPTL - TBCB)	Double Circuit	Private Sector	SGL	58.0	400.0
1329	1328	2019-12-31	Edaomon (KSEB) - Muvattupuzha (PG) (Quad) line (2nd Ckt.)	Double Circuit	Central Sector	PGCIL	148.0	400.0
1330	1329	2019-12-31	Madhugiri - Yelhanka line (Quad) line (1st Ckt.)	Double Circuit	Central Sector	PGCIL	66.0	400.0
1331	1330	2019-12-31	Re-conductoring of New Purnea - Purnea line	Double Circuit	Central Sector	PGCIL	2.0	220.0
1332	1331	2019-12-31	LILO of Raita - Jagdalpur at Kurud	Double Circuit	State Sector	CSPTCL	2.0	400.0
1333	1332	2019-12-31	TPS-II - Neyveli 230kV S/S	Double Circuit	State Sector	TANTRANSCO	10.0	230.0
1334	1333	2019-12-31	2nd Ckt. of 220 kV Tilwani - Miraj line (From loc no 4 to 43)	Single Circuit on Double Circuit	State Sector	MSETCL	13.0	220.0
1335	1334	2019-12-31	DCDS Barsoor - Jagdalpur line	Double Circuit	State Sector	CSPTCL	177.0	220.0
1336	1335	2019-12-31	Hatia (JUSNL) - Namkum (PGCIL)	Double Circuit	State Sector	JUSNL	65.0	220.0
1337	1336	2019-12-31	Kavanoor - Karaikudi (Existing)	Double Circuit	State Sector	TANTRANSCO	176.0	220.0
1338	1337	2019-12-31	LILO of 220 kV KTS- Lower Sileru-I line at 220/11kV VK Ramavaram LI SS	Double Circuit	State Sector	TSTRANSCO	3.0	220.0
1339	1338	2019-12-31	LILO of both ckt. Fatehabad - Rania line at 220kV Mehna Khera	Double Circuit	State Sector	HVPNL	92.0	220.0
1340	1339	2020-01-31	Chilkaluripeta - Cudappah (PSITL - TBCB)	Double Circuit	Central Sector	PGCIL	577.0	765.0
1341	1340	2020-01-31	Vemagiri - Chilkaluripeta (PSITL -TBCB)	Double Circuit	Central Sector	PGCIL	558.0	765.0
1342	1341	2020-01-31	Nirmal - Dichpally at Jangaon (QM) line	Double Circuit	State Sector	TSTRANSCO	120.0	400.0
1343	1342	2020-01-31	Balimela - Malkangiri 2nd Ckt.	Single Circuit	State Sector	OPTCL	21.0	220.0
1344	1343	2020-01-31	LILO of existing KTS - Shapurnagar at Waddekothapally (Jangaon District)	Single Circuit	State Sector	TSTRANSCO	17.0	220.0
1345	1344	2020-01-31	LILO of existing KTS-Shapurnagar proposed line at Jangaon	Single Circuit	State Sector	TSTRANSCO	45.0	220.0
1346	1345	2020-01-31	LILO of existing Waddekothapally - Bhongir (Both Ckts.) to proposed at Jangaon (Jangaon District)	Multiple Circuits	State Sector	TSTRANSCO	104.0	220.0
1347	1346	2020-01-31	LILO of Savarkundla - Sagapara line at Gariyadhar S/s	Double Circuit	State Sector	GETCO	15.0	220.0
1348	1347	2020-01-31	Makhu - Rashiana	Double Circuit	State Sector	PSTCL	92.0	220.0
1349	1348	2020-01-31	Sabalgarh - Sheopurline (1st Ckt.)	Double Circuit	State Sector	MPPTCL	106.0	220.0
1350	1349	2020-01-31	Shivarampally - Asifnagar 2nd ckt.	Single Circuit	State Sector	TSTRANSCO	4.0	220.0
1351	1350	2020-01-31	Ghatampur - Kanpur line	Double Circuit	Private Sector	APL	98.0	400.0
1352	1351	2020-02-29	Madhugiri - Yelhanka line (Quad) line (2nd Ckts) line	Double Circuit	Central Sector	PGCIL	65.0	400.0
1353	1352	2020-02-29	Sector-148 t Sector-123 Noida	Double Circuit	State Sector	UPPTCL	40.0	400.0
1354	1353	2020-02-29	Tervaikandigai - Korattur common point to Kovilpathagai OH-UG Junction Point (Portion of Thervaikandigai - Korattur 400 kV S/C line)	Double Circuit	State Sector	TANTRANSCO	19.0	400.0
1355	1354	2020-02-29	Abdullapur (PG) - Rajokheri	Double Circuit	State Sector	HVPNL	44.0	220.0
1356	1355	2020-02-29	LILO of Bareilly - Shahjahanpur line at Faridpur	Double Circuit	State Sector	UPPTCL	8.0	220.0
1357	1356	2020-02-29	LILO of both ckts of Rangala Rajpur - Palwal at Prithala	Multiple Circuits	State Sector	HVPNL	25.0	220.0
1358	1357	2020-02-29	Neemuch - Ratangarh line (GEC-I)	Double Circuit	State Sector	MPPTCL	88.0	220.0
1359	1358	2020-02-29	(PMDP - Kashmir) LILO of Zainkote - Delina at Kunzar (Sterlite S/S)	Double Circuit	State Sector	JKPDD	20.0	220.0
1360	1359	2020-02-29	Zainakote - Alusteng (Portion of Zainkote -Alusteng - Mirbazar 220 kV D/C line)	Double Circuit	State Sector	JKPDD	92.0	220.0
1361	1360	2020-02-29	Alipurduar (PG) - Siliguri (PG) (ATL - TBCB)	Double Circuit	Private Sector	KPTL	231.0	400.0
1362	1361	2020-03-31	Bikaner - Moga (PG) line	Double Circuit	Central Sector	PGCIL	734.0	765.0
1363	1362	2020-03-31	Vadavi-Halvad (Pkg 1) ( Vadavi to AP-41)	Double Circuit	State Sector	GETCO	149.0	400.0
1364	1363	2020-03-31	Ulundurpet 230 kV SS to the proposed Sankarapuram 230 kV SS	Single Circuit on Double Circuit	State Sector	TANTRANSCO	58.0	230.0
1365	1364	2020-03-31	LILO of 220kV Vapi - Tarapur line at 220kV Sarigam	Multiple Circuits	State Sector	GETCO	13.0	220.0
1366	1365	2020-03-31	LILO of one ckt. of 220KV Humbran - Ferozpur Road (Ludhiana) at 220KV Ladowal	Double Circuit	State Sector	PSTCL	25.0	220.0
1367	1366	2020-03-31	Khandwa Pool - Indore (KTL - TBCB)	Double Circuit	Private Sector	SGL	180.0	765.0
1368	1367	2020-03-31	Hiriyur - Mysore line (Ckt-I)	Double Circuit	Private Sector	PGCIL	206.0	400.0
1369	1368	2020-03-31	Kadarpur - Sohna Road (GPTL - TBCB)	Double Circuit	Private Sector	SGL	21.0	400.0
1370	1369	2020-03-31	Khargone TPP - Khandwa Pool (Q) (KTL - TBCB)	Double Circuit	Private Sector	SGL	50.0	400.0
1371	1370	2020-03-31	LILO of Gurgaon - Manesar at Sohna Road (GPTL - TBCB)	Double Circuit	Private Sector	SGL	2.0	400.0
1372	1371	2020-04-30	Tehri Pooling Station - Meerut (Remaining part)	Single Circuit	Central Sector	PGCIL	1.0	765.0
1373	1372	2020-04-30	Hiriyur - Mysore line (Ckt.-II)	Double Circuit	Central Sector	PGCIL	206.0	400.0
1374	1373	2020-04-30	Neyveli - Kadalangudi line	Single Circuit	State Sector	TANTRANSCO	77.0	230.0
1375	1374	2020-04-30	Jagalur (Hiremallanahole) - Kudligi	Double Circuit	State Sector	KPTCL	83.0	220.0
1376	1375	2020-04-30	Kothipura (Ramanagara) - Tubinakere	Double Circuit	State Sector	KPTCL	142.0	220.0
1377	1376	2020-05-31	Baharampur (PG) -Bheramerar (Bangladesh) line (2nd Ckt.) - India Portion	Double Circuit	Central Sector	PGCIL	172.0	400.0
1378	1377	2020-05-31	LILO of Meramundali - Duburi Ckt-I at Goda	Single Circuit	State Sector	OPTCL	12.0	220.0
1379	1378	2020-05-31	LILO of one Ckt. of Bhopal - Hoshangabad at Adampur	Double Circuit	State Sector	MPPTCL	6.0	220.0
1380	1379	2020-06-30	Charging of Tehri Pooling - Meerut line (2nd Ckt.)	Single Circuit	Central Sector	PGCIL	1.0	765.0
1381	1380	2020-06-30	LILO of 220 kV Sarni - Pandhurna line at Betul (PGCIL)	Double Circuit	State Sector	MPPTCL	78.0	220.0
1382	1381	2020-06-30	LILO of 2nd Ckt. of PGCIL Jalandhar - Kotla Jangan (nakodar) line at Kartarpur	Double Circuit	State Sector	PSTCL	1.0	220.0
1383	1382	2020-06-30	LILO of both ckt. Nagda - Neemuch at Mandsaur (LILO from loc.No. 211) S/s (GEC-I)	Direct Current Distribution System	State Sector	MPPTCL	56.0	220.0
1384	1383	2020-06-30	LILO of one Ckt. of 220kV KTS-Lower Sileru-I line - 400/220kV Asupaka S/S	Double Circuit	State Sector	TSTRANSCO	1.0	220.0
1385	1384	2020-06-30	LILO of Ratlam - Daloda 220kV line at Jaora (2nd Ckt.)	Double Circuit	State Sector	MPPTCL	4.0	220.0
1386	1385	2020-06-30	LILO of Sikandararao - Jawaharpur TPSat Kashganj	Double Circuit	State Sector	UPPTCL	88.0	220.0
1387	1386	2020-06-30	PGCIL Bhadson - Salempur	Double Circuit	State Sector	HVPNL	13.0	220.0
1388	1387	2020-06-30	Rudrapur (Brahmwari) - Ghansali (Srinagar) line	Double Circuit	State Sector	PTCUL	150.0	220.0
1389	1388	2020-07-31	NNTPS Sw. Yd. - Ariyalur (Villupuram ) Line	Double Circuit	Central Sector	PGCIL	147.0	400.0
1390	1389	2020-07-31	Rajarhat - Purnea line (Triple Snowbird) (Balance Portion)	Double Circuit	Central Sector	PGCIL	420.0	400.0
1391	1390	2020-07-31	LILO in 230 kV Othakalmandapam - Palladam at the proposed Edayarpalayam 400 kV SS	Double Circuit	State Sector	TANTRANSCO	4.0	230.0
1392	1391	2020-07-31	LILO in the existing 230 kV Neyveli TS-I Tiruvannamalai at Sankarapuram 230 kV SS	Double Circuit	State Sector	TANTRANSCO	64.0	230.0
1393	1392	2020-07-31	Bolangir (OPTCL) - Bolangir (PGCIL)	Double Circuit	State Sector	OPTCL	3.0	220.0
1394	1393	2020-07-31	Dwarka - Pappan Kalan-I (underground XLPE Cable)	Double Circuit	State Sector	DTL	3.0	220.0
1395	1394	2020-07-31	Gonda - Sohawal (PG)	Double Circuit	State Sector	UPPTCL	41.0	220.0
1396	1395	2020-07-31	Lahal - bhudhil line	Single Circuit	State Sector	HPPTCL	2.0	220.0
1397	1396	2020-07-31	LILO of both Ckts. of Badshahpur - Sector -77 at Sohna Road Gurugram	Double Circuit	State Sector	HVPNL	3.0	220.0
1398	1397	2020-07-31	LILO of Kadakola - Chamarajanagara line to the proposed line at Begur	Multiple Circuits	State Sector	KPTCL	100.0	220.0
1399	1398	2020-07-31	LILO of one Ckt of Ashta- Dewas line at 220 kV S/S Chapda S/S	Double Circuit	State Sector	MPPTCL	68.0	220.0
1400	1399	2020-07-31	LILO of Pandharpur - Malinagar at Bhalwani S/S	Double Circuit	State Sector	MSETCL	20.0	220.0
1401	1400	2020-07-31	Termination of one d/c of Achhalia- Jambuva line at Vyankatpura s/s	Double Circuit	State Sector	GETCO	72.0	220.0
1402	1401	2020-07-31	Upgradation of 132kV Malegaon - Manmad SCSC line to 220kV line using same corridor/ROW	Double Circuit	State Sector	MSETCL	65.0	220.0
1403	1402	2020-07-31	New Kohima -New Mariani (Twin Moose ACSR) (K-MTL - TBCB)	Double Circuit	Private Sector	KPTL	236.0	400.0
1404	1403	2020-08-31	Banaskantha PS - Banaskantha (PG) line	Double Circuit	Central Sector	PGCIL	132.0	400.0
1405	1404	2020-08-31	Chhata- Vrindawan Line	Single Circuit	State Sector	UPPTCL	35.0	220.0
1406	1405	2020-08-31	Daltonganj (PG)- Garhwa	Double Circuit	State Sector	JUSNL	183.0	220.0
1407	1406	2020-08-31	Godda - Dumka line	Double Circuit	State Sector	JUSNL	142.0	220.0
1408	1407	2020-08-31	Godda - Lalmatia	Double Circuit	State Sector	JUSNL	44.0	220.0
1409	1408	2020-08-31	Jasidih - Dumka	Double Circuit	State Sector	JUSNL	149.0	220.0
1410	1409	2020-08-31	Jasidih - Giridih line	Double Circuit	State Sector	JUSNL	154.0	220.0
1411	1410	2020-08-31	Kaithal (PGCIL) - Neemwala	Double Circuit	State Sector	HVPNL	64.0	220.0
1412	1411	2020-08-31	LILO of both ckt of Nagda - Neemuch 220 KV line at Mandsore(Sitamau) 400 kV S/s (Ckt II)	Direct Current Distribution System	State Sector	MPPTCL	47.0	220.0
1413	1412	2020-08-31	LILO of one Ckt of existing STPS - Ratangarh line at 220kV GSS Rawatsar	Double Circuit	State Sector	RVPNL	85.0	220.0
1414	1413	2020-08-31	Maath(400)- Vrindawan Line	Single Circuit	State Sector	UPPTCL	44.0	220.0
1415	1414	2020-08-31	Mandsaur (Sitamau) - Marut Shakti Pool (GEC-I)	Direct Current Distribution System	State Sector	MPPTCL	93.0	220.0
1416	1415	2020-09-30	Raigarh (HVDC stn) - Pugalur (HVDC stn) HVDC Bipole Link	BIPOLE	Central Sector	PGCIL	3531.0	800.0
1417	1416	2020-09-30	Pugalur HVDC - Arasur line (Q)	Double Circuit	Central Sector	PGCIL	118.0	400.0
1418	1417	2020-09-30	Pugalur HVDC - Pugalur line (Q)	Double Circuit	Central Sector	PGCIL	100.0	400.0
1419	1418	2020-09-30	LILO of chittoor - Krishnapatnam at Rachagunneri S/S	Double Circuit	State Sector	APTRANSCO	127.0	400.0
1420	1419	2020-09-30	Neyveli 230/110 kV SS to the existing Thiruvannamalai and Cuddalore feeders	Double Circuit	State Sector	TANTRANSCO	6.0	230.0
1421	1420	2020-09-30	Asoj - IOCL line with ACSR Zebra conductor	Double Circuit	State Sector	GETCO	66.0	220.0
1422	1421	2020-09-30	Baghpat (220) - Baghpat (400) (2nd line)	Double Circuit	State Sector	UPPTCL	15.0	220.0
1423	1422	2020-09-30	Kamalapuram LISS - V.K.Ramavaram line	Double Circuit	State Sector	TSTRANSCO	28.0	220.0
1424	1423	2020-09-30	LILO of Ataur - Muradnagar-II line at Madhuban Bapudham	Double Circuit	State Sector	UPPTCL	24.0	220.0
1425	1424	2020-09-30	LILO of FGPP - BBMB Samaypur line at Sector58 S/s	Double Circuit	State Sector	HVPNL	5.0	220.0
1426	1425	2020-09-30	LILO of one ckt. Nuna Majra - Daultabad at Sec.-107 Gurugram	Double Circuit	State Sector	HVPNL	4.0	220.0
1427	1426	2020-09-30	LILO of Wanakbori - Asoj and Wanakbori - Vyankatpura line on M/C tower with ACSR Zebra conductor and OPGW at Selvaliya S/S	Double Circuit	State Sector	GETCO	23.0	220.0
1428	1427	2020-09-30	Madakkathara - Malaparamba line	Double Circuit	State Sector	KSEB	97.0	220.0
1429	1428	2020-09-30	Shalimarbagh - Sanjay Gandhi Transport Nagar	Multiple Circuits	State Sector	DTL	8.0	220.0
1430	1429	2020-09-30	Shujalpur - Narsinghgarh Line	Direct Current Distribution System	State Sector	MPPTCL	51.0	220.0
1431	1430	2020-10-31	LILO of both ckt. Jhakri Abdullapur at (Gumma) Pragati Nagar	Double Circuit	State Sector	HPPTCL	3.0	400.0
1432	1431	2020-10-31	LILO of one circuit of Akal - Jodhpur (new) line at Jaisalmer-2 (GEC-I)	Double Circuit	State Sector	RVPNL	14.0	400.0
1433	1432	2020-10-31	Sagardighi TPS - Gokarna line	Double Circuit	State Sector	WBSETCL	89.0	400.0
1434	1433	2020-10-31	Thennampatty - SEPC IPP	Double Circuit	State Sector	TANTRANSCO	104.0	400.0
1435	1434	2020-10-31	LILO in the existing 230 kV Pasumalai - Alagarkoil at the proposed Samayanallur 230 kV SS	Double Circuit	State Sector	TANTRANSCO	9.0	230.0
1436	1435	2020-10-31	Kanwan - Dhar line (GEC-I)	Direct Current Distribution System	State Sector	MPPTCL	63.0	220.0
1437	1436	2020-10-31	LILO of Jhalawar - Chhabra line at 220 KV GSS Aklera	Double Circuit	State Sector	RVPNL	98.0	220.0
1438	1437	2020-11-30	LILO of Parulia - Dtps at Durgapur steel TPS	Double Circuit	Central Sector	DVC	14.0	220.0
1439	1438	2020-11-30	Bemetara - Mungeli line 2nd circuit	Single Circuit	State Sector	CSPTCL	40.0	220.0
1440	1439	2020-11-30	Gurur - Kurud (Bangoli)	Double Circuit	State Sector	CSPTCL	74.0	220.0
1441	1440	2020-11-30	Jambuva - Waghodia ( PGCIL) line with AL-59 Conductor	Double Circuit	State Sector	GETCO	68.0	220.0
1442	1441	2020-11-30	Konnakuzhy - Chalakudy line	Double Circuit	State Sector	KSEB	22.0	220.0
1443	1442	2020-11-30	LILO of both Purnea (PG) - Begusarai at Khagaria (New)	Double Circuit	State Sector	BSPTCL	14.0	220.0
1444	1443	2020-11-30	LILO of Jadla - Jamsher at 220 KV S/S Banga	Double Circuit	State Sector	PSTCL	11.0	220.0
1445	1444	2020-11-30	LILO of Vallabhipur - Vartej line at Maglana S/s	Double Circuit	State Sector	GETCO	9.0	220.0
1446	1445	2020-11-30	Palanpur - Amarigadh (DFCC) line	Double Circuit	State Sector	GETCO	80.0	220.0
1447	1446	2020-11-30	Snail -Hatkoti	Double Circuit	State Sector	HPPTCL	13.0	220.0
1448	1447	2020-12-31	Ramgarh - Bhadla line (Ckt-I)	Double Circuit	State Sector	RVPNL	160.0	400.0
1449	1448	2020-12-31	Badod - Nalkheda (Susner ) (GEC)	Direct Current Distribution System	State Sector	MPPTCL	105.0	220.0
1450	1449	2020-12-31	Bhatia - Bhogat line (AL-59)	Double Circuit	State Sector	GETCO	26.0	220.0
1451	1450	2020-12-31	Brahmapuram - Thuthiyoor line	Multiple Circuits	State Sector	KSEB	8.0	220.0
1452	1451	2020-12-31	Devanahalli Hardware park - Devanahali HW park S/S	Multiple Circuits	State Sector	KPTCL	12.0	220.0
1453	1452	2020-12-31	LILO of Muzaffarnagar - Nanauta line at Badhaikalan	Double Circuit	State Sector	UPPTCL	10.0	220.0
1454	1453	2020-12-31	LILO of one Ckt. of Ukai - Achhaliya line no.3 at Virpor (Package -2)	Double Circuit	State Sector	GETCO	27.0	220.0
1455	1454	2020-12-31	LILO of Second Ckts. from BAIL (Begur - Hoskote at Devanahlli H/W Park	Single Circuit	State Sector	KPTCL	18.0	220.0
1456	1455	2020-12-31	Shirsuphal - Shirsai line	Single Circuit	State Sector	MSETCL	3.0	220.0
1457	1456	2020-12-31	Thuthiyoor - Kaloor (UG Cable)	Double Circuit	State Sector	KSEB	14.0	220.0
1458	1457	2020-12-31	Imphal - New Kohima (Twin Moose ACSR) (K-MTL - TBCB)	Double Circuit	Private Sector	KPTL	272.0	400.0
1459	1458	2021-01-31	Tehri Gen. - Tehri Pooling Station	Single Circuit	Central Sector	PGCIL	13.0	400.0
1460	1459	2021-01-31	Ramgarh - Bhadla line (Ckt-II)	Double Circuit	State Sector	RVPNL	160.0	400.0
1461	1460	2021-01-31	Cuddalore - Veerapuram (SP Koil) Via Neyveli	Double Circuit	State Sector	TANTRANSCO	348.0	230.0
1462	1461	2021-01-31	LILO of existing 230 kV Shoolagiri - Vinnamangalam line at the proposed Tirupattur 230 kV SS	Double Circuit	State Sector	TANTRANSCO	12.0	230.0
1463	1462	2021-01-31	Chelari - Nallalam	Multiple Circuits	State Sector	KSEB	25.0	220.0
1464	1463	2021-01-31	LILO on 220 kV Deoli (PG) - Ghatodi line for 220kV Yavatmal	Double Circuit	State Sector	MSETCL	21.0	220.0
1465	1464	2021-01-31	Subashgram (PG) - Baruipur	Double Circuit	State Sector	WBSETCL	64.0	220.0
1466	1465	2021-01-31	Surajmaninagar - P. K. Bari line (NER-II TL-TBCB)	Double Circuit	Private Sector	SGL	155.0	400.0
1467	1466	2021-02-28	Ranchi - Medinipur line (PM-JTL-TBCB)	Double Circuit	Central Sector	PGCIL	538.0	765.0
1468	1467	2021-02-28	LILO of both ckts. of Chandithala - Kharagpur at Medinipur (PM-JTL-TBCB)	Double Circuit	Central Sector	PGCIL	148.0	400.0
1469	1468	2021-02-28	Tumkur (Pavagada) PS - Devanahally (KPTCL) line - (Q)	Double Circuit	Central Sector	PGCIL	312.0	400.0
1470	1469	2021-02-28	LILO of both Ckts. of Mamidipalli- Dindi TMDC line to Maheshwaram S/S on M/C	Multiple Circuits	State Sector	TSTRANSCO	13.0	400.0
1471	1470	2021-02-28	Madakkathara - Areekode line	Double Circuit	State Sector	KSEB	176.0	400.0
1472	1471	2021-02-28	Nagda - Ujjain line (GEC-I)	Direct Current Distribution System	State Sector	MPPTCL	53.0	400.0
1473	1472	2021-02-28	LILO of Thingalur - Ingur 230kV line at the proposed Erode GIS S/S	Double Circuit	State Sector	TANTRANSCO	28.0	230.0
1474	1473	2021-02-28	2nd Ckt. Stringing of 220kV Tlwani - Miraj line (Balance work)	Single Circuit + Double Circuit	State Sector	MSETCL	9.0	220.0
1475	1474	2021-02-28	Aluva - Kothamangalam line	Double Circuit	State Sector	KSEB	68.0	220.0
1476	1475	2021-02-28	Bahraich - Sohawal 400 (PG) line	Single Circuit	State Sector	UPPTCL	109.0	220.0
1477	1476	2021-02-28	Gajner - Chhatargarh line (GEC-I)	Double Circuit	State Sector	RVPNL	166.0	220.0
1478	1477	2021-02-28	Georai - Thapti Tanda s/s	Double Circuit	State Sector	MSETCL	110.0	220.0
1479	1478	2021-02-28	LILO of 220kV Kalapaka - Dairyfarm to proposed 220/132/33kV S/S Simhachalam on MC Towers	Double Circuit	State Sector	APTRANSCO	24.0	220.0
1480	1479	2021-02-28	LILO of 220kV Narwana - Mund line at 400kV PGCIL Jind	Double Circuit	State Sector	HVPNL	168.0	220.0
1481	1480	2021-02-28	LILO of Firozabad (220) -Agra(PG) at Firozabad(400)	Double Circuit	State Sector	UPPTCL	22.0	220.0
1482	1481	2021-02-28	LILO of Himmatpura - jagraon at Ajitwal	Double Circuit	State Sector	PSTCL	3.0	220.0
1483	1482	2021-02-28	LILO of one Ckt. of 220kV Ukai- Achhaliya line no. 2 at 220kV Virpor s/s on D/C and M/C Tower (Package-1) with AL-59 Condu. and OPGW	Double Circuit	State Sector	GETCO	42.0	220.0
1484	1483	2021-02-28	Makhu - Algaon	Double Circuit	State Sector	PSTCL	101.0	220.0
1485	1484	2021-02-28	Rachagunneru - Naidupeta line	Double Circuit	State Sector	APTRANSCO	30.0	220.0
1486	1485	2021-02-28	Silchar (PG) - Misa (PG) (Q) line (NER-II TL-TBCB)	Double Circuit	Private Sector	SGL	357.0	400.0
1487	1486	2021-03-31	Additional 400KV D/C line at P.K.Bari s/s and Silchar S/S end for termination of P.K. Bari - Silchar 400KV D/C line	Double Circuit	Central Sector	PGCIL	22.0	400.0
1488	1487	2021-03-31	Darbhanga - Sitamarhi (New) line (Ckt.-I) (Triple Snowbird) (ERSS XXITL - TBCB)	Double Circuit	Central Sector	PGCIL	80.0	400.0
1489	1488	2021-03-31	LILO of both Ckts. of Nabinagar-II - Gaya (Q) line at Chandauti (ERSS XXITL- TBCB)	Double Circuit	Central Sector	PGCIL	6.0	400.0
1490	1489	2021-03-31	LILO of North Trichur - Cochin line at North Trichur HDVC Station (Q)	Double Circuit	Central Sector	PGCIL	1.0	400.0
1491	1490	2021-03-31	Re-Conducting of Rangpo -New Siliguri line	Double Circuit	Central Sector	PGCIL	220.0	400.0
1492	1491	2021-03-31	Wardha - Aurangabad line (up-gradable on 1200 kV)	Double Circuit	Central Sector	PGCIL	696.0	400.0
1493	1492	2021-03-31	Pugalur - North Trichur (Kerala) HVDC Bipole Link	High-Voltage Direct Current	Central Sector	PGCIL	288.0	320.0
1494	1493	2021-03-31	LILO Agra(South)-Fahtehabad(Agra) at Firozabad	Double Circuit	State Sector	UPPTCL	26.0	400.0
1495	1494	2021-03-31	LILO of Gorakhpur (PG) - Lucknow (PG) line Ckt.-IV at Basti	Double Circuit	State Sector	UPPTCL	60.0	400.0
1496	1495	2021-03-31	LILO of one ckt. of Satna (PGCIL) - Bina (PGCIL) at Sagar (GEC-I)	Direct Current Distribution System	State Sector	MPPTCL	50.0	400.0
1497	1496	2021-03-31	LILO of Somanahalli - Kolar SC line to Mylasandra (New Electric City)	Single Circuit	State Sector	KPTCL	2.0	400.0
1498	1497	2021-03-31	Nagda (400kV) S/S - Ujjain (400kV) S/S (Ckt-II)	Direct Current Distribution System	State Sector	MPPTCL	53.0	400.0
1499	1498	2021-03-31	Nagda - Mandsaur (GEC-I)	Direct Current Distribution System	State Sector	MPPTCL	137.0	400.0
1500	1499	2021-03-31	Tanda (TPS) - Bhaukhari (Basti) line	Double Circuit	State Sector	UPPTCL	88.0	400.0
1501	1500	2021-03-31	Yurembam - Thoubal via Nambol	Double Circuit	State Sector	ED, Manipur	90.0	400.0
1502	1501	2021-03-31	Akal- Jaisalmer-2 line (GEC-I)	Double Circuit	State Sector	RVPNL	114.0	220.0
1503	1502	2021-03-31	Brahmapuram - Kaloor line	Double Circuit	State Sector	KSEB	23.0	220.0
1504	1503	2021-03-31	Chichali - Udaipura	Single Circuit	State Sector	MPPTCL	47.0	220.0
1505	1504	2021-03-31	Deroli Ahir - Narnaul	Double Circuit	State Sector	HVPNL	26.0	220.0
1506	1505	2021-03-31	Dichpally 400kV - Banswada 220kV	Double Circuit	State Sector	TSTRANSCO	168.0	220.0
1507	1506	2021-03-31	Dwarka - Budella	Double Circuit	State Sector	DTL	12.0	220.0
1508	1507	2021-03-31	HDVC Kolar - T. Gollahali (Thimmasandra) line	Double Circuit	State Sector	KPTCL	58.0	220.0
1509	1508	2021-03-31	Jammalamadugu - Chakrayapet	Double Circuit	State Sector	APTRANSCO	172.0	220.0
1510	1509	2021-03-31	Jammalamadugu - Tirumalayapalli	Double Circuit	State Sector	APTRANSCO	34.0	220.0
1511	1510	2021-03-31	Kalikiri - Kalikiri line	Double Circuit	State Sector	APTRANSCO	8.0	220.0
1512	1511	2021-03-31	Kamavarapukota - Nuziveedu	Double Circuit	State Sector	APTRANSCO	90.0	220.0
1513	1512	2021-03-31	Kudagi - Tapping point of NTPC (part of Kudagi-Vajramatti line)	Double Circuit	State Sector	KPTCL	153.0	220.0
1514	1513	2021-03-31	Kumbhargaon - Krishnoor line (Ckt-I)	Double Circuit	State Sector	MSETCL	16.0	220.0
1515	1514	2021-03-31	LILO of Arambag - Rishra at N. Chanditala	Double Circuit	State Sector	WBSETCL	31.0	220.0
1516	1515	2021-03-31	LILO of Baraut (220)- Shamli at Nirpura line	Double Circuit	State Sector	UPPTCL	26.0	220.0
1517	1516	2021-03-31	LILO of Bina - Gwalior at Pichhore	Single Circuit	State Sector	MPPTCL	1.0	220.0
1518	1517	2021-03-31	LILO of Both ckt. of Badod - Ujjain at Ujjain	Direct Current Distribution System	State Sector	MPPTCL	24.0	220.0
1519	1518	2021-03-31	LILO of Both ckt Pulivendula - Hindupur at Gollapuram	Double Circuit	State Sector	APTRANSCO	156.0	220.0
1520	1519	2021-03-31	LILO of both ckts. Nagda - Ujjain at Ujjain	Direct Current Distribution System	State Sector	MPPTCL	43.0	220.0
1521	1520	2021-03-31	LILO of Chikkodi - Ghataprabha at Mughalkod	Double Circuit	State Sector	KPTCL	12.0	220.0
1522	1521	2021-03-31	LILO of Chormar - Fathebad line at Hukmawali	Single Circuit	State Sector	HVPNL	41.0	220.0
1523	1522	2021-03-31	LILO of Kashipur - Pantnagar line at 220kV S/S Jafarpur	Double Circuit	State Sector	PTCUL	8.0	220.0
1524	1523	2021-03-31	LILO of Pandharpur - Malinagar line at 220 kV Bhalawani S/S (Ckt-II)	Double Circuit	State Sector	MSETCL	20.0	220.0
1525	1524	2021-03-31	LILO of Pendurthy - Garividi at Garividi	Double Circuit	State Sector	APTRANSCO	120.0	220.0
1526	1525	2021-03-31	LILO of Podili - Nellore at Atmakur	Double Circuit	State Sector	APTRANSCO	80.0	220.0
1527	1526	2021-03-31	LILO of Rasra (220)- Gazipur at Rasra	Double Circuit	State Sector	UPPTCL	26.0	220.0
1528	1527	2021-03-31	LILO to Existing 220kV Podili - Nellore line at Prakasam District	Multiple Circuits	State Sector	APTRANSCO	20.0	220.0
1529	1528	2021-03-31	Pallikkara - Aluva line	Double Circuit	State Sector	KSEB	23.0	220.0
1530	1529	2021-03-31	Pithampur -Depalpur	Direct Current Distribution System	State Sector	MPPTCL	75.0	220.0
1531	1530	2021-03-31	(PMDP - Kashmir) Extension of Mirbazar - Alusteng line upto New Wanpoh	Double Circuit	State Sector	JKPDD	8.0	220.0
1532	1531	2021-03-31	R.K. Puram- Ridge Valley Ckt-I	Single Circuit	State Sector	DTL	5.0	220.0
1533	1532	2021-03-31	R.K. Puram - Ridge Valley Ckt-II	Single Circuit	State Sector	DTL	5.0	220.0
1534	1533	2021-03-31	R.K. Puram-Trauma Centre Ckt-I	Single Circuit	State Sector	DTL	5.0	220.0
1535	1534	2021-03-31	R.K. Puram- Trauma Centre Ckt-II	Single Circuit	State Sector	DTL	5.0	220.0
1536	1535	2021-03-31	Agra (UP)-Greater Noida (WUPPTCL)(GTL-TBCB)	Single Circuit	Private Sector	APL	159.0	765.0
1537	1536	2021-03-31	Fatehgarh PS/S - Bhadla (PG) (initially to be operated at 400 	Double Circuit	Private Sector	APL	292.0	765.0
1538	1537	2021-03-31	Ghatampur TPS-Agra (UP) (GTL-TBCB)	Single Circuit	Private Sector	APL	229.0	765.0
1539	1538	2021-03-31	LILO of 765kV Anpara D - Unnao SC (Quad) line at Obra - CTPS	Double Circuit	Private Sector	APL	17.0	765.0
1540	1539	2021-03-31	Roza - Badaun	Double Circuit	Private Sector	APL	171.0	400.0
1541	1540	2021-03-31	LlLO of C.B.Ganj - Badaun at Badaun (OBTL-TBCB)	Single Circuit	Private Sector	APL	2.0	220.0
1542	1541	2021-03-31	LlLO of Chandausi - Badaun at Badaun (OBTL-TBCB)	Single Circuit	Private Sector	APL	37.0	220.0
1543	1542	2021-04-30	Ajmer (PG) - Phagi line	Double Circuit	Central Sector	PGCIL	268.0	765.0
1544	1543	2021-04-30	Darbhanga - Sitamarhi (New) line (Ckt-II) line	Double Circuit	Central Sector	PGCIL	80.0	400.0
1545	1544	2021-04-30	Sitamarhi (New) - Motihari line (Triple Snowbird) (ERSS XXITL-TBCB)	Double Circuit	Central Sector	PGCIL	171.0	400.0
1546	1545	2021-04-30	2nd ckt stringing of 220 kV Valve - Jamde SCDC line	Single Circuit	State Sector	MSETCL	13.0	220.0
1547	1546	2021-05-31	New Mariani - Misa	Double Circuit	Central Sector	PGCIL	2.0	400.0
1548	1547	2021-05-31	LILO of 400 kV Aligarh-Sikandrabad at Harduaganj TPS Line	Double Circuit	State Sector	UPPTCL	61.0	400.0
1549	1548	2021-05-31	LILO of 220kV Gonda- Basti line at Bhaukhari	Double Circuit	State Sector	UPPTCL	26.0	220.0
1550	1549	2021-05-31	LILO of Joda-TTPS line at Telkoi	Double Circuit	State Sector	OPTCL	29.0	220.0
1551	1550	2021-05-31	LILO of onc Ckt. of 220kV Undi-Eluru (Gudivada) line to proposed S/S at Akiveedu in West Godavari District	Single Circuit	State Sector	APTRANSCO	3.0	220.0
1552	1551	2021-05-31	Maradam (from 400kV Maradam) - Pydibhimavaram line	Double Circuit	State Sector	APTRANSCO	46.0	220.0
1553	1552	2021-06-30	Jigmeling - Alipurdauar line (Q) (India Side)	Double Circuit	Central Sector	PGCIL	326.0	400.0
1554	1553	2021-06-30	LILO of Sagardighi - Subhasgram line at Jeerat	Single Circuit	Central Sector	PGCIL	2.0	400.0
1555	1554	2021-06-30	Akkaram-Markook	Double Circuit	State Sector	TSTRANSCO	18.0	220.0
1556	1555	2021-06-30	Greater Noida (765) - Integrated township Gr. Noida line	Double Circuit	State Sector	UPPTCL	80.0	220.0
1557	1556	2021-06-30	LILO of Nirmal - Renzal at Mupkal	Single Circuit	State Sector	TSTRANSCO	1.0	220.0
1558	1557	2021-06-30	LILO of one Ckt. of Mamidipally - Shadnagar at Kothur S/S	Double Circuit	State Sector	TSTRANSCO	1.0	220.0
1559	1558	2021-06-30	LILO of one Ckt. of Shamshabad - Kethireddypalli (Manikonda) at Kothur S/S	Double Circuit	State Sector	TSTRANSCO	19.0	220.0
1560	1559	2021-06-30	Manuguru - BTPS	Double Circuit	State Sector	TSTRANSCO	46.0	220.0
1561	1560	2021-06-30	(PMDP - Jammu) LILO of Hiranagar - Bishnah at Jatwal Grid station	Double Circuit	State Sector	JKPDD	4.0	220.0
1562	1561	2021-06-30	Rajgarh (B) - Susner (Nalkheda)	Direct Current Distribution System	State Sector	MPPTCL	124.0	220.0
1563	1562	2021-06-30	Ramadugu - Rampur	Double Circuit	State Sector	TSTRANSCO	70.0	220.0
1564	1563	2021-06-30	Ujjain - Susner (Nalkheda) (GEC)	Direct Current Distribution System	State Sector	MPPTCL	160.0	220.0
1565	1564	2021-07-31	Julurupadu - Pedagopathi line	Double Circuit	State Sector	TSTRANSCO	90.0	220.0
1566	1565	2021-07-31	Kethireddypally (Manikonda) - Kankamamidi line	Double Circuit	State Sector	TSTRANSCO	9.0	220.0
1567	1566	2021-07-31	LILO of both Ckts. Durshed-Sirchilla line at Ramadugu	Double Circuit	State Sector	TSTRANSCO	48.0	220.0
1568	1567	2021-07-31	LILO of Ckt.-I Mainpuri (PG) - Neebkarori line at Farrukhabad	Double Circuit	State Sector	UPPTCL	16.0	220.0
1569	1568	2021-07-31	LILO of Dindi - Maheshwaram at Madugula	Double Circuit	State Sector	TSTRANSCO	6.0	220.0
1570	1569	2021-07-31	LILO of Hiranagar-Bishnah line at Samba	Double Circuit	State Sector	JKPDD	11.0	220.0
1571	1570	2021-07-31	LILO of Oglapur - Durshad at Huzurabad	Double Circuit	State Sector	TSTRANSCO	20.0	220.0
1572	1571	2021-07-31	LILO of Regumangadda - Gudipalligattu at Yelluru Water Grid s/s	Double Circuit	State Sector	TSTRANSCO	7.0	220.0
1573	1572	2021-07-31	LILO of RSS -Bheemgal Feeder at Rampur s/s	Double Circuit	State Sector	TSTRANSCO	2.0	220.0
1574	1573	2021-07-31	LILO of RSS -Nagaram at Ramagundam Fertillizers and Chemicals Limited (RFCL)	Double Circuit	State Sector	TSTRANSCO	22.0	220.0
1575	1574	2021-07-31	LILO of RSS -Nrimal at Jagityal line	Double Circuit	State Sector	TSTRANSCO	3.0	220.0
1576	1575	2021-07-31	LILO of Shamshabad-Yeddumailaram line and Shadnagar-Shankerpally line to proposed at Kethireddypally	Double Circuit	State Sector	TSTRANSCO	14.0	220.0
1577	1576	2021-07-31	LILO of Thein-Hiranagar at Kathua-II (Ghatti)	Double Circuit	State Sector	JKPDD	5.0	220.0
1578	1577	2021-07-31	LILO of Vemnur-Nirmal to 220kv Jagityal s/s	Double Circuit	State Sector	TSTRANSCO	3.0	220.0
1579	1578	2021-07-31	LILO of Yelluru - Gudipalligattu at Gouridevipally	Single Circuit	State Sector	TSTRANSCO	4.0	220.0
1580	1579	2021-07-31	Maheshwaram 400/220 kV SS to Fabcity 220kV SS	Double Circuit	State Sector	TSTRANSCO	47.0	220.0
1581	1580	2021-07-31	Malayammma - Kunnamangalam	Multiple Circuits	State Sector	KSEB	15.0	220.0
1582	1581	2021-07-31	Mitha - Katosan TSS line	Double Circuit	State Sector	GETCO	33.0	220.0
1583	1582	2021-07-31	Narketpally - Udaya Samudram (LIS)	Double Circuit	State Sector	TSTRANSCO	18.0	220.0
1584	1583	2021-07-31	Narsapur -Meenajipet line	Double Circuit	State Sector	TSTRANSCO	48.0	220.0
1585	1584	2021-07-31	Nirmal -Renzal line	Double Circuit	State Sector	TSTRANSCO	136.0	220.0
1586	1585	2021-07-31	Nirmal s/s - Existing 220/132kV Nirmal s/s	Double Circuit	State Sector	TSTRANSCO	9.0	220.0
1587	1586	2021-07-31	Radhanesda - Vav (Khimanvas) line with AL-59 Conductor	Double Circuit	State Sector	GETCO	73.0	220.0
1588	1587	2021-07-31	Rampur -Rajeshwar Rao Peta s/s	Double Circuit	State Sector	TSTRANSCO	72.0	220.0
1589	1588	2021-07-31	Shahjahanpur PG (400)- Azizpur line	Double Circuit	State Sector	UPPTCL	49.0	220.0
1590	1589	2021-07-31	Sitapuram -Huzurnagar line	Double Circuit	State Sector	TSTRANSCO	59.0	220.0
1591	1590	2021-07-31	Sundilla - Annaram line	Double Circuit	State Sector	TSTRANSCO	58.0	220.0
1592	1591	2021-07-31	Sundilla - Medigadda line	Double Circuit	State Sector	TSTRANSCO	148.0	220.0
1593	1592	2021-07-31	LILO of both ckt. of Ranchi - Maithon-RB line at Dhanbad (NKTL-TBCB)	Double Circuit	Private Sector	APL	5.0	400.0
1594	1593	2021-07-31	Vindhyachal - Varansai line	Double Circuit	Central Sector	PGCIL	379.0	765.0
1595	1594	2021-07-31	Edayarpalayam (TANTRANSCO)- Udumulpet line (Q)	Double Circuit	Central Sector	PGCIL	94.0	400.0
1596	1595	2021-07-31	Palatana - Surajmaninagar	Double Circuit	Central Sector	PGCIL	24.0	400.0
1597	1596	2021-07-31	Pugalur HVDC-Edayarpalayam (TANTRANSCO) line (Q)	Double Circuit	Central Sector	PGCIL	105.0	400.0
1598	1597	2021-07-31	LILO of Gorakhpur (PG) - Lucknow (PG) line Ckt.-III at Basti	Double Circuit	State Sector	UPPTCL	47.0	400.0
1599	1598	2021-07-31	LILO of Ibrahim Patti (PGCIL) - Kasaramau (Mau) at Rasra	Double Circuit	State Sector	UPPTCL	74.0	400.0
1600	1599	2021-07-31	Dharmapuri (Palavadi) - Udanapally 230 kV S	Double Circuit	State Sector	TANTRANSCO	115.0	230.0
1601	1600	2021-07-31	Thiruvalam - Singarapet Feeder (Loc1 to 4)	Double Circuit	State Sector	TANTRANSCO	2.0	230.0
1602	1601	2021-07-31	2nd ckt. Stringing on existing line from Malyalpally - Jagityal line	Single Circuit	State Sector	TSTRANSCO	58.0	220.0
1603	1602	2021-07-31	400/220 kV Janagaon s/s -220/132/33 Janagaon s/s	Double Circuit	State Sector	TSTRANSCO	7.0	220.0
1604	1603	2021-07-31	Asupaka - Aswaroapet line	Double Circuit	State Sector	TSTRANSCO	40.0	220.0
1605	1604	2021-07-31	Dhanonda- Deroli Ahir	Double Circuit	State Sector	HVPNL	57.0	220.0
1606	1605	2021-07-31	Dindi - Nagarkurnool	Single Circuit	State Sector	TSTRANSCO	79.0	220.0
1607	1606	2021-07-31	Gajwel - Akkaram (TMDC)	Double Circuit	State Sector	TSTRANSCO	14.0	220.0
1608	1607	2021-08-31	Fatehgarh-II PS - Bhadla-II section (PGCIL-RTM)	Double Circuit	Central Sector	PGCIL	374.0	765.0
1609	1608	2021-08-31	Ramgarh - Ranchi (PG) (Bypassing Gola SS) (Balance portion)	Single Circuit	Central Sector	DVC	95.0	220.0
1610	1609	2021-08-31	LILO of ckt-II of Kursi Rd PG- Unnao line at Hardoi Rd (Jehata)	Double Circuit	State Sector	UPPTCL	25.0	400.0
1611	1610	2021-08-31	LILO of ckt-I of 400 kV DC Kursi Rd PG- Unnao line at Hardoi Rd(Jehata)	Double Circuit	State Sector	UPPTCL	34.0	400.0
1612	1611	2021-08-31	Telangana STPP - Narsapur	Double Circuit	State Sector	TSTRANSCO	354.0	400.0
1613	1612	2021-08-31	Telangana STPP - Ramadugu	Double Circuit	State Sector	TSTRANSCO	104.0	400.0
1614	1613	2021-08-31	LILO of 220 kV Uran- JNPT MUSS line at 220 kV JNPT SEZ S/S	Single Circuit	State Sector	MSETCL	5.0	220.0
1615	1614	2021-08-31	LILO of one Ckt. of Budhipadar-Basundhara at Lephripara s/s	Double Circuit	State Sector	OPTCL	9.0	220.0
1616	1615	2021-08-31	LILO of one ckt of Rengali-Barkote line at Deogarh	Single Circuit	State Sector	OPTCL	25.0	220.0
1617	1616	2021-08-31	LILO of Sector- 72 -Ranglarajpur line at Sohna Road	Double Circuit	State Sector	HVPNL	9.0	220.0
1618	1617	2021-08-31	LILO of Vadavi - Chhatral line at Santej S/s	Double Circuit	State Sector	GETCO	51.0	220.0
1619	1618	2021-08-31	Melasandra (New elctronic city) - Yerandanahalli	Multiple Circuits	State Sector	KPTCL	27.0	220.0
1620	1619	2021-08-31	Mylasandra - Somanahalli-Naganthapura-HSR Layout	Multiple Circuits	State Sector	KPTCL	20.0	220.0
1621	1620	2021-08-31	Nirmal - Indravelly (Utnoor) proposed line at Adilabad District	Double Circuit	State Sector	TSTRANSCO	199.0	220.0
1622	1621	2021-08-31	Second Ckt. stringing Padegaon - Sawangi line	Single Circuit on Double Circuit	State Sector	MSETCL	15.0	220.0
1623	1622	2021-08-31	Solapur (PG) - Narangwadi	Double Circuit	State Sector	MSETCL	148.0	220.0
1624	1623	2021-08-31	Bikaner (PG) - Khetri S/S	Double Circuit	Private Sector	APL	481.0	765.0
1625	1624	2021-09-30	Khetri - Jhatikara line (CKt-I)	Double Circuit	Central Sector	PGCIL	146.0	765.0
1626	1625	2021-09-30	Medinipur - Jeerat (New) (PM-JTL-TBCB)	Double Circuit	Central Sector	PGCIL	338.0	765.0
1627	1626	2021-09-30	Bhadla-II PS-Bhadla (PG) line (CKt-I)	Double Circuit	Central Sector	PGCIL	48.0	400.0
1628	1627	2021-09-30	Jeerat (New) - Jeerat (WBSETCL) (PM-JTL-TBCB)	Double Circuit	Central Sector	PGCIL	51.0	400.0
1629	1628	2021-09-30	Khetri - Sikar (PG) line	Double Circuit	Central Sector	PGCIL	156.0	400.0
1630	1629	2021-09-30	LILO of both Ckt. of Kishanganj - Patna 400kV (Q) line at Saharsa (Ckt-I)	Double Circuit	Central Sector	PGCIL	75.0	400.0
1631	1630	2021-09-30	LILO the existing 230 kV Alundur - Thanjavur at the proposed Thuvankudy	Multiple Circuits	State Sector	TANTRANSCO	30.0	230.0
1632	1631	2021-09-30	Chhatarpur - Tikamgarh 220 KV Line	Direct Current Distribution System	State Sector	MPPTCL	92.0	220.0
1633	1632	2021-10-31	Khetri - Jhatikara line (Ckt-II)	Double Circuit	Central Sector	PGCIL	146.0	765.0
1634	1633	2021-10-31	LILO of both Ckt. 765kV D/C (op. at 400kV) Fatehgarh (TBCB) - Bhadla (PG) at Fateharh-II PS (Loop in of Ckt-I)	Double Circuit	Central Sector	PGCIL	40.0	765.0
1635	1634	2021-10-31	LILO of both Ckts. of Ajmer - Bikaner line at Bhadla-II PS (PGCIL-RTM)	Double Circuit	Central Sector	PGCIL	527.0	765.0
1636	1635	2021-10-31	LILO of both Ckt. of Kishanganj - Patna (Q) line at Saharsa (CKt-II)	Double Circuit	Central Sector	PGCIL	75.0	400.0
1637	1636	2021-10-31	Pugalur HVDC - Thiruvalam line (Q)	Double Circuit	Central Sector	PGCIL	782.0	400.0
1638	1637	2021-10-31	Chatra - Latehar	Double Circuit	State Sector	JUSNL	218.0	220.0
1639	1638	2021-10-31	Halvad - Sadla line with AL-59 conductor	Double Circuit	State Sector	GETCO	76.0	220.0
1640	1639	2021-10-31	Julwaniya - Kukshi line	Direct Current Distribution System	State Sector	MPPTCL	133.0	220.0
1641	1640	2021-10-31	Kattakkada-Vizhinjam	Double Circuit	State Sector	KSEB	39.0	220.0
1642	1641	2021-10-31	LILO of 220 kV D/C Wagoora-Mirbazar line at Lassipora	Double Circuit	State Sector	JKPDD	10.0	220.0
1643	1642	2021-10-31	LILO of both Ckts. Kansari -Deodar line at Bhildi S/S M/C Tower	Multiple Circuits	State Sector	GETCO	10.0	220.0
1644	1643	2021-10-31	Raebareli-Amethi Line	Double Circuit	State Sector	UPPTCL	89.0	220.0
1645	1644	2021-11-30	LILO of both Ckts. of (op.at 400 kV) Fatehgarh (TBCB)- Bhadla (PG) at Fatehgarh-II PS (Loop in of Ckt-II)	Double Circuit	Central Sector	PGCIL	39.0	765.0
1646	1645	2021-11-30	Anpara D - Unnao	Single Circuit	State Sector	UPPTCL	426.0	765.0
1647	1646	2021-11-30	Julurupadu - Kamalapuram line	Double Circuit	State Sector	TSTRANSCO	79.0	400.0
1648	1647	2021-11-30	LILO of Mundra - Hadala line at Halvad	Double Circuit	State Sector	GETCO	89.0	400.0
1649	1648	2021-11-30	LILO Firozabad (400) (TBCB) - Agra PG (765) line at Tundla	Double Circuit	State Sector	UPPTCL	1.0	220.0
1650	1649	2021-11-30	LILO of Shahjahanpur - Nighasan line at Gola (220)	Double Circuit	State Sector	UPPTCL	7.0	220.0
1651	1650	2021-11-30	Sitamarhi(New) - Motipur	Double Circuit	State Sector	BSPTCL	140.0	220.0
1652	1651	2021-11-30	TTPS - Govindpur TL	Double Circuit	State Sector	JUSNL	181.0	220.0
1653	1652	2021-12-31	Bhadla-II PS-Bhadla (PG) (Twin HTLS) (Ckt.-II) (PGCIL-RTM)	Double Circuit	Central Sector	PGCIL	49.0	400.0
1654	1653	2021-12-31	Kahalgaon - Durgapur line (Bypassing of Farakka-Kahalgaon (Ckt.-3 and 4 and Farakka -Durgapur	Double Circuit	Central Sector	PGCIL	6.0	400.0
1655	1654	2021-12-31	Bajoli Holi - Lahal	Double Circuit	State Sector	HPPTCL	36.0	220.0
1656	1655	2021-12-31	LILO of 220kV Gachibowli - Miyapur line at Rayadurg GIS (UG Cable)	Double Circuit	State Sector	TSTRANSCO	7.0	220.0
1657	1656	2021-12-31	LILO of 220kV Gachibowli - Shapurnagar line at Rayadurg GIS (UG Cable)	Double Circuit	State Sector	TSTRANSCO	9.0	220.0
1658	1657	2021-12-31	LILO of existing Hiriyur -Gowribidanur line to the proposed 220kV at Sira S/S	Double Circuit	State Sector	KPTCL	25.0	220.0
1659	1658	2021-12-31	Ghatampur TPS-Hapur (WUPPTCL) line	Single Circuit	Private Sector	APL	411.0	765.0
1660	1659	2021-12-31	Khandwa Pool - Dhule Line (KTL - TBCB)	Double Circuit	Private Sector	SGL	383.0	765.0
1661	1660	2022-01-31	Kethireddypally-Rayadurg (GIS)	Double Circuit	State Sector	TSTRANSCO	83.0	400.0
1662	1661	2022-01-31	LILO of both Ckts. of Lonikand-II -Girvali line at Karjat S/S	Multiple Circuits	State Sector	MSETCL	25.0	400.0
1663	1662	2022-01-31	Patratu (JUSNL)- Bero (New Ranchi)	Double Circuit	State Sector	JUSNL	98.0	400.0
1664	1663	2022-01-31	Soja - Zerda line (Pkg-1) with Twin AL-59 conductor	Double Circuit	State Sector	GETCO	134.0	400.0
1665	1664	2022-01-31	LILO of 220kV Fatehabad (PGCIL) - Chormar line with (MC at 220kV Hukmawali S/S (Loop in Portion)	Double Circuit	State Sector	HVPNL	41.0	220.0
1666	1665	2022-01-31	LILO of 220kV Nanauta -Shamli line at Shamli (400) (GIS)	Double Circuit	State Sector	UPPTCL	12.0	220.0
1667	1666	2022-01-31	LILO of existing 220kV S/C Lingpur-Kushatagi and 220kV Lingapur-Sindhanur lines to the proposed 220/110/11kV Gangavathi (Sulekal) s/s	Multiple Circuits	State Sector	KPTCL	52.0	220.0
1668	1667	2022-01-31	LILO of Sasaram - Sahupuri at Karmnasa (New)	Double Circuit	State Sector	BSPTCL	1.0	220.0
1669	1668	2022-01-31	Patratu - Ratu (Burmu ) line	Double Circuit	State Sector	JUSNL	63.0	220.0
1670	1669	2022-01-31	Satgachia - Rishra	Double Circuit	State Sector	WBSETCL	15.0	220.0
1671	1670	2022-01-31	Sitamarhi (New) - Raxaul (New) (Twin Moose)	Double Circuit	State Sector	BSPTCL	177.0	220.0
1672	1671	2022-02-28	LILO of 2nd Ckt. of Teesta-III - Kishanganj line at Rangpo (Q) - Twin HTLS Conductor	Double Circuit	Central Sector	PGCIL	24.0	400.0
1673	1672	2022-02-28	LILO of One Ckt of Bamnauli - Jhattikara at Dwarka-I	Double Circuit	Central Sector	PGCIL	17.0	400.0
1674	1673	2022-02-28	Navsari (PG) - Bhestan line	Double Circuit	Central Sector	PGCIL	37.0	220.0
1675	1674	2022-02-28	Ariyalur - Thiruvalam PGCIL	Double Circuit	State Sector	TANTRANSCO	347.0	765.0
1676	1675	2022-02-28	North Chennai PS - Ariyalur	Double Circuit	State Sector	TANTRANSCO	548.0	765.0
1677	1676	2022-02-28	LILO of Ckt.-I of Unchahar (NTPC) - Fatehpur PGCIL line at Raebareli	Double Circuit	State Sector	UPPTCL	65.0	400.0
1678	1677	2022-02-28	Bakhtiyarpur (New) - Hathidah (New)	Double Circuit	State Sector	BSPTCL	62.0	220.0
1679	1678	2022-02-28	Bakhtiyarpur (New) - Sheikhpura (New)	Double Circuit	State Sector	BSPTCL	86.0	220.0
1680	1679	2022-02-28	Basni-NPH (Jodhpur) Line Ckt-I	Double Circuit	State Sector	RVPNL	7.0	220.0
1681	1680	2022-02-28	Bidadi GI S/s - 220/66/11 kV Vrushabhavathi Valley S/s (UG cable)	Single Circuit	State Sector	KPTCL	23.0	220.0
1682	1681	2022-02-28	Guttur S/S - Proposed 220/66 kV S/S at Guttur	Double Circuit	State Sector	KPTCL	2.0	220.0
1683	1682	2022-02-28	Hindupur (400) - Hindupur (220)(GEC-I)	Single Circuit	State Sector	APTRANSCO	16.0	220.0
1684	1683	2022-02-28	Honnali - Benkikere (Channagiri)	Double Circuit	State Sector	KPTCL	97.0	220.0
1685	1684	2022-02-28	LILO of 220kV Gachibowli - Erragadda line-400/220/132kV Rayadurg GIS ( UG Cable)	Double Circuit	State Sector	TSTRANSCO	7.0	220.0
1686	1685	2022-02-28	LILO of 220kV Sitapur (220) -Shahjahanpur (220) S/C line at Shahjahanpur (400) PG	Single Circuit	State Sector	UPPTCL	7.0	220.0
1687	1686	2022-02-28	LILO of Gaya (PG) - Sonenagar at both Bodhgaya (BSPTCL) and Chadauti (New)	Double Circuit	State Sector	BSPTCL	41.0	220.0
1688	1687	2022-02-28	LILO of Korba (E) - Siltara at DSPM	Double Circuit	State Sector	CSPTCL	3.0	220.0
1689	1688	2022-02-28	Manyatha-(GIS in premises of existing HBR Layout	Double Circuit	State Sector	KPTCL	10.0	220.0
1690	1689	2022-03-31	LILO of both Ckts. of 765kV D/C (op at 400kV) Fatehgarh (TBCB) - Bhadla (PG) line at Fatehgarh-II PS (Loop Out Portion) (PGCIL-RTM)	Double Circuit	Central Sector	PGCIL	80.0	765.0
1691	1690	2022-03-31	LILO of both ckts of Bawana - Mandola at Maharanibagh	Double Circuit	Central Sector	PGCIL	120.0	400.0
1692	1691	2022-03-31	Jassa Singh - HMEL 400kV Switching Station at Village Behman	Double Circuit	State Sector	PSTCL	34.0	400.0
1693	1692	2022-03-31	LILO of 400kV Talwandi Sabo-Moga Ckts. at Switching Station at Behman Jassa Singh	Double Circuit	State Sector	PSTCL	32.0	400.0
1694	1693	2022-03-31	LILO of both Ckts. of Fedra (Pachchham) - Dholera SIR AA line at Dholera Solar Park S/S	Multiple Circuits	State Sector	GETCO	39.0	400.0
1695	1694	2022-03-31	LILO of ckt. III and IV (Quad) Patna - Balia at Naubatpur (New)	Double Circuit	State Sector	BSPTCL	6.0	400.0
1696	1695	2022-03-31	Rasipalayam - Dharmapuri (Palavadi)	Double Circuit	State Sector	TANTRANSCO	379.0	400.0
1697	1696	2022-03-31	Wanakbori-Soja line (Pkg-2) with Twin AL-59 conductor	Double Circuit	State Sector	GETCO	94.0	400.0
1698	1697	2022-03-31	220kV cable terminating tower (Loc No-11 VTP line) to the proposed 220/66kv GIS Exora S/S (UG Cable)	Double Circuit	State Sector	KPTCL	3.0	220.0
1699	1698	2022-03-31	Amreli - Babara line (AL-59)	Double Circuit	State Sector	GETCO	53.0	220.0
1700	1699	2022-03-31	Basni-NPH (Jodhpur) line (Ckt.-II)	Double Circuit	State Sector	RVPNL	7.0	220.0
1701	1700	2022-03-31	Bhaukhari (400) - Dulhipar (220) line	Double Circuit	State Sector	UPPTCL	108.0	220.0
1702	1701	2022-03-31	Bihta (New) - Bihta	Double Circuit	State Sector	BSPTCL	34.0	220.0
1703	1702	2022-03-31	Bihta-Sipara (New)	Double Circuit	State Sector	BSPTCL	84.0	220.0
1704	1703	2022-03-31	Bolangir - Kesinga line	Double Circuit	State Sector	OPTCL	164.0	220.0
1705	1704	2022-03-31	Chitradurga - Hiriyur S/S	Double Circuit	State Sector	KPTCL	46.0	220.0
1706	1705	2022-03-31	Fedra (Pachchham) - Dholera AA line with Twin AL-59 Conductor	Double Circuit	State Sector	GETCO	67.0	220.0
1707	1706	2022-03-31	Gaunsgarh - Ladhowal	Double Circuit	State Sector	PSTCL	34.0	220.0
1708	1707	2022-03-31	Itarsi (PGCIL) - Budhni	Direct Current Distribution System	State Sector	MPPTCL	60.0	220.0
1709	1708	2022-03-31	Jeheta (400)- Hardoi Rd (220) Interconnector	Double Circuit	State Sector	UPPTCL	20.0	220.0
1710	1709	2022-03-31	Kapadwanj - Mehmdabad line	Double Circuit	State Sector	GETCO	93.0	220.0
1711	1710	2022-03-31	Kottayam - Ettumanoor	Double Circuit	State Sector	KSEB	12.0	220.0
1712	1711	2022-03-31	Kottayam - Thuravoor (Kottayam Dist Alapuzha Dist)	Double Circuit	State Sector	KSEB	51.0	220.0
1713	1712	2022-03-31	LILO line on M/C towers from existing 220KV Belagavi-Chikkodi line to the AEQUS S/S	Double Circuit	State Sector	KPTCL	23.0	220.0
1714	1713	2022-03-31	LILO of 220kV Sikar -Dhod line at GSS PGCIL Sikar	Double Circuit	State Sector	RVPNL	16.0	220.0
1715	1714	2022-03-31	LILO of Ara (PG) - Pusauli (PG) at Dumraon GIS	Double Circuit	State Sector	BSPTCL	81.0	220.0
1716	1715	2022-03-31	LILO of Begusarai - Biharsarif at Mokama line	Double Circuit	State Sector	BSPTCL	13.0	220.0
1717	1716	2022-03-31	LILO of both Ckts. Otha - Sagapara line at Talaja	Double Circuit	State Sector	GETCO	40.0	220.0
1718	1717	2022-03-31	LILO of Narendrapur - Therubali line at Gunupur S/S	Double Circuit	State Sector	OPTCL	27.0	220.0
1719	1718	2022-03-31	LILO of one Ckt. of Hadala-Sartanpar line at propsed 220kV Ghiyavad on M/C tower	Double Circuit	State Sector	GETCO	17.0	220.0
1720	1719	2022-03-31	LILO of PL -AM - Kottayam at Kottayam	Multiple Circuits	State Sector	KSEB	8.0	220.0
1721	1720	2022-03-31	Muktsar - Sandhwan line	Single Circuit on Double Circuit	State Sector	PSTCL	39.0	220.0
1722	1721	2022-03-31	Nagamangala- Anchepalya	Double Circuit	State Sector	KPTCL	100.0	220.0
1723	1722	2022-03-31	Pallivasal - Aluva line	Double Circuit	State Sector	KSEB	166.0	220.0
1724	1723	2022-03-31	PGCIL Station at Beerenahalli (Hiriyur) to existing Hiriyur s/s	Single Circuit	State Sector	KPTCL	15.0	220.0
1725	1724	2022-03-31	Sandhour- Kup Kalan line (Raiway)	Double Circuit	State Sector	PSTCL	11.0	220.0
1726	1725	2022-04-30	LILO of Kishanganj (POWERGRID) - Darbhanga (DMTCL) (QUAD) line at Saharsa (New)	Double Circuit	Central Sector	PGCIL	78.0	400.0
1727	1726	2022-04-30	LILO of Nabinagar -II - Patna (PG) at Jakkanpur (New)	Double Circuit	State Sector	BSPTCL	33.0	400.0
1728	1727	2022-04-30	Vellalavidhuthi 400 kV SS - Nemmeli Thippayakudy 230 kV SS	Single Circuit	State Sector	TANTRANSCO	23.0	230.0
1729	1728	2022-04-30	Biharsharif - Asthawan (New)	Double Circuit	State Sector	BSPTCL	40.0	220.0
1730	1729	2022-04-30	Dindi -Existing Kondamallepally line	Double Circuit	State Sector	TSTRANSCO	66.0	220.0
1731	1730	2022-04-30	Eklahare - Pimpalgaon	Double Circuit	State Sector	MSETCL	88.0	220.0
1732	1731	2022-04-30	Kodungallur - Irinjalakuda	Double Circuit	State Sector	KSEB	28.0	220.0
1733	1732	2022-04-30	LILO of 220kV Roza-Budaun at Datagang (220) line	Double Circuit	State Sector	UPPTCL	14.0	220.0
1734	1733	2022-04-30	LILO of 2nd Ckts. of 220kV Kunihar- Panchkula line	Double Circuit	State Sector	HPPTCL	4.0	220.0
1735	1734	2022-04-30	LILO of Lakhwar- Dehradun at Vyasi	Double Circuit	State Sector	PTCUL	71.0	220.0
1736	1735	2022-04-30	LILO of One ckt 220 kV Sohawal (PG) -New Tanda line at Ayodhya (220)	Double Circuit	State Sector	UPPTCL	26.0	220.0
1737	1736	2022-04-30	LILO of one ckt. Fatehpur-Unchahar at Malwan	Double Circuit	State Sector	UPPTCL	64.0	220.0
1738	1737	2022-04-30	Passian-Dhablan line (Railway) line	Double Circuit	State Sector	PSTCL	8.0	220.0
1739	1738	2022-04-30	Pirana (PG) - Barejadi line	Double Circuit	State Sector	GETCO	46.0	220.0
1740	1739	2022-04-30	Saharsa (New) - Khagaria (New)	Double Circuit	State Sector	BSPTCL	72.0	220.0
1741	1740	2022-04-30	Sector 69-Sector72 Ckt.-II	Double Circuit	State Sector	HVPNL	2.0	220.0
1742	1741	2022-04-30	Extn. ofESSAR-Lakadia/Bhachau (Tripple snow bird) line upto Jamkhambaliya PS	Double Circuit	Private Sector	APL	37.0	400.0
1743	1742	2022-05-31	Badaun-Sambhal Line	Double Circuit	State Sector	UPPTCL	90.0	400.0
1744	1743	2022-05-31	Gokarna - New Chanditala	Double Circuit	State Sector	WBSETCL	360.0	400.0
1745	1744	2022-05-31	Indore (PGCIL) - Ujjian (GEC-I)	Direct Current Distribution System	State Sector	MPPTCL	91.0	400.0
1746	1745	2022-05-31	Barabanki - Satrikh Road line	Double Circuit	State Sector	UPPTCL	49.0	220.0
1747	1746	2022-05-31	Benkikere S/s - proposed Hosadurga line	Double Circuit	State Sector	KPTCL	82.0	220.0
1748	1747	2022-05-31	LILO of 220kV Sambhal -Chandausi line at Sambhal (400)	Double Circuit	State Sector	UPPTCL	32.0	220.0
1749	1748	2022-05-31	LILO of both Ckts. 220kV Tharad-Deodar line at Mera s/s with AL-59 Conductor line	Multiple Circuits	State Sector	GETCO	40.0	220.0
1750	1749	2022-05-31	Muzaffarpur (PG) - Gouraul line	Double Circuit	State Sector	BSPTCL	20.0	220.0
1751	1750	2022-05-31	Pandiabili PGCIL - Pratapsasan line	Double Circuit	State Sector	OPTCL	61.0	220.0
1752	1751	2022-05-31	Rajarhat (PGCIL) - Barasat 220kV s/s	Double Circuit	State Sector	WBSETCL	17.0	220.0
1753	1752	2022-06-30	Reconfiguration of BhujPS- Lakadia PS as to establish Bhuj-II-Lakadia line as well as Bhuj-II-Bhuj-II line	Double Circuit	Central Sector	PGCIL	106.0	765.0
1754	1753	2022-06-30	MTPS - Ramgarh (Bypassing Gola SS)	Single Circuit	Central Sector	DVC	211.0	220.0
1755	1754	2022-06-30	MTPS- Ranchi (PG) (Bypassing Gola SS)	Single Circuit	Central Sector	DVC	232.0	220.0
1756	1755	2022-06-30	Ashta (400kV)- Ujjain (400kV) line	Direct Current Distribution System	State Sector	MPPTCL	180.0	400.0
1757	1756	2022-06-30	Hadala-Shapar line with (Twin AL-59) conductor	Double Circuit	State Sector	GETCO	129.0	400.0
1758	1757	2022-06-30	Sembatty-Checkanurani	Single Circuit on Double Circuit	State Sector	TANTRANSCO	16.0	230.0
1759	1758	2022-06-30	Dehan - Hamirpur	Double Circuit	State Sector	HPPTCL	116.0	220.0
1760	1759	2022-06-30	Kalapaka -HPCL-I and II	Double Circuit	State Sector	APTRANSCO	22.0	220.0
1761	1760	2022-06-30	LILO of Ara (PG) - Khagaul (BSPTCL) at Naubatpur (New)	Double Circuit	State Sector	BSPTCL	27.0	220.0
1762	1761	2022-06-30	LILO of both Ckt. of 220kV RTPP Salempur at 220kV S/S at Bakana (Ckt.-I)	Double Circuit	State Sector	HVPNL	15.0	220.0
1763	1762	2022-06-30	LILO of both Ckt. of 220kV RTPP Salempur at 220kV S/S at Bakana (Ckt.-II)	Double Circuit	State Sector	HVPNL	15.0	220.0
1764	1763	2022-06-30	LILO of both Ckts. pf 220kV Bhimasar-Chardava line at proposed 220kV Vankada (Nichi Mandal) with AL-59 conductor with OPGW	Multiple Circuits	State Sector	GETCO	5.0	220.0
1765	1764	2022-06-30	LILO of KTPS V-Lower Sileru-II - proposed Pump House-1 at B.G. Kottur	Double Circuit	State Sector	TSTRANSCO	33.0	220.0
1766	1765	2022-06-30	LILO of VTS Ckt.-I Kamavarapukota at Nuziveedu line	Single Circuit	State Sector	APTRANSCO	2.0	220.0
1767	1766	2022-06-30	LILO on 220kV ONGC-Panvel S/S at 220kV Panvel TSS	Double Circuit	State Sector	MSETCL	2.0	220.0
1768	1767	2022-06-30	LILO point -PGCIL Indore at Indore (NZ) line	Direct Current Distribution System	State Sector	MPPTCL	21.0	220.0
1769	1768	2022-06-30	Naubatpur (New) - Bhusaula (New)	Double Circuit	State Sector	BSPTCL	32.0	220.0
1770	1769	2022-06-30	Naubatpur (New) - Bihta (BSPTCL)	Double Circuit	State Sector	BSPTCL	40.0	220.0
1771	1770	2022-06-30	Rewa 220 - Rewa UMSP 220kV line	Direct Current Distribution System	State Sector	MPPTCL	77.0	220.0
1772	1771	2022-06-30	Shapar - Babara line (AL-59)	Double Circuit	State Sector	GETCO	139.0	220.0
1773	1772	2022-06-30	Sheiikhopursarai-Asthawan (New)	Double Circuit	State Sector	BSPTCL	35.0	220.0
1774	1773	2022-06-30	Sunda-Hatkoti	Double Circuit	State Sector	HPPTCL	50.0	220.0
1775	1774	2022-06-30	Vijayapura proposed -Aaheri line	Double Circuit	State Sector	KPTCL	124.0	220.0
1776	1775	2022-06-30	Dharamjaygarh Pool section B - Raigarh (Tamnar) Pool line (G-TTPL-TBCB)	Double Circuit	Private Sector	SGL	137.0	765.0
1777	1776	2022-06-30	Jaunpur -Obra (Twin)	Double Circuit	Private Sector	APL	334.0	400.0
1778	1777	2022-07-31	Lakadia PS -Bhuj II line (A portion of Reconfiguration of Bhuj PS - Lakadia PS Bhuj-II-Lakadia (Bhuj-Bhuj II) (Loop out portion )	Double Circuit	Central Sector	PGCIL	106.0	765.0
1779	1778	2022-07-31	Rampur -Sambhal line	Double Circuit	Central Sector	PGCIL	149.0	400.0
1780	1779	2022-07-31	Re-conductoring of Maithon RB - Maithon line	Double Circuit	Central Sector	PGCIL	63.0	400.0
1781	1780	2022-07-31	Amrapur - Thaptitanda line	Double Circuit	State Sector	MSETCL	145.0	220.0
1782	1781	2022-07-31	Badhana - Dadri Toe Jhajjar	Double Circuit	State Sector	HVPNL	30.0	220.0
1783	1782	2022-07-31	Dwarka -PPK -II U/G	Double Circuit	State Sector	DTL	11.0	220.0
1784	1783	2022-07-31	Karmnasa (New) - Pusauli (BSPTCL) (TM)	Double Circuit	State Sector	BSPTCL	73.0	220.0
1785	1784	2022-07-31	LILO of 220kv Sambhal -Gajraula line at Sambhal (400)	Double Circuit	State Sector	UPPTCL	91.0	220.0
1786	1785	2022-07-31	LILO of Budhipadar - Tarkera at Bamra	Single Circuit	State Sector	OPTCL	11.0	220.0
1787	1786	2022-07-31	LILO of Nagda -Daloda line at Nagda (220kV) line	Direct Current Distribution System	State Sector	MPPTCL	2.0	220.0
1788	1787	2022-07-31	Raxaul (New) - Gopalganj (TM/ Single Zebra)	Double Circuit	State Sector	BSPTCL	130.0	220.0
1789	1788	2022-07-31	Saharsa (New) - Begusarai	Double Circuit	State Sector	BSPTCL	187.0	220.0
1790	1789	2022-07-31	Tughlakabad - R.K.Puram (U/G Cable)	Double Circuit	State Sector	DTL	26.0	220.0
1791	1790	2022-07-31	Lakadia PS - Banaskantha PS	Double Circuit	Private Sector	APL	351.0	765.0
1792	1791	2022-07-31	LILO of 2nd Ckts. of Zebra -Ranchodpura 400 kV D/C line at Banaskantha (PG) PS	Double Circuit	Private Sector	SGL	35.0	400.0
1793	1792	2022-08-31	Jeerat (New) - Subhasgram (PM-JTL-TBCB)	Double Circuit	Central Sector	PGCIL	214.0	400.0
1794	1793	2022-08-31	Guna-Shivpuri line	Double Circuit	Central Sector	PGCIL	203.0	220.0
1795	1794	2022-08-31	Damaracherla - Miryalaguda (Ckt.-I)	Double Circuit	State Sector	TSTRANSCO	16.0	220.0
1796	1795	2022-08-31	Jalandhar (PGCIL) - Kartarpur	Double Circuit	State Sector	PSTCL	12.0	220.0
1797	1796	2022-08-31	LILO of 220kV Gonda (400) - Bahraich line at Balrampur (220)	Double Circuit	State Sector	UPPTCL	99.0	220.0
1798	1797	2022-08-31	LILO of 220kV Hardoi - Sahjahanpur (PG) at Mallawan (220)	Double Circuit	State Sector	UPPTCL	86.0	220.0
1799	1798	2022-08-31	LILO of 220kV Jahangirpur (765)-IITGNL line at Jewar (220)	Double Circuit	State Sector	UPPTCL	14.0	220.0
1800	1799	2022-08-31	LILO of 220kV Sarojini Nagar - Bachhrawan line at Vijnor (220)	Double Circuit	State Sector	UPPTCL	9.0	220.0
1801	1800	2022-08-31	LILO on 220kV Badnera - Dhamangaon line for 150MW Solar plant of M/s Avadhaa at Dhamangaon Dist Amravati	Single Circuit	State Sector	MSETCL	19.0	220.0
1802	1801	2022-08-31	Wadakkanchery - Kunnamkulam	Multiple Circuits	State Sector	KSEB	45.0	220.0
1803	1802	2022-09-30	Bina - Guna line	Double Circuit	Central Sector	PGCIL	214.0	400.0
1804	1803	2022-09-30	Bhind -Morena line	Double Circuit	Central Sector	PGCIL	109.0	220.0
1805	1804	2022-09-30	Guna - Guna line	Double Circuit	Central Sector	PGCIL	53.0	220.0
1806	1805	2022-09-30	Parulia - Burdwan line	Double Circuit	Central Sector	DVC	207.0	220.0
1807	1806	2022-09-30	Barnala - Handiaya Rly. S/Stn. (Railway Deptt.)	Double Circuit	State Sector	PSTCL	2.0	220.0
1808	1807	2022-09-30	LILO from existing 200kV HSR -Hoody line (proposed GIS) at Shobha Dream Acres line	Double Circuit	State Sector	KPTCL	1.0	220.0
1809	1808	2022-09-30	LILO of 220kV Meerut - Amroha at Chandpur line	Double Circuit	State Sector	UPPTCL	51.0	220.0
1810	1809	2022-09-30	LILO of 220 kV Panki (220) - Bhauti (PG) Kanpur (400) line at Kidwai Nagar Govindnagar (Kanpur) line	Double Circuit	State Sector	UPPTCL	6.0	220.0
1811	1810	2022-09-30	LILO on existing 220kV Ahemadnagar - Bhose line for 400 kV Karjat S/s	Double Circuit	State Sector	MSETCL	72.0	220.0
1812	1811	2022-09-30	Modipuram-II Bagpat PG line	Double Circuit	State Sector	UPPTCL	77.0	220.0
1813	1812	2022-09-30	Rajarhat (PG) - Newtown- II C 220kV DC/CKt. UG Cable line	Double Circuit	State Sector	WBSETCL	23.0	220.0
1814	1813	2022-09-30	LILO of Bhachau - EPGL (Tiple) line at Lakadia PS	Double Circuit	Private Sector	APL	77.0	400.0
1815	1814	2022-10-31	Ingur - Arasur (PGCIL)	Single Circuit	State Sector	TANTRANSCO	54.0	230.0
1816	1815	2022-10-31	RA Puram-Mylapore Feeder UG Cable	Single Circuit	State Sector	TANTRANSCO	4.0	230.0
1817	1816	2022-10-31	LILO of 220kV Chorania - Sadla line and 220kV Sadla- Gondal line at 220kV Shapar s/s	Multiple Circuits	State Sector	GETCO	5.0	220.0
1818	1817	2022-10-31	Panchgaon 400 kV - Panchgaon 220 kV	Double Circuit	State Sector	HVPNL	1.0	220.0
1819	1818	2022-10-31	Vairag- Avaada Solar Park	Single Circuit	State Sector	MSETCL	26.0	220.0
1820	1819	2022-10-31	Bhuj PS - Lakadia PS	Double Circuit	Private Sector	APL	215.0	765.0
1821	1820	2022-10-31	North Karanpura - Chandwa (Jharkhand) NKSTPP line (NKTL -TBCB)	Multiple Circuits	Private Sector	APL	26.0	400.0
1822	1821	2022-10-31	North Karanpura - Chandwa (Jharkhand) PS line (NKTL -TBCB)	Double Circuit	Private Sector	APL	50.0	400.0
1823	1822	2022-11-30	Diversion of Dhauliganga - Bareilly 400 kV D/C line (operated at 220kV) at Bareilly end from Bareilly (UP) to Bareilly (PG) line (one ckt charged)	Double Circuit	Central Sector	PGCIL	8.0	400.0
1824	1823	2022-11-30	LILO of both ckt.of 400 kV D/C Dhauliganga - Bareilly (PG) line at Jauljivi ( 2 Ckts charged)	Double Circuit	Central Sector	PGCIL	3.0	400.0
1825	1824	2022-11-30	Disconnection of 220 kV LILO arrangement of Dhauliganga - Bareilly at Pithoragarh and connecting it to Jauljivi (one ckt charged	Double Circuit	Central Sector	PGCIL	24.0	220.0
1826	1825	2022-11-30	LILO of Karad - Lonikand at Jejuri	Double Circuit	State Sector	MSETCL	22.0	400.0
1827	1826	2022-11-30	Varanasi (PG)-Jaunpur Line	Double Circuit	State Sector	UPPTCL	145.0	400.0
1828	1827	2022-11-30	Bareilly (400) - Amaria line	Double Circuit	State Sector	UPPTCL	77.0	220.0
1829	1828	2022-11-30	Gajwel - Siddipet line (on Galvanized Towers with Mosse ACSR)	Double Circuit	State Sector	TSTRANSCO	65.0	220.0
1830	1829	2022-11-30	LILO of Balimela-Malkangir line at Kalimela	Double Circuit	State Sector	OPTCL	72.0	220.0
1831	1830	2022-11-30	LILO on 220kV Girwali - Hingoli line at 220kV Kurunda S/S	Double Circuit	State Sector	MSETCL	1.0	220.0
1832	1831	2022-11-30	Rasra (400) - Bhadaura (Gazipur) line	Double Circuit	State Sector	UPPTCL	111.0	220.0
1833	1832	2022-12-31	Re-conductring of the NP Kunta-Kolar (Twin Moose) section with high capacity conductors (like twin HTLS equivalent or QM)	Single Circuit	Central Sector	PGCIL	131.0	400.0
1834	1833	2022-12-31	Disconnection of 220kv LILO arrangement of Dhauliganga -Bareilly at Pithoragarh and connecting it to Jaulivi (balance one Ckt. charged)	Double Circuit	Central Sector	PGCIL	24.0	220.0
1835	1834	2022-12-31	LILO of one ckt of Khandwa (PGCIL) - Rajgarh (PGCIL) at Chhegaon	Direct Current Distribution System	State Sector	MPPTCL	3.0	400.0
1836	1835	2022-12-31	Yadadri TPP switchyard - Damaracherla S/S	Double Circuit	State Sector	TSTRANSCO	10.0	400.0
1837	1836	2022-12-31	230 kV D/C line on tower with Zebra conductor for rerouting the existing 230kV PUSHEP - Arasur and Shenbagapudur- arasur feeders in between loc. 306-309	Double Circuit	State Sector	TANTRANSCO	2.0	230.0
1838	1837	2022-12-31	220kV D/C line from 765kV S/stn. PGCIL Bhiwani to 220kV S/stn HVPNL Bhiwani	Double Circuit	State Sector	HVPNL	29.0	220.0
1839	1838	2022-12-31	220kV SCDC line from 220kV Ner S/S - 100MW Solar power plant by M/s. Avaada MH Solar Pvt. Ltd.	Single Circuit	State Sector	MSETCL	14.0	220.0
1840	1839	2022-12-31	2nd Circuit stringing of 220kV Darbhanga (400/220)-Samastipur (New) line	Double Circuit	State Sector	BSPTCL	46.0	220.0
1841	1840	2022-12-31	Ambetha- Devdha	Double Circuit	State Sector	GETCO	20.0	220.0
1842	1841	2022-12-31	Damaracherla - Miryalaguda (Ckt.-II)	Double Circuit	State Sector	TSTRANSCO	16.0	220.0
1843	1842	2022-12-31	LILO of Kharghar -Kalwa (TIFFII-(Trombay section) at Pawne S/S by underground cable	Double Circuit	State Sector	MSETCL	1.0	220.0
1844	1843	2022-12-31	LILO of one Ckt. 220kV D/C FGPP- Pallaline at 220kV S/S Sector-78 Faridabad	Double Circuit	State Sector	HVPNL	4.0	220.0
1845	1844	2022-12-31	LILO of one Ckt of 220kV D/C Amreli - Babara line at proposed 220kV Patkhilori	Double Circuit	State Sector	GETCO	43.0	220.0
1846	1845	2022-12-31	Muzaffarpur (PG) - Chhapra (New)	Double Circuit	State Sector	BSPTCL	129.0	220.0
1847	1846	2022-12-31	Raebareli (400) - Sangipur line	Double Circuit	State Sector	UPPTCL	26.0	220.0
1848	1847	2022-12-31	Diversion of Dhauliganga -Bareilly 400kV D/C (operated at 220kV) at Bareilly end from Bareilly to Bareilly (PG) line (balance one Ckt Charged)	Double Circuit	Central Sector	PGCIL	8.0	400.0
1849	1848	2022-12-31	LILO of both Ckt. of 400kV D/C Dhauliganga -Bareilly (PG) line at Jaulijvi (Balance 2 Ckts Charged)	Double Circuit	Central Sector	PGCIL	3.0	400.0
1850	1849	2023-01-31	UT Chandigarh s/s -Punchkula (PG) s/s line under establishment of 220kV GIS at UT Chandigarh along with 220 kV D/C line from Chandigarh GIS to 400/220kV Punchkula (PG) s/s (Only Ckt.-1)	Double Circuit	Central Sector	PGCIL	24.0	220.0
1851	1850	2023-01-31	Bus Extn. from Old Switchyard - New Switchyard for evacuation arrangement for 1x660MW Generation of Bhusawal	Double Circuit	State Sector	MSETCL	1.0	400.0
1852	1851	2023-01-31	Lahal GISS - Chamera (PS) (Both Ckts.)	Double Circuit	State Sector	HPPTCL	71.0	400.0
1853	1852	2023-01-31	LILO of 400kV HNPCL- Kamavarapukota TMDC line to proposed 400/220/11 kV Guddigudem S/S	Double Circuit	State Sector	APTRANSCO	41.0	400.0
1854	1853	2023-01-31	Kethireddypally - Chandanvally s/s	Double Circuit	State Sector	TSTRANSCO	25.0	220.0
1855	1854	2023-01-31	Koradi-II - Uppalwadi UG and O/H line	Double Circuit	State Sector	MSETCL	14.0	220.0
1856	1855	2023-01-31	LILO of Budhipadar - Tarkera at Kuanramunda	Double Circuit	State Sector	OPTCL	32.0	220.0
1857	1856	2023-01-31	LILO of Hiranagar-Gladni at Chowadhi	Single Circuit	State Sector	JKPDD	1.0	220.0
1858	1857	2023-01-31	LILO of one Ckt. of Bhopal -Ashta line at 220kv Bairagarh line	Direct Current Distribution System	State Sector	MPPTCL	7.0	220.0
1859	1858	2023-01-31	LILO of VTS- 3 and 4 -Piduguralla	Double Circuit	State Sector	APTRANSCO	1.0	220.0
1860	1859	2023-01-31	LILO on 220kV MC/DC towers from 220kV Narendra-Haveri line to proposed S/S (for a distance of 2.418 kms)	Double Circuit	State Sector	KPTCL	19.0	220.0
1861	1860	2023-01-31	Mundayad - Thalasseri line	Double Circuit	State Sector	KSEB	43.0	220.0
1862	1861	2023-01-31	Pulivendula - Mutyalacheruvu	Double Circuit	State Sector	APTRANSCO	109.0	220.0
1863	1862	2023-01-31	Lakadia - Vadodara Transmission line	Double Circuit	Private Sector	SGL	670.0	765.0
1864	1863	2023-02-28	Lower Subhansiri - Biswanath Chariyali line -I	Double Circuit	Central Sector	PGCIL	354.0	400.0
1865	1864	2023-02-28	NTPC Limited -Bhadla-II (On D/C Tower)	Single Circuit	Central Sector	NTPC Ltd.	25.0	400.0
1866	1865	2023-02-28	NTPC ltd 300MW Power Plant -Common (PS) of NTPCs 250MW and 300MW Solar Project	Single Circuit	Central Sector	NTPC Ltd.	1.0	400.0
1867	1866	2023-02-28	NTPC ltd -Tuticorin-II (GIS)	Single Circuit	Central Sector	NTPC Ltd.	18.0	230.0
1868	1867	2023-02-28	NTPC Ltd 300MW Power Plant-Bhadla-II (PS)	Single Circuit	Central Sector	NTPC Ltd.	19.0	220.0
1869	1868	2023-02-28	NTPC Ltd (90MW) Power Plant -Common (PS) of NTPCs (150MW) and (90MW) Solar Project at Devikoot-Fatehgarh-II (PS)	Single Circuit	Central Sector	NTPC Ltd.	2.0	220.0
1870	1869	2023-02-28	Solar Project at Devikoot(150MW) -Fatehgharh-II (PS)	Single Circuit	Central Sector	NTPC Ltd.	2.0	220.0
1871	1870	2023-02-28	Various DTLs from Solar Park-Pavagada (PS)	Double Circuit	State Sector	KSPDCL	87.0	400.0
1872	1871	2023-02-28	Basin Bride - Pulianthope (UG Cable)	Single Circuit	State Sector	TANTRANSCO	1.0	230.0
1873	1872	2023-02-28	Extn. of new EGT supply Laying of 230kV XLPE AI UG cable for a route length of 1Km from CTT tower - Metering point inside consumer premises	Single Circuit	State Sector	TANTRANSCO	1.0	230.0
1874	1873	2023-02-28	Tondiarpet SS to Pulianthope GIS SS (UG Cable)	Double Circuit	State Sector	TANTRANSCO	5.0	230.0
1875	1874	2023-02-28	Vellalaviduthi 400 kV SS - Thuvakudy 230 kV SS	Single Circuit	State Sector	TANTRANSCO	48.0	230.0
1876	1875	2023-02-28	Chatra - Pakribarwadih	Double Circuit	State Sector	JUSNL	120.0	220.0
1877	1876	2023-02-28	Chibramau- Farrukhabad line	Double Circuit	State Sector	UPPTCL	52.0	220.0
1878	1877	2023-02-28	Galiveedu PSS-1-NP Kunta (CKt.-I)	Double Circuit	State Sector	APSPCL	9.0	220.0
1879	1878	2023-02-28	Galiveedu PSS-1- NP Kunta (Ckt.-II)	Double Circuit	State Sector	APSPCL	9.0	220.0
1880	1879	2023-02-28	Galiveedu PSS-3-NP Kunta (Ckt-1)	Double Circuit	State Sector	APSPCL	3.0	220.0
1881	1880	2023-02-28	Galiveedu PSS-3-NP Kunta (Ckt.II)	Double Circuit	State Sector	APSPCL	3.0	220.0
1882	1881	2023-02-28	LILO of Jaunpur -Gajokhar at Junpur LIne	Double Circuit	State Sector	UPPTCL	59.0	220.0
1883	1882	2023-02-28	LILO of Jetpur - Sardargadh line at Shapur s/s	Double Circuit	State Sector	GETCO	12.0	220.0
1884	1883	2023-02-28	LILO of one Ckt of Azamgarh-II -Bhadoi line at Machhlisahar (Jaunpur)	Double Circuit	State Sector	UPPTCL	78.0	220.0
1885	1884	2023-02-28	LILO of Sarnath - Sahupuri at Bhadaura	Double Circuit	State Sector	UPPTCL	154.0	220.0
1886	1885	2023-02-28	LILO on Lalpar - Sartanpar line at Wankaner (M/C tower by replacement of existing 132kV towers) (AL-59)	Double Circuit	State Sector	GETCO	76.0	220.0
1887	1886	2023-02-28	NP Kunta PSS2-NP Kunta (CKt.-1)	Double Circuit	State Sector	APSPCL	2.0	220.0
1888	1887	2023-02-28	NP Kunta Pss2-NP Kunta (Ckt-2)	Double Circuit	State Sector	APSPCL	2.0	220.0
1889	1888	2023-02-28	NP Kunta PSS3-NP Kunta (Ckt-1)	Double Circuit	State Sector	APSPCL	5.0	220.0
1890	1889	2023-02-28	NP Kunta PSS3-NP Kunta (Ckt-2)	Double Circuit	State Sector	APSPCL	5.0	220.0
1891	1890	2023-02-28	NP Kunta PSS4 -NP Kunta (Ckt-1)	Double Circuit	State Sector	APSPCL	7.0	220.0
1892	1891	2023-02-28	NP Kunta PSS4 -NP Kunta (Ckt-2)	Double Circuit	State Sector	APSPCL	7.0	220.0
1893	1892	2023-02-28	Tibber -Sohal line	Double Circuit	State Sector	PSTCL	7.0	220.0
1894	1893	2023-02-28	Adani Generation Switchyar-Fatehgarh (PS)	Double Circuit	Private Sector	AREPRL	1.0	400.0
1895	1894	2023-02-28	Avaada Energy Private Limited -Bikaner (PS)	Single Circuit	Private Sector	AVAADA	14.0	400.0
1896	1895	2023-02-28	Ayana Renewable Power One Pvt. Ltd. Plant- Bikaner (PS)	Single Circuit	Private Sector	AYANA	10.0	400.0
1897	1896	2023-02-28	Ayana Renewable Power Three Power Plant Common (PS) of Ayana Renewable Power One and Three Pvt. Ltd. -Bikaner (PS)	Single Circuit	Private Sector	AYANA	1.0	400.0
1898	1897	2023-02-28	Common Pooling Point of both Azure Bikaner 500MW Plants -Bikaner	Single Circuit	Private Sector	AZURE	3.0	400.0
1899	1898	2023-02-28	RENEW (Jharkhand Four) PowerPlant- Common (PS) of RENEW (Jharkhand Four) -Bikaner (PS)	Single Circuit	Private Sector	RENEWSOLARENERGY	13.0	400.0
1900	1899	2023-02-28	ReNew Solar Power Plant Switchyard -Bikaner	Single Circuit	Private Sector	RENEWSOLARPOWER	4.0	400.0
1901	1900	2023-02-28	Betam Wind Energy-Tuticorin-II	Single Circuit	Private Sector	BWEPL	18.0	230.0
1902	1901	2023-02-28	Green Infra Renewable- Tuticorin-II	Single Circuit	Private Sector	GREENINFRA	35.0	230.0
1903	1902	2023-02-28	GRT Jewllers (India) Private Limited-Tuticorin-II (GIS)	Single Circuit	Private Sector	GRT	7.0	230.0
1904	1903	2023-02-28	JSW Future Energy Ltd-Tuticorin-II	Single Circuit	Private Sector	JSWFuture	23.0	230.0
1905	1904	2023-02-28	Mytrah Wind Farms-Tirunelveli (PS)	Double Circuit	Private Sector	MYTRAH	16.0	230.0
1906	1905	2023-02-28	Orange Sironj - Tuticorin-II	Single Circuit	Private Sector	ORANGE	29.0	230.0
1907	1906	2023-02-28	Sprng Renewable-Pugalur	Single Circuit	Private Sector	SPRNG	4.0	230.0
1908	1907	2023-02-28	ABC Bhadla Solar Power Plant -Bhadla-II P(S)	Single Circuit	Private Sector	ABCSolar	12.0	220.0
1909	1908	2023-02-28	ACME Bhadla Solar Power Plant-Bhadla	Single Circuit	Private Sector	ACME	10.0	220.0
1910	1909	2023-02-28	ACME Solar Holdings Ltd. Power Plant - Bhadla -II (PS)	Single Circuit	Private Sector	ACME	10.0	220.0
1911	1910	2023-02-28	Adani Green Energy Nine Solar Power Project-Fatehgarh-II (Scope od ISTS)	Single Circuit	Private Sector	AHEJL	45.0	220.0
1912	1911	2023-02-28	Adani Grren Energy Seven Ltd. Plant -Fatehgarh-II (PS)	Single Circuit	Private Sector	AHEJL	25.0	220.0
1913	1912	2023-02-28	Alfanar -Energy Private Limited (AEPL-Kotda Madh) - Bhuj (PS)	Single Circuit	Private Sector	ALFANAR	66.0	220.0
1914	1913	2023-02-28	AREPRL Solar Park-Bhadla	Double Circuit	Private Sector	AREPRL	35.0	220.0
1915	1914	2023-02-28	Avaada Energy Pvt Ltd Solar Power Plant - Bhadla-II (PS)	Single Circuit	Private Sector	AVAADA	22.0	220.0
1916	1915	2023-02-28	Avikiran Solar India Private Limited -Bhuj PS	Single Circuit	Private Sector	AVIKIRAN	83.0	220.0
1917	1916	2023-02-28	Avikiran Surya India Pvt. Solar Power Plant- Bikaner PS	Single Circuit	Private Sector	AVIKIRAN	10.0	220.0
1918	1917	2023-02-28	Azure 130MW Plant-Bhadla	Single Circuit	Private Sector	AZURE	14.0	220.0
1919	1918	2023-02-28	AZURE Solar PV Plant -Bhadla-2-Bhadla	Single Circuit	Private Sector	AZURE	21.0	220.0
1920	1919	2023-02-28	AZURE Solar PV Plant Bhadla -Bhadla	Single Circuit	Private Sector	AZURE	4.0	220.0
1921	1920	2023-02-28	Chhugar PS -Dayapar/Ratadiaya (PS)	Single Circuit	Private Sector	AWEKL	37.0	220.0
1922	1921	2023-02-28	CLP India Private Limited -Jam Khambhaliya (PS)	Single Circuit	Private Sector	APRAAVA	43.0	220.0
1923	1922	2023-02-28	Construction 220kV S/C each from Jaisalmer I Project and Jaisalmer-II Project upto Common point of Jaisalmer -I Project and Jaisalmer-II Project-II -Fatehgarh-II	Single Circuit	Private Sector	RENEWSOLARENERGY	17.0	220.0
1924	1923	2023-02-28	Construction 220kV S/C line from Jaisalmer I Project and Jaislamer II Project upto common point Common point of Jaisalmer -I Project and Jaisalmer II Project -Fatehgarh -II	Double Circuit	Private Sector	RENEWSOLARENERGY	7.0	220.0
1925	1924	2023-02-28	Dayapar / Ratadiya PS-Bhuj (with Capacity of at least 725 MW at Nominal Voltage)	Double Circuit	Private Sector	AWEKL	37.0	220.0
1926	1925	2023-02-28	EDEN Cite ISTS RAj Power Plant -Fatehgarh-II (New ) (PS)	Single Circuit	Private Sector	EDEN	13.0	220.0
1927	1926	2023-02-28	Essel Solar Park- Bhadla	Double Circuit	Private Sector	ESUCRL	76.0	220.0
1928	1927	2023-02-28	Green Infra Wind Energy Ltd. (GIWEL) -(Bhuj) - Bhuj (PS)	Single Circuit	Private Sector	GIWEL	64.0	220.0
1929	1928	2023-02-28	Green Infra Wind Energy Ltd. (GIWEL-Roha)- Bhuj(PS)	Single Circuit	Private Sector	GIWEL	65.0	220.0
1930	1929	2023-02-28	Hero Solar Generation Switchyard-Bhadla	Single Circuit	Private Sector	HEROSOLAR	10.0	220.0
1931	1930	2023-02-28	IWISL -Bhuj (PS)	Double Circuit	Private Sector	INOX	77.0	220.0
1932	1931	2023-02-28	IWISL (Dayapar)-Bhuj (PS)	Double Circuit	Private Sector	CONTINUUM	73.0	220.0
1933	1932	2023-02-28	Jaisalmer-3 Plant - Fatehgarh-II	Single Circuit	Private Sector	RENEWSOLARENERGY	19.0	220.0
1934	1933	2023-02-28	Jaisalmer-4 Project-Fatehgarh-II (PS)	Single Circuit	Private Sector	RENEWSOLARPOWER	8.0	220.0
1935	1934	2023-02-28	Mahindra Susten 250MW Solar Project-Bhadla	Single Circuit	Private Sector	MAHINDRA	16.0	220.0
1936	1935	2023-02-28	Mahindra Susten Solar Power Project- Bhadla-II	Single Circuit	Private Sector	MAHINDRA	19.0	220.0
1937	1936	2023-02-28	Mahoba Solar Power Plant Switch YArd -Bhadla	Single Circuit	Private Sector	AREHL	16.0	220.0
1938	1937	2023-02-28	Mahoba Solar (UP) Private Limeted Power Project-Fatehgarh-II (New) PS	Double Circuit	Private Sector	AREHL	72.0	220.0
1939	1938	2023-02-28	Mahoba Solar (UP) Private Limited-Bhadla	Single Circuit	Private Sector	AREHL	16.0	220.0
1940	1939	2023-02-28	Murchbana/Mokhra PS - Dayapar/Ratadiya (PS)	Single Circuit	Private Sector	AWEKL	37.0	220.0
1941	1940	2023-02-28	Netra-Bhuj (PS)	Single Circuit	Private Sector	NETRA	81.0	220.0
1942	1941	2023-02-28	OKWPL - Bhachau (PS)	Double Circuit	Private Sector	OSTRO	69.0	220.0
1943	1942	2023-02-28	POWERICA Ltd. -Jam Khambaliya (PS)	Single Circuit	Private Sector	POWERICA	1.0	220.0
1944	1943	2023-02-28	ReNew Power Limited -Hiriyur	Single Circuit	Private Sector	RENEWPOWER	78.0	220.0
1945	1944	2023-02-28	ReNew Wind Energy (AP2) Private Limited- Bhuj (PS)	Single Circuit	Private Sector	RENEW	73.0	220.0
1946	1945	2023-02-28	RPVPL- Bhachau	Double Circuit	Private Sector	RENEWPOWER	48.0	220.0
1947	1946	2023-02-28	RUMS Ltd. Switchyard -Rewa (PS)	3xDouble Circuit	Private Sector	RUMSL	10.0	220.0
1948	1947	2023-02-28	SBER Eleven Solar Power Project -Bikaner	Single Circuit	Private Sector	SBSR	11.0	220.0
1949	1948	2023-02-28	SBE Renewables Ten Private Ltd Power Project-Fatehgarh-II (PS)	Double Circuit	Private Sector	SBERTPL	57.0	220.0
1950	1949	2023-02-28	SBESS-Indore (PG)	Single Circuit	Private Sector	AWEMPL	70.0	220.0
1951	1950	2023-02-28	SEI Sunshine PSS_Shivpuri (MPPTCL)	Double Circuit	Private Sector	SEISUNSHINE	4.0	220.0
1952	1951	2023-02-28	SESPL -Bhuj-II	Single Circuit	Private Sector	SRIJAN	20.0	220.0
1953	1952	2023-02-28	Sherisha Rooftop Solar SPV Four Private Ltd.- Raipur (Capacity at least200MW at Nominal Voltage)	Single Circuit	Private Sector	SHERISHA	1.0	220.0
1954	1953	2023-02-28	Sitac-Bhuj-II	Single Circuit	Private Sector	SITAC	60.0	220.0
1955	1954	2023-02-28	Tata Power Green Energy Ltd Solar Power Plant-Bikaner-I (PS)	Single Circuit	Private Sector	TATAGREEN	19.0	220.0
1956	1955	2023-02-28	Tata Power Renewable Energy Limited-Bhadla	Single Circuit	Private Sector	TATARENEW	46.0	220.0
1957	1956	2023-02-28	TPREL 500 MW Solar Power Project Chhayan- Bhadla	Single Circuit	Private Sector	TATARENEW	46.0	220.0
1958	1957	2023-03-31	LILO of 765kV Gr. Noida (765kV)- Hapur(765) line at Meerut	Single Circuit	Central Sector	PGCIL	70.0	765.0
1959	1958	2023-03-31	LILO of 400kV Bareilly (PGCIL) - Moradabad line (Ckt-1) at Rampur s/s (under Mohanlalgani Intrastate Project )	Double Circuit	Central Sector	PGCIL	5.0	400.0
1960	1959	2023-03-31	Mohindergarh - Bhiwani line	Double Circuit	Central Sector	PGCIL	122.0	400.0
1961	1960	2023-03-31	Reconducting of Kolhapur (PG)- Kolhapur (MSETCL) (Ckt-1) under TS Strengthening beyond Kolhapur for export of power from Solar and Wind Energy Zones in Southern Region	Double Circuit	Central Sector	PGCIL	40.0	400.0
1962	1961	2023-03-31	Simbhavali -Meerut line	Double Circuit	Central Sector	PGCIL	57.0	400.0
1963	1962	2023-03-31	(Assam) Rangia - Amingaon line	Double Circuit	Central Sector	PGCONSULTANCY	198.0	220.0
1964	1963	2023-03-31	(Assam) Tinsukia - Behiating (new Dibrugarh)	Double Circuit	Central Sector	PGCONSULTANCY	336.0	220.0
1965	1964	2023-03-31	(Nagaland) New Kohima - Mokokchung (PG)	Double Circuit	Central Sector	PGCONSULTANCY	276.0	220.0
1966	1965	2023-03-31	Re-conducting of Alipurduar - Solakati 220kV line with Single GTLS conductor under NERSS-XII	Double Circuit	Central Sector	PGCIL	202.0	220.0
1967	1966	2023-03-31	(Sikkim) Rangpo (PG) - Samardong	Double Circuit	Central Sector	PGCONSULTANCY	5.0	220.0
1968	1967	2023-03-31	UT Chandigarh S/s - Panchkula (PG) s/s line under Establishment of 220/22 kV GIS at UT Chandigarh along with 220 kV D/C line from Chandigarh GIS-400/220 kV Panchkula (PG) s/s (Ckts-II )	Double Circuit	Central Sector	PGCIL	24.0	220.0
1969	1968	2023-03-31	Kalaburagi (Ferozabad) MC tower of 400kV YTPS -BPS line near Merched Village at Kalaburagi	Double Circuit	State Sector	KPTCL	234.0	400.0
1970	1969	2023-03-31	Kamuthi - Newly constructed Ottapidara	Double Circuit	State Sector	TANTRANSCO	143.0	400.0
1971	1970	2023-03-31	LILO of both circuits of 400kV Khammam - Mamidipally to Choutuppal S/S	Double Circuit	State Sector	TSTRANSCO	33.0	400.0
1972	1971	2023-03-31	Manali - Pulianthoppe	Double Circuit	State Sector	TANTRANSCO	19.0	400.0
1973	1972	2023-03-31	LILO of Existing Paramathi - Alundur at Valayapatty	Double Circuit	State Sector	TANTRANSCO	60.0	230.0
1974	1973	2023-03-31	LILO of T. Sipcot -Savasapuram 230kV Feeder - the Ottapidaram	Double Circuit	State Sector	TANTRANSCO	12.0	230.0
1975	1974	2023-03-31	Aug. of 1st Ckt from Rajpura - Mandi Gobindgarh 1 with HTLS	Single Circuit	State Sector	PSTCL	32.0	220.0
1976	1975	2023-03-31	Aug. of 2nd Ckts from Rajpura-Mandi Gobindgarh 1 with HTLS	Single Circuit	State Sector	PSTCL	32.0	220.0
1977	1976	2023-03-31	Balotra -HRRL (Refinery) HPCL Rajasthan Refinery Ltd line from 220kV GSS RVPNL Balotra	Single Circuit	State Sector	RVPNL	29.0	220.0
1978	1977	2023-03-31	Bhiwadi -DFCCIL TSS Mundana (Deposit work of DFCCIL Railway)	Double Circuit	State Sector	RVPNL	6.0	220.0
1979	1978	2023-03-31	Boner - Aligarh (400) line	Single Circuit	State Sector	UPPTCL	18.0	220.0
1980	1979	2023-03-31	Jagalur (Hiremallanahole) - Chitradurga	Double Circuit	State Sector	KPTCL	72.0	220.0
1981	1980	2023-03-31	Jodhpur (400 kV GSS) - Banar	Double Circuit	State Sector	RVPNL	21.0	220.0
1982	1981	2023-03-31	Kalaburagi (Ferozabad) Line1 from proposed Kalaburagi s/s (Ferozabad) - Existing line at Shahabad (Sedam)	Double Circuit	State Sector	KPTCL	34.0	220.0
1983	1982	2023-03-31	Kalaburagi (Ferozabad) line 2 from proposed 400/220 kV Kalaburagi s/s - Existing 220kV S/C line from Shahapur-Kapnoor line at Shahapppur	Double Circuit	State Sector	KPTCL	7.0	220.0
1984	1983	2023-03-31	LILO from Kothipura - Tubinakere at Channapatna	Double Circuit	State Sector	KPTCL	7.0	220.0
1985	1984	2023-03-31	LILO line on M/C Towers from 220kV RTPS - Sedam - Ramasamudra S/S	Multiple Circuits	State Sector	KPTCL	37.0	220.0
1986	1985	2023-03-31	LILO of 220kV Muzaffarnagar - Modipuram (220) at Khatauli (220)	Double Circuit	State Sector	UPPTCL	2.0	220.0
1987	1986	2023-03-31	LILO of both circuits of Malkaram - Narketpally to Choutuppal SS (Multi circuit towers)	Multiple Circuits	State Sector	TSTRANSCO	61.0	220.0
1988	1987	2023-03-31	LILO of Jetpur-Visavadar line at Bhesan s/s	Double Circuit	State Sector	GETCO	5.0	220.0
1989	1988	2023-03-31	LILO of Khagaul (BSPTCL) - Sipara (BSPTCL) at Jakkanpur (New)	Single Circuit	State Sector	BSPTCL	50.0	220.0
1990	1989	2023-03-31	LILO of KTPP-Howrah at Proposed Food Park (GIS) s/s	Double Circuit	State Sector	WBSETCL	2.0	220.0
1991	1990	2023-03-31	LILO of Moradabad (400) - Rampur (220) at Rampur (765) line	Double Circuit	State Sector	UPPTCL	17.0	220.0
1992	1991	2023-03-31	LILO of VSS - Kakinada line at Parawada in Visakhapatnam District	Double Circuit	State Sector	APTRANSCO	1.0	220.0
1993	1992	2023-03-31	Malout - Abohar	Single Circuit on Double Circuit	State Sector	PSTCL	30.0	220.0
1994	1993	2023-03-31	Maszid Moth - Tughlakabad (U/G) Cable	Double Circuit	State Sector	DTL	14.0	220.0
1995	1994	2023-03-31	Samardong - Dikchu Pool line	Double Circuit	State Sector	SIKKIM	45.0	220.0
1996	1995	2023-03-31	Verpal-Dhukhniwaran line	Double Circuit	State Sector	PSTCL	6.0	220.0
1997	1996	2023-04-30	Sholinganallur (Ottiyambakkam) - Omega	Double Circuit	State Sector	TANTRANSCO	66.0	230.0
1998	1997	2023-04-30	Jangaon -Devannapet line	Double Circuit	State Sector	TSTRANSCO	109.0	220.0
1999	1998	2023-04-30	LILO of Duburi - Balasore at Dhamra	Double Circuit	State Sector	OPTCL	70.0	220.0
2000	1999	2023-04-30	Saharanpur PG (400) - Deoband line	Double Circuit	State Sector	UPPTCL	50.0	220.0
2001	2000	2023-04-30	Tajpur- Goraul line	Double Circuit	State Sector	BSPTCL	102.0	220.0
2002	2001	2023-04-30	AGEL - Bhuj-II line	Single Circuit	Private Sector	ADANIGREEN	79.0	220.0
2003	2002	2023-05-31	Laying of 400 KV 1X2500 Sq.mm XLPE UG cable from perumbakkam junction to Pallikarunai OH/UG Junction in the Sholinghanallur to Guindy 400 KV Feeder for aroute length of 8.546 Km under turnkey basis	Single Circuit	State Sector	TANTRANSCO	8.0	400.0
2004	2003	2023-05-31	Soja -Zerda line (Pkg-2) with Twin AL-59 Conductor	Double Circuit	State Sector	GETCO	135.0	400.0
2005	2004	2023-05-31	Erection of 230KV SC on DC tower with ZEBRA conductor from Pudukottai 230 LV SS to Vellalaviduthy 400/230 KV SS.	Single Circuit	State Sector	TANTRANSCO	51.0	230.0
2006	2005	2023-05-31	220KV DC/SC (2-Phase) line from the existing 220/11KV LIS SS Settypalli to proposed 220/25KV RTSS Veldurthy	Double Circuit+Single Circuit	State Sector	APTRANSCO	6.0	220.0
2007	2006	2023-05-31	220KV Pallantla-Guddigudem DC Line at Loc.No.54 to 400/220/11KV Guddigudem SS	Double Circuit	State Sector	APTRANSCO	25.0	220.0
2008	2007	2023-05-31	2-Phase Single Circuit Transmission line on D/C towers from 220 kV S/s Jafferpur to TSS Rudraupur for M/s IRCON	Single Circuit	State Sector	PTCUL	10.0	220.0
2009	2008	2023-05-31	Hindupur (400) - Pampanur Tanda (220)(GEC-I)	Double Circuit	State Sector	APTRANSCO	140.0	220.0
2010	2009	2023-05-31	LILO of 220kV Phulpur- Jhunsi 400kV Machhalishahar	Single Circuit	State Sector	UPPTCL	99.0	220.0
2011	2010	2023-05-31	LILO of Bina - Ganjbasoda 220 KV Line at Bina (MPPTCL) 400KV S/s	Direct Current Distribution System	State Sector	MPPTCL	25.0	220.0
2012	2011	2023-05-31	LILO of Howarh-KTPP at Jangalpur 220 kV GIS	Double Circuit	State Sector	WBSETCL	1.0	220.0
2013	2012	2023-05-31	LILO on 220 kV Nalasopara- Boisar line at Palghar	Double Circuit	State Sector	MSETCL	5.0	220.0
2014	2013	2023-05-31	LILO Pallantla -Pattiseema line at Guddigudem line	Double Circuit	State Sector	APTRANSCO	23.0	220.0
2015	2014	2023-06-30	Bikaner-II PS-Khetri 400kV line (phase II part F)	Multiple Circuits	Central Sector	PGCIL	1102.0	400.0
2016	2015	2023-06-30	Khetri-Bhiwadi 400kV line (Twin HTLS) (PHASE II Part F)	Double Circuit	Central Sector	PGCIL	251.0	400.0
2017	2016	2023-06-30	Re-conductoring of BTPS- Salakati 220kv line with Single HTLS Conductor	Double Circuit	Central Sector	PGCIL	8.0	220.0
2018	2017	2023-06-30	Dindi S/s -Yedula s/s	Double Circuit	State Sector	TSTRANSCO	111.0	400.0
2019	2018	2023-06-30	220kV DC line from 220kV Wani s/s to 132kV Pandharkawda	Double Circuit	State Sector	MSETCL	65.0	220.0
2020	2019	2023-06-30	220 kV Pilipokhar Agra (400) - I.O.C.L. Mathura D/C line	Double Circuit	State Sector	UPPTCL	84.0	220.0
2021	2020	2023-06-30	Bhari (proposed) - Daheru Railway TSS line	Double Circuit	State Sector	PSTCL	26.0	220.0
2022	2021	2023-06-30	Existing 220/132kV Fabcity - Amazon (Fabcity) S/S	Double Circuit	State Sector	TSTRANSCO	4.0	220.0
2023	2022	2023-06-30	LILO of Pulukurthy- Bheemghanpur line to KTPP SS	Double Circuit	State Sector	TSTRANSCO	46.0	220.0
2024	2023	2023-06-30	Warangal(New)- Warangal(Existing)	Double Circuit	Private Sector	APL	95.0	400.0
2025	2024	2023-07-31	Removal of LILO of one Ckt. of Bhadla-Bikaner  at Bikaner  and Extension of this LILO section from Bikaner  to Bikaner-PS -Bikaner 	Double Circuit	Central Sector	PGCIL	68.0	400.0
2026	2025	2023-07-31	220kV Budaun  - Dataganj DC line	Double Circuit	State Sector	UPPTCL	55.0	220.0
2027	2026	2023-07-31	220kV TMDC from 400kV Hindupur S/S - 220kV S/S Gollapuram	Double Circuit	State Sector	APTRANSCO	59.0	220.0
2028	2027	2023-07-31	Diversion of existing STPS-Asansol Transmission line	Double Circuit	State Sector	WBSETCL	5.0	220.0
2029	2028	2023-07-31	LILO of Durgapur - Asansole Tr. Line at proposed Mongalpur 220kV GIS	Mixed Circuit	State Sector	WBSETCL	9.0	220.0
2030	2029	2023-07-31	Hyderabad - Kurnool	Double Circuit	Private Sector	APL	335.0	765.0
2031	2030	2023-08-31	Reconductoring of Kolhapur - Kolhapur  400kv D/C line  under TS strengthening beyond Kolhapur for export of power from Solar and Wind Energy	Double Circuit	nan	PGCIL	40.0	400.0
2032	2031	2023-08-31	LILO of one circuit of 220kV D/C BECL - Botad line at proposed 220kV Vallabhipur with ACSR Zebra conductor with OPGW	Double Circuit	Central Sector	GETCO	11.0	220.0
2033	2032	2023-08-31	Strengthening of existing 220kV Antharasanahalli-Nelamangala SC line by replacing Drake by HTLS conductor	Single Circuit	Central Sector	KPTCL	59.0	220.0
2034	2033	2023-08-31	Rewa UMSP - Sidhi 220kV DCDS line	Direct Current Double Sided	Central Sector	MPPTCL	126.0	220.0
2035	2034	2023-08-31	LILO of 220kV Sirohi - Bhinmal line at 220kV GSS Reodar line	Double Circuit	Central Sector	RVPNL	50.0	220.0
2036	2035	2023-08-31	220kV 1000Sq.mm XPLE Cable from 220kV SS Maheswaram- 220/33kV Amazon  SS 	Double Circuit	Central Sector	TSTRANSCO	1.0	220.0
2037	2036	2023-08-31	LILO of 220 kV Agra PG- Sikandra line at Kirawali	Double Circuit	Central Sector	UPPTCL	4.0	220.0
2038	2037	2023-08-31	LILO of 220 kV Hapur- Simbhaoli line at Simbhaoli	Double Circuit	Central Sector	UPPTCL	39.0	220.0
2039	2038	2023-09-30	Fatehgarh-III  - Jaisalmer-II 	Double Circuit	Central Sector	PGCIL	100.0	400.0
2040	2039	2023-09-30	Sitamarhi   - Dhalkebar  	Double Circuit	Central Sector	PGCIL	78.0	400.0
2041	2040	2023-09-30	Jammalamadugu - Porumamilla YSR Kadapa District	Double Circuit	State Sector	APTRANSCO	200.0	220.0
2042	2041	2023-09-30	Creation of 220kV D/C Mund-IOCL line	Double Circuit	State Sector	HVPNL	68.0	220.0
2043	2042	2023-09-30	Narlapur SS - Yedula SS	Double Circuit	State Sector	TSTRANSCO	55.0	400.0
2044	2043	2023-09-30	LILO of Salivagu- Bheemghanpur line to KTPP SS	Double Circuit	State Sector	TSTRANSCO	42.0	220.0
2045	2044	2023-09-30	LILO of 220kV Gorakhpur - Mahrajganj DC line at Annand Nagar	Double Circuit	State Sector	UPPTCL	70.0	220.0
2046	2045	2023-09-30	LILO of 220kV Sitapur  - Nighasan  SC line at Kanduni	Double Circuit	State Sector	UPPTCL	59.0	220.0
2047	2046	2023-09-30	Maharajganj - Gorakhpur PG  line	Double Circuit	State Sector	UPPTCL	175.0	220.0
2048	2047	2023-09-30	Warangal  - Chilakaluripeta	Double Circuit	Private Sector	APL	392.0	765.0
2049	2048	2023-09-30	Warangal  - Hyderabad	Double Circuit	Private Sector	APL	268.0	765.0
2050	2049	2023-09-30	Masaya Solar Energy Private Limeted- Khandwa 220kV S/C Line	Single Circuit	Private Sector	MASAYA	14.0	220.0
2051	2050	2023-09-30	TPL- Jam Khambhaliya PS line	Single Circuit	Private Sector	TORRENT	28.0	220.0
2052	2051	2023-10-31	LILO of one Ckt. on Monopole of Ataur  - Indirapuram  D/C Quad Moose on Noida under TB - 202111 	Double Circuit	Central Sector	PGCIL	21.0	400.0
2053	2052	2023-10-31	LILO of both Clts. of 220 kV D/C Thavar -Tharad line at proposed 220kV Ghodasr  with Al-59 conductor with OPGW	Mixed Circuit	State Sector	GETCO	23.0	220.0
2054	2053	2023-10-31	Construction from the existing Chintamani S/s - the proposed Srinivasapura S/s at Srinivasapura	Double Circuit	State Sector	KPTCL	48.0	220.0
2055	2054	2023-10-31	220kV Deoli  -Ghatodi line upto Yawatmal LILO point	Double Circuit	State Sector	MSETCL	99.0	220.0
2056	2055	2023-10-31	LILO of Karaikudi - Pugalur feeder-I at Vellalaviduthi	Double Circuit	State Sector	TANTRANSCO	167.0	400.0
2057	2056	2023-10-31	Erection of 230kV Dc line on DC towers with Zebra conductor by making LILO of 230 kV MTPS- Salem Feeder at the New Karuppur 230/110kV s/s	Double Circuit	State Sector	TANTRANSCO	25.0	230.0
2058	2057	2023-10-31	Erection of 230kV S/C line on D/C tower from Vellalaviduthi 400kV S/S  - Thuvakudy 230kV S/S	Single Circuit	State Sector	TANTRANSCO	46.0	230.0
2059	2058	2023-10-31	Erection of 230 kV S/C line on DC tower from Vellalaviduthi 400 kV S/S - Nemmeli Thippayajudy 230 kV S/S	Single Circuit	State Sector	TANTRANSCO	23.0	230.0
2060	2059	2023-10-31	Vellalaviduthi - existing Pudukottaai 230 kV SS	Single Circuit on Double Circuit	State Sector	TANTRANSCO	21.0	230.0
2061	2060	2023-10-31	Vellaviduthi S/S  and 230 kV S/C line on D/C tower for Loc A - Mondipatty 230kV s/s	Single Circuit	State Sector	TANTRANSCO	92.0	230.0
2062	2061	2023-10-31	Yedula-Vattem QMDC line	Double Circuit	State Sector	TSTRANSCO	30.0	400.0
2063	2062	2023-10-31	220kV Shahjahanpur  - Gola  DC line	Double Circuit	State Sector	UPPTCL	115.0	220.0
2064	2063	2023-10-31	Bhadohi - Raja Ka Talab DC line	Double Circuit	State Sector	UPPTCL	3.0	220.0
2065	2064	2023-10-31	Kursi Road  - Kanduni line	Double Circuit	State Sector	UPPTCL	91.0	220.0
2066	2065	2023-10-31	LILO of 220kV Parichha  - Orai Ckt.II at Moth line	Double Circuit	State Sector	UPPTCL	11.0	220.0
2067	2066	2023-10-31	LILO of Modipuram- Faridnagar at Modipuram-II line	Double Circuit	State Sector	UPPTCL	12.0	220.0
2068	2067	2023-10-31	Warora  - Warangal 	Double Circuit	Private Sector	ADANI	665.0	765.0
2069	2068	2023-10-31	Kharghar -Vikhroli D/C and M/C line with bays at Kharghar and Vikhroli  along with 400kV Bus Extn. at Kharghar	Double Circuit on Mixed Circuit	Private Sector	ADANI	43.0	400.0
2070	2069	2023-10-31	LILO of both Ckts. of Pugalur-Pugalur   at Karur PS	Double Circuit	Private Sector	ADANI	9.0	400.0
2071	2070	2023-10-31	Koppal PS - Narendra  Trans. Ltd.	Double Circuit	Private Sector	RENEW	276.0	400.0
2072	2071	2023-11-30	400kV D/C Muradnagar-II – Simbhawali Line under Meerut Simbhawali :INTRASTATE Project	Double Circuit	Central Sector	PGCIL	142.0	400.0
2073	2072	2023-11-30	220 kV D/C  Kalawad - Kangasiyali Line	Double Circuit	State Sector	GETCO	114.0	220.0
2074	2073	2023-11-30	Ramanagara _MCMV Line: Construction of 220-66 kV MC line from 220 kV Bidadi S/s 18.188 kms	Mixed Circuit	State Sector	KPTCL	75.0	220.0
2075	2074	2023-11-30	220/ 110 kV MCMV line from kanhirode to Mundayad	Double Circuit	State Sector	KSEB	18.0	220.0
2076	2075	2023-11-30	LILO of Gwalior - Datiya 220kV line at Gwalior 765kV S/s	Direct Current Double Sided	State Sector	MPPTCL	6.0	220.0
2077	2076	2023-11-30	LILO  of 230 kV Sriperumpudur – Korattur feederfor extension of new EHT supply for a initial demand of 40000 KVA to M/s.Ctrls Data Centers Ltd.,-  SIDCO Ambathur Industrial Estate, Chennai	DC	State Sector	TANTRANSC O	3.0	230.0
2078	2077	2023-11-30	Erection of 230 kV SC line on DC towers with Zebra conductor from Nemmeli Thippiyakudy 230 kV SS to Karaikudi 230 kV SS	SC	State Sector	TANTRANSC O	104.0	230.0
2079	2078	2023-11-30	220 kV Harduaganj - Khair Line	Double Circuit	State Sector	UPPTCL	77.0	220.0
2080	2079	2023-11-30	LILO of 220 kV Auraiya  - Sikandara  Ckt II @ Saifai  Line	Double Circuit	State Sector	UPPTCL	30.0	220.0
2081	2080	2023-11-30	220 kV Gr. Noida  - YEIDA Sec-24 Line	Mixed Circuit	State Sector	UPPTCL	54.0	220.0
2082	2081	2023-11-30	220 kV Gr. Noida  - YEIDA Sec-18 Line	Mixed Circuit	State Sector	UPPTCL	45.0	220.0
2083	2082	2023-11-30	220 kV Gonda-Basti -II Line	Single Circuit	State Sector	UPPTCL	78.0	220.0
2084	2083	2023-11-30	220 kV Azamgarh-II-Bhadohi Line	Double Circuit	State Sector	UPPTCL	72.0	220.0
2085	2084	2023-12-31	Fatehgarh-III  -Fatehgarh-II 400kV D/c line  under Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan  under phase-II- Part A SPV Name: POWERGRID Ramgarh Transmission Limited	Double Circuit	Central Sector	PGCIL	88.0	400.0
2086	2085	2023-12-31	400KV D/C Lower Subhansiri - Biswanath Chariyali line - II under Part C of North East / Northern Western Interconnector -I Project	Double Circuit	Central Sector	PGCIL	371.0	400.0
2087	2086	2023-12-31	Reconductoring of Parli  – Parli CKT-I 400KV D/C Line with Twin HTLS  Conductor & Associated Line Upgradation Activities Under Western Region Expansion Scheme-XXX 	Single Circuit	Central Sector	PGCIL	5.0	400.0
2088	2087	2023-12-31	765KV Rampur-Ghatampur line under CKT-2 LILO OF 765 KV Ghatampur- Hapur  Line on 765 KV GIS S/S RAMPUR  :INTRASTATE Project 	Single Circuit	Central Sector	PGCIL	116.0	765.0
2089	2088	2023-12-31	LILO of 220kV Pallantla-Pattisema DC line at Guddigudem	Double Circuit	State Sector	APTRANSCO	24.0	220.0
2090	2089	2023-12-31	Hindupur - Penukonda	Double Circuit	State Sector	APTRANSCO	50.0	220.0
2091	2090	2023-12-31	Amnour - Digha	Double Circuit	State Sector	BSPTCL	48.0	220.0
2092	2091	2023-12-31	220 kV DC line from 400 kV Jejuri Substation to location no. 28 of existing 220 kV Jejuri-Lonand circuit	LILO	State Sector	MSETCL	14.0	220.0
2093	2092	2023-12-31	Provision of 220 KV 2nd Ckt. Using special arrangement for connecting 400 kv S/s Dhanansu with 220 Kv S/s Gounsgarh regading power evacuation from 400 kv S/s Dhanansu	Single Circuit	State Sector	PSTCL	2.0	220.0
2094	2093	2023-12-31	Udangudi - Ottapidaram  line	Double Circuit	State Sector	TANTRANSCO	141.0	400.0
2095	2094	2023-12-31	230 kV SC line on DC towers with Zebra conductor from Loc.No:153 of existing 230 kV Chekkanurani - Sembatty feeder to proposed 230 kV Samayanallur SS.	Single Circuit	State Sector	TANTRANSCO	5.0	230.0
2096	2095	2023-12-31	220KV  line from 220KV Chandanvally SS to 220KV Amazon 	Double Circuit	State Sector	TSTRANSCO	3.0	220.0
2097	2096	2023-12-31	Jeerat - Krishnanagar 220 kV D/C connectivity	Double Circuit	State Sector	WBSETCL	114.0	220.0
2098	2097	2023-12-31	Babai-Bhiwani D/C Transmission Line	Double Circuit	Private Sector	TATA POWER	222.0	400.0
2099	2098	2024-01-31	LILO of MTPS-A  to Durgapur line at Barjora S/S	Single Circuit	Central Sector	DVC	9.0	220.0
2100	2099	2024-01-31	Ckt-2 of Re-conductoring of Siliguri – Bongaigaon 400kV D/c line with Twin HTLS conductor under North Eastern Region Strengthening Scheme-XII 	Single Circuit	Central Sector	PGCIL	218.0	400.0
2101	2100	2024-01-31	LILO of Krishnapatnam - Manubolu  Quad Moose line at Sembcorp  400KV GIS Substation	Double Circuit	State Sector	APTRANSCO	7.0	400.0
2102	2101	2024-01-31	220KV DC/SC line from 220KV SWS Inaparajupalli to M/s Shree Cement Ltd.	Single Circuit	State Sector	APTRANSCO	2.0	220.0
2103	2102	2024-01-31	Rachaganneri-Racherla	Double Circuit	State Sector	APTRANSCO	107.0	220.0
2104	2103	2024-01-31	Sullurpeta-Racherla	Double Circuit	State Sector	APTRANSCO	39.0	220.0
2105	2104	2024-01-31	220 kV D/C Vadavi - Sanand DFCC Line	Double Circuit	State Sector	GETCO	62.0	220.0
2106	2105	2024-01-31	220 kV Double Circuit Transmission Line from 220/132 kV GIS Sub-Station Mazra to 220/33 GIS Sub-Station Karian.	Double Circuit	State Sector	HPPTCL	36.0	220.0
2107	2106	2024-01-31	LILO of Both ckt of 220kV D/C Sohna Road-Rangala Rajpur at 220kV s/stn. RojKaMeo	Mixed Circuit	State Sector	HVPNL	9.0	220.0
2108	2107	2024-01-31	220kV SCDC line from 220kV Phaltan MIDC to 220kV Mol- Manjarwadi Solar Project of M/s. T.S.Wind Farm Developer.	Single Circuit	State Sector	MSETCL	20.0	220.0
2109	2108	2024-01-31	LILO of one ckt of 400 KV Jalandhar Kurukshetra DC line at 400 KV Dhanansu.	Double Circuit	State Sector	PSTCL	8.0	400.0
2110	2109	2024-01-31	LILO of 220 KV Rajpura Mohali at 220 KV Switching Station for release of conncetion to M/s Ultratech.	Double Circuit	State Sector	PSTCL	2.0	220.0
2111	2110	2024-01-31	230KV,1X1200 sq mm XLPE Aluminium UG cable from new joint bay in Royapettah high road masilamani road to 230kv Mylapore GIS SS for a route length of 1.149 kms for the deviation of existing 230KV TNEB HQ GIS SS to Mylapore feeder	SC	State Sector	TANTRANSCO	1.0	230.0
2112	2111	2024-01-31	220 kV Jehata-Mallawan DC line	Double Circuit	State Sector	UPPTCL	158.0	220.0
2113	2112	2024-01-31	LILO of 220kV R.C. Green - Sector-148  line at Knowledge Park-5 Noida	Double Circuit	State Sector	UPPTCL	14.0	220.0
2114	2113	2024-01-31	LILO of 220kV R.C. Green - Gr. Noida line at Jalpura	Double Circuit	State Sector	UPPTCL	28.0	220.0
2115	2114	2024-01-31	Khavda PS GIS – Bhuj PS 765 kV D/C Line	Double Circuit	Private Sector	ADANI	218.0	765.0
2116	2115	2024-02-29	765KV Rampur-Hapur line under LILO OF 765 KV Ghatampur- Hapur  Line on 765 KV GIS S/S RAMPUR  :INTRASTATE Project 	Single Circuit	Central Sector	PGCIL	112.0	765.0
2117	2116	2024-02-29	Reconductoring of Parli  – Parli CKT-II 400KV D/C Line with Twin HTLS  Conductor & Associated Line Upgradation Activities Under Western Region Expansion Scheme-XXX 	Single Circuit	Central Sector	PGCIL	5.0	400.0
2118	2117	2024-02-29	Reconductoring of 400 kV Jodhpur   – Kankroli S/c  line with twin HTLS conductor under Scheme to relieve high loading of WR-NR Inter Regional Corridor 	Single Circuit	Central Sector	PGCIL	188.0	400.0
2119	2118	2024-02-29	220 KV Krishnagiri-Settypalli feeder  	Single Circuit	State Sector	APTRANSCO	11.0	220.0
2120	2119	2024-02-29	LILO of both circuits of 220kV D/C Palanpur - Kheralu line at proposed 220kV Sisrana  with AL-59 conductor with OPGW	Mixed Circuit	State Sector	GETCO	51.0	220.0
2121	2120	2024-02-29	Alusteng-Harwan Transmission Line	Single Circuit	State Sector	JKPDD	14.0	220.0
2122	2121	2024-02-29	LILO on 220kV Kathapur- Lonikand -I line at 220kV Khed City	Double Circuit	State Sector	MSETCL	11.0	220.0
2123	2122	2024-02-29	LILO of Pugalur - Kalivanthapattu Line at Ariyalur	Double Circuit	State Sector	TANTRANSCO	14.0	400.0
2124	2123	2024-02-29	Erection of 230 KV DC line on DC/MC tower with Zebra conductor from LILO of Sanganeri – Abhishekapatti 230KV DC feeder between Tower No.70 – 71 to M/s.TP Solar Ltd	Double Circuit	State Sector	TANTRANSCO	6.0	230.0
2125	2124	2024-02-29	LILO of Motiram Adda  - Barahuan  Line @ 220kV Khorabar 	Double Circuit	State Sector	UPPTCL	6.0	220.0
2126	2125	2024-02-29	Pachora SEZ PP -Bhopal  400 kV D/c line	Double Circuit	Private Sector	G R INFRA	288.0	400.0
2127	2126	2024-03-31	LILO of 400kV Lucknow  - Sultanpur S/C Line at 400kV Substation Mohanlalganj, Lucknow  :INTRASTATE Project 	Single Circuit	Central Sector	PGCIL	14.0	400.0
2128	2127	2024-03-31	LILO of 400kV Sarojnai Nagar - Unnao  S/C Line at 400kV GIS Substation Mohanlalganj, Lucknow  :INTRASTATE Project 	Single Circuit	Central Sector	PGCIL	77.0	400.0
2129	2128	2024-03-31	Ckt-1 of Re-conductoring of Siliguri – Bongaigaon 400kV D/c line with Twin HTLS conductor under North Eastern Region Strengthening Scheme-XII 	Double Circuit	Central Sector	PGCIL	218.0	400.0
2130	2129	2024-03-31	Neemuch PS – Chhittorgarh  s/s 400 kV D/C line 	Double Circuit	Central Sector	PGCIL	233.0	400.0
2131	2130	2024-03-31	Neemuch PS- Mandsaur s/s 400 kV D/C line 	Double Circuit	Central Sector	PGCIL	236.0	400.0
2132	2131	2024-03-31	CKT-1 FOR RECONDUCTORING WORK  OF JHARSUGUDA/SUNDARGARH# – ROURKELA  400KV 2XD/C   	Double Circuit	Central Sector	PGCIL	142.0	400.0
2133	2132	2024-03-31	CKT-3 FOR RECONDUCTORING WORK  OF JHARSUGUDA/SUNDARGARH# – ROURKELA  400KV 2XD/C    	Double Circuit	Central Sector	PGCIL	96.0	400.0
2134	2133	2024-03-31	220KV Guddigudem-Purushothapatnam D/C line	Double Circuit	State Sector	APTRANSCO	47.0	220.0
2135	2134	2024-03-31	BTPP-Naubatpur Line 	Double Circuit	State Sector	BSPTCL	248.0	400.0
2136	2135	2024-03-31	BTPP-Dehri-on-sone 	Double Circuit	State Sector	BSPTCL	150.0	220.0
2137	2136	2024-03-31	400 kV D/C BHOGAT - KALAWAD LINE with Twin AL-59 cond. & 1 OPGW and 1 Earth Wire.	Double Circuit	State Sector	GETCO	250.0	400.0
2138	2137	2024-03-31	LILO of one circuit of 400 kV VADAVI - HALVAD LINE at 400 kV SANAND-II GIDC S/S with Twin AL-59 cond. & OPGW.	Double Circuit	State Sector	GETCO	85.0	400.0
2139	2138	2024-03-31	Balance work of 400 kV D/C VADINAR - AMRELI LINE  with ACSR Twin Moose condu. & Earth Wire, M/s Jyoti	Double Circuit	State Sector	GETCO	121.0	400.0
2140	2139	2024-03-31	LILO of 220 kV Gondal - Sadla line at Kamlapur with AL- 59 conductor	Double Circuit	State Sector	GETCO	46.0	220.0
2141	2140	2024-03-31	Panchkula  -  Panchkula Sector-32	Double Circuit	State Sector	HVPNL	43.0	220.0
2142	2141	2024-03-31	Take in arrangement of Madanpur-Kunihar line at Sector- 32 and take in arrangement from remaining portion of Madanpur-Kunihar line at  PGCIL,Naggal.	Double Circuit	State Sector	HVPNL	43.0	220.0
2143	2142	2024-03-31	 LILO of one ckt. Alusteng - New Wanpoh at Tailbal	Double Circuit	State Sector	JKPDD	7.0	220.0
2144	2143	2024-03-31	 Extension of Mirbazar - Alusteng line upto New Wanpoh	Double Circuit	State Sector	JKPDD	12.0	220.0
2145	2144	2024-03-31	Ghanagapura  to  Kalaburagi  line	Double Circuit	State Sector	KPTCL	72.0	220.0
2146	2145	2024-03-31	220kV Chintamani - Mittemari line:	Double Circuit	State Sector	KPTCL	100.0	220.0
2147	2146	2024-03-31	 Byrnihat  – Mawngap – New Shillong 220 kV D/c line	Double Circuit	State Sector	MeECL	258.0	220.0
2148	2147	2024-03-31	220kV line from 220kV S/s Nipaniya for Power supply of 54.5 MVA to Pump house of Shamgarh - Suwasra	Single Circuit	State Sector	MPPTCL	15.0	220.0
2149	2148	2024-03-31	LILO of Birsinghpur-Satna 220kV line at New S/s Manpur 	Double Circuit	State Sector	MPPTCL	37.0	220.0
2150	2149	2024-03-31	220KV DC Kalmeshwar-Warud  	Double Circuit	State Sector	MSETCL	53.0	220.0
2151	2150	2024-03-31	220 kV DC line from 400 kV Kumbhargaon  - Kurunda - Pkg A 	Double Circuit	State Sector	MSETCL	67.0	220.0
2152	2151	2024-03-31	220KV DC Kalmeshwar-Warud  	Double Circuit	State Sector	MSETCL	84.0	220.0
2153	2152	2024-03-31	220kV Wani Pandharkawda DC line 	Double Circuit	State Sector	MSETCL	51.0	220.0
2154	2153	2024-03-31	220kV Umred - Nagbhid DCDC line Part-I .	Double Circuit	State Sector	MSETCL	53.0	220.0
2155	2154	2024-03-31	220kV LILO of Narendrapur-Therubali at Aska New S/s	Double Circuit	State Sector	OPTCL	85.0	220.0
2156	2155	2024-03-31	•  S/C transmission line from PPS-1 to PGCIL Bhadla-II  •  S/C Transmission Line from PPS-2 to PGCIL Bhadla-II through 220 kV D/C dead end tower outside premises of PPS-1 without entering in PPS-1  •  S/C Transmission Line from PPS-3 to PGCIL Bhadla-II through 220 kV D/C dead end tower outside premises of PPS-4 without entering in PPS-4  •  S/C Transmission Line from PPS-4 to PGCIL Bhadla-II 	Single Circuit	State Sector	Rajasthan Solar Park Development Company Ltd.	121.0	220.0
2157	2156	2024-03-31	NCTPS Stage-III - North Chennai  line	Double Circuit	State Sector	TANTRANSCO	13.0	765.0
2158	2157	2024-03-31	LILO Mahabubabad - Warangal line to Ammavaripet	Double Circuit	State Sector	TSTRANSCO	64.0	220.0
2159	2158	2024-03-31	400 kV Panki - PTPS Line 	Double Circuit	State Sector	UPPTCL	1.0	400.0
2160	2159	2024-03-31	Stringing of 220 kV Sarnath - Gajokhar Line 	Double Circuit	State Sector	UPPTCL	30.0	220.0
2161	2160	2024-03-31	AGEL-PSS3 Khavda-I PS 400kV S/c line	Single Circuit	Private Sector	Adani Green Energy Limited	5.0	400.0
2162	2161	2024-03-31	AREHFL PSS1  – Khavda   PS 400kV S/c line 	Single Circuit	Private Sector	Adani Renewable Energy Holding Four Ltd. 	3.0	400.0
2163	2162	2024-03-31	AREHFL PSS2 – Khavda   PS 400kV S/c line 	Single Circuit	Private Sector	Adani Renewable Energy Holding Four Ltd. 	5.0	400.0
2164	2163	2024-03-31	SBE Renewables Sixteen Private Limited Power Plant – Fatehgarh-II PS 220kV S/c line	Single Circuit	Private Sector	Adani Renewable Energy Holding Sixteen Ltd	14.0	220.0
2165	2164	2024-03-31	AltraXergi Power Pvt. Ltd. Solar power plant – Fatehgarh- III PS 220 kV S/c high capacity line on D/c tower	Single Circuit	Private Sector	Altra Xergi Power Private Limited	5.0	220.0
2166	2165	2024-03-31	Common Pooling Station of Amp Energy Green Four & Five Solar Power Plant - Bhadla-II PS 220 kV S/c line	Single Circuit	Private Sector	AMP Energy Green Private Limited	12.0	220.0
2167	2166	2024-03-31	Ayana Renewable Power Six Pvt Ltd –Koppal PS 220kV S/c line	Single Circuit	Private Sector	Ayana Renewable Power Six Pvt Ltd	24.0	220.0
2168	2167	2024-03-31	Common PS  of  Power Project of 100 MW each for One Volt Energy Private Limited, Amplus Ages Private Limited and Grian Energy Private Limited) – Bikaner-II PS 220 kV S/c line	Single Circuit	Private Sector	Grian Energy Private Limited	3.0	220.0
2169	2168	2024-03-31	LILO of both circuits of Parli – Pune 400kV D/c line at Kallam PS	Mixed Circuit	Private Sector	INDIGRID	68.0	400.0
2170	2169	2024-03-31	JSW Renew Energy Limited – Karur 230kV S/c line 	Single Circuit	Private Sector	JSW Neo Energy Limited	4.0	230.0
2171	2170	2024-03-31	JSW Renew Energy Limited – Tuticorin-II 230kV S/c line	Single Circuit	Private Sector	JSW Renew Energy Ltd	20.0	230.0
2172	2171	2024-03-31	Generation PS of JSW Renew Energy Ltd.- Tuticorin-II 230kV S/c line .	Single Circuit	Private Sector	JSW Renew Energy Ltd	22.0	230.0
2173	2172	2024-03-31	Prerak Greentech Private Limited Project – Bikaner-II PS 220 kV S/c line on D/c tower	Single Circuit	Private Sector	Prerak Greentech Private Limited	11.0	220.0
2174	2173	2024-03-31	Renew Solar Power Pvt Ltd – Koppal PS 220kV S/c line	Single Circuit	Private Sector	Renew Solar Power Pvt Ltd	54.0	220.0
2175	2174	2024-03-31	ReNew Surya Aayan Private Limited solar power plant – Fatehgarh-III PS 220 kV S/c line on D/c tower	Single Circuit	Private Sector	ReNew Surya Aayan Private Limited	9.0	220.0
2176	2175	2024-03-31	ReNew Surya Ojas Private Limited generation switchyard – Koppal 220kV S/c	Single Circuit	Private Sector	ReNew Surya Ojas Pvt Ltd	24.0	220.0
2177	2176	2024-03-31	ReNew Surya Roshni Private Limited hybrid power plant – Fatehgarh-III PS 220 kV S/c high capacity line on D/c tower	Single Circuit	Private Sector	Renew Surya Roshni Private Limited	18.0	220.0
2178	2177	2024-03-31	ReNew Surya Vihaan Private Ltd. – Fatehgarh-III PS 220 kV S/c line	Single Circuit	Private Sector	Renew Surya Vihaan Private Limited	6.0	220.0
2179	2178	2024-03-31	Agar Unit - 4  - Pachora SEZ PP 220kV S/c line	Single Circuit	Private Sector	Rewa Ultra Mega Solar Ltd.	1.0	220.0
2180	2179	2024-03-31	Agar Unit-5  - Pachora SEZ PP 220kV S/c line	Single Circuit	Private Sector	Rewa Ultra Mega Solar Ltd.	32.0	220.0
2181	2180	2024-04-30	LILO of Ckt-I of 400kV Varanasi  - Biharshariff DC Line at 400kV Sahupuri	Double Circuit	State Sector	UPPTCL	52.0	400.0
2182	2181	2024-04-30	Extension of Shoolagiri Karimangalam line  to Udanapally 230 KV SS	Single Circuit	State Sector	TANTRANSCO	2.0	230.0
2183	2182	2024-04-30	UG Cable from Basin Bridge to TNEB Head Quarters	Single Circuit	State Sector	TANTRANSCO	6.0	230.0
2184	2183	2024-04-30	BTPP - Karmnasa GSS line 	Double Circuit	State Sector	BSPTCL	59.0	220.0
2185	2184	2024-04-30	LILO of both circuits of 220kV D/C Mota - Ambheta  line at proposed 220kV Mahuva	Mixed Circuit	State Sector	GETCO	44.0	220.0
2186	2185	2024-04-30	LILO of 220kV Sarna Wadala -Granthian at Gurdaspur	Double Circuit	State Sector	PSTCL	16.0	220.0
2187	2186	2024-05-31	LILO of 220kV VTS-Tallapally-1 at 220/132 kV SS Rentachintala	Double Circuit	State Sector	APTRANSCO	3.0	220.0
2188	2187	2024-05-31	BTPP - Dumraon  GSS	Double Circuit	State Sector	BSPTCL	129.0	220.0
2189	2188	2024-05-31	400/220 kV GIS of POWERGRID at Airendwala to 220/132/33 kV AIS of HPPTCL at Andheri Kala Amb Distt. Sirmaur	Double Circuit	State Sector	HPPTCL	11.0	220.0
2190	2189	2024-05-31	Kudligi  line from existing 220 kV Itagi SS to the proposed Station at Kudligi	Double Circuit	State Sector	KPTCL	65.0	220.0
2191	2190	2024-05-31	LILO of 220 KV Balimela Jayanagar Circuit III at 220/33 KV GSS Govindpali	Double Circuit	State Sector	OPTCL	2.0	220.0
2192	2191	2024-05-31	LILO of 220 kV line New Duburi - Paradeep Circuit I at 220/33 KV GSS Balichandrapur Palei	Double Circuit	State Sector	OPTCL	2.0	220.0
2193	2192	2024-06-30	LILO of CTPS  - Kalyaneswari line at RTPS	Double Circuit	Central Sector	DVC	52.0	220.0
2194	2193	2024-06-30	YTPP Switchyard - 400kV Dindi SS	Double Circuit	State Sector	TSTRANSCO	208.0	400.0
2195	2194	2024-06-30	LILO of Ckt.II of 400 KV DC Quad Varanasi   -Biharsharif at 400 kV Sahupuri SS 	Double Circuit	State Sector	UPPTCL	53.0	400.0
2196	2195	2024-06-30	Pusouli  - Dehri	Double Circuit	State Sector	BSPTCL	125.0	220.0
2197	2196	2024-06-30	Patan 	Double Circuit	State Sector	CSPTCL	45.0	220.0
2198	2197	2024-06-30	LILO of both circuits of Satna-Chhatarpur 220kV line at Ajaygarh 	Double Circuit	State Sector	MPPTCL	14.0	220.0
2199	2198	2024-06-30	LILO of 220 kV S/Stn Mansa - Sunam at 400 kV S/Stn Patran	Double Circuit	State Sector	PSTCL	85.0	220.0
2200	2199	2024-07-31	LILO of one Ckt. of 400kV Ludhiana PGCIL- Koldam at proposed 400kV s/s Ropar	Double Circuit	State Sector	PSTCL	14.0	400.0
2201	2200	2024-07-31	400kV Shamli - Aligarh Line	Double Circuit	State Sector	UPPTCL	482.0	400.0
2202	2201	2024-07-31	LILO of 230 kV Basin Bridge -TNEB Head Quarters feeder at Pulianthope 400 KV GIS SS 	Double Circuit	State Sector	TANTRANSCO	1.0	230.0
2203	2202	2024-07-31	220 kV Brandix - Atchuthapuram	Double Circuit	State Sector	APTRANSCO	7.0	220.0
2204	2203	2024-07-31	220kV DC line from 400kV Kamavarapukota to 220kV SS Bhimadole SS	Double Circuit	State Sector	APTRANSCO	37.0	220.0
2205	2204	2024-07-31	220 kV D/C Choraniya - Salejada line	Double Circuit	State Sector	GETCO	136.0	220.0
2206	2205	2024-07-31	Conversion of 220 kV Bidnal-Soundatti- Mahalingapura S/C line - 220 kV Bidnal - Mahalingapur D/C line	Double Circuit	State Sector	KPTCL	125.0	220.0
2207	2206	2024-07-31	LILO of 2nd circuit of 220kV Bidnal -Mahalinapur DC Line at Soundatti SS	Double Circuit	State Sector	KPTCL	21.0	220.0
2208	2207	2024-07-31	Sagar - Begamganj 220 kV line  	Double Circuit	State Sector	MPPTCL	125.0	220.0
2209	2208	2024-07-31	220 kV Koradi-II to Butibori-III DCMC line	Double Circuit	State Sector	MSETCL	109.0	220.0
2210	2209	2024-07-31	Connecting 220 kV PGCIL Ludhiana-Doraha SC line with 220 kV Lalton Kalan-Dhandari Kalan forming PGCIL Ludhiana- Dhandari Kalan SC line 	Single Circuit	State Sector	PSTCL	10.0	220.0
2211	2210	2024-07-31	Darshan Nagar GIS to Sohawal 	Single Circuit	State Sector	UPPTCL	1.0	220.0
2212	2211	2024-07-31	LILO of KTPP- Jangalpur 220 kV D/C line at Food Park 220 kV Substation	Double Circuit	State Sector	WBSETCL	2.0	220.0
2213	2212	2024-08-31	Fatehgarh II- Bhadla II 765kV D/C Line  Under Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan  under phase- II- Part B (SPV Name POW	Double Circuit	Central Sector	PGCIL	405.0	765.0
2214	2213	2024-08-31	LILO of Kayathar - Thennampatti 400 kV line Virudhunagar 765/400 KV SS	Double Circuit	State Sector	TANTRANSCO	140.0	400.0
2215	2214	2024-08-31	LILO of 220 kv ongole-Racherlpadu line at 220 kv ss Kandukur	Double Circuit	State Sector	APTRANSCO	7.0	220.0
2216	2215	2024-08-31	Devanahalli Hardware Park  from 400 kV DWHP to CTT for Double LILO of 220 kV Nelamanagal -Hoody DC line 	Mixed Circuit	State Sector	KPTCL	21.0	220.0
2217	2216	2024-08-31	LILO on 220kV Bhigwan Kurkumb line at 400kV Karjat s/s	Double Circuit	State Sector	MSETCL	34.0	220.0
2218	2217	2024-08-31	Damaracherla -Huzurnagar line	Double Circuit	State Sector	TSTRANSCO	77.0	220.0
2219	2218	2024-08-31	220 kV Modipuram-II - Shamli Line	Double Circuit	State Sector	UPPTCL	150.0	220.0
2220	2219	2024-08-31	LILO of KTPP-Howrah 220 kV D/C Line at Proposed Food Park 220/132 KV GIS S/S	Mixed Circuit	State Sector	WBSETCL	2.0	220.0
2221	2220	2024-09-30	LILO of Mylsandra-Yeradanahalli at Keonics 	Double Circuit	State Sector	KPTCL	7.0	220.0
2222	2221	2024-09-30	LILO of 220 kV Shendra- Chitepimpalgaon line at 220 kV Shendra DMIC GIS s/s 	Double Circuit	State Sector	MSETCL	12.0	220.0
2223	2222	2024-09-30	400 kV D/C Gadag PS-Narendra  line  Karnataka-Part-A Phase-I)	Double Circuit	Private Sector	RENEW	187.0	400.0
2224	2223	2024-09-30	LILO of Padghe -Ghatkopar/Vikroli 400 kV S/C line at Navi Mumbai GIS 	Single Circuit	Private Sector	STERLITE	38.0	400.0
2225	2224	2024-09-30	Padghe  - Kharghar 400 kV D/C  line 	Double Circuit	Private Sector	STERLITE	140.0	400.0
2226	2225	2024-09-30	Vapi-II-Sayali 220 kV D/C line 	Double Circuit	Private Sector	STERLITE	45.0	220.0
2227	2226	2024-10-31	Sikar II - Aligarh 765kV D/C line  under phase-II- Part D)	Double Circuit	Central Sector	PGCIL	513.0	765.0
2228	2227	2024-10-31	Sikar II - Neemrana 400kV D/C line   under phase-II- Part C)	Double Circuit	Central Sector	PGCIL	270.0	400.0
2229	2228	2024-10-31	LILO of 400kV VTS-IV Sattenapalli TMDC line at Thallayapalem and Temporary diversion of PGCIL VTS/Nunna-Nellore 3 and 4 Ckts. to avoid aerial passage over 400/220kV GIS Thallayapalem	Double Circuit	State Sector	APTRANSCO	2.0	400.0
2230	2229	2024-10-31	Vemagiri - Kamavarapukota	Double Circuit	State Sector	APTRANSCO	116.0	400.0
2231	2230	2024-10-31	LILO of Talegaon -Kalwa at Vikroli 	Double Circuit	State Sector	MSETCL	24.0	400.0
2232	2231	2024-10-31	220kV D/C line from 220kv Meerpur Kurali to TSS Rundhi as a deposit work of Indian Railway	Double Circuit	State Sector	HVPNL	25.0	220.0
2233	2232	2024-10-31	Jerur- Karjat line	Double Circuit	State Sector	MSETCL	101.0	220.0
2234	2233	2024-10-31	LILO of Badaun- C.B. Ganj line at Badaun Road	Double Circuit	State Sector	UPPTCL	1.0	220.0
2235	2234	2024-10-31	Bongaigaon  - Nangalbibra  line	Double Circuit	Private Sector	STERLITE	246.0	400.0
2236	2235	2024-10-31	Xeldem - Mapusa  line 	Double Circuit	Private Sector	STERLITE	106.0	400.0
2237	2236	2024-10-31	LILO of Apta-Kalwa/Taloja at Navi Mumbai 	Double Circuit	Private Sector	STERLITE	5.0	220.0
2238	2237	2024-10-31	Xeldem  - Xeldem  Transmission line	Double Circuit	Private Sector	STERLITE	45.0	220.0
2239	2238	2024-11-30	220 kV Krishnagiri- Nansuralla Line	Single Circuit	State Sector	APTRANSCO	24.0	220.0
2240	2239	2024-11-30	Jammalamadugu  to proposed Bethamcherla  in Kurnool District	Double Circuit	State Sector	APTRANSCO	151.0	220.0
2241	2240	2024-11-30	Banka-Goradih Transmission line	Double Circuit	State Sector	BSPTCL	65.0	220.0
2242	2241	2024-11-30	220 kV U/G cable from Kashmiri Gate SS to 220 kV Timarpur  SS	Double Circuit	State Sector	DTL	10.0	220.0
2243	2242	2024-11-30	Sonepat to GIS Rai line 	Double Circuit	State Sector	HVPNL	51.0	220.0
2244	2243	2024-11-30	LILO of 220 kV Allipura-Ragalapadu line at Somasamudra SS	Double Circuit	State Sector	KPTCL	12.0	220.0
2245	2244	2024-11-30	LILO of Somanahalli-hoody line at Keonics 	Double Circuit	State Sector	KPTCL	14.0	220.0
2246	2245	2024-11-30	220 kV D/C Surpura-Banar line 	Double Circuit	State Sector	RVPNL	20.0	220.0
2247	2246	2024-11-30	LILO of 220 kV Durgapur -DPL unit-8 line at AB Zone 220 kV Substation.	Double Circuit	State Sector	WBSETCL	8.0	220.0
2248	2247	2024-12-31	Bhadla II - Sikar II 765 kV D/C line  under phase-II- Part C)	Double Circuit	Central Sector	PGCIL	618.0	765.0
2249	2248	2024-12-31	Chandwa - Latehar  line	Double Circuit	State Sector	JUSNL	83.0	400.0
2250	2249	2024-12-31	LILO of 400 kV Rajwest-Kankani line at 400 kV Pachpadra GSS	Double Circuit	State Sector	RVPNL	72.0	400.0
2251	2250	2024-12-31	LILO of existing 220 kV Madanapalli-Palamaner line to 220 kV Punganur S/S	Double Circuit	State Sector	APTRANSCO	5.0	220.0
2252	2251	2024-12-31	LILO of both circuits of 220 kV D/C Jambuva - Karamsad line at Dhuvaran CCPP	Double Circuit	State Sector	GETCO	18.0	220.0
2253	2252	2024-12-31	LILO of 220 kV D/C Bajoli Holi to Lahal Transmission Line at 220/66 kV Heiling S/S	Double Circuit	State Sector	HPPTCL	1.0	220.0
2254	2253	2024-12-31	LILO of Sec -72 Gurugram  to Sec -72 Gurugram  ckt - IV at 220 kV Sec 15-II Gurugram220kV Sec 15-II Gurugram	Double Circuit	State Sector	HVPNL	16.0	220.0
2255	2254	2024-12-31	Powerloom metta to Parambayi	Mixed Circuit	State Sector	KSEB	1.0	220.0
2256	2255	2024-12-31	LILO of both circuits of Sidhi - Hindalco 220 kV line at Bargawan  S/s 	Double Circuit	State Sector	MPPTCL	8.0	220.0
2257	2256	2024-12-31	LILO of 220 kV Jalna - Chikhali line at 220 kV Nagewadi S/s	Double Circuit	State Sector	MSETCL	3.0	220.0
2258	2257	2024-12-31	LILO of 220 kV Balotra-Boranada line at 400 kV Pachpadra GSS	Double Circuit	State Sector	RVPNL	18.0	220.0
2259	2258	2025-02-28	LILO of CKT-II of Patna  - Barh  at Bakhtiyarpur SS	Double Circuit	State Sector	BSPTCL	21.0	400.0
2260	2259	2025-02-28	LILO of Kamavarapukota  - Nuziveedu line at Kamavarapukota SS 	Single Circuit	State Sector	APTRANSCO	3.0	220.0
2261	2260	2025-02-28	Kurud-Rajim line 	Double Circuit	State Sector	CSPTCL	33.0	220.0
2262	2261	2025-02-28	Ghangapura  SS to Sindagi  SS in Vijayapura Dist	Double Circuit	State Sector	KPTCL	112.0	220.0
2263	2262	2025-02-28	Halabarga SS to Santhpur SS	Double Circuit	State Sector	KPTCL	57.0	220.0
2264	2263	2025-02-28	Narsapur - Bowrampet line	Mixed Circuit + Double Circuit	State Sector	TSTRANSCO	149.0	220.0
2265	2264	2025-02-28	Bachhrawan-Sirsira  line	Double Circuit	State Sector	UPPTCL	161.0	220.0
2266	2265	2025-02-28	Shatabdinagar- NCRTC RSS line	Double Circuit	State Sector	UPPTCL	5.0	220.0
2267	2266	2025-02-28	Unnao- Ajgain TSS Line	Single Circuit	State Sector	UPPTCL	12.0	220.0
2268	2267	2025-03-31	765 kV D/C Kurnool III  - Kurnool  line Part-A and Part-B	Double Circuit	Central Sector	PGCIL	226.0	765.0
2269	2268	2025-03-31	400 kV D/C Banaskantha - Sankhari Line  under Project - Transmission Network Expansion in Gujarat to increase its ATC from ISTS Part-C	Single Circuit	Central Sector	PGCIL	44.0	400.0
2270	2269	2025-03-31	Navsari   -Magarwada  400 kV D/C Line under Project - Transmission Network Expansion in Gujarat to increase its ATC from ISTS Part-B	Double Circuit	Central Sector	PGCIL	192.0	400.0
2271	2270	2025-03-31	Raipur Pool - Dhamtari 400 kV D/C line under Project WRES-XXVII 	Double Circuit	Central Sector	PGCIL	176.0	400.0
2272	2271	2025-03-31	400 kV Vemagiri-Kamavarapukota TMDC line from 400 kV Sub-Station Kamavarapukota from Loc No. AP 1/0 to Loc.No.AP 42/0  	Double Circuit	State Sector	APTRANSCO	71.0	400.0
2273	2272	2025-03-31	LILO of 400kV Shamli-Aligarh Line at THDC Khurja Power Plant	Double Circuit	State Sector	UPPTCL	23.0	400.0
2274	2273	2025-03-31	LILO of Ottiyambakkam - Omega 2 at proposed 230/110 kV Mambakkam SS 	Double Circuit	State Sector	TANTRANSCO	5.0	230.0
2275	2274	2025-03-31	LILO of Ottiyambakkam - Omega 2 at proposed 230/110kV Mambakkam SS  for a route length of 19.918 km 	Double Circuit	State Sector	TANTRANSCO	40.0	230.0
2276	2275	2025-03-31	220 kV AP Carbides - Settipalli D/C Line in Kurnool Dist	Double Circuit	State Sector	APTRANSCO	57.0	220.0
2277	2276	2025-03-31	220 kV D/C Wagra - Bharuch TSS  line	Double Circuit	State Sector	GETCO	30.0	220.0
2278	2277	2025-03-31	LILO of both circuit of 220 kV PTPS-Jind D/C line at 220 kV Nain SS	Mixed Circuit	State Sector	HVPNL	32.0	220.0
2279	2278	2025-03-31	LILO of one ckt of 220kV D/C Samaypur-Palwal at 220kV Harfali	Double Circuit	State Sector	HVPNL	19.0	220.0
2280	2279	2025-03-31	400/220 kV BTPS to Somasamudra S/s for a distance of 20.387 Kms	Double Circuit	State Sector	KPTCL	41.0	220.0
2281	2280	2025-03-31	LILO of both circuit of 220KV B.Bagewadi-	Mixed Circuit	State Sector	KPTCL	39.0	220.0
2282	2281	2025-03-31	220KV DC Kalmeshwar-Warud Phase-III	Double Circuit	State Sector	MSETCL	45.0	220.0
2283	2282	2025-03-31	220 kV Kumbhargaon - Kurunda line 	Double Circuit	State Sector	MSETCL	57.0	220.0
2284	2283	2025-03-31	220 kV line from 400 kV Solapur PG to 220 kV Bale S/S 	Double Circuit	State Sector	MSETCL	27.0	220.0
2285	2284	2025-03-31	Balance work of 220 kV SC Karad- Koyna line 	Single Circuit	State Sector	MSETCL	4.0	220.0
2286	2285	2025-03-31	LILO of 220 kV M/C Tarapur-Borivali and Boisar- Ghodbandar line at Kudus 	Mixed Circuit	State Sector	MSETCL	126.0	220.0
2287	2286	2025-03-31	220 kV D/C Baram-Jauljivi Line	Double Circuit	State Sector	PTCUL	25.0	220.0
2288	2287	2025-03-31	KPS2-Lakadia 765kV D/C line 	Double Circuit	Private Sector	ADANI	355.0	765.0
2289	2288	2025-03-31	765kV D/C KPS1 to KPS2 GIS 	Double Circuit	Private Sector	MEGHA	41.0	765.0
2290	2289	2025-03-31	ACME Solar Holdings limited PS at Jaisalmer- Fatehgarh  line 	Single Circuit	Private Sector	ACME	16.0	400.0
2291	2290	2025-03-31	AGEL  - KPS-1  400 kV S/c line 	Single Circuit	Private Sector	ADANIGREEN	10.0	400.0
2292	2291	2025-03-31	AGEL  - KPS-1  400 kV S/c line 	Single Circuit	Private Sector	ADANIGREEN	8.0	400.0
2293	2292	2025-03-31	AGEL -KPS-1 	Single Circuit	Private Sector	ADANIGREEN	11.0	400.0
2294	2293	2025-03-31	Adani Renewable Energy Holding Four Limited Power Plant -Bhadla-II PS 400 kV S/c line 	Single Circuit	Private Sector	AREHFL	11.0	400.0
2295	2294	2025-03-31	RGESL PSS-4 at Solapur Konhali-Limbi Chincholi  Solapur S/S 	Single Circuit	Private Sector	Renew Green Energy Solutions	13.0	400.0
2296	2295	2025-03-31	SRPL  -KPS-1  400 kV S/c line 	Single Circuit	Private Sector	Sarjan Realities	14.0	400.0
2297	2296	2025-03-31	AREH4L 500 MW Power Plant S/s -Fatehgarh-II PS 220 kV D/c line 	Single Circuit	Private Sector	AREHFL	24.0	220.0
2298	2297	2025-03-31	RSRPL at Gadag - Gadag SS  	Single Circuit	Private Sector	Renew Surya Roshni	30.0	220.0
2299	2298	2025-03-31	Renew Surya Vihaan Private Limited Solar Power Plant at Jaisalmer-PGCIL Fatehgarh-III PS	Single Circuit	Private Sector	Renew Surya Vihaan	13.0	220.0
2300	2299	2025-03-31	M/s Sembcorb Green Infra Private Limited generation pooling Station at Koppa-Gadag PS  line 	Single Circuit	Private Sector	Sembcorp Green Infra	54.0	220.0
2301	2300	2025-03-31	Serentica Renewables India Private Limited  PS -Bikaner II PS  	Single Circuit	Private Sector	Serentica Renewables India	8.0	220.0
2302	2301	2025-03-31	Serentica Renewables India 1 Private Limited  PS at Koppal to Koppal PS  	Single Circuit	Private Sector	Serentica Renewables India 1	5.0	220.0
2303	2302	2025-03-31	Vena Energy Vidyuth Private Limited PS at Koppal-Gadag  line 	Single Circuit	Private Sector	Vena Energy Vidyuth	58.0	220.0
2304	2303	2025-01-31	RIL  GIS Jam Khabaliya  PS line 	Double Circuit	Central Sector	PGCIL	90.0	400.0
2305	2304	2025-01-31	LILO of CKT-I of Patna  - Barh  at Bakhtiyarpur SS	Double Circuit	State Sector	BSPTCL	21.0	400.0
2306	2305	2025-01-31	LILO of Pudhansandhai - Pugalur 230 kV Feeder at Nallur SS	Double Circuit	State Sector	TANTRANSCO	12.0	230.0
2307	2306	2025-01-31	Tajpur - Samastipur line 	Double Circuit	State Sector	BSPTCL	41.0	220.0
2308	2307	2025-01-31	Thakurganj-Kishanganj line 	Double Circuit	State Sector	BSPTCL	95.0	220.0
2309	2308	2025-01-31	220 kV D/C Motigop Babarzar line  - 	Double Circuit	State Sector	GETCO	5.0	220.0
2310	2309	2025-01-31	LILO of both circuits of Sidhi - Hindalco line at Bargawan 220 kV S/s  	Double Circuit	State Sector	MPPTCL	9.0	220.0
2311	2310	2025-01-31	LILO of 220kV Eklahare - Navsari line  at 220 kV Reliance Life science GIS SS	Single Circuit	State Sector	MSETCL	1.0	220.0
2312	2311	2025-01-31	Pachpadra - HRRL  line Ckt-I and Ckt-II	Double Circuit	State Sector	RVPNL	30.0	220.0
2313	2312	2025-01-31	LILO of STPS - J K NAGAR line at 220 kV Asansol SS	Double Circuit	State Sector	WBSETCL	63.0	220.0
2314	2313	2025-04-30	LILO of Kobra (West)-Khedamara (Bhilai) S/c line at Dhardehi (Bilaspur) S/s	Single Circuit	State Sector	CSPTCL	14.0	400.0
2315	2314	2025-04-30	Manali-Korattur S/c Line (Manali to Manjambakkam gantry point-OH line and Manjambakkam gantry point to Koratur-UG Cable)	Single Circuit	State Sector	TANTRANSCO	16.0	400.0
2316	2315	2025-04-30	Kushtagi-Yelburga line	Double Circuit	State Sector	KPTCL	58.0	220.0
2317	2316	2025-04-30	Nagewadi- Bhokardhan line	Double Circuit	State Sector	MSETCL	90.0	220.0
2318	2317	2025-04-30	Nuapada (Cuttack)-Pratapsason line	Double Circuit	State Sector	OPTCL	92.0	220.0
2319	2318	2025-04-30	Bhadohi-Sahupuri Line	Single Circuit	State Sector	UPPTCL	77.0	220.0
2320	2319	2025-04-30	LILO of one ckt. of 400 kV D/c Kalisindh-Anta Line at Sangod GSS (Intra state TBCB)	Double Circuit	Private Sector	ADANI	11.0	400.0
2321	2320	2025-05-31	LILO of Gokarna-New Chanditala line at Satgachia GIS	Double Circuit	State Sector	WBSETCL	21.0	400.0
2322	2321	2025-05-31	220 kV Nunna-Gunadala line (Monopole)	Double Circuit	State Sector	APTRANSCO	17.0	220.0
2323	2322	2025-05-31	LILO of Sector-65 - Palli line at 400 kV Kadarpur SS	Double Circuit	State Sector	HVPNL	26.0	220.0
2324	2323	2025-05-31	220 kV Shivajinagar to Ampyr Renewables Energy resources Solar power Park (at Bhamer and Bhadgaon Tal. Sakri Dist Dhule)	Single Circuit	State Sector	MSETCL	11.0	220.0
2325	2324	2025-05-31	220 kV Umred-Nagbhid line (Part-II)	Double Circuit	State Sector	MSETCL	49.0	220.0
2326	2325	2025-05-31	220 kV Uppalwadi-Pardi underground cable (circuit I)	Double Circuit	State Sector	MSETCL	13.0	220.0
2327	2326	2025-05-31	LILO of Virur-Gadchiroli line at 220 kV Konsari substation (by M/s Lloyds Metal and Energy Ltd.)	Double Circuit	State Sector	MSETCL	32.0	220.0
2328	2327	2025-05-31	Nayagarh GSS to Railway Traction Substation at Nayagarh	Single Circuit	State Sector	OPTCL	14.0	220.0
2329	2328	2025-05-31	Lilo of one ckt of Jamalpur-Dhandari Kalan line at Sherpur SS (by replacing 66 kV Existing multi circuit line to 220kV)	Double Circuit	State Sector	PSTCL	2.0	220.0
2330	2329	2025-05-31	220 kV Khair-Harduaganj Line	Double Circuit	State Sector	UPPTCL	77.0	220.0
2331	2330	2025-06-30	Ckt-1 of 765 kV D/C KPS2-KPS3 line under Project Establishment of Khavda Pooling Station-3 (KPS3) in Khavda RE Park (SPV Name POWERGRID KPS3 TRANSMISSION LIMITED)	Single Circuit	Central Sector	PGCIL	15.0	765.0
2332	2331	2025-06-30	400 kV D/C Jeypore (POWERGRID)-Jagdalpur (CSPTCL) line under Project Inter-regional ER-WR Interconnection (SPV Name ERWR Power Transmission Ltd.)	Double Circuit	Central Sector	PGCIL	136.0	400.0
2333	2332	2025-06-30	Kathalguri (NEEPCO)-Namsai (POWERGRID) 220 kV D/C line under Project System Strengthening Scheme for Eastern and North Eastern Regions (SPV Name POWERGRID ER NER Transmission Limited)	Double Circuit	Central Sector	PGCIL	142.0	220.0
2334	2333	2025-06-30	LILO of one ckt of Mohana-Samalkha line at Jajji SS	Double Circuit	State Sector	HVPNL	7.0	220.0
2335	2334	2025-06-30	Ghanagapura S/S Kalaburagi (Ferozabad) S/s to Kapnoor line	Double Circuit	State Sector	KPTCL	21.0	220.0
2336	2335	2025-06-30	LILO of one ckt of Mhaisal-Jath at Alkud SS (Jath to Alkud Portion)	Double Circuit	State Sector	MSETCL	22.0	220.0
2337	2336	2025-06-30	Keonjhar (PGCIL SS) to Turumunga GSS	Double Circuit	State Sector	OPTCL	34.0	220.0
2338	2337	2025-06-30	LILO of 220 kV Akal-Giral Line at 220 kV GSS Sheo	Double Circuit	State Sector	RVPNL	8.0	220.0
2339	2338	2025-06-30	LILO of 220 kV Balotra-HRRL Line at 400 kV GSS Pachpadra	Double Circuit	State Sector	RVPNL	10.0	220.0
2340	2339	2025-06-30	Juna Renewable Energy Private Limited Solar Power Plant (switchyard located in Village Kawani District-Bikaner Rajasthan)-Bikaner-II (ISTS) Pooling station 220 kV line	Single Circuit	Private Sector	Juna Renewable Energy	16.0	220.0
