  "fields": [{"id":"_id","type":"int"},{"id":"id","type":"int4","info":{"label":"index","units":null,"unit_type":false,"formula":null,"unit_conversion":null,"original_derived":false,"visual_exclude":false}},{"id":"date","type":"date","info":{"label":"Date","units":"","unit_type":true,"formula":"","unit_conversion":"","original_derived":true,"visual_exclude":true}},{"id":"transmission_line","type":"text","info":{"label":"Transmission Line","units":"","unit_type":true,"formula":"","unit_conversion":"","original_derived":true,"visual_exclude":true}},{"id":"circuit_type","type":"text","info":{"label":"Circuit Type","units":"","unit_type":true,"formula":"","unit_conversion":"","original_derived":true,"visual_exclude":true}},{"id":"sector","type":"text","info":{"label":"Sector","units":"","unit_type":true,"formula":"","unit_conversion":"","original_derived":true,"visual_exclude":true}},{"id":"executing_agency","type":"text","info":{"label":"Execution Authority","units":"","unit_type":true,"formula":"","unit_conversion":"","original_derived":true,"visual_exclude":true}},{"id":"line_length","type":"numeric","info":{"label":"Length","units":"cKM","unit_type":true,"formula":"","unit_conversion":"","original_derived":true,"visual_exclude":true}},{"id":"voltage_level","type":"numeric","info":{"label":"Voltage","units":"kV","unit_type":true,"formula":"","unit_conversion":"","original_derived":true,"visual_exclude":true}}],
  "records": [
    [1,0,"2014-01-31","Meerut - Bhiwani line","Single Circuit","Central Sector","PGCIL",174.0,765.0],
    [2,1,"2014-01-31","Raigarh Pooling Station (Near Kotra) - Raipur Pooling Station line","Double Circuit","Central Sector","PGCIL",480.0,765.0],
    [3,2,"2014-01-31","LILO of Bangalore - Salam at Hosur","Double Circuit","Central Sector","PGCIL",25.0,400.0],
    [4,3,"2014-01-31","Ranchi (New) -Ranchi line -I","Double Circuit","Central Sector","PGCIL",162.0,400.0],
    [5,4,"2014-01-31","Shifting of Ankola -Aurangabad (MSETCL) to Aurangabad (PG)","Double Circuit","Central Sector","PGCIL",102.0,400.0],
    [6,5,"2014-01-31","Anta - Phagi (Jaipur South Ckt-2)(Charged at 400 kV)","Single Circuit","State Sector","RVPNL",214.0,765.0],
    [7,6,"2014-01-31","Alamathy -Sunguvarchatram (1st Ckt)","Double Circuit","State Sector","TANTRANSCO",98.0,400.0],
    [8,7,"2014-01-31","Kawai - Anta (Baran)","Double Circuit","State Sector","RVPNL",101.0,400.0],
    [9,8,"2014-01-31","Paricha - Mainpuri 2nd Ckt.)","Double Circuit","State Sector","UPPTCL",259.0,400.0],
    [10,9,"2014-01-31","Raigarh - Saraipalli","Double Circuit","State Sector","CSPTCL",222.0,400.0],
    [11,10,"2014-01-31","Vadinar - Amreli (Part line)","Double Circuit","State Sector","GETCO",117.0,400.0],
    [12,11,"2014-01-31","Churk - Robertsganj","Double Circuit","State Sector","UPPTCL",13.0,220.0],
    [13,12,"2014-01-31","LILO of 2nd Ckt of GHTP - Mansa at Dhanaula","Double Circuit","State Sector","PSTCL",78.0,220.0],
    [14,13,"2014-01-31","LILO of GGSSTP - Sahnewal at Ghulal","Double Circuit","State Sector","PSTCL",11.0,220.0],
    [15,14,"2014-01-31","LILO of Manubolu - Renigunta at Ranchagunneri S/S","Double Circuit","State Sector","APTRANSCO",2.0,220.0],
    [16,15,"2014-01-31","LILO of one ckt of Jamsher - Sultanpur at Badshahpur","Double Circuit","State Sector","PSTCL",14.0,220.0],
    [17,16,"2014-01-31","LILO of Tadikanda - Ongole at Podili (Lot I & II)","Double Circuit","State Sector","APTRANSCO",143.0,220.0],
    [18,17,"2014-01-31","Pune (PG) - Aurangabad (MSETCL)","Multiple Circuits with Double Circuit","Private Sector","RPTL",476.0,400.0],
    [19,18,"2014-02-28","Satna - Gwalior line (Ckt-I)","Single Circuit","Central Sector","PGCIL",337.0,765.0],
    [20,19,"2014-02-28","LILO of Nathpa Jhakri - Nalagarh at Rampur (Loop in portion)","Double Circuit","Central Sector","PGCIL",5.0,400.0],
    [21,20,"2014-02-28","Khedamara - Raipur","Double Circuit","State Sector","CSPTCL",90.0,400.0],
    [22,21,"2014-02-28","Kolaghat TPS - Kharagpur","Single Circuit","State Sector","WBSETCL",91.0,400.0],
    [23,22,"2014-02-28","Kotputli - Manoharpur","Double Circuit","State Sector","RVPNL",99.0,220.0],
    [24,23,"2014-02-28","Latehar- Daltonganj","Double Circuit","State Sector","JUSNL",130.0,220.0],
    [25,24,"2014-02-28","Tiroda - Akola-II","Single Circuit","Private Sector","APL",361.0,765.0],
    [26,25,"2014-02-28","Akola- I - Akola-II","Double Circuit","Private Sector","APL",61.0,400.0],
    [27,26,"2014-03-31","LILO of Ranchi - WR Pooling Station at Dharamjaygarh / near Korba.","Double Circuit","Central Sector","PGCIL",10.0,765.0],
    [28,27,"2014-03-31","Lucknow - Bareilly line","Single Circuit","Central Sector","PGCIL",252.0,765.0],
    [29,28,"2014-03-31","Ranchi - WR Pooling Station","Single Circuit","Central Sector","PGCIL",381.0,765.0],
    [30,29,"2014-03-31","Bareilly (New) - Bareilly (Exist) line (Quad)","Double Circuit","Central Sector","PGCIL",2.0,400.0],
    [31,30,"2014-03-31","Kurnool (new) - Kurnool line","Double Circuit","Central Sector","PGCIL",20.0,400.0],
    [32,31,"2014-03-31","LILO of Bhiwadi - Bassi at Kotputli","Double Circuit","Central Sector","PGCIL",17.0,400.0],
    [33,32,"2014-03-31","LILO of Kahalgaon - Biharshariff line (Ist line) at Lakhisarai","Double Circuit","Central Sector","PGCIL",56.0,400.0],
    [34,33,"2014-03-31","LILO of Kolar - Sriperumbdure at Thiruvalam","Double Circuit","Central Sector","PGCIL",42.0,400.0],
    [35,34,"2014-03-31","LILO of Nagarjunsagar - Gooty at Kurnool","Double Circuit","Central Sector","PGCIL",70.0,400.0],
    [36,35,"2014-03-31","LILO of One Ckt of Talchar - Meramundali at Angul Pooling Station","Double Circuit","Central Sector","PGCIL",34.0,400.0],
    [37,36,"2014-03-31","LILO of Vapi - Navi Mumbai at Kala","Double Circuit","Central Sector","PGCIL",18.0,400.0],
    [38,37,"2014-03-31","Ranchi (New) -Ranchi line -II","Double Circuit","Central Sector","PGCIL",158.0,400.0],
    [39,38,"2014-03-31","Tiruvelam (PG) - Chitoor","Double Circuit","Central Sector","PGCIL",42.0,400.0],
    [40,39,"2014-03-31","Vadodara - Pirana (Quad)","Double Circuit","Central Sector","PGCIL",274.0,400.0],
    [41,40,"2014-03-31","Vadodra - Asoj line","Double Circuit","Central Sector","PGCIL",24.0,400.0],
    [42,41,"2014-03-31","Vapi - Kala (Part of Vapi-Navimumbai)","Double Circuit","Central Sector","PGCIL",61.0,400.0],
    [43,42,"2014-03-31","Anta - Phagi (Jaipur South Ckt-1)","Single Circuit","State Sector","RVPNL",212.0,765.0],
    [44,43,"2014-03-31","Alamathy -Sunguvarchatram (2nd Ckt)","Double Circuit","State Sector","TANTRANSCO",100.0,400.0],
    [45,44,"2014-03-31","Chandrapur switching Stn. - Chandrapur II S/S","Single Circuit","State Sector","MSETCL",4.0,400.0],
    [46,45,"2014-03-31","Kalisndh TPS - Anta (Baran) Pooling Station (Quad)","Double Circuit","State Sector","RVPNL",159.0,400.0],
    [47,46,"2014-03-31","Pithampur-Indore","Double Circuit","State Sector","MPPTCL",128.0,400.0],
    [48,47,"2014-03-31","LILO of Kundha PH III - PUSHEP at Karamadai","Double Circuit","State Sector","TANTRANSCO",2.0,230.0],
    [49,48,"2014-03-31","BAAP - Bhadla","Double Circuit","State Sector","RVPNL",104.0,220.0],
    [50,49,"2014-03-31","BECL (Padva)- Sagapara line","Double Circuit","State Sector","GETCO",83.0,220.0],
    [51,50,"2014-03-31","Dhuri-Bangan","Double Circuit","State Sector","PSTCL",101.0,220.0],
    [52,51,"2014-03-31","Diversion of Koradi - Kalwa Ckt-I (Bhusawal - Aurangabad ) at Jalgaon","Single Circuit","State Sector","MSETCL",2.0,220.0],
    [53,52,"2014-03-31","Diversion of Koradi - Kalwa Ckt-I (Bhusawal - BBLR ) at Jalgaon","Single Circuit","State Sector","MSETCL",2.0,220.0],
    [54,53,"2014-03-31","Diversion of Sarni - Pandhurna","Double Circuit","State Sector","MPPTCL",4.0,220.0],
    [55,54,"2014-03-31","Extn. of Hajipur - Muzaffarpur (Kanti) to Muzaffarpur (PG)","Double Circuit","State Sector","BSPTCL",14.0,220.0],
    [56,55,"2014-03-31","LILO of 2nd Ckt Vita -Pandhrapur line at Hiwarwadi S/S","Double Circuit","State Sector","MSETCL",6.0,220.0],
    [57,56,"2014-03-31","LILO of Bharthana - Manipuri at Saifai","Double Circuit","State Sector","UPPTCL",2.0,220.0],
    [58,57,"2014-03-31","LILO of both ckts of Hadala - Halvad at Sartanpar","Double Circuit","State Sector","GETCO",51.0,220.0],
    [59,58,"2014-03-31","LILO of Chorania-Gondal at Sadla","Double Circuit","State Sector","GETCO",59.0,220.0],
    [60,59,"2014-03-31","LILO of Domjur - Howrah at Foundry Park","Double Circuit","State Sector","WBSETCL",60.0,220.0],
    [61,60,"2014-03-31","LILO of Gachibowli - Thandur at Yeddumailaram","Double Circuit","State Sector","APTRANSCO",20.0,220.0],
    [62,61,"2014-03-31","LILO of Halvad - Bhimasar at Halvad","Double Circuit","State Sector","GETCO",18.0,220.0],
    [63,62,"2014-03-31","LILO of Jeerat - KLC at NTAA-III","Double Circuit","State Sector","WBSEDCL",4.0,220.0],
    [64,63,"2014-03-31","LILO of Khaparkheda - Wardha at New Buttibori-III","Double Circuit","State Sector","MSETCL",3.0,220.0],
    [65,64,"2014-03-31","LILO of Korba- Amarkantak I & II at Churri","Double Circuit","State Sector","CSPTCL",2.0,220.0],
    [66,65,"2014-03-31","LILO of Navsari - Vav line at Popada","Double Circuit","State Sector","GETCO",18.0,220.0],
    [67,66,"2014-03-31","LILO of one ckt Wanakbori-Asoj line at Jarod","Double Circuit","State Sector","GETCO",28.0,220.0],
    [68,67,"2014-03-31","LILO of Pusad - Nanded at Ghatodi","Double Circuit","State Sector","MSETCL",33.0,220.0],
    [69,68,"2014-03-31","LILO of Ratangarh - Reengus at Laxmangarh","Double Circuit","State Sector","RVPNL",6.0,220.0],
    [70,69,"2014-03-31","LILO of Tappar - Shivlakha at PS 3 (Bhachau)","Double Circuit","State Sector","GETCO",3.0,220.0],
    [71,70,"2014-03-31","LILO of Waluj Bahaleshwar at Deogaon Rangari S/S","Double Circuit","State Sector","MSETCL",26.0,220.0],
    [72,71,"2014-03-31","Modification/Shifting of Jabalpur - Amarkantak","Double Circuit","State Sector","MPPTCL",16.0,220.0],
    [73,72,"2014-03-31","Modification / Shifting of Sukha - Birsinghpur / Amarkantak","Double Circuit","State Sector","MPPTCL",13.0,220.0],
    [74,73,"2014-03-31","Ratlam - Daloda line","Double Circuit","State Sector","MPPTCL",74.0,220.0],
    [75,74,"2014-03-31","Ridge Valley - Trauma Centre/ AIIMS","Double Circuit","State Sector","DTL",12.0,220.0],
    [76,75,"2014-03-31","Sattenapalli (Narsaraopet) - Narsaraopet","Double Circuit","State Sector","APTRANSCO",40.0,220.0],
    [77,76,"2014-03-31","Tap on Babhaleshwar - Chalisgaon at Kopergaon","Double Circuit","State Sector","MSETCL",11.0,220.0],
    [78,77,"2014-03-31","Tap on Vita - Comboti at Mahali S/S","Double Circuit","State Sector","MSETCL",2.0,220.0],
    [79,78,"2014-03-31","Yeddumailaram - Sadasivpet","Double Circuit","State Sector","APTRANSCO",74.0,220.0],
    [80,79,"2014-03-31","LILO of Rourkela - Raigarh at Sterlite TPP ( 2nd LILO)","Double Circuit","Private Sector","VEDANTA",60.0,400.0],
    [81,80,"2014-03-31","Nasik-Bableshwar (1st Ckt)","Double Circuit","Private Sector","IBPL",57.0,400.0],
    [82,81,"2014-03-31","Subhasgram (PGCIL) - CESC 220 KV S/S","Double Circuit","Private Sector","CESC",48.0,220.0],
    [83,82,"2014-04-30","Aurangabad (PG)-Aurangabad (MSETCL)","Double Circuit","Central Sector","PGCIL",118.0,400.0],
    [84,83,"2014-04-30","LILO of Teesta-V Siliguri line at Rangpo (1 D/C & 1.5 M/C)","Double Circuit","Central Sector","PGCIL",7.0,400.0],
    [85,84,"2014-04-30","Nellor - Thiruvalam (Quad) line","Double Circuit","Central Sector","PGCIL",352.0,400.0],
    [86,85,"2014-04-30","Moga- Nakodar","Double Circuit","State Sector","PSTCL",128.0,400.0],
    [87,86,"2014-04-30","LILO of Arasur-Ingur at Karamadai S/S","Double Circuit","State Sector","TANTRANSCO",5.0,220.0],
    [88,87,"2014-04-30","LILO of Debari - Banswara at Madri (Udaipur)","Double Circuit","State Sector","RVPNL",34.0,220.0],
    [89,88,"2014-04-30","LILO of Moga - Ferozepur at Talwandi Bhai","Double Circuit","State Sector","PSTCL",4.0,220.0],
    [90,89,"2014-04-30","LILO of Muradnagar - Modipuram at Faridnagar","Single Circuit","State Sector","UPPTCL",31.0,220.0],
    [91,90,"2014-05-31","Bina - Gwalior line (3rd Ckt)","Single Circuit","Central Sector","PGCIL",231.0,765.0],
    [92,91,"2014-05-31","Champa Pooling Station - Dharamjaygarh / Near Korba Switching Station line","Single Circuit","Central Sector","PGCIL",62.0,765.0],
    [93,92,"2014-05-31","Champa Pooling Station - Raipur Pooling Station line","Double Circuit","Central Sector","PGCIL",298.0,765.0],
    [94,93,"2014-05-31","Indore - Vadodara","Single Circuit","Central Sector","PGCIL",320.0,765.0],
    [95,94,"2014-05-31","Gola - Ramgarh","Double Circuit","Central Sector","DVC",74.0,220.0],
    [96,95,"2014-05-31","LILO of Waluj - Bhusawal at Thaptitanda","Double Circuit","State Sector","MSETCL",154.0,400.0],
    [97,96,"2014-05-31","Nakodar - Makhu line","Double Circuit","State Sector","PSTCL",105.0,400.0],
    [98,97,"2014-05-31","Rajpura Thermal - Nakodar","Double Circuit","State Sector","PSTCL",279.0,400.0],
    [99,98,"2014-05-31","Thaptitanda (Aurangabad -II) - Ektuni","Double Circuit","State Sector","MSETCL",9.0,400.0],
    [100,99,"2014-05-31","Ajari - Bhadla line","Double Circuit","State Sector","RVPNL",48.0,220.0],
    [101,100,"2014-05-31","Bap-Ajari line","Double Circuit","State Sector","RVPNL",57.0,220.0],
    [102,101,"2014-05-31","Dhuri (Bhalwan) - Dhanaula","Double Circuit","State Sector","PSTCL",75.0,220.0],
    [103,102,"2014-05-31","LILO of Dhuri - Bangan at Chhajali (Loop out)","Single Circuit","State Sector","PSTCL",27.0,220.0],
    [104,103,"2014-05-31","LILO of Ratangarh -Bikaner at Bandnu","Double Circuit","State Sector","RVPNL",42.0,220.0],
    [105,104,"2014-05-31","Nakodar - Nurmehal","Double Circuit","State Sector","PSTCL",30.0,220.0],
    [106,105,"2014-06-30","Kurnool - Raichur (IInd Ckt)","Single Circuit","Central Sector","PGCIL",118.0,765.0],
    [107,106,"2014-06-30","Rihand - Vindhyachal Pooling Station (1st Ckt)","Single Circuit","Central Sector","PGCIL",31.0,765.0],
    [108,107,"2014-06-30","LILO of 2nd Ckt of Lucknow - Bareliiy line (PG) at Shahjahanpur","Double Circuit","Central Sector","PGCIL",25.0,400.0],
    [109,108,"2014-06-30","LILO of Neyveli - Trichy at Nagapattnam Pooling station","Single Circuit","Central Sector","PGCIL",46.0,400.0],
    [110,109,"2014-06-30","Anpara C - Anpara D","Single Circuit","State Sector","UPPTCL",3.0,765.0],
    [111,110,"2014-06-30","Lalitpur TPS - Jhansi","Double Circuit","State Sector","UPPTCL",185.0,220.0],
    [112,111,"2014-06-30","LILO of Khodri - Rishikesh at Dehradun","Double Circuit","State Sector","PTCUL",5.0,220.0],
    [113,112,"2014-06-30","Makhu - Dharam kot","Double Circuit","State Sector","PSTCL",42.0,220.0],
    [114,113,"2014-06-30","Narasaraopet - Parchur","Double Circuit","State Sector","APTRANSCO",106.0,220.0],
    [115,114,"2014-06-30","Patti - Algon (2nd Ckt)","Single Circuit","State Sector","PSTCL",20.0,220.0],
    [116,115,"2014-06-30","Raichur - Sholapur line (RSTL - TBCB)","Single Circuit","Private Sector","RSTCL",208.0,765.0],
    [117,116,"2014-06-30","LILO of ACBIL-Baraari (Bilaspur) PS at Bandakhar (Maruti Clean Coal)","Double Circuit","Private Sector","MCCPL",6.0,400.0],
    [118,117,"2014-07-31","Jharsuguda Pooling Station Dharamjaygarh line.","Double Circuit","Central Sector","PGCIL",300.0,765.0],
    [119,118,"2014-07-31","Wardha - Aurangabad-I","Double Circuit","Central Sector","PGCIL",690.0,765.0],
    [120,119,"2014-07-31","Thiruvalam - Sholinganallur line","Double Circuit","Central Sector","PGCIL",228.0,400.0],
    [121,120,"2014-07-31","Babhaleshwar - Aurangabad II","Double Circuit","State Sector","MSETCL",254.0,400.0],
    [122,121,"2014-07-31","Karaikudi - Kayathar","Double Circuit","State Sector","TANTRANSCO",390.0,400.0],
    [123,122,"2014-07-31","Mukatsar -Makhu","Double Circuit","State Sector","PSTCL",191.0,400.0],
    [124,123,"2014-07-31","Pugalur - Ottiyambakkam - Kalivanthapattu (Melakottaiyur)","Double Circuit","State Sector","TANTRANSCO",727.0,400.0],
    [125,124,"2014-07-31","LILO of Kayathar - Anuppankulam at Kayathar","Double Circuit","State Sector","TANTRANSCO",4.0,230.0],
    [126,125,"2014-07-31","LILO of Kayathar - Pasumalai at Kayathar","Double Circuit","State Sector","TANTRANSCO",4.0,230.0],
    [127,126,"2014-07-31","LILO of Thudiyalur - Othakalmandapam at Coimbatore","Double Circuit","State Sector","TANTRANSCO",10.0,230.0],
    [128,127,"2014-07-31","Kashipur - Mahuakheraganj","Double Circuit","State Sector","PTCUL",34.0,220.0],
    [129,128,"2014-07-31","LILO of Baja khana - Mukatsar at Kotkapura","Double Circuit","State Sector","PSTCL",3.0,220.0],
    [130,129,"2014-07-31","Terminating tower point - HSR Layout (Cable work)","Underground Cable","State Sector","KPTCL",3.0,220.0],
    [131,130,"2014-07-31","Bhopal - Bhopal (BDTCL - TBCB)","Double Circuit","Private Sector","SGL",17.0,400.0],
    [132,131,"2014-07-31","Byrnihat - Azara (2nd Ckt) (Part of Silchar - Azara)","Single Circuit","Private Sector","NETC",42.0,400.0],
    [133,132,"2014-08-31","Satna - Gwalior line (60 Km D/C Portion) Ckt-II","Double Circuit+Single Circuit","Central Sector","PGCIL",300.0,765.0],
    [134,133,"2014-08-31","Anuppur (Moser Baer) - Jabalpur Pooling Station","Double Circuit","Central Sector","PGCIL",492.0,400.0],
    [135,134,"2014-08-31","Kosamba-Chorania line","Double Circuit","State Sector","GETCO",460.0,400.0],
    [136,135,"2014-08-31","Hura - Raghunathpur","Double Circuit","State Sector","WBSETCL",67.0,220.0],
    [137,136,"2014-08-31","Korba -Vishrampur","Single Circuit","State Sector","CSPTCL",153.0,220.0],
    [138,137,"2014-08-31","LILO of Dausa -Alwar at Alwar","Double Circuit","State Sector","RVPNL",9.0,220.0],
    [139,138,"2014-08-31","LILO of GAVASAD - SLPP at Karjan","Double Circuit","State Sector","GETCO",23.0,220.0],
    [140,139,"2014-08-31","LILO of Harduagani - Hathras at Khair","Double Circuit","State Sector","UPPTCL",75.0,220.0],
    [141,140,"2014-08-31","LILO of Karamsad-Vartej at Dhuvaran CCPP-III","Double Circuit","State Sector","GETCO",78.0,220.0],
    [142,141,"2014-08-31","LILO of Mandawar-Alwar (MIA) at Alwar","Double Circuit","State Sector","RVPNL",1.0,220.0],
    [143,142,"2014-08-31","LILO of Raigarh - Jindal (Tamnar) at Girwani","Double Circuit","State Sector","CSPTCL",15.0,220.0],
    [144,143,"2014-08-31","LILO of Rewan Road - Fatehpur at Sirathu","Single Circuit","State Sector","UPPTCL",6.0,220.0],
    [145,144,"2014-08-31","LILO of Thiruvalam - Kanchipuram SP Koil at Thiruvalam","Double Circuit","State Sector","TANTRANSCO",10.0,220.0],
    [146,145,"2014-08-31","Shalimar bagh - Wazirpur, U/G,1000 mm, 200 MW","Double Circuit","State Sector","DTL",8.0,220.0],
    [147,146,"2014-08-31","Akola - Aurangabad line ckt-I","Single Circuit","Private Sector","APL",219.0,765.0],
    [148,147,"2014-08-31","DB Power (Baradarha) - Raigarh (Kotra) Pooling Station","Double Circuit","Private Sector","DBPCL",36.0,400.0],
    [149,148,"2014-08-31","Derang - Angul Pooling Station","Multiple Circuits with Double Circuit","Private Sector","JPL",154.0,400.0],
    [150,149,"2014-08-31","LILO of one ckt of Bhadravati (PG) - Parli at Dhariwal","Double Circuit","Private Sector","DIL",31.0,400.0],
    [151,150,"2014-09-30","Dadr-Loni (Harsh Vihar)","Single Circuit","Central Sector","NTPC Ltd.",108.0,400.0],
    [152,151,"2014-09-30","Koderma - Gaya (Balance part)","Double Circuit","Central Sector","PGCIL",152.0,400.0],
    [153,152,"2014-09-30","Maithon -Gaya line (Balance part)","Double Circuit","Central Sector","PGCIL",130.0,400.0],
    [154,153,"2014-09-30","Talwandi Sabo-Mukatsar","Double Circuit","State Sector","PSTCL",201.0,400.0],
    [155,154,"2014-09-30","Bhawad - Bhopalgarh","Double Circuit","State Sector","RVPNL",93.0,220.0],
    [156,155,"2014-09-30","BTPS-Agia-Sarusajai (2nd Circuit, Balance portion)","Single Circuit","State Sector","AEGCL",65.0,220.0],
    [157,156,"2014-09-30","Ghazipur - Rasra","Single Circuit","State Sector","UPPTCL",59.0,220.0],
    [158,157,"2014-09-30","Kanti - Darbhanga (2nd Ckt)","Single Circuit","State Sector","BSPTCL",68.0,220.0],
    [159,158,"2014-09-30","Khaperkheda - Butibori -I","Double Circuit","State Sector","MSETCL",126.0,220.0],
    [160,159,"2014-09-30","LILO of Bawana-Najafgarh at Kanjhawla","Double Circuit","State Sector","DTL",6.0,220.0],
    [161,160,"2014-09-30","LILO of Budidampad - Bhongiri at Weddekothapally","Double Circuit","State Sector","APTRANSCO",14.0,220.0],
    [162,161,"2014-09-30","LILO of New Pallom- Kayamkulam at Punnapra","Double Circuit","State Sector","KPCL",36.0,220.0],
    [163,162,"2014-09-30","LILO of Obra - Allahabad II Ckt at Mizrapur","Double Circuit","State Sector","UPPTCL",8.0,220.0],
    [164,163,"2014-09-30","Maharani Bagh- Gazipur (0.5kM cable on Maharani Bagh side & 8.5kM OH line)","Double Circuit","State Sector","DTL",19.0,220.0],
    [165,164,"2014-09-30","Purti - Butibori - III","Double Circuit","State Sector","MSETCL",78.0,220.0],
    [166,165,"2014-09-30","Dhule (IPTC) - Dhule (MSETCL) (BDTCL - TBCB)","Double Circuit","Private Sector","SGL",35.0,400.0],
    [167,166,"2014-09-30","GEPL -MIDC S/S","Double Circuit","Private Sector","GEPL",20.0,220.0],
    [168,167,"2014-09-30","Koldam - Ludhinana (JV Portion)","Double Circuit","Joint Sector","PKTCL",301.0,400.0],
    [169,168,"2014-09-30","Parbati -II- Koldam line -II","Single Circuit","Joint Sector","PKTCL",76.0,400.0],
    [170,169,"2014-10-31","Kurnool - Nellore","Double Circuit","Central Sector","PGCIL",602.0,765.0],
    [171,170,"2014-10-31","Balipara - Bongaigaon","Double Circuit","Central Sector","PGCIL",609.0,400.0],
    [172,171,"2014-10-31","LILO of Both Ckt Jamshedpur - Rourkela line at Chaibasa","Double Circuit","Central Sector","PGCIL",56.0,400.0],
    [173,172,"2014-10-31","LILO of Nathpa Jhakri - Nalagarh at Rampur (2nd Ckt balance)","Double Circuit","Central Sector","PGCIL",2.0,400.0],
    [174,173,"2014-10-31","LILO of Teesta-V Siliguri line at Rangpo (2nd ckt balance)","Double Circuit","Central Sector","PGCIL",5.0,400.0],
    [175,174,"2014-10-31","LILO of Moradabad - CB Ganj at Rampur","Double Circuit","State Sector","UPPTCL",24.0,220.0],
    [176,175,"2014-10-31","LILO of Muzaffarngr - Nara -II ckt at Jansath","Double Circuit","State Sector","UPPTCL",20.0,220.0],
    [177,176,"2014-10-31","LILO of Thiruvalam - Singarapet at Thiruvalam","Double Circuit","State Sector","TANTRANSCO",20.0,220.0],
    [178,177,"2014-10-31","Puricha - Jhansi","Double Circuit","State Sector","UPPTCL",14.0,220.0],
    [179,178,"2014-10-31","Aurangabad - Dhule (BDTCL - TBCB)","Single Circuit","Private Sector","SGL",192.0,765.0],
    [180,179,"2014-10-31","Bhopal - Indore (BDTCL - TBCB)","Single Circuit","Private Sector","SGL",176.0,765.0],
    [181,180,"2014-10-31","Parbati- II - Koldam line-I","Single Circuit","Joint Sector","PKTCL",81.0,400.0],
    [182,181,"2014-11-30","LILO of Bhilwara -Bali at Bamantukda","Double Circuit","State Sector","RVPNL",26.0,220.0],
    [183,182,"2014-11-30","LILO of Duni - SEZ(220 KV GSS) line at Jaipur (south)(PG)","Double Circuit","State Sector","RVPNL",55.0,220.0],
    [184,183,"2014-11-30","LILO of Jabalpur (Sukha) - Birsinghpur / Amarkantak at Panagar","Double Circuit","State Sector","MPPTCL",7.0,220.0],
    [185,184,"2014-11-30","LILO of Jeur - Karkambh at Shinde SKS","Double Circuit","State Sector","MSETCL",5.0,220.0],
    [186,185,"2014-11-30","LILO of one ckt of Badshahpur - Bhiwadi at HSIIDC Bawal","Double Circuit","State Sector","HVPNL",36.0,220.0],
    [187,186,"2014-11-30","LILO of Tanda - Sultanpur at Tanda(New)","Double Circuit","State Sector","UPPTCL",8.0,220.0],
    [188,187,"2014-11-30","Manubolu - Sullurpeta","Double Circuit","State Sector","APTRANSCO",136.0,220.0],
    [189,188,"2014-11-30","Ramgarh (GTPP) - Chandan","Double Circuit","State Sector","RVPNL",194.0,220.0],
    [190,189,"2014-11-30","Bongaigoan - Siliguri Line (ENICL - TBCB)","Double Circuit","Private Sector","SGL",443.0,400.0],
    [191,190,"2014-11-30","Kurnool - Thiruvalam line","Double Circuit","Central Sector","PGCIL",710.0,765.0],
    [192,191,"2014-11-30","Raipur Pooling Station - Wardha line","Double Circuit","Central Sector","PGCIL",736.0,765.0],
    [193,192,"2014-11-30","LILO of Navsai - Boisar at Magarwada","Double Circuit","Central Sector","PGCIL",16.0,400.0],
    [194,193,"2014-11-30","Chhegaon - Julwania","Double Circuit","State Sector","MPPTCL",225.0,400.0],
    [195,194,"2014-11-30","LILO of Muzaffarnagar -Vishnuprayag at Srinagar","Double Circuit","State Sector","UPPTCL",7.0,400.0],
    [196,195,"2014-11-30","Aau-Baithwasia","Double Circuit","State Sector","RVPNL",93.0,220.0],
    [197,196,"2014-11-30","Bhawad-Baithwasia","Double Circuit","State Sector","RVPNL",66.0,220.0],
    [198,197,"2014-11-30","Daloda - Mandsaur","Double Circuit","State Sector","MPPTCL",14.0,220.0],
    [199,198,"2014-11-30","Harduaganj - Jahangirabad","Double Circuit","State Sector","UPPTCL",99.0,220.0],
    [200,199,"2014-11-30","Jaipur (South -PG) - Vatika line","Double Circuit","State Sector","RVPNL",56.0,220.0],
    [201,200,"2014-11-30","LILO of Ajmer -Beawer line at Ajmer","Double Circuit","State Sector","RVPNL",38.0,220.0],
    [202,201,"2014-12-31","Bokaro TPS Extn.- Koderma TPS","Double Circuit","Central Sector","PGCIL",200.0,400.0],
    [203,202,"2014-12-31","Sagardighi - Baharampur","Double Circuit","Central Sector","PGCIL",52.0,400.0],
    [204,203,"2014-12-31","220 kV Apta - Kalwa line at Loc. No 647& 652 & 220 kV Kalwa - Taloja at Loc. No. 652 to 654 for Metra Rail Depot","Single Circuit","State Sector","MSETCL",4.0,220.0],
    [205,204,"2014-12-31","Chandan - Dechu","Double Circuit","State Sector","RVPNL",202.0,220.0],
    [206,205,"2014-12-31","Khadaki (VSNL - Dighi) - Theur-II line from Lonikand -I to Lonikand-II S/S","Single Circuit","State Sector","MSETCL",1.0,220.0],
    [207,206,"2014-12-31","LILO of 2nd Ckt of Patiala - Patran at Rajla","Double Circuit","State Sector","PSTCL",12.0,220.0],
    [208,207,"2014-12-31","LILO of Hinjewadi - Infosys line at Pegasus","Double Circuit","State Sector","MSETCL",6.0,220.0],
    [209,208,"2014-12-31","LILO of Kolhapur II - Mumewadi at Ghorpade","Double Circuit","State Sector","MSETCL",7.0,220.0],
    [210,209,"2014-12-31","LILO of Morbi - Lalpar at Sartanpar","Double Circuit on Multiple Circuits","State Sector","GETCO",17.0,220.0],
    [211,210,"2014-12-31","LILO of Tappar - Nani Khakhar at Mokha","Double Circuit","State Sector","GETCO",21.0,220.0],
    [212,211,"2014-12-31","Mendhasal-Bidanasi","Double Circuit","State Sector","OPTCL",62.0,220.0],
    [213,212,"2014-12-31","Sarna - Sujanpur line","Double Circuit","State Sector","PSTCL",9.0,220.0],
    [214,213,"2014-12-31","Shifting & height raising of 220 kV Kalwa - Taloja & 220 kV Kalwa - Apta line Loc. 652-653-654 for Metro rail Depot and Loc. No 647 to 652 metro rail at Panchananda","Single Circuit","State Sector","MSETCL",4.0,220.0],
    [215,214,"2014-12-31","Tap on 220 kV Bhigwan-Kurkumbh at 220 kV Shirsuphal","Single Circuit","State Sector","MSETCL",5.0,220.0],
    [216,215,"2014-12-31","Tarapur - Boisar line","Single Circuit","State Sector","MSETCL",1.0,220.0],
    [217,216,"2014-12-31","Tarapur - Borivali line","Single Circuit","State Sector","MSETCL",1.0,220.0],
    [218,217,"2014-12-31","Kamalanga (GMR) - Angul pooling station","Double Circuit","Private Sector","GMR ENERG",60.0,400.0],
    [219,218,"2015-01-31","Bachou - Varsana line","Double Circuit","Central Sector","PGCIL",20.0,400.0],
    [220,219,"2015-01-31","LILO of both ckts of Tuticorin JV - Maduri at Tuticorin Pooling station","Double Circuit","Central Sector","PGCIL",9.0,400.0],
    [221,220,"2015-01-31","Sikar - Ratnagarh line","Double Circuit","Central Sector","PGCIL",156.0,400.0],
    [222,221,"2015-01-31","Chhabra TPS - Anta (Baran)","Double Circuit","State Sector","RVPNL",179.0,400.0],
    [223,222,"2015-01-31","LILO of Palatana - Bongaigaon at Azara S/S","Double Circuit","State Sector","AEGCL",7.0,400.0],
    [224,223,"2015-01-31","LILO of Panki - Muradnagar at Aligarh","Double Circuit","State Sector","UPPTCL",66.0,400.0],
    [225,224,"2015-01-31","MTPS Stage-III - Thiruvalam","Double Circuit","State Sector","TANTRANSCO",204.0,400.0],
    [226,225,"2015-01-31","Gonda - Basti","Single Circuit","State Sector","UPPTCL",105.0,220.0],
    [227,226,"2015-01-31","Gurgaon Sector-72- Gurgaon Sector-20","Double Circuit","State Sector","HVPNL",24.0,220.0],
    [228,227,"2015-01-31","Kadaperi - Kalivanthapattu line","Single Circuit","State Sector","TANTRANSCO",38.0,220.0],
    [229,228,"2015-01-31","LILO of Badod - Kota line & Badod - Modak line at Bhanpura","Double Circuit","State Sector","MPPTCL",4.0,220.0],
    [230,229,"2015-01-31","LILO of Bina - Bhopal line at Ganjbasoda","Double Circuit","State Sector","MPPTCL",11.0,220.0],
    [231,230,"2015-01-31","LILO of Both ckt Viramgam - Bhat at Sanand","Double Circuit","State Sector","GETCO",22.0,220.0],
    [232,231,"2015-01-31","LILO of K.R.Thoppur-Deviakurichi at Singapuram","Double Circuit","State Sector","TANTRANSCO",14.0,220.0],
    [233,232,"2015-01-31","LILO of Narsinghpur - Itarsi at Pipariya","Double Circuit","State Sector","MPPTCL",9.0,220.0],
    [234,233,"2015-01-31","Azara - Bongaigaon (2nd Ckt)","Double Circuit","Private Sector","NETC",159.0,400.0],
    [235,234,"2015-01-31","Bina TPS - Suitable location (along Bina (PG) - Bina (MPPTCL)","Double Circuit","Private Sector","JV(PG&JP)",40.0,400.0],
    [236,235,"2015-01-31","Dhariwal TPS -Channdrapur II (2nd Ckt)","Single Circuit","Private Sector","DIL",10.0,400.0],
    [237,236,"2015-01-31","Haldia - Subhasgram line","Double Circuit","Private Sector","CESC",178.0,400.0],
    [238,237,"2015-01-31","Tamnar TPP - Raigarh (Tamnar) Pooling Station","2xDouble Circuit","Private Sector","JPL",44.0,400.0],
    [239,238,"2015-02-28","Sholapur - Pune","Single Circuit","Central Sector","PGCIL",268.0,765.0],
    [240,239,"2015-02-28","LILO of Parli - Pune at Pune","Double Circuit","Central Sector","PGCIL",39.0,400.0],
    [241,240,"2015-02-28","LILO of Ckt-II Jullandhur - Hamirpur at Hamirpur (PG)","Double Circuit","Central Sector","PGCIL",19.0,220.0],
    [242,241,"2015-02-28","Bonapally - Chittoor (Quad)","Double Circuit","State Sector","APTRANSCO",196.0,400.0],
    [243,242,"2015-02-28","LILO of Mundra - Chorania at Halvad S/S","Double Circuit","State Sector","GETCO",4.0,400.0],
    [244,243,"2015-02-28","CBE - Mandapam","Double Circuit","State Sector","TANTRANSCO",10.0,230.0],
    [245,244,"2015-02-28","LILO of Kundha PH III - PUSHEP at Karamadai","Double Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [246,245,"2015-02-28","Ashta - Berchha (2nd Ckt)","Double Circuit","State Sector","MPPTCL",45.0,220.0],
    [247,246,"2015-02-28","Ashta - Indore - II (Jetpura)","Single Circuit on Double Circuit","State Sector","MPPTCL",199.0,220.0],
    [248,247,"2015-02-28","Berchha - Shajapur -I","Double Circuit","State Sector","MPPTCL",20.0,220.0],
    [249,248,"2015-02-28","Gurgaon Sector-72- Gurgaon Sector-20 (2nd Ckt)","Double Circuit","State Sector","HVPNL",24.0,220.0],
    [250,249,"2015-02-28","LILO of Botad - Vartej at Vallabhipur","Double Circuit","State Sector","GETCO",2.0,220.0],
    [251,250,"2015-02-28","LILO of Pandharpur - Malinagar at karkambh","Double Circuit","State Sector","MSETCL",3.0,220.0],
    [252,251,"2015-02-28","LILO of Ras - Merta line at Jethana","Double Circuit","State Sector","RVPNL",39.0,220.0],
    [253,252,"2015-02-28","Dhule - Vadodara (BDTCL - TBCB)","Single Circuit","Private Sector","SGL",263.0,765.0],
    [254,253,"2015-03-31","Angul Pooling Station - Jharsuguda Pooling Station line-I","Single Circuit","Central Sector","PGCIL",274.0,765.0],
    [255,254,"2015-03-31","Vindhyachal Pooling Station - Satna line (2 Km D/C Portion) Ckt-I","Double Circuit+Single Circuit","Central Sector","PGCIL",271.0,765.0],
    [256,255,"2015-03-31","Wardha - Aurangabad -II","Double Circuit","Central Sector","PGCIL",701.0,765.0],
    [257,256,"2015-03-31","LILO of Dehar - Panipat at Panchkula","Double Circuit","Central Sector","PGCIL",18.0,400.0],
    [258,257,"2015-03-31","Silchar - Imphal (New) line (to be charged at 132KV)","Double Circuit","Central Sector","PGCIL",334.0,400.0],
    [259,258,"2015-03-31","a) Jujjuru - Sattenapalli (b) LILO of VTS - Srisailam line at Sattenapalli","Double Circuit","State Sector","APTRANSCO",134.0,400.0],
    [260,259,"2015-03-31","Bara - Meza line","Double Circuit","State Sector","UPPTCL",65.0,400.0],
    [261,260,"2015-03-31","LILO of Panki - Obra at Rewa Road","Double Circuit","State Sector","UPPTCL",1.0,400.0],
    [262,261,"2015-03-31","Mundra - Zerda line (Terminated at Varsana)","Double Circuit","State Sector","GETCO",161.0,400.0],
    [263,262,"2015-03-31","Rewa Road - Meza line","Double Circuit","State Sector","UPPTCL",68.0,400.0],
    [264,263,"2015-03-31","Amravati - Badnera line (2 Ckt)","Single Circuit","State Sector","MSETCL",30.0,220.0],
    [265,264,"2015-03-31","Barmer - M/s Carins","Single Circuit","State Sector","RVPNL",23.0,220.0],
    [266,265,"2015-03-31","Berchha - Shajapur -II","Double Circuit","State Sector","MPPTCL",20.0,220.0],
    [267,266,"2015-03-31","Gwalior (PGCIL) - Gwalior-II","Double Circuit","State Sector","MPPTCL",3.0,220.0],
    [268,267,"2015-03-31","Heerapura -Nala Power House (Upgradation)","Double Circuit","State Sector","RVPNL",12.0,220.0],
    [269,268,"2015-03-31","Hiriyur - Gowribidanur","Double Circuit","State Sector","KPTCL",241.0,220.0],
    [270,269,"2015-03-31","Lalitpur TPS - Lalitpur TPS S/S (Ckt-I)","Double Circuit","State Sector","UPPTCL",19.0,220.0],
    [271,270,"2015-03-31","LILO of Dhanki - Veramgam at Dhanki","Double Circuit","State Sector","GETCO",1.0,220.0],
    [272,271,"2015-03-31","LILO of Gangapur - Malegaon (Satana) at Sakri (Shivajinagar)","Double Circuit","State Sector","MSETCL",55.0,220.0],
    [273,272,"2015-03-31","LILO of Halvad - Bhimasar at Chardava","Double Circuit","State Sector","GETCO",2.0,220.0],
    [274,273,"2015-03-31","LILO of Kadana - Dhansura at Modasa","2xDouble Circuit","State Sector","GETCO",22.0,220.0],
    [275,274,"2015-03-31","LILO of Lucknow - Sitapur at BKT","Double Circuit","State Sector","UPPTCL",3.0,220.0],
    [276,275,"2015-03-31","LILO of Monga - Jagron at Himatpura","Double Circuit","State Sector","PSTCL",56.0,220.0],
    [277,276,"2015-03-31","LILO of Navsari -Bhilad at Atul S/s","Double Circuit","State Sector","GETCO",9.0,220.0],
    [278,277,"2015-03-31","LILO of one ckt Kosamba-Mobha line at Suva","Double Circuit","State Sector","GETCO",115.0,220.0],
    [279,278,"2015-03-31","LILO of one ckt of Bapp - Bhadla at Badisid","Double Circuit","State Sector","RVPNL",29.0,220.0],
    [280,279,"2015-03-31","Mukatsar - Ghubaya","Double Circuit","State Sector","PSTCL",81.0,220.0],
    [281,280,"2015-03-31","Nakodar - Kartarpur","Double Circuit","State Sector","PSTCL",55.0,220.0],
    [282,281,"2015-03-31","Sujangarh - Tehendesar (GSS)","Single Circuit","State Sector","RVPNL",53.0,220.0],
    [283,282,"2015-03-31","Tiroda - Koradi - Akola - Aurangabad line ckt-II","Single Circuit","Private Sector","APL",575.0,765.0],
    [284,283,"2015-03-31","Amravati - Akola (Bableshwar) - I","Double Circuit","Private Sector","IBPL",207.0,400.0],
    [285,284,"2015-03-31","Azara - Bongaigaon","Double Circuit","Private Sector","NETC",201.0,400.0],
    [286,285,"2015-03-31","Satpura - Ashta","Double Circuit","Private Sector","KPTL",482.0,400.0],
    [287,286,"2015-04-30","Sasan - Vindhyachal (PS)","Single Circuit","Central Sector","PGCIL",6.0,765.0],
    [288,287,"2015-04-30","400 kV D/C trans. Line for swapping of Kahalgaon #1 bay with Sasaram# 1 bay at Biharshariff S/Stn.","Double Circuit","Central Sector","PGCIL",20.0,400.0],
    [289,288,"2015-04-30","Bareilly - Kashipur line (Quad)","Double Circuit","Central Sector","PGCIL",202.0,400.0],
    [290,289,"2015-04-30","Sholapur STPP - Sholapur line-I","Double Circuit","Central Sector","PGCIL",22.0,400.0],
    [291,290,"2015-04-30","Kadapperi - Guindy (UG Cable)","Single Circuit","State Sector","TANTRANSCO",14.0,230.0],
    [292,291,"2015-04-30","Ahmednagar - Jeur (Kaudgaon)","Single Circuit","State Sector","MSETCL",53.0,220.0],
    [293,292,"2015-04-30","Babhaleshwar - Jeur (Kaudgaon)","Single Circuit","State Sector","MSETCL",87.0,220.0],
    [294,293,"2015-04-30","Gurgaon Sector 72 (PGCIL) - Gurgaon Sector 33 (HVPNL)","Double Circuit","State Sector","HVPNL",7.0,220.0],
    [295,294,"2015-04-30","Gurgaon Sector 72 (PGCIL) - Gurgaon Sector 72 (HVPNL)","Double Circuit","State Sector","HVPNL",1.0,220.0],
    [296,295,"2015-04-30","Lalitpur - Lalitpur TPS (Ckt-II)","Double Circuit","State Sector","UPPTCL",19.0,220.0],
    [297,296,"2015-04-30","LILO of 1st ckt of Shapurnagar - Gachibowlly line at Miyapur","Double Circuit","State Sector","TSTRANSCO",2.0,220.0],
    [298,297,"2015-04-30","LILO of Asoj - Karamsad at Mogar S/S","Double Circuit","State Sector","GETCO",15.0,220.0],
    [299,298,"2015-04-30","LILO of Badshahpur - Bhiwadi - Mau line at Panchgaon","Double Circuit","State Sector","HVPNL",3.0,220.0],
    [300,299,"2015-04-30","LILO of Bina - Gwalior at Datia","Double Circuit","State Sector","MPPTCL",2.0,220.0],
    [301,300,"2015-04-30","LILO of Both Ckt Malerkotla - Barnala at Sandhaur","Double Circuit","State Sector","PSTCL",12.0,220.0],
    [302,301,"2015-04-30","LILO of Both Ckt Malerkotla - Pakhowal at Sandhaur","Double Circuit","State Sector","PSTCL",13.0,220.0],
    [303,302,"2015-04-30","LILO of Korba - Vishrampur at Churri","Double Circuit","State Sector","CSPTCL",30.0,220.0],
    [304,303,"2015-04-30","LILO of Muzaffarnagar - Nara II at Jansath Ckt-II","Double Circuit","State Sector","UPPTCL",20.0,220.0],
    [305,304,"2015-04-30","LILO of Shivlakha - Deodhar line at PS-2","Double Circuit","State Sector","GETCO",56.0,220.0],
    [306,305,"2015-04-30","LILO of Waluj Bahaleshwar - Deogaon Rangari S/S","Double Circuit","State Sector","MSETCL",26.0,220.0],
    [307,306,"2015-04-30","Mamidipally - Fab city","Double Circuit","State Sector","TSTRANSCO",6.0,220.0],
    [308,307,"2015-04-30","Mundka -Peeragarhi U/G 200 mm, 250 MW","Double Circuit","State Sector","DTL",26.0,220.0],
    [309,308,"2015-04-30","Muzaffarnagar - Nara Ckt-II","Double Circuit","State Sector","UPPTCL",12.0,220.0],
    [310,309,"2015-04-30","Sanganer- Sitapura (Upgradation) Ckt-II","Double Circuit","State Sector","RVPNL",11.0,220.0],
    [311,310,"2015-04-30","Tapping on Lonand Kandalgaon for Lonand MIDC","Single Circuit","State Sector","MSETCL",1.0,220.0],
    [312,311,"2015-05-31","Meerut - Moga line","Single Circuit","Central Sector","PGCIL",337.0,765.0],
    [313,312,"2015-05-31","Raigarh Pooling Station (Near Kotra) - Champa Pooling Station line","Single Circuit","Central Sector","PGCIL",96.0,765.0],
    [314,313,"2015-05-31","Barh-II - Gorakhpur","Double Circuit","Central Sector","PGCIL",698.0,400.0],
    [315,314,"2015-05-31","Rangpo - New Melli line (Twin Moose) (20.5 D/C & 1.5 M/C)","Multiple Circuits with Double Circuit","Central Sector","PGCIL",54.0,220.0],
    [316,315,"2015-05-31","Aurangabad (Ektuni - III) - Aurangabad -II (Thaptitanda) Ckt-II","Single Circuit","State Sector","MSETCL",5.0,400.0],
    [317,316,"2015-05-31","LILO of One ckt of Korba (W) - Khedamara at Marwa","Double Circuit","State Sector","CSPTCL",116.0,400.0],
    [318,317,"2015-05-31","LILO of one ckt Palatana - Bongaigaon at Byrnihat line","Double Circuit","State Sector","MeECL",4.0,400.0],
    [319,318,"2015-05-31","LILO point of IEPL to LILO point of Warora-Wardha line","Double Circuit","State Sector","MSETCL",97.0,400.0],
    [320,319,"2015-05-31","MTPS Stage-III - Thiruvalam (Ckt-II) (Balance)","Double Circuit","State Sector","TANTRANSCO",338.0,400.0],
    [321,320,"2015-05-31","Bhatinda - Mukatsar (2nd CKt)","Double Circuit","State Sector","PSTCL",23.0,220.0],
    [322,321,"2015-05-31","LILO of one ckt Kotputli -Manoharpur at Kotputli (PG)","Double Circuit","State Sector","RVPNL",12.0,220.0],
    [323,322,"2015-05-31","LILO of one ckt Neemrana -Kotputli at Behror","Double Circuit","State Sector","RVPNL",31.0,220.0],
    [324,323,"2015-05-31","LILO of Shapur Nagar - Gachilbowli feeder at GIS Erragadda SS","Direct Current Underground Cable","State Sector","TSTRANSCO",19.0,220.0],
    [325,324,"2015-05-31","Masudpur-Samain line","Double Circuit","State Sector","HVPNL",91.0,220.0],
    [326,325,"2015-05-31","Binjkote - Raigarh (Kotra) Pooling Station","Double Circuit","Private Sector","SKS",55.0,400.0],
    [327,326,"2015-05-31","Jhabua Power TPS - Jabalpur Pooling Station.","Double Circuit","Private Sector","JHAPL",131.0,400.0],
    [328,327,"2015-06-30","LILO of Moga - Bhiwani at Hissar line","Double Circuit","Central Sector","PGCIL",4.0,400.0],
    [329,328,"2015-06-30","Mariani (New) - Mokikchung (PG)","Double Circuit","Central Sector","PGCIL",97.0,220.0],
    [330,329,"2015-06-30","Karaikudi-Pugalur","Double Circuit","State Sector","TANTRANSCO",320.0,400.0],
    [331,330,"2015-06-30","LILO of RTPS - Btps at YTPS","Double Circuit","State Sector","KPTCL",33.0,400.0],
    [332,331,"2015-06-30","Arasur 400 kV S/S - Karamadai 230 kV S/S","Single Circuit","State Sector","TANTRANSCO",39.0,230.0],
    [333,332,"2015-06-30","Atri - Pandiabil","Double Circuit","State Sector","OPTCL",45.0,220.0],
    [334,333,"2015-06-30","Charanka - Jangral","Double Circuit","State Sector","GETCO",193.0,220.0],
    [335,334,"2015-06-30","Chinchwad - Apta","Multiple Circuits","State Sector","MSETCL",30.0,220.0],
    [336,335,"2015-06-30","Damoh - Tikamgarh (2nd Ckt)","Double Circuit","State Sector","MPPTCL",158.0,220.0],
    [337,336,"2015-06-30","Dumka - Rupnarayanpur","Double Circuit","State Sector","JUSNL",147.0,220.0],
    [338,337,"2015-06-30","LILO of Ajmer -Kishangarh line at Ajmer","Double Circuit","State Sector","RVPNL",11.0,220.0],
    [339,338,"2015-06-30","LILO of Khetri - Heerapura line at Babai","Double Circuit","State Sector","RVPNL",5.0,220.0],
    [340,339,"2015-06-30","LILO of Kuchamancity -Dhod at Deedwana","Double Circuit","State Sector","RVPNL",88.0,220.0],
    [341,340,"2015-06-30","LILO of Rewa - Ton at Sirmour","Double Circuit","State Sector","MPPTCL",10.0,220.0],
    [342,341,"2015-06-30","LILO (Tapping) of Dhule - Malegaon at Sayne","Single Circuit","State Sector","MSETCL",5.0,220.0],
    [343,342,"2015-06-30","Shedyal - Jath line","Double Circuit","State Sector","MSETCL",37.0,220.0],
    [344,343,"2015-06-30","Shivajinagar - Malegaon","Single Circuit","State Sector","MSETCL",114.0,220.0],
    [345,344,"2015-06-30","Shivajinagar - Satana","Single Circuit","State Sector","MSETCL",96.0,220.0],
    [346,345,"2015-06-30","SSNNL PS-I - PS-2 (ACSR Zebra conductor)","Double Circuit","State Sector","GETCO",22.0,220.0],
    [347,346,"2015-06-30","Talwandi - Dharamkot","Double Circuit","State Sector","PSTCL",63.0,220.0],
    [348,347,"2015-06-30","Jabalpur - Bhopal (BDTCL - TBCB)","Single Circuit","Private Sector","SGL",274.0,765.0],
    [349,348,"2015-06-30","Jabalpur - Bina (JTCL - TBCB)","Single Circuit","Private Sector","SGL",245.0,765.0],
    [350,349,"2015-07-31","LILO of Dehar - Bhiwani at Rajpura (PSTCL)","Single Circuit","Central Sector","PGCIL",29.0,400.0],
    [351,350,"2015-07-31","LILO of One Ckt of Baripada - Mendhasal line at Dubri (OPTCL)","Double Circuit","Central Sector","PGCIL",32.0,400.0],
    [352,351,"2015-07-31","Silchar - Purba Kanchan Bari line (charged at 132KV)","Double Circuit","Central Sector","PGCIL",254.0,400.0],
    [353,352,"2015-07-31","Vijayawada - Nellore line","Double Circuit","Central Sector","PGCIL",661.0,400.0],
    [354,353,"2015-07-31","Krishnapatnam TPS- Chittoor(Balance)","Double Circuit","State Sector","APTRANSCO",180.0,400.0],
    [355,354,"2015-07-31","Vizag TPP - Kalpaka","Double Circuit","State Sector","APTRANSCO",14.0,400.0],
    [356,355,"2015-07-31","LILO of Neyveli Zero unit - Neyveli - TS-II at Ulundurpet","Single Circuit","State Sector","TANTRANSCO",52.0,230.0],
    [357,356,"2015-07-31","LILO of AD Hydro-Nalagarh at Fozal","Double Circuit","State Sector","HPPTCL",13.0,220.0],
    [358,357,"2015-07-31","LILO of Alamathy - Koyembedut Thiruverkkadu","Double Circuit","State Sector","TANTRANSCO",2.0,220.0],
    [359,358,"2015-07-31","LILO of both ckt Dindi - Chandrayangutta at Bonguloor","Double Circuit","State Sector","TSTRANSCO",2.0,220.0],
    [360,359,"2015-07-31","LILO of Dhuri - Bangan at Chhajali (Loop in)","Double Circuit","State Sector","PSTCL",29.0,220.0],
    [361,360,"2015-07-31","LILO of Kalivanthapattu - Veerapuram at OMEGA","Double Circuit","State Sector","TANTRANSCO",39.0,220.0],
    [362,361,"2015-07-31","LILO of Kandalgaon - Lonand at Lonand MIDC","Double Circuit","State Sector","MSETCL",8.0,220.0],
    [363,362,"2015-07-31","LILO of Kanjhawala - Najafgarh at Mundka 400 kV S/S","Double Circuit","State Sector","DTL",11.0,220.0],
    [364,363,"2015-07-31","LILO of Mandawar -Nadbai- Bharatpur at Chonkarwada","Double Circuit","State Sector","RVPNL",5.0,220.0],
    [365,364,"2015-07-31","LILO of Shoolagiri - Singarapet at Gurabarapally","Double Circuit","State Sector","TANTRANSCO",2.0,220.0],
    [366,365,"2015-07-31","LILO of Ulundurpet - STCMS at Ulundurpet","Double Circuit","State Sector","TANTRANSCO",68.0,220.0],
    [367,366,"2015-07-31","Mau - Balwal","Double Circuit","State Sector","HVPNL",37.0,220.0],
    [368,367,"2015-07-31","Puri (Samangra) - Pandiabil","Double Circuit","State Sector","OPTCL",92.0,220.0],
    [369,368,"2015-07-31","Raikheda (GMR) - Raipur Pooling Station","Double Circuit","Private Sector","GMR ENERG",131.0,400.0],
    [370,369,"2015-07-31","Rosa - Shahjehanpur (PG)","Double Circuit","Private Sector","RPTL",16.0,400.0],
    [371,370,"2015-08-31","Gwalior - Jaipur (Ckt 1)","Single Circuit","Central Sector","PGCIL",305.0,765.0],
    [372,371,"2015-08-31","Gwalior - Jaipur line (Ckt 2)","Single Circuit","Central Sector","PGCIL",311.0,765.0],
    [373,372,"2015-08-31","Jaipur - Bhiwani line","Single Circuit","Central Sector","PGCIL",272.0,765.0],
    [374,373,"2015-08-31","Rihand - Vindhyachal Pooling Station (2nd Ckt)","Double Circuit","Central Sector","PGCIL",31.0,765.0],
    [375,374,"2015-08-31","Vindhyachal Pooling Station - Satna Ckt-II","Single Circuit","Central Sector","PGCIL",271.0,765.0],
    [376,375,"2015-08-31","LILO of 2nd ckt of Neyveli - Trichy at Nagapattnam","Double Circuit","Central Sector","PGCIL",46.0,400.0],
    [377,376,"2015-08-31","Salem Pooling Station - Salem","Double Circuit","Central Sector","PGCIL",120.0,400.0],
    [378,377,"2015-08-31","Kodarma-Giridih","Double Circuit","Central Sector","DVC",212.0,220.0],
    [379,378,"2015-08-31","LILO of Moga-Hisar line at RGTPS Khedar","Double Circuit","State Sector","HVPNL",2.0,400.0],
    [380,379,"2015-08-31","Meramundali-Duburi (1st Ckt)","Double Circuit","State Sector","OPTCL",192.0,400.0],
    [381,380,"2015-08-31","Thiruvalam - Almathy","Double Circuit","State Sector","TANTRANSCO",143.0,400.0],
    [382,381,"2015-08-31","LILO of Manali - Basin Bridge (BBGTP) at Vyasarpadi","Double Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [383,382,"2015-08-31","Kotputli (PG) - Bansur","Double Circuit","State Sector","RVPNL",84.0,220.0],
    [384,383,"2015-08-31","LILO of Chinchwad - Phursungi at Kondhwa","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [385,384,"2015-08-31","LILO of Kangasiyali - Nyara at Hadala","Double Circuit","State Sector","GETCO",33.0,220.0],
    [386,385,"2015-08-31","LILO of Korattur - Koyambedu at Alamathy","Double Circuit","State Sector","TANTRANSCO",6.0,220.0],
    [387,386,"2015-08-31","LILO of KTPS - Sanganer line at Vatika","Double Circuit","State Sector","RVPNL",11.0,220.0],
    [388,387,"2015-08-31","LILO of Mhaisal - Jath at Mendhegiri S/S (Ckt-I)","Double Circuit","State Sector","MSETCL",20.0,220.0],
    [389,388,"2015-08-31","LILO of one ckt Halvad - Morbi line to Bhimasar (PG) at Charadava S/S","Double Circuit","State Sector","GETCO",2.0,220.0],
    [390,389,"2015-08-31","LILO of One Ckt Langpi - Sarusajai at Sonapur","Double Circuit","State Sector","AEGCL",2.0,220.0],
    [391,390,"2015-08-31","LILO of Pusouli (PG) - Ara (PG) at Pusouli (New)","Double Circuit","State Sector","BSPTCL",5.0,220.0],
    [392,391,"2015-08-31","LILO of Raigarh - Budipadar line at Raigarh (PG)","Double Circuit","State Sector","CSPTCL",18.0,220.0],
    [393,392,"2015-08-31","Mukatsar - Abohar","Double Circuit","State Sector","PSTCL",87.0,220.0],
    [394,393,"2015-08-31","Nanded - Waghala","Double Circuit","State Sector","MSETCL",30.0,220.0],
    [395,394,"2015-08-31","Sikka - Moti Paneli line","Double Circuit","State Sector","GETCO",157.0,220.0],
    [396,395,"2015-08-31","Kudgi STPS - Narendra (KTL - TBCB)","2xDouble Circuit","Private Sector","KTCL",36.0,400.0],
    [397,396,"2015-08-31","Nasik - Bobleshwar (2nd Ckt)","Double Circuit","Private Sector","IBPL",57.0,400.0],
    [398,397,"2015-09-30","+/- 800KV HVDC Biswanath Chariyali - Agra Bi-pole line","BIPOLE","Central Sector","PGCIL",3506.0,800.0],
    [399,398,"2015-09-30","Aurangabad - Solapur line","Double Circuit","Central Sector","PGCIL",556.0,765.0],
    [400,399,"2015-09-30","Dharamjaygarh - Jabalpur Pooling Station line","Double Circuit","Central Sector","PGCIL",848.0,765.0],
    [401,400,"2015-09-30","Balipara - Biswanath Chariyali","Double Circuit","Central Sector","PGCIL",114.0,400.0],
    [402,401,"2015-09-30","Mysore - Kozhikode","Double Circuit","Central Sector","PGCIL",420.0,400.0],
    [403,402,"2015-09-30","220 kV LOC 49 of Roza-Hardoi to 220 Shahjehanpur","Double Circuit","State Sector","UPPTCL",20.0,220.0],
    [404,403,"2015-09-30","Debari - Salumber (2nd Ckt)","Double Circuit","State Sector","RVPNL",64.0,220.0],
    [405,404,"2015-09-30","Gurgaon Sector 72 - Nuh - Rangla Raipur (Ckt-I & II)","Double Circuit","State Sector","HVPNL",146.0,220.0],
    [406,405,"2015-09-30","LILO of Harduaganj- Khair (Aligarh) line at Boner","Double Circuit","State Sector","UPPTCL",6.0,220.0],
    [407,406,"2015-09-30","LILO of khurja-NAPP-I line at Debai","Double Circuit","State Sector","UPPTCL",1.0,220.0],
    [408,407,"2015-09-30","LILO of Korattur - Koyambedu at Alamathy (Balance Portion)","Double Circuit","State Sector","TANTRANSCO",23.0,220.0],
    [409,408,"2015-09-30","Sawangi - Bhokardhan","Double Circuit","State Sector","MSETCL",134.0,220.0],
    [410,409,"2015-09-30","Thimmapuram- Yellanur","Double Circuit","State Sector","APTRANSCO",8.0,220.0],
    [411,410,"2015-09-30","Dhramjaygarh - Jabalpur (JTCL - TBCB)","Double Circuit","Private Sector","SGL",758.0,765.0],
    [412,411,"2015-10-31","Bhiwani - Hissar line","Double Circuit","Central Sector","PGCIL",113.0,400.0],
    [413,412,"2015-10-31","LILO of Ranganadi - Balipara 400KV D/C line at Biswanath Chariyali (Pooling Point)","Double Circuit","Central Sector","PGCIL",114.0,400.0],
    [414,413,"2015-10-31","LILO of Kalapaka (Vizag) - Khammam at Asupaka","Double Circuit","State Sector","TSTRANSCO",34.0,400.0],
    [415,414,"2015-10-31","Purushottapatnam (Nunna) - Jujjuru","Double Circuit","State Sector","APTRANSCO",112.0,400.0],
    [416,415,"2015-10-31","Yemmiganur - Uravakonda","Double Circuit","State Sector","APTRANSCO",205.0,400.0],
    [417,416,"2015-10-31","Amreli - Sukhpar line","Double Circuit","State Sector","GETCO",80.0,220.0],
    [418,417,"2015-10-31","Chharodi - Ford line","Double Circuit","State Sector","GETCO",38.0,220.0],
    [419,418,"2015-10-31","Ghatodi - Hingoli line","Single Circuit","State Sector","MSETCL",86.0,220.0],
    [420,419,"2015-10-31","Jalore - Sayla","Single Circuit","State Sector","RVPNL",54.0,220.0],
    [421,420,"2015-10-31","Khanapur length tap to Vita - Lamboti line","Double Circuit","State Sector","MSETCL",47.0,220.0],
    [422,421,"2015-10-31","Kharagpur - Vidyasagar Park","Double Circuit","State Sector","WBSETCL",92.0,220.0],
    [423,422,"2015-10-31","LILO of Alamathy - CMRL Koyembedu at Thiruverkkadu","Double Circuit","State Sector","TANTRANSCO",9.0,220.0],
    [424,423,"2015-10-31","LILO on one ckt of Jamanwada - Varsana line at Ukheda S/s","Double Circuit","State Sector","GETCO",10.0,220.0],
    [425,424,"2015-10-31","Neemrana-(PG)-Behror","Double Circuit","State Sector","RVPNL",54.0,220.0],
    [426,425,"2015-10-31","Tehandesar(proposed)-Badnu","Single Circuit","State Sector","RVPNL",32.0,220.0],
    [427,426,"2015-10-31","Varsana - Jamanwada line","Double Circuit","State Sector","GETCO",348.0,220.0],
    [428,427,"2015-10-31","LILO of one ckt Karcham wangto - Abdullapur at Sorang HEP","Double Circuit","Private Sector","HSPPL",7.0,400.0],
    [429,428,"2015-11-30","Narendra (New, Kudgi) - Kolhapur (new)","Double Circuit","Central Sector","PGCIL",374.0,765.0],
    [430,429,"2015-11-30","Gooty - Madhugiri","Double Circuit","Central Sector","PGCIL",418.0,400.0],
    [431,430,"2015-11-30","Kurukshetra - Jallandhar (Ckt-I)","Double Circuit","Central Sector","PGCIL",266.0,400.0],
    [432,431,"2015-11-30","LILO of Abdullapur - Sonepat at Kurukshetra (Tripal)","Double Circuit","Central Sector","PGCIL",30.0,400.0],
    [433,432,"2015-11-30","LILO of both ckt of Kolhapur - Mapusa at Kolhapur (new)","Double Circuit","Central Sector","PGCIL",90.0,400.0],
    [434,433,"2015-11-30","Narendra (New, Kudgi) - Narendra (Existing)","Double Circuit","Central Sector","PGCIL",354.0,400.0],
    [435,434,"2015-11-30","Bikaner- Merta","Single Circuit","State Sector","RVPNL",172.0,400.0],
    [436,435,"2015-11-30","LILO of Srisailam - Hyderabad (Ckt-I) atYeddumailaram (Shankarapally)","Double Circuit","State Sector","TSTRANSCO",158.0,400.0],
    [437,436,"2015-11-30","Singareni TPS (Jaipur TPP) - Gajwel","Double Circuit","State Sector","TSTRANSCO",325.0,400.0],
    [438,437,"2015-11-30","Appannadorapalem - Bobbili (Ckt-I)","Double Circuit","State Sector","APTRANSCO",84.0,220.0],
    [439,438,"2015-11-30","Badaun - Sambhal","Single Circuit","State Sector","UPPTCL",90.0,220.0],
    [440,439,"2015-11-30","Bhadreshwar - Varsana line","Double Circuit","State Sector","GETCO",104.0,220.0],
    [441,440,"2015-11-30","Chhuri - Mopka (Bilaspur)","Double Circuit","State Sector","CSPTCL",189.0,220.0],
    [442,441,"2015-11-30","Gokarna - Krishnanagar","Double Circuit","State Sector","WBSETCL",210.0,220.0],
    [443,442,"2015-11-30","Hindaun -Chonkarwada","Double Circuit","State Sector","RVPNL",72.0,220.0],
    [444,443,"2015-11-30","LILO of Alwar -Kotputli at Bansur","Double Circuit","State Sector","RVPNL",2.0,220.0],
    [445,444,"2015-11-30","LILO of Sawangi - Bhokardan at Phulambri","Double Circuit","State Sector","MSETCL",11.0,220.0],
    [446,445,"2015-11-30","New Bhusawal - Chalisgaon","Double Circuit","State Sector","MSETCL",258.0,220.0],
    [447,446,"2015-11-30","Sanganer-Chaksu (Upgradation)","Double Circuit","State Sector","RVPNL",66.0,220.0],
    [448,447,"2015-11-30","Varsana - Mokha","Double Circuit","State Sector","GETCO",109.0,220.0],
    [449,448,"2015-12-31","LILO of one ckt Badshahpur - Mau - Bhiwadi at HSIIDC Bawal","Double Circuit","State Sector","HVPNL",39.0,220.0],
    [450,449,"2015-12-31","LILO of Peenya - Hoody at Chikkabettahalli","Multiple Circuits","State Sector","KPTCL",11.0,220.0],
    [451,450,"2015-12-31","LILO of Sarnath (400) - Azamgarh at Harhua","Single Circuit","State Sector","UPPTCL",42.0,220.0],
    [452,451,"2015-12-31","MTPS Stage-III - Thingalur","Single Circuit","State Sector","TANTRANSCO",92.0,220.0],
    [453,452,"2015-12-31","Rajgarh (PG) - Karamsad (GETCO)","Double Circuit","Private Sector","RPTL",486.0,400.0],
    [454,453,"2015-12-31","Kurnool (New) - Raichur line","Double Circuit","Central Sector","PGCIL",120.0,765.0],
    [455,454,"2015-12-31","Ranchi (New) - Dharamjaygarh /Near Korba","Single Circuit","Central Sector","PGCIL",341.0,765.0],
    [456,455,"2015-12-31","Kashipur - Roorkee line","Single Circuit","Central Sector","PGCIL",302.0,400.0],
    [457,456,"2015-12-31","Ib-Meramundali (Loc No. 122/0 to Meramundali)","Double Circuit","State Sector","OPTCL",418.0,400.0],
    [458,457,"2015-12-31","Jammalamadugu - Narnur (Kurnool)","Double Circuit","State Sector","APTRANSCO",202.0,400.0],
    [459,458,"2015-12-31","LILO of Bhiwani - Bahadurgarh (PGCIL) at Kaboolpur S/S","Double Circuit","State Sector","HVPNL",13.0,400.0],
    [460,459,"2015-12-31","LILO of Koradi II- Wardh(PG) at Bela TPP","Double Circuit","State Sector","MSETCL",49.0,400.0],
    [461,460,"2015-12-31","A5(Faridabad) - A4(Faridabad) (Ckt-II)","Double Circuit","State Sector","HVPNL",8.0,220.0],
    [462,461,"2015-12-31","Bagalkot - Gadag","Double Circuit","State Sector","KPTCL",193.0,220.0],
    [463,462,"2015-12-31","Goindwal Sahib - Chola Sahib","Double Circuit","State Sector","PSTCL",55.0,220.0],
    [464,463,"2015-12-31","Hinjewadi -II (400 kV) - Hinjewadi-II (220 kV) S/S","Double Circuit","State Sector","MSETCL",8.0,220.0],
    [465,464,"2015-12-31","LILO of 220 kV of Shamshabad - Firozabad at Agra (400 kV)","Double Circuit","State Sector","UPPTCL",6.0,220.0],
    [466,465,"2015-12-31","LILO of Amravati - Badnera line at Nandgaon Peth.","Double Circuit","State Sector","MSETCL",62.0,220.0],
    [467,466,"2015-12-31","LILO of Arasikere -Kanthenahalli at Arasikere S/S","Double Circuit","State Sector","KPTCL",8.0,220.0],
    [468,467,"2015-12-31","LILO of existing Kalikiri - C.K.Palli at Thimmapuram S/S","Double Circuit","State Sector","APTRANSCO",2.0,220.0],
    [469,468,"2015-12-31","LILO of Hubli - Lingapur 2nd Ckt at Gadag","Double Circuit on Multiple Circuits","State Sector","KPTCL",15.0,220.0],
    [470,469,"2015-12-31","LILO of Nagaur -Merta at Kuchera","Double Circuit","State Sector","RVPNL",17.0,220.0],
    [471,470,"2016-01-31","Angul Pooling Station - Jharsuguda Pooling Station line-II","Single Circuit","Central Sector","PGCIL",284.0,765.0],
    [472,471,"2016-01-31","Khamam - Nagarjunasagar line (PVTL-TBCB))","Double Circuit","Central Sector","PGCIL",290.0,400.0],
    [473,472,"2016-01-31","Kurukshetra - Jallandhar (Ckt-II)","Double Circuit","Central Sector","PGCIL",265.0,400.0],
    [474,473,"2016-01-31","Surjamaninagar (Tripura) - Indo-Bangladesh Border line (operated at 132 kV)","Double Circuit","Central Sector","PGCIL",35.0,400.0],
    [475,474,"2016-01-31","Koradi TPS - Wardha","Double Circuit","State Sector","MSETCL",144.0,400.0],
    [476,475,"2016-01-31","Chikkodi-Kudachi","Double Circuit","State Sector","KPTCL",70.0,220.0],
    [477,476,"2016-01-31","Kapnoor - Humnabad line","Double Circuit","State Sector","KPTCL",106.0,220.0],
    [478,477,"2016-01-31","Kasor - Herang line","Double Circuit","State Sector","GETCO",39.0,220.0],
    [479,478,"2016-01-31","LILO of 220 kV Lonikand - Kathapur line at Lonikand-II","Double Circuit","State Sector","MSETCL",2.0,220.0],
    [480,479,"2016-01-31","LILO of both ckt of Balipara (PG) Samaguri at Sonabil","2xDouble Circuit","State Sector","AEGCL",6.0,220.0],
    [481,480,"2016-01-31","LILO of RSS - Warangal at Manthani","Double Circuit","State Sector","TSTRANSCO",60.0,220.0],
    [482,481,"2016-01-31","LILO of Sultanpur - Phoolpur at Pratapgarh","Double Circuit","State Sector","UPPTCL",46.0,220.0],
    [483,482,"2016-01-31","Namrup - Mariani","Single Circuit","State Sector","AEGCL",145.0,220.0],
    [484,483,"2016-01-31","TRN (TPP) - Raigarh PS (Tamnar)","Double Circuit","Private Sector","TRNE",30.0,400.0],
    [485,484,"2016-02-29","LILO of Chandrapur - Parli ckt-II at Kumbhargaon (Nanded) S/S","Double Circuit","State Sector","MSETCL",88.0,400.0],
    [486,485,"2016-02-29","Mundra (Adani) - Zerda line 2","Double Circuit","State Sector","GETCO",671.0,400.0],
    [487,486,"2016-02-29","LILO of Narendrapur - Mendhasal at Attri (Old Karadagadia)","Double Circuit","State Sector","OPTCL",5.0,220.0],
    [488,487,"2016-02-29","Peeragarhi-Wazirpur U/G 1000 mm, 200 MW","Double Circuit","State Sector","DTL",17.0,220.0],
    [489,488,"2016-02-29","Pulivendula-Hindupur","Double Circuit","State Sector","APTRANSCO",250.0,220.0],
    [490,489,"2016-02-29","Teesta LDP - IV - New Jalpaiguri (NJP)","Double Circuit","State Sector","WBSETCL",145.0,220.0],
    [491,490,"2016-03-31","Balia - Varanasi","Single Circuit","Central Sector","PGCIL",165.0,765.0],
    [492,491,"2016-03-31","LILO of Gaya - Fatehpur at Varanasi S/S","Single Circuit","Central Sector","PGCIL",7.0,765.0],
    [493,492,"2016-03-31","Ext. of one ckt Biharshariff - Sasaram at Varanasi (Q)","Double Circuit","Central Sector","PGCIL",251.0,400.0],
    [494,493,"2016-03-31","Kishanganj - Patna line (Quad)","Double Circuit","Central Sector","PGCIL",692.0,400.0],
    [495,494,"2016-03-31","LILO of Meerut - Kaithal at Bagpat (Ckt-I)","Double Circuit","Central Sector","PGCIL",61.0,400.0],
    [496,495,"2016-03-31","LILO of Sasaram - Allabhadad at Varanasi (Q)","Double Circuit","Central Sector","PGCIL",24.0,400.0],
    [497,496,"2016-03-31","LILO of Siliguri (Existing) - Purnea at Kishanganj","Double Circuit","Central Sector","PGCIL",16.0,400.0],
    [498,497,"2016-03-31","NCC gen Sw Yd. - Nellore PS line (Q)","Double Circuit","Central Sector","PGCIL",66.0,400.0],
    [499,498,"2016-03-31","LILO of Siliguri - Dalkhola line at New Pooling Station Kishanganj","Double Circuit","Central Sector","PGCIL",36.0,220.0],
    [500,499,"2016-03-31","Anpara B-Anpara D (Ckt-I)","Double Circuit","State Sector","UPPTCL",5.0,400.0],
    [501,500,"2016-03-31","LILO of VTS - Malkaram (Ckt-I) at Suryapet","Double Circuit","State Sector","TSTRANSCO",7.0,400.0],
    [502,501,"2016-03-31","Avadi-Ayappakkam line","Single Circuit","State Sector","TANTRANSCO",3.0,230.0],
    [503,502,"2016-03-31","LILO of K.R. Thoppur - Ingur at Thingalur","Double Circuit","State Sector","TANTRANSCO",44.0,230.0],
    [504,503,"2016-03-31","Balchak - Naraingarh","Double Circuit","State Sector","PSTCL",33.0,220.0],
    [505,504,"2016-03-31","Bhigwan - Walchandnagar","Double Circuit","State Sector","MSETCL",54.0,220.0],
    [506,505,"2016-03-31","Bridgestone-II - Chakan-II","Double Circuit","State Sector","MSETCL",10.0,220.0],
    [507,506,"2016-03-31","Chaibasa - Chaibasa line","Double Circuit","State Sector","JUSNL",1.0,220.0],
    [508,507,"2016-03-31","Diversion of Bhusawal - Chalisgaon along with existing Bhusawal - Chalisgaon line","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [509,508,"2016-03-31","Gajokhar-Jaunpur","Single Circuit on Double Circuit","State Sector","UPPTCL",37.0,220.0],
    [510,509,"2016-03-31","Kanti - Gopalganj (2nd Ckt.)","Single Circuit","State Sector","BSPTCL",101.0,220.0],
    [511,510,"2016-03-31","Koradi TPS-New Khaparhkeda","Double Circuit","State Sector","MSETCL",28.0,220.0],
    [512,511,"2016-03-31","Kumbhargaon - Waghala","Double Circuit","State Sector","MSETCL",31.0,220.0],
    [513,512,"2016-03-31","Lamboti - Tuljapur","Double Circuit","State Sector","MSETCL",77.0,220.0],
    [514,513,"2016-03-31","LILO of Arasur (PG) - Karamadai at Karuvalur","Double Circuit","State Sector","TANTRANSCO",1.0,220.0],
    [515,514,"2016-03-31","LILO of Beed - Patoda at Manjarsumbha","Double Circuit","State Sector","MSETCL",9.0,220.0],
    [516,515,"2016-03-31","LILO of Chitegaon - Shendra at Chitepimpalgaon (PG)","Double Circuit","State Sector","MSETCL",2.0,220.0],
    [517,516,"2016-03-31","LILO of Harduagani - Hathras at Aligarh","Double Circuit","State Sector","UPPTCL",43.0,220.0],
    [518,517,"2016-03-31","LILO of Heerapura - Babai at Niwana","Double Circuit","State Sector","RVPNL",1.0,220.0],
    [519,518,"2016-03-31","LILO of Kanhan - Bhandara at M/s Ultratech cement","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [520,519,"2016-03-31","LILO of One ckt of Bina - Guna at Ashoknagar","Single Circuit","State Sector","MPPTCL",8.0,220.0],
    [521,520,"2016-03-31","LILO of one ckt of Jeerat - Rishra at Dharampur","Single Circuit","State Sector","WBSETCL",4.0,220.0],
    [522,521,"2016-03-31","LILO of One Ckt of Kolhapur - Sawantwadi at Mudhaltitta (Bidri Ckt-I)","Double Circuit","State Sector","MSETCL",13.0,220.0],
    [523,522,"2016-03-31","LILO of Vita - Pandharpur at Bhalwani","Double Circuit","State Sector","MSETCL",26.0,220.0],
    [524,523,"2016-03-31","Lonikand-I - Lonikand -II","Double Circuit","State Sector","MSETCL",3.0,220.0],
    [525,524,"2016-03-31","Nanded - Bhokar","Double Circuit","State Sector","MSETCL",74.0,220.0],
    [526,525,"2016-03-31","Renwal -Danta Ramgarh","Single Circuit","State Sector","RVPNL",33.0,220.0],
    [527,526,"2016-03-31","Shahjahanpur - Nighasan","Single Circuit","State Sector","UPPTCL",155.0,220.0],
    [528,527,"2016-03-31","Subhasgram- Saintala","Double Circuit","State Sector","WBSETCL",25.0,220.0],
    [529,528,"2016-03-31","Varahi -Khemar- Kavoor in the existing 110 kV corridor(balance portion)","Double Circuit on Multiple Circuits","State Sector","KPTCL",245.0,220.0],
    [530,529,"2016-04-30","Gaya - Varanasi","Single Circuit","Central Sector","PGCIL",273.0,765.0],
    [531,530,"2016-04-30","Lara STPS - Raigarh (Kotra) line","Double Circuit","Central Sector","PGCIL",36.0,400.0],
    [532,531,"2016-04-30","LILO of Kadapa (Cuddapah) - Kolar at N.P. Kunta Pooling Station","Double Circuit","Central Sector","PGCIL",21.0,400.0],
    [533,532,"2016-04-30","LILO of Pune - Aurangabad at Pune (GIS)","2xDouble Circuit","Central Sector","PGCIL",58.0,400.0],
    [534,533,"2016-04-30","Panchkula - Patiala","Double Circuit","Central Sector","PGCIL",131.0,400.0],
    [535,534,"2016-04-30","Interconnection of one ckt of Jhanor - Navsari line with one ckt of Ukai - Kosamba line","Double Circuit","State Sector","GETCO",1.0,400.0],
    [536,535,"2016-04-30","LILO of Chabra TPS - Anta line at Supercritical Chhabta TPS","Double Circuit","State Sector","RVPNL",3.0,400.0],
    [537,536,"2016-04-30","LILO of one ckt Raj west -Jodhpur at Jodhpur (New)","Double Circuit","State Sector","RVPNL",102.0,400.0],
    [538,537,"2016-04-30","Aau - Badisid","Double Circuit","State Sector","RVPNL",118.0,220.0],
    [539,538,"2016-04-30","Kashang - Bhaba (2nd Ckt)","Double Circuit","State Sector","HPPTCL",39.0,220.0],
    [540,539,"2016-04-30","LILO of 220 kV Katni - Satna at PGCIL Satna","Double Circuit","State Sector","MPPTCL",1.0,220.0],
    [541,540,"2016-04-30","LILO of Gummidipoondi - M/s Michelin Tyres line at Thervoykandigai 400 kV S/S","Double Circuit","State Sector","TANTRANSCO",2.0,220.0],
    [542,541,"2016-04-30","LILO of Jodhpur (GSS) - Jodhpur at Barli","Double Circuit","State Sector","RVPNL",1.0,220.0],
    [543,542,"2016-04-30","LILO of Kasor-Botad at Dhuvaran CCPP-III","Double Circuit","State Sector","GETCO",81.0,220.0],
    [544,543,"2016-04-30","LILO of Kota (PG) -Bhilwara at Mandalgarh","Double Circuit","State Sector","RVPNL",40.0,220.0],
    [545,544,"2016-04-30","N P Kunta PS - 400 kV N P Kunta (PGCIL) S/S","Double Circuit","State Sector","APTRANSCO",4.0,220.0],
    [546,545,"2016-04-30","Parigi 220 kV S/S - Shankarpally 400 kV S/S","Double Circuit","State Sector","TSTRANSCO",90.0,220.0],
    [547,546,"2016-04-30","Ramagundam - Mandamarri (Bellampally) (2nd Ckt)","Double Circuit","State Sector","TSTRANSCO",34.0,220.0],
    [548,547,"2016-04-30","LILO of Agra - Meerut line at Greater Noida","2xSingle Circuit","Private Sector","WUPPTCL",11.0,765.0],
    [549,548,"2016-04-30","Greater Noida-Sikandrabad","Double Circuit","Private Sector","WUPPTCL",34.0,400.0],
    [550,549,"2016-05-31","LILO of Meerut - Kaithal at Bagpat (Ckt-II)","Double Circuit","Central Sector","PGCIL",61.0,400.0],
    [551,550,"2016-05-31","Roorkee - Saharanpur line (Quad) (Ckt-I)","Double Circuit","Central Sector","PGCIL",37.0,400.0],
    [552,551,"2016-05-31","400 kV Aurangabad II (Thaptitanda) - 765 kV Aurangabad III (Ektuni) (Ckt 3 & 4)","Double Circuit","State Sector","MSETCL",10.0,400.0],
    [553,552,"2016-05-31","Baghpat - Baghpat (PG)","Single Circuit","State Sector","UPPTCL",15.0,220.0],
    [554,553,"2016-05-31","Kharagpur - Egra","Double Circuit","State Sector","WBSETCL",107.0,220.0],
    [555,554,"2016-05-31","LILO of 2nd Ckt Shahbad - Pehowa at Durala","Double Circuit","State Sector","HVPNL",6.0,220.0],
    [556,555,"2016-05-31","LILO of Ferozepur - Talwandi Bhai line at Sadiq","Double Circuit","State Sector","PSTCL",48.0,220.0],
    [557,556,"2016-05-31","LILO of Kolhapur - Sawantwadi at Mudhaltitta (Bidri)S/S (Tap line, Ckt-II)","Double Circuit","State Sector","MSETCL",13.0,220.0],
    [558,557,"2016-05-31","LILO of Ranasan - Karamsad at Barejadi S/S","Double Circuit","State Sector","GETCO",15.0,220.0],
    [559,558,"2016-05-31","Sahupuri-Bhelupur","Double Circuit","State Sector","UPPTCL",29.0,220.0],
    [560,559,"2016-05-31","Tap on Babhaleshwar - Chalisgaon for Kopergaon S/S (Ckt-II)","Double Circuit","State Sector","MSETCL",11.0,220.0],
    [561,560,"2016-05-31","Athena Singhitarai - Raigarh Pooling Station (near Kotra)","Double Circuit","Private Sector","ACPLT",50.0,400.0],
    [562,561,"2016-06-30","Kanpur - Jhatikara","Single Circuit","Central Sector","PGCIL",466.0,765.0],
    [563,562,"2016-06-30","Varanasi - Kanpur","Double Circuit","Central Sector","PGCIL",652.0,765.0],
    [564,563,"2016-06-30","Jharkhand Pool (Chandwa) - Gaya (Quad) line","Double Circuit","Central Sector","PGCIL",234.0,400.0],
    [565,564,"2016-06-30","Kanpur (new) - Kanpur (exit)","Double Circuit","Central Sector","PGCIL",41.0,400.0],
    [566,565,"2016-06-30","LILO of 400 kV D/C Baripada - Mendhasal at Pindiabil","2xDouble Circuit","Central Sector","PGCIL",112.0,400.0],
    [567,566,"2016-06-30","Ranchi - Jharkhand Pool line (Chandwa)","Double Circuit","Central Sector","PGCIL",138.0,400.0],
    [568,567,"2016-06-30","Roorkee - Saharanpur line (Ckt-II)","Double Circuit","Central Sector","PGCIL",37.0,400.0],
    [569,568,"2016-06-30","LILO of Gladni - Hiranagar at Samba (PG)","Double Circuit","Central Sector","PGCIL",28.0,220.0],
    [570,569,"2016-06-30","Jammalamadugu - Uravakonda","Double Circuit","State Sector","APTRANSCO",255.0,400.0],
    [571,570,"2016-06-30","LILO of Jodhpur - Merta line at Jodhpur (New)","Double Circuit","State Sector","RVPNL",99.0,400.0],
    [572,571,"2016-06-30","Rasipalayam - Anaikadavu","Double Circuit","State Sector","TANTRANSCO",77.0,400.0],
    [573,572,"2016-06-30","Thappakundu - Anaikadavu","Double Circuit","State Sector","TANTRANSCO",358.0,400.0],
    [574,573,"2016-06-30","400 kV Gonda - 220 kV Gonda Interconnector (one ckt)","Double Circuit","State Sector","UPPTCL",14.0,220.0],
    [575,574,"2016-06-30","A5(Faridabad) - A4(Faridabad) (Ckt-I)","Double Circuit","State Sector","HVPNL",8.0,220.0],
    [576,575,"2016-06-30","Bahraich - 400 kv Gonda line (one ckt.)","Double Circuit","State Sector","UPPTCL",74.0,220.0],
    [577,576,"2016-06-30","Bhadla-Kanasar","Double Circuit","State Sector","RVPNL",63.0,220.0],
    [578,577,"2016-06-30","Kanjali - Science city line (Jalandhar)","Double Circuit","State Sector","PSTCL",30.0,220.0],
    [579,578,"2016-06-30","LILO of 220 kV Parichha - Banda line at Mahoba","Double Circuit","State Sector","UPPTCL",10.0,220.0],
    [580,579,"2016-06-30","LILO of Both ckt of 220 KV Jamanwada - Varsana at Bhachunda (AL-59) M/C","2xDouble Circuit","State Sector","GETCO",83.0,220.0],
    [581,580,"2016-06-30","LILO of Deviakurichy - Pudhansanthai at Valayapatty","Double Circuit","State Sector","TANTRANSCO",52.0,220.0],
    [582,581,"2016-06-30","LILO of Existing SP Koil - Thiruvalam at Kanchipuram S/S","Double Circuit","State Sector","TANTRANSCO",1.0,220.0],
    [583,582,"2016-06-30","LILO of Existing Sunguvarchatram - Arni at Kanchipuram S/S","Double Circuit","State Sector","TANTRANSCO",16.0,220.0],
    [584,583,"2016-06-30","LILO of Ganguwal - Mohali at Majra","Double Circuit","State Sector","PSTCL",21.0,220.0],
    [585,584,"2016-06-30","LILO of GGSSTP - Jamsher at Jadla","Double Circuit","State Sector","PSTCL",21.0,220.0],
    [586,585,"2016-06-30","LILO of Harduaganj - Mainpuri S/C line at Sikandra Rau","Double Circuit","State Sector","UPPTCL",3.0,220.0],
    [587,586,"2016-06-30","LILO of Kalpakkam - Arani at Purisai","Double Circuit","State Sector","TANTRANSCO",24.0,220.0],
    [588,587,"2016-06-30","LILO of Malout - GNDTP Bhatinda at Badal","Double Circuit","State Sector","PSTCL",50.0,220.0],
    [589,588,"2016-06-30","LILO of one ckt of 220kV Bhopal - Ashta line at Mungaliyachhap s/s","Double Circuit","State Sector","MPPTCL",52.0,220.0],
    [590,589,"2016-06-30","LILO of Pithampur - Indore line at 220kV Pithampur-II s/s","Double Circuit","State Sector","MPPTCL",15.0,220.0],
    [591,590,"2016-06-30","LILO of Siruseri - Taramani (Kids park) line at 400 kV Ottiyambakkam S/S","Double Circuit","State Sector","TANTRANSCO",5.0,220.0],
    [592,591,"2016-06-30","LILO of Tuticorin Sipcot - Checkanurani line at Savasapuram S/s","Double Circuit","State Sector","TANTRANSCO",13.0,220.0],
    [593,592,"2016-06-30","LILO on 220 kV Kandalgaon Topworth for M/s Pioneer Gas Power Ltd.","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [594,593,"2016-06-30","Rajpura - Lalru","Double Circuit","State Sector","PSTCL",59.0,220.0],
    [595,594,"2016-06-30","RTPP (Muddanur) - Chinakampalli","Double Circuit","State Sector","APTRANSCO",121.0,220.0],
    [596,595,"2016-06-30","Uravakonda - Vajrakarur","Double Circuit","State Sector","APTRANSCO",32.0,220.0],
    [597,596,"2016-06-30","Jullandhar - Samba line (NRSS-XXIX TL - TBCB)","Double Circuit","Private Sector","SGL",270.0,400.0],
    [598,597,"2016-06-30","Kharagpur (WBSETCL) - Chaibasa (PG) (P&KTCL - TBCB)","Double Circuit","Private Sector","SGL",323.0,400.0],
    [599,598,"2016-06-30","LILO of both ckt of Patiala - Kaithal at Patran (PTL - TBCB)","Double Circuit","Private Sector","PATRANTCL",1.0,400.0],
    [600,599,"2016-06-30","RAPP - Shujalpur line (RAPPTCL - TBCB)","Double Circuit","Private Sector","SGL",402.0,400.0],
    [601,600,"2016-07-31","LILO IN of Both Ckt Teesta-III - Kishanganj at Rangpo","Multiple Circuits with Double Circuit","Central Sector","PGCIL",21.0,400.0],
    [602,601,"2016-07-31","Line for swapping of Purnea bay with Sasaram bay at Biharshariff s/s","Double Circuit","Central Sector","PGCIL",10.0,400.0],
    [603,602,"2016-07-31","Srinagar HEP - Sringar 400 kV S/S.","Double Circuit","State Sector","PTCUL",28.0,400.0],
    [604,603,"2016-07-31","400 KV Karamadai S/S - 230 KV Thudiyalur S/S (Part of line from Loc. 1 to 81)","Single Circuit on Double Circuit","State Sector","APTRANSCO",21.0,220.0],
    [605,604,"2016-07-31","Bawana-Rohini -II (Sec -29) line","Double Circuit","State Sector","DTL",12.0,220.0],
    [606,605,"2016-07-31","Bhinmal - Sayla line","Double Circuit","State Sector","RVPNL",78.0,220.0],
    [607,606,"2016-07-31","Gaya (PG) - Sonenagar (New)","Double Circuit","State Sector","BSPTCL",183.0,220.0],
    [608,607,"2016-07-31","GPPC (Pipavav)- Dhokadva","Double Circuit","State Sector","GETCO",94.0,220.0],
    [609,608,"2016-08-31","Betul - Khandwa (Quad) line","Double Circuit","Central Sector","PGCIL",338.0,400.0],
    [610,609,"2016-08-31","Khandwa - Indore line","Double Circuit","Central Sector","PGCIL",344.0,400.0],
    [611,610,"2016-08-31","Meja - Allahabad line","Double Circuit","Central Sector","PGCIL",56.0,400.0],
    [612,611,"2016-08-31","Sasaram - Allahabad line (1 ckt shifted from NR bus to ER bus) Addition","Double Circuit","Central Sector","PGCIL",6.0,400.0],
    [613,612,"2016-08-31","LILO of both ckt of MTPS stage III - Arasur (PGCIL) at Karamadai","Multiple Circuits","State Sector","TANTRANSCO",124.0,400.0],
    [614,613,"2016-08-31","Suryapet - Nandiwanaparthi (part of Suryapet- Shankarpally line)","Double Circuit","State Sector","TSTRANSCO",240.0,400.0],
    [615,614,"2016-08-31","Bajakhana - Bagha Purana","Double Circuit","State Sector","PSTCL",71.0,220.0],
    [616,615,"2016-08-31","Boisar II-Borivali","Multiple Circuits","State Sector","MSETCL",331.0,220.0],
    [617,616,"2016-08-31","Budidampadu - Bhongiri (2nd Ckt)","Double Circuit","State Sector","TSTRANSCO",14.0,220.0],
    [618,617,"2016-08-31","Chatrail-Ramgarh","Double Circuit","State Sector","RVPNL",90.0,220.0],
    [619,618,"2016-08-31","Chittorgarh - Sawa","Double Circuit","State Sector","RVPNL",53.0,220.0],
    [620,619,"2016-08-31","Garividi - Tekkali (2nd Ckt) line","Single Circuit","State Sector","APTRANSCO",92.0,220.0],
    [621,620,"2016-08-31","Hardoi - Shahjahanpur (PG) line","Double Circuit","State Sector","UPPTCL",60.0,220.0],
    [622,621,"2016-08-31","Kasor - Herang (DFCC) line","Double Circuit","State Sector","GETCO",39.0,220.0],
    [623,622,"2016-08-31","LILO of 220 kV Jodhpur (220 kV GSS) - Pali at 400 kV GSS Jodhpur (New)","Double Circuit","State Sector","RVPNL",10.0,220.0],
    [624,623,"2016-08-31","LILO of Bhugaon - Pusad at Wardha (PG)","Double Circuit","State Sector","MSETCL",14.0,220.0],
    [625,624,"2016-08-31","LILO of Kankroli (PG) -Debari at Amberi","Double Circuit","State Sector","RVPNL",30.0,220.0],
    [626,625,"2016-08-31","LILO of one ckt of Ganguwal - Gobindgarh-II at Bhari","Double Circuit","State Sector","PSTCL",6.0,220.0],
    [627,626,"2016-08-31","LILO of Patiala - Mandi Gobindgarh at Rajpura","Double Circuit","State Sector","PSTCL",68.0,220.0],
    [628,627,"2016-08-31","LILO of Radhanpur - Mehsana at Sankhari","Double Circuit","State Sector","GETCO",62.0,220.0],
    [629,628,"2016-08-31","Lower Jurala HEP - Upper Jurala","Double Circuit","State Sector","TSTRANSCO",21.0,220.0],
    [630,629,"2016-08-31","Lucknow PG (400) - Kursi Road","Double Circuit","State Sector","UPPTCL",30.0,220.0],
    [631,630,"2016-08-31","Palwal (Meghpur) - Meerpur Kurali","Double Circuit","State Sector","HVPNL",53.0,220.0],
    [632,631,"2016-08-31","Parigi - Kosigi line","Double Circuit","State Sector","TSTRANSCO",40.0,220.0],
    [633,632,"2016-08-31","Roza - Dohna","Double Circuit","State Sector","UPPTCL",216.0,220.0],
    [634,633,"2016-08-31","Visavadar - Timbdi","Double Circuit","State Sector","GETCO",180.0,220.0],
    [635,634,"2016-08-31","Mainpuri-Greater Noida","Single Circuit","Private Sector","WUPPTCL",181.0,765.0],
    [636,635,"2016-08-31","Cuddalore - Naggapattinam","Double Circuit","Private Sector","ITPCL",95.0,400.0],
    [637,636,"2016-08-31","LILO of Moradabad-Muzzafarnagar at Hapur","Double Circuit","Private Sector","WUPPTCL",2.0,400.0],
    [638,637,"2016-08-31","Madhugiri - Bidadi (KTL - TBCB)","Double Circuit","Private Sector","KTCL",185.0,400.0],
    [639,638,"2016-09-30","Champa Pooling Station - Kurukshetra (HVDC) BIPOLE Line","BIPOLE","Central Sector","PGCIL",2574.0,800.0],
    [640,639,"2016-09-30","Jaipur (RVPNL) - Bhiwani (IInd Ckt) line","Single Circuit","Central Sector","PGCIL",277.0,765.0],
    [641,640,"2016-09-30","Srikakulam PP - Vemagiri - II PS (PVTL-TBCB)","Double Circuit","Central Sector","PGCIL",668.0,765.0],
    [642,641,"2016-09-30","Essar Gujarat TPS - Bachau (Tripal)","Double Circuit","Central Sector","PGCIL",446.0,400.0],
    [643,642,"2016-09-30","LILO of One ckt RAPP - Kankroli at Chittorgarh","Double Circuit","Central Sector","PGCIL",28.0,400.0],
    [644,643,"2016-09-30","Unchahar - Fatehpur line (PUTL-TBCB)","Double Circuit","Central Sector","PGCIL",107.0,400.0],
    [645,644,"2016-09-30","Lalitpur TPS - Agra (UP) Ckt-I","Single Circuit","State Sector","UPPTCL",337.0,765.0],
    [646,645,"2016-09-30","Anpara B - Anpara D (2nd ckt)","Double Circuit","State Sector","UPPTCL",5.0,400.0],
    [647,646,"2016-09-30","LILO of 400 kV Agra (UP) - Muradnagar 400 kV S/C line at Agra (UP) 765/400 kV S/S","Double Circuit","State Sector","UPPTCL",156.0,400.0],
    [648,647,"2016-09-30","LILO of Kayathar - Karaikudi line at 400 kV Kamudhi s/s","Double Circuit","State Sector","TANTRANSCO",223.0,400.0],
    [649,648,"2016-09-30","LILO of one ckt of 400 kV Agra (UP) - Agra (PG) 400 kV D/C line at Agra (UP) 765/400 kV S/S","Double Circuit","State Sector","UPPTCL",73.0,400.0],
    [650,649,"2016-09-30","Chandrapur MIDC - Ballarshah (Ckt- I )","Double Circuit","State Sector","MSETCL",21.0,220.0],
    [651,650,"2016-09-30","LILO 220 kV of Muradnagar - Shamli at Baghpat","Single Circuit","State Sector","UPPTCL",1.0,220.0],
    [652,651,"2016-09-30","LILO of 220 kV Mainpuri (PG) - Mainpuri line at Sirsaganj","Double Circuit","State Sector","UPPTCL",68.0,220.0],
    [653,652,"2016-09-30","LILO of 220 kV Orai - Mainpuri line at Bah S/S","Double Circuit","State Sector","UPPTCL",157.0,220.0],
    [654,653,"2016-09-30","LILO of 230 kV Chekkanurani - TTPS (feeder-I) at 230 kV Kinnimangalam","Double Circuit","State Sector","TANTRANSCO",1.0,220.0],
    [655,654,"2016-09-30","Narendra (New) - Madhugiri (KTL - TBCB)","Double Circuit","Private Sector","KTCL",758.0,765.0],
    [656,655,"2016-10-31","Nagapattinam PS - Salem (PNMTL-TBCB)","Double Circuit","Central Sector","PGCIL",406.0,765.0],
    [657,656,"2016-10-31","Varanasi - Sarnath (Q)","Double Circuit","Central Sector","PGCIL",213.0,400.0],
    [658,657,"2016-10-31","Kamavarapukota - Surypet ( Chinnakorukondi - Suryapet)","Double Circuit","State Sector","TSTRANSCO",170.0,400.0],
    [659,658,"2016-10-31","Kamavarapukota - Surypet (Kamavarrapukota - Chinnakorukondi)","Double Circuit","State Sector","APTRANSCO",179.0,400.0],
    [660,659,"2016-10-31","Bhandup - Borivali line on M/C tower (from loc. no. 20 to 48)","Single Circuit on Multiple Circuits","State Sector","MSETCL",9.0,220.0],
    [661,660,"2016-10-31","Kalwa - Borivali line M/C tower (from loc no. 20 to 48)","Single Circuit on Multiple Circuits","State Sector","MSETCL",9.0,220.0],
    [662,661,"2016-10-31","Kishanganj (PG) - Kishanganj (New)","2xDouble Circuit","State Sector","BSPTCL",16.0,220.0],
    [663,662,"2016-10-31","LILO of Begusarai - Kanti at Samastipur","2xDouble Circuit","State Sector","BSPTCL",24.0,220.0],
    [664,663,"2016-10-31","LILO of one ckt Jaipur (South) to Chaksu at Goner","Double Circuit","State Sector","RVPNL",58.0,220.0],
    [665,664,"2016-10-31","LILO on 220kV Shivajinagar-Satana line (From loc.No.211) at 220kV Gangapur S/s","Double Circuit","State Sector","MSETCL",96.0,220.0],
    [666,665,"2016-10-31","Mutiara TPP(Coastal Energen Gen. Switchyard) - Tuticorin Pooling Station (Balance portion)","Double Circuit","Private Sector","CEPL",24.0,400.0],
    [667,666,"2016-10-31","Uchpinda (RKM Powergen Private Ltd.) - Kotra s/s (Raigarh) line","Double Circuit","Private Sector","RKMPPL",53.0,400.0],
    [668,667,"2016-11-30","Tuticorin Pooling Station - Salem Pooling Station","Double Circuit","Central Sector","PGCIL",731.0,765.0],
    [669,668,"2016-11-30","Tungabhadra river - Yemmiganur","Double Circuit","State Sector","APTRANSCO",43.0,400.0],
    [670,669,"2016-11-30","Veltoor - Thungabhadra River (Q) line","Double Circuit","State Sector","TSTRANSCO",147.0,400.0],
    [671,670,"2016-11-30","Bidanasi -Cuttack","Double Circuit","State Sector","OPTCL",20.0,220.0],
    [672,671,"2016-11-30","LILO on 220 KV Pandharpur - Malinagar line for M/s Vittal SSK Co-generation Plant","Double Circuit","State Sector","MSETCL",2.0,220.0],
    [673,672,"2016-11-30","Pulichintala HEP - Huzurnagar line","Double Circuit","State Sector","TSTRANSCO",74.0,220.0],
    [674,673,"2016-11-30","Samatipur (New) s/s - Samastipur s/s (initially charged at 132 KV)","Double Circuit","State Sector","BSPTCL",25.0,220.0],
    [675,674,"2016-11-30","Thallak - M/s BARC","Double Circuit","State Sector","KPTCL",22.0,220.0],
    [676,675,"2016-11-30","Jorethang HEP - New Melli","Double Circuit","Private Sector","DEPL",20.0,220.0],
    [677,676,"2016-12-31","Srikakulam Pooling Station - Angul line","Double Circuit","Central Sector","PGCIL",552.0,765.0],
    [678,677,"2016-12-31","LILO of Gazuwaka - Vijayawada 400KV S/C line at Vemagiri PS","Double Circuit","Central Sector","PGCIL",38.0,400.0],
    [679,678,"2016-12-31","Navsari - Boisor line (Balance portion )","Double Circuit","Central Sector","PGCIL",161.0,400.0],
    [680,679,"2016-12-31","Karaikudi - Kamudhi","Double Circuit","State Sector","TANTRANSCO",220.0,400.0],
    [681,680,"2016-12-31","Koradi-II - Koradi-III (Ckt-I)","Double Circuit","State Sector","MSETCL",38.0,400.0],
    [682,681,"2016-12-31","LILO of Vizag - Khammam (Ckt-I) at Asupaka","Double Circuit","State Sector","TSTRANSCO",34.0,400.0],
    [683,682,"2016-12-31","Phagi GSS (Jaipur) - Heerpura line","Double Circuit","State Sector","RVPNL",104.0,400.0],
    [684,683,"2016-12-31","Raita - Jagadalpur line","Double Circuit","State Sector","CSPTCL",657.0,400.0],
    [685,684,"2016-12-31","Tirunelveli (Abishekapatty) - Kanarpatty","Single Circuit","State Sector","TANTRANSCO",15.0,400.0],
    [686,685,"2016-12-31","ACC Limited - LMEL Ghugus","Single Circuit","State Sector","MSETCL",2.0,220.0],
    [687,686,"2016-12-31","Bina s/s - M/s Bharat Oman Refinaries Ltd. Agasod, Bina","Double Circuit","State Sector","MPPTCL",36.0,220.0],
    [688,687,"2016-12-31","Deepalpur-Sonepat HSIIDC Rai ( terminated at Rajiv Gandhi s/s)","Multiple Circuits","State Sector","HVPNL",41.0,220.0],
    [689,688,"2016-12-31","Deepalpur - Sonipat (Sector- 6)","Double Circuit","State Sector","HVPNL",11.0,220.0],
    [690,689,"2016-12-31","Extension of Bikaner- Barsinghsar at Barsinghsar TPS","Single Circuit","State Sector","RVPNL",3.0,220.0],
    [691,690,"2016-12-31","Gaddamvaripalli- Goddumari","Double Circuit","State Sector","APTRANSCO",9.0,220.0],
    [692,691,"2016-12-31","Ghanapur - Marripally - Nagole (Uppal)","Double Circuit","State Sector","TSTRANSCO",36.0,220.0],
    [693,692,"2016-12-31","Kalwa - Borivali (under Mumbai Strengthening)","Single Circuit on Multiple Circuits","State Sector","MSETCL",3.0,220.0],
    [694,693,"2016-12-31","Karamadai - Common Point","Single Circuit","State Sector","TANTRANSCO",21.0,220.0],
    [695,694,"2016-12-31","LILO of 220KV Jodhpur -400KV Jodhpur interconnector at 220KV Jhalamand","Double Circuit","State Sector","RVPNL",1.0,220.0],
    [696,695,"2016-12-31","LILO of both Ckt of Cheeka - Durala at Sonta s/s","Double Circuit","State Sector","HVPNL",78.0,220.0],
    [697,696,"2016-12-31","LILO of both ckts Ramgarh GTPS -Dechu at Ramgarh","Double Circuit","State Sector","RVPNL",1.0,220.0],
    [698,697,"2016-12-31","LILO of Darbhanga - Kanti at Musahari","Double Circuit","State Sector","BSPTCL",90.0,220.0],
    [699,698,"2016-12-31","LILO of (Existing) Budhipadar-Burla at Lapanga","Double Circuit","State Sector","OPTCL",7.0,220.0],
    [700,699,"2016-12-31","LILO of Existing Ingur - Palladam at Kurukathi S/S","Double Circuit","State Sector","TANTRANSCO",62.0,220.0],
    [701,700,"2016-12-31","LILO of Existing Trichy - Perambalur at Jambunathapuram S/S","Double Circuit","State Sector","TANTRANSCO",54.0,220.0],
    [702,701,"2016-12-31","LILO of Korattur - Koyembedu at Ambattur (3rd Main Road)","Double Circuit","State Sector","TANTRANSCO",1.0,220.0],
    [703,702,"2016-12-31","LILO of Rengali - Tarkera at Bonai","Double Circuit","State Sector","OPTCL",6.0,220.0],
    [704,703,"2016-12-31","LILO of Siruseri - Tharamani at Sholinganallur","Double Circuit","State Sector","TANTRANSCO",5.0,220.0],
    [705,704,"2016-12-31","Moulali - Osmania University","Direct Current Underground Cable","State Sector","TSTRANSCO",9.0,220.0],
    [706,705,"2016-12-31","Neyveli - Eachengadu S/S","Single Circuit","State Sector","TANTRANSCO",34.0,220.0],
    [707,706,"2016-12-31","Sitapura- Sitapura (Existing) (Upgradation)","Double Circuit","State Sector","RVPNL",1.0,220.0],
    [708,707,"2016-12-31","Thudiyalur s/s - Common point at loc. 81 to 148 (Associated line of Karamadai 400 KV s/s -single ckt only)","Single Circuit","State Sector","TANTRANSCO",19.0,220.0],
    [709,708,"2016-12-31","Mainpuri - Bara Ckt-II","Single Circuit","Private Sector","SEUPPTCL",377.0,765.0],
    [710,709,"2016-12-31","Avantha Bhandar TPS (Korba West) - Raigarh (Kotra)","Double Circuit","Private Sector","KWPCL",37.0,400.0],
    [711,710,"2016-12-31","Balco - Dharamjaygar Pooling Station","Double Circuit","Private Sector","BALCO",46.0,400.0],
    [712,711,"2016-12-31","LILO of Orai - Mainpuri line at Mainpuri","2xDouble Circuit","Private Sector","SEUPPTCL",93.0,400.0],
    [713,712,"2016-12-31","Mainpuri - Aligarh","Double Circuit","Private Sector","SEUPPTCL",186.0,400.0],
    [714,713,"2017-01-31","Dgen TPS- Navsari line","Double Circuit","Private Sector","TOR. POW. (UNOSUGEN)",210.0,400.0],
    [715,714,"2017-01-31","Kurukshetra - Malerkotla line (NRSS-XXXITL (B) - TBCB)","Double Circuit","Private Sector","ESSEL",278.0,400.0],
    [716,715,"2017-01-31","Purulia - Ranchi (PG) (P&KTCL - TBCB)","Double Circuit","Private Sector","SGL",223.0,400.0],
    [717,716,"2017-01-31","LILO of existing Seoni-Bina at Gadarwara STPP","Double Circuit","Central Sector","PGCIL",16.0,765.0],
    [718,717,"2017-01-31","Dehradun - Bagpat line (Q)","Double Circuit","Central Sector","PGCIL",330.0,400.0],
    [719,718,"2017-01-31","Sikar - Jaipur line","Double Circuit","Central Sector","PGCIL",339.0,400.0],
    [720,719,"2017-01-31","LILO of 400 kV Solapur - Kolhapur PGCIL line for 400 kV Alkud S/S","Double Circuit","State Sector","MSETCL",25.0,400.0],
    [721,720,"2017-01-31","Naranoor - Ghani line","Double Circuit","State Sector","APTRANSCO",33.0,400.0],
    [722,721,"2017-01-31","Hathras-Gokul line","Single Circuit","State Sector","UPPTCL",41.0,220.0],
    [723,722,"2017-01-31","LILO of 220kV Orai - Bhauti at Orai","Double Circuit","State Sector","UPPTCL",8.0,220.0],
    [724,723,"2017-01-31","Mulund - Bhandup line","Single Circuit on Multiple Circuits","State Sector","MSETCL",3.0,220.0],
    [725,724,"2017-02-28","LILO of One Ckt Parbati Pooling Station - Amritsar at Jalandhar","Double Circuit","Central Sector","PGCIL",34.0,400.0],
    [726,725,"2017-02-28","Koradi II to Koradi -III line (ckt.II)","Double Circuit","State Sector","MSETCL",38.0,400.0],
    [727,726,"2017-02-28","LILO of Jeerat - KTPS 400 kV S/C at N. Chanditala","Double Circuit+Single Circuit","State Sector","WBSETCL",7.0,400.0],
    [728,727,"2017-02-28","Kamudhi s/s - Tiruchulis/s (Muthuramlingapuram) - Ckt-I","Double Circuit","State Sector","TANTRANSCO",69.0,230.0],
    [729,728,"2017-02-28","Bechraji - Maruti Suzuki line","Double Circuit","State Sector","GETCO",2.0,220.0],
    [730,729,"2017-02-28","Chandrayanagutta - 220KV Imlibun GIS (UG Cable)","Double Circuit","State Sector","TSTRANSCO",10.0,220.0],
    [731,730,"2017-02-28","Durshed - Siricilla line","Double Circuit","State Sector","TSTRANSCO",134.0,220.0],
    [732,731,"2017-02-28","Harsh Vihar - Patparganj line (U/G cable link)","Double Circuit","State Sector","DTL",29.0,220.0],
    [733,732,"2017-02-28","HSR Layout - Nimhans S/S (UG Cable)","Underground Cable","State Sector","KPTCL",11.0,220.0],
    [734,733,"2017-02-28","Interconnection of one ckt. of GSEG - Kosamba line with Essar - Ichhapore line","Double Circuit","State Sector","GETCO",1.0,220.0],
    [735,734,"2017-02-28","Koyna PSS - Karad(Loc. 8 - 144) line","Single Circuit on Double Circuit","State Sector","MSETCL",44.0,220.0],
    [736,735,"2017-02-28","LILO of Bakreswar - Gokarna at Sadaipur","Double Circuit","State Sector","WBSETCL",13.0,220.0],
    [737,736,"2017-02-28","LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet S/S","Double Circuit","State Sector","TSTRANSCO",48.0,220.0],
    [738,737,"2017-02-28","LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet S/S","Double Circuit","State Sector","TSTRANSCO",42.0,220.0],
    [739,738,"2017-02-28","LILO of Ghanapur - Malkaram at Moulali","Double Circuit","State Sector","TSTRANSCO",9.0,220.0],
    [740,739,"2017-02-28","LILO of one Ckt of Chilakallu - Narkatpally at Suryapet S/S","Double Circuit","State Sector","TSTRANSCO",24.0,220.0],
    [741,740,"2017-02-28","LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar","Double Circuit","State Sector","RVPNL",33.0,220.0],
    [742,741,"2017-02-28","LILO of Wanaparthy - Ragimanagadda at Singotam X Road SS","Double Circuit","State Sector","TSTRANSCO",10.0,220.0],
    [743,742,"2017-02-28","LILO on one ckt of Nelamangala - Anchepalya line at Magadi","Double Circuit","State Sector","KPTCL",31.0,220.0],
    [744,743,"2017-02-28","RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing)","Double Circuit","State Sector","TSTRANSCO",140.0,220.0],
    [745,744,"2017-02-28","Ajmer - Deedwana","Single Circuit","Private Sector","APL",111.0,400.0],
    [746,745,"2017-02-28","Bikaner - Deedwana","Single Circuit","Private Sector","APL",129.0,400.0],
    [747,746,"2017-02-28","Hindaun - Alwar","Single Circuit","Private Sector","APL",97.0,400.0],
    [748,747,"2017-02-28","JP Nigri TPP - Satna (PG)","Double Circuit","Private Sector","JAL",322.0,400.0],
    [749,748,"2017-02-28","Sujangarh - Deedwana","Double Circuit","Private Sector","APL",60.0,220.0],
    [750,749,"2017-03-31","LILO of Bishwanath Chariali - Agra at Alipurduar","High-Voltage Direct Current","Central Sector","PGCIL",44.0,800.0],
    [751,750,"2017-03-31","Raipur Pooling station - Wardha line -II","Double Circuit","Central Sector","PGCIL",714.0,765.0],
    [752,751,"2017-03-31","Wardha - Nizamabad line (Part of Wardha - Hyderabad line)","Double Circuit","Central Sector","PGCIL",576.0,765.0],
    [753,752,"2017-03-31","Farakka-Gokarna Portion of Raharhat-Purnea Lin, alongwith LILO at Farakka & Gokarna to form Farakka - Gokarna line","Double Circuit","Central Sector","PGCIL",238.0,400.0],
    [754,753,"2017-03-31","LILO of Bongaigaon - Siliguri at Alipurduar","Double Circuit","Central Sector","PGCIL",13.0,400.0],
    [755,754,"2017-03-31","LILO of Dadri - Malerkotla at Kaithal","Double Circuit","Central Sector","PGCIL",50.0,400.0],
    [756,755,"2017-03-31","Nizamabad - Dichpalli line -Ckt-I","Double Circuit","Central Sector","PGCIL",9.0,400.0],
    [757,756,"2017-03-31","LILO of Birpara - Salakati line at Alipurduar (New Pooling Station)","Double Circuit","Central Sector","PGCIL",5.0,220.0],
    [758,757,"2017-03-31","Alachi - Khalsi S/S","Single Circuit","State Sector","JKPDD",31.0,66.0],
    [759,758,"2017-03-31","Chutak HEP-Gramthong -II","Single Circuit","State Sector","JKPDD",5.0,66.0],
    [760,759,"2017-03-31","Chutak HEP-Kargil-I","Single Circuit","State Sector","JKPDD",10.0,66.0],
    [761,760,"2017-03-31","Gramthong -II - Sankoo","Single Circuit","State Sector","JKPDD",27.0,66.0],
    [762,761,"2017-03-31","Khangral - Mulbek -II","Single Circuit","State Sector","JKPDD",23.0,66.0],
    [763,762,"2017-03-31","Leh (C.P.) - Kharu S/S","Single Circuit","State Sector","JKPDD",25.0,66.0],
    [764,763,"2017-03-31","Mulbek-II - Kargil -I","Single Circuit","State Sector","JKPDD",28.0,66.0],
    [765,764,"2017-03-31","Charanka - Veloda Line","Double Circuit","State Sector","GETCO",199.0,400.0],
    [766,765,"2017-03-31","Kirori - Jind line (Ckt-II)","Double Circuit","State Sector","HVPNL",50.0,400.0],
    [767,766,"2017-03-31","LILO of 400kV Gajwel - Yeddumailaram (Shankarpally) ckt-I at 400 kV Narsapur SS.","Double Circuit","State Sector","TSTRANSCO",6.0,400.0],
    [768,767,"2017-03-31","LILO of Chandrapur-Parli S/C line for 400KV Nanded (Khumbhargaon)","Double Circuit","State Sector","MSETCL",80.0,400.0],
    [769,768,"2017-03-31","LILO of Eachangadu - Thatchankurichi at Poiyur 230 KV SS","Double Circuit","State Sector","TANTRANSCO",22.0,230.0],
    [770,769,"2017-03-31","LILO of Korattur- Alamathy line at Ambattur 3rd Main Road 230 KV SS","Double Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [771,770,"2017-03-31","Palladam - Kurukathi Line","Single Circuit","State Sector","TANTRANSCO",78.0,230.0],
    [772,771,"2017-03-31","Balimela - Malkangiri line","Single Circuit","State Sector","OPTCL",22.0,220.0],
    [773,772,"2017-03-31","Botad - Parabadi (Ajmer) line (Ckt-1)","Double Circuit","State Sector","GETCO",64.0,220.0],
    [774,773,"2017-03-31","Dehradun (PTCUL) - Dehradun (PGCIL) line","Double Circuit","State Sector","PTCUL",12.0,220.0],
    [775,774,"2017-03-31","Gwalior (Malanpur) - Morena line","Double Circuit","State Sector","MPPTCL",60.0,220.0],
    [776,775,"2017-03-31","Kharghar- Boriwali line","Double Circuit","State Sector","MSETCL",76.0,220.0],
    [777,776,"2017-03-31","Lamboti -Vairag line (by making tap arrangement on 220kV Tuljapur- Vairag line for Vairag SS)","Single Circuit on Double Circuit","State Sector","MSETCL",64.0,220.0],
    [778,777,"2017-03-31","LILO of 220 kV Sambhal-Badaun Line at Chandausi S/s","Double Circuit","State Sector","UPPTCL",33.0,220.0],
    [779,778,"2017-03-31","LILO of I-Ckt. of Panki - Bhauti PG(400) line at Rania s/s","Double Circuit","State Sector","UPPTCL",33.0,220.0],
    [780,779,"2017-03-31","LILO of Jeerat - Rishra 220 kV S/C Line at Dharampur","Double Circuit","State Sector","WBSETCL",2.0,220.0],
    [781,780,"2017-03-31","LILO of Jodhpur(400 kV)-Jodhpur 220 kV interconnector-II line for 220 kV GSS Barli","Double Circuit","State Sector","RVPNL",3.0,220.0],
    [782,781,"2017-03-31","LILO of one ckt Bhigwan-Walchandnagar at Loni Deokar s/s (Ckt-1)","Single Circuit on Double Circuit","State Sector","MSETCL",19.0,220.0],
    [783,782,"2017-03-31","LILO of one ckt of 220KV Indore II(Jaitpura) to Indore 400KV at 220KV S/s NZ Indore","Double Circuit","State Sector","MPPTCL",20.0,220.0],
    [784,783,"2017-03-31","LILO of Somanahalli - Malur at Vikas Tech Park","Double Circuit","State Sector","KPTCL",16.0,220.0],
    [785,784,"2017-03-31","LILO point to Phojal","Double Circuit","State Sector","HPPTCL",20.0,220.0],
    [786,785,"2017-03-31","Morak - Bhawanimandi line","Single Circuit","State Sector","RVPNL",40.0,220.0],
    [787,786,"2017-03-31","Sadla - Maruti wind park line","Single Circuit","State Sector","GETCO",1.0,220.0],
    [788,787,"2017-03-31","Sohawal - Faizabad PG (400)","Double Circuit","State Sector","UPPTCL",47.0,220.0],
    [789,788,"2017-03-31","Visavadar - Amreli line","Double Circuit","State Sector","GETCO",132.0,220.0],
    [790,789,"2017-04-30","Darlipalli TPS - Jharsuguda (Sundergarh) PS line","Double Circuit","Central Sector","PGCIL",41.0,765.0],
    [791,790,"2017-04-30","Lalitpur TPS - Fatehabad (Agra (UP)) Ckt-II","Single Circuit","State Sector","UPPTCL",335.0,765.0],
    [792,791,"2017-04-30","Bhadla-Bikaner","Double Circuit","State Sector","RVPNL",379.0,400.0],
    [793,792,"2017-04-30","Bhilwara TPS -Ajmer","Double Circuit","State Sector","RVPNL",320.0,400.0],
    [794,793,"2017-04-30","Fatehabad (Agra (UP)) - Maath ( Mathura) line","Single Circuit","State Sector","UPPTCL",142.0,400.0],
    [795,794,"2017-04-30","LILO of both ckt of Mamidipally - Srisailam at Dindi S/s","Double Circuit","State Sector","TSTRANSCO",5.0,400.0],
    [796,795,"2017-04-30","LILO of Atri-puri at Pandiabil S/s","Double Circuit","State Sector","OPTCL",3.0,220.0],
    [797,796,"2017-04-30","LILO of Mettur - Karimangalam at Dharmapuri S/s","Double Circuit","State Sector","TANTRANSCO",6.0,220.0],
    [798,797,"2017-04-30","Maath (Mathura) -Chhata line","Double Circuit","State Sector","UPPTCL",68.0,220.0],
    [799,798,"2017-04-30","Mylapore - Tharamani (UG Cable)","Double Circuit","State Sector","TANTRANSCO",25.0,220.0],
    [800,799,"2017-04-30","Sikandrabad (WUPPTCL) - Sikandrabad (ckt-I&II)","Double Circuit","State Sector","UPPTCL",50.0,220.0],
    [801,800,"2017-04-30","Malerkotla - Amritsar line (NRSS-XXXI TL(B) - TBCB)","Double Circuit","Private Sector","ESSEL",299.0,400.0],
    [802,801,"2017-04-30","Muzaffarpur - Darbhanga line (DMTCL - TBCB)","Double Circuit","Private Sector","ESSEL",126.0,400.0],
    [803,802,"2017-05-31","Gadarwara - Jabalpor Pool line (Balance Portion from LILO of Seoni - Bina to Jabalpur) (PWTL-TBCB)","Double Circuit","Central Sector","PGCIL",187.0,765.0],
    [804,803,"2017-05-31","Kakarapar APP - Navsari line","Double Circuit","Central Sector","PGCIL",77.0,400.0],
    [805,804,"2017-05-31","Kakrapar APP - Vapi line","Double Circuit","Central Sector","PGCIL",234.0,400.0],
    [806,805,"2017-05-31","Lucknow - Kanpur line","Double Circuit","Central Sector","PGCIL",320.0,400.0],
    [807,806,"2017-05-31","Aligarh - Sikandarabad line","Double Circuit","State Sector","UPPTCL",190.0,400.0],
    [808,807,"2017-05-31","Allahabad - Banda Line","Double Circuit","State Sector","UPPTCL",355.0,400.0],
    [809,808,"2017-05-31","LILO of Patran - Rajla at Patran (PGCIL) s/s","Double Circuit","State Sector","PSTCL",3.0,400.0],
    [810,809,"2017-05-31","Nandiwanaparthi - Shankarpally (part of Suryapet- Shankarpally line)","Double Circuit","State Sector","TSTRANSCO",222.0,400.0],
    [811,810,"2017-05-31","PH Road - Koyambedu (UG Cable)","Double Circuit","State Sector","TANTRANSCO",3.0,230.0],
    [812,811,"2017-05-31","LILO of 2nd ckt Bhigwan - Walchandnagar at Loni Deokar s/s (Ckt. -II)","Single Circuit on Double Circuit","State Sector","MSETCL",19.0,220.0],
    [813,812,"2017-05-31","LILO of Patran - Kakrala at Patran (PGCIL) s/s","Double Circuit","State Sector","PSTCL",24.0,220.0],
    [814,813,"2017-05-31","LILO on Both circuits of Waluj - Jalna at Taptitanda s/s","2xDouble Circuit","State Sector","MSETCL",32.0,220.0],
    [815,814,"2017-05-31","Warora - Wardha - II (Bhugaon)","Double Circuit","State Sector","MSETCL",165.0,220.0],
    [816,815,"2017-05-31","Hapur-Greater Noida line","Single Circuit","Private Sector","WUPPTCL",66.0,765.0],
    [817,816,"2017-05-31","Mainpuri-Hapur line","Single Circuit","Private Sector","WUPPTCL",217.0,765.0],
    [818,817,"2017-05-31","Greater Noida-Noida Sec -148 line","Double Circuit","Private Sector","WUPPTCL",94.0,400.0],
    [819,818,"2017-05-31","LILO of Rishikesh -Kashipur line at Nehtaur s/s","Double Circuit","Private Sector","WUPPTCL",15.0,400.0],
    [820,819,"2017-05-31","Haldia TPP (IPCL) - New Haldia (WBSETCL)","Double Circuit","Private Sector","IPCHL",5.0,220.0],
    [821,820,"2017-06-30","Lara STPS - Champa Pooling Station line (Q)","Double Circuit","Central Sector","PGCIL",224.0,400.0],
    [822,821,"2017-06-30","Agra(UP) - Agra (South)","Double Circuit","State Sector","UPPTCL",139.0,400.0],
    [823,822,"2017-06-30","Bellary (PS) - New Madhugiri (near Tumakur)","Double Circuit","State Sector","KPTCL",450.0,400.0],
    [824,823,"2017-06-30","Kanarpatti - Kayathar line","Double Circuit","State Sector","TANTRANSCO",25.0,400.0],
    [825,824,"2017-06-30","Kirori - Jind line (Ckt-I)","Double Circuit","State Sector","HVPNL",50.0,400.0],
    [826,825,"2017-06-30","LILO of Agra - Muradnagar at Mathura","Double Circuit","State Sector","UPPTCL",64.0,400.0],
    [827,826,"2017-06-30","Maheshwaram (PGCIL) - Maheshwaram (TSTRANSCO)","Double Circuit","State Sector","TSTRANSCO",3.0,400.0],
    [828,827,"2017-06-30","Maheshwaram - Shankarpally S/s","Double Circuit","State Sector","TSTRANSCO",12.0,400.0],
    [829,828,"2017-06-30","Rayalaseema TPP - Chittoor line","Double Circuit","State Sector","APTRANSCO",429.0,400.0],
    [830,829,"2017-06-30","Vizag TPP(HNPCL) - Kamavarapukota","Double Circuit","State Sector","APTRANSCO",486.0,400.0],
    [831,830,"2017-06-30","Kamudhi - Kavanoor","Double Circuit","State Sector","TANTRANSCO",56.0,230.0],
    [832,831,"2017-06-30","LILO of Alandur - Alagarkoil at Mondipatti 230 Kv S/S","Double Circuit","State Sector","TANTRANSCO",25.0,230.0],
    [833,832,"2017-06-30","Rohini theatre take off structure to CMRL Koyambedu 230kV GIS S/s (230 kV UG cable )","Single Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [834,833,"2017-06-30","Chandrapur MIDC - Ballarshah (Ckt- II)","Double Circuit","State Sector","MSETCL",21.0,220.0],
    [835,834,"2017-06-30","Hapur (765) - Hapur","Single Circuit","State Sector","UPPTCL",8.0,220.0],
    [836,835,"2017-06-30","Indira Gandhi Nagar -Sitapur (Upgradation)","Double Circuit","State Sector","RVPNL",8.0,220.0],
    [837,836,"2017-06-30","LILO of 1st ckt. Darbhanga-MTPS(Kanti) at Motipur","Double Circuit","State Sector","BSPTCL",72.0,220.0],
    [838,837,"2017-06-30","LILO of 2nd ckt. Darbhanga-MTPS(Kanti) at Motipur","Double Circuit","State Sector","BSPTCL",56.0,220.0],
    [839,838,"2017-06-30","LILO of 2nd ckt Pusouli (PG) - Ara (PG) at Pusouli (New).","Double Circuit","State Sector","BSPTCL",5.0,220.0],
    [840,839,"2017-06-30","LILO of Arasur - Palladam at Tiruppur","Double Circuit","State Sector","TANTRANSCO",20.0,220.0],
    [841,840,"2017-06-30","LILO of Chillakallu S/S - Narketpally line at Huzurnagar S/S","Double Circuit","State Sector","TSTRANSCO",24.0,220.0],
    [842,841,"2017-06-30","LILO of Chorania - Salejada at Bagodara S/s","Double Circuit","State Sector","GETCO",4.0,220.0],
    [843,842,"2017-06-30","LILO of Moradabad - Nehtaur at Amroha","Double Circuit","State Sector","UPPTCL",45.0,220.0],
    [844,843,"2017-06-30","LILO of Motipur - Darbhanga ckt-II at Musahari","Double Circuit","State Sector","BSPTCL",41.0,220.0],
    [845,844,"2017-06-30","LILO of Shadnagar - Yeddumailaram at Yeddumailaram","Double Circuit","State Sector","TSTRANSCO",12.0,220.0],
    [846,845,"2017-06-30","Mamidipally S/s-M/s K.S.K. Photo Voltaic near Fabcity Ravirala (V)","Double Circuit","State Sector","TSTRANSCO",11.0,220.0],
    [847,846,"2017-06-30","Nimbahera - Pratapgarh (Part of Pratapgarh -Chittorgarh line)","Double Circuit","State Sector","RVPNL",181.0,220.0],
    [848,847,"2017-06-30","Patna (PG) - Gourichak","Double Circuit","State Sector","BSPTCL",1.0,220.0],
    [849,848,"2017-06-30","Uravakonda - Borampalli","Double Circuit","State Sector","APTRANSCO",72.0,220.0],
    [850,849,"2017-06-30","Veltur-Thimmajipet","Double Circuit","State Sector","TSTRANSCO",80.0,220.0],
    [851,850,"2017-06-30","Hapur-Ataur","Double Circuit","Private Sector","WUPPTCL",106.0,400.0],
    [852,851,"2017-06-30","Hapur-dasna","Double Circuit","Private Sector","WUPPTCL",29.0,400.0],
    [853,852,"2017-06-30","JSW TPS - Bellary (PS)","Double Circuit","Private Sector","JPL",19.0,400.0],
    [854,853,"2017-06-30","LILO of Moradabad - Muradnagar TL at Ataur s/s","Double Circuit","Private Sector","WUPPTCL",30.0,400.0],
    [855,854,"2017-06-30","LILO of Moradabad - Muradnagar TL at Hapur s/s","Double Circuit","Private Sector","WUPPTCL",4.0,400.0],
    [856,855,"2017-06-30","LILO of Rishikesh - Kashipur line at Nehtaur (Balance portion)","Double Circuit","Private Sector","WUPPTCL",15.0,400.0],
    [857,856,"2017-07-31","Nizamabad - Hyderabad line (Part of Wardha - Hyderabad line)","Double Circuit","Central Sector","PGCIL",486.0,765.0],
    [858,857,"2017-07-31","Kishenpur - New Wanpoh line (132 KM D/C + 7 KM Multi Ckt)","Multiple Circuits with Double Circuit","Central Sector","PGCIL",279.0,400.0],
    [859,858,"2017-07-31","Loop out (Kurnool - Maheshwaram portion of LILO of Hyderabad - Kurnool at Maheshwaram","Single Circuit","Central Sector","PGCIL",4.0,400.0],
    [860,859,"2017-07-31","Mauda-II - Betul (Quad) line","Double Circuit","Central Sector","PGCIL",393.0,400.0],
    [861,860,"2017-07-31","RAPP - Kota line","Double Circuit","Central Sector","PGCIL",90.0,400.0],
    [862,861,"2017-07-31","Gr. Noida - Noida (Quad)","Double Circuit","State Sector","UPPTCL",91.0,400.0],
    [863,862,"2017-07-31","LILO of NCTPS Stage-II - Alamathy line at Manali GIS","Double Circuit","State Sector","TANTRANSCO",66.0,400.0],
    [864,863,"2017-07-31","Koladi - PH Road (Alamathy - Koyembedu)","Double Circuit","State Sector","TANTRANSCO",27.0,230.0],
    [865,864,"2017-07-31","400 kV Betul s/s - 220 kV Betul s/s","Double Circuit","State Sector","MPPTCL",4.0,220.0],
    [866,865,"2017-07-31","Morti (220kV) - Ataur (400kV)","Double Circuit","State Sector","UPPTCL",13.0,220.0],
    [867,866,"2017-07-31","Tondiarpet - Basin Bridge (UG Cable)","Double Circuit","State Sector","TANTRANSCO",4.0,220.0],
    [868,867,"2017-07-31","Mainpuri (765kV) - Aligarh line (Balance portion)","Double Circuit","Private Sector","SEUPPTCL",54.0,400.0],
    [869,868,"2017-08-31","Jabalpur PS - Orai Substation","Double Circuit","Central Sector","PGCIL",714.0,765.0],
    [870,869,"2017-08-31","LILO of Karcham Wangtoo - Abdullapur at Kala Amb (PKATL-TBCB)","Double Circuit","Central Sector","PGCIL",2.0,400.0],
    [871,870,"2017-08-31","D/C LILO of PPSP - Arambagh 400 kV D/C line at New PPSP 400 kV GIS","Double Circuit","State Sector","WBSETCL",1.0,400.0],
    [872,871,"2017-08-31","LILO of one ckt. of 400kV Khammam -Gajwel Line at 400kV Asupaka S/s","Double Circuit","State Sector","TSTRANSCO",34.0,400.0],
    [873,872,"2017-08-31","Rasipalayam - Salem (Palavady)","Double Circuit","State Sector","TANTRANSCO",388.0,400.0],
    [874,873,"2017-08-31","Thiruverkadu - Ambattur 3rd Main road S/S (UG Cable)","Double Circuit","State Sector","TANTRANSCO",10.0,230.0],
    [875,874,"2017-08-31","Vyasarpadi - Pulianthoppe (UG Cable)","Double Circuit","State Sector","TANTRANSCO",2.0,230.0],
    [876,875,"2017-08-31","Balapur - Malegaon line Ckt.-I","Double Circuit","State Sector","MSETCL",71.0,220.0],
    [877,876,"2017-08-31","LILO of 2nd Ckt. Damoh - Sagar line at Damoh S/s","Double Circuit","State Sector","MPPTCL",1.0,220.0],
    [878,877,"2017-08-31","Phaltan - Walchandnagar","Double Circuit","State Sector","MSETCL",114.0,220.0],
    [879,878,"2017-08-31","LILO of Barh - Gorakhpur 400 kV D/C Line at Motihari (DMTCL -TBCB)","2xDouble Circuit","Private Sector","ESSEL",151.0,400.0],
    [880,879,"2017-08-31","Nizamabad - Yeddumailaram (Shankarpalli) (MTL - TBCB)","Double Circuit","Private Sector","SGL",279.0,400.0],
    [881,880,"2017-08-31","OPGC - Jharsuguda (OGP-IITL - TBCB)","Double Circuit","Private Sector","SGL",103.0,400.0],
    [882,881,"2017-09-30","Allahabad - Kanpur line","Double Circuit","Central Sector","PGCIL",481.0,400.0],
    [883,882,"2017-09-30","Aurangabad - Boisar","Double Circuit","Central Sector","PGCIL",690.0,400.0],
    [884,883,"2017-09-30","Loop-In (Hyderabad-Maheshwaram) portion of LILO of Hyderabad-Kurnool 400kV S/C line at Maheswaram","Double Circuit","Central Sector","PGCIL",3.0,400.0],
    [885,884,"2017-09-30","Raghunathpur TPS -Ranchi (PG)","Double Circuit","Central Sector","DVC",311.0,400.0],
    [886,885,"2017-09-30","Solapur STPP - Solapur line - II (Q)","Double Circuit","Central Sector","PGCIL",25.0,400.0],
    [887,886,"2017-09-30","Kharagpur - N. Chanditala","Double Circuit","State Sector","WBSETCL",277.0,400.0],
    [888,887,"2017-09-30","Dharmapuri (Palavady) - Gurubarapally","Single Circuit","State Sector","TANTRANSCO",58.0,220.0],
    [889,888,"2017-09-30","Jethana - Ajmer line","Double Circuit","State Sector","RVPNL",120.0,220.0],
    [890,889,"2017-09-30","Jodhpur (New) - Jhalamand (TK)","Double Circuit","State Sector","RVPNL",40.0,220.0],
    [891,890,"2017-09-30","Kalisindh TPS - Bhawanimandi","Single Circuit","State Sector","RVPNL",34.0,220.0],
    [892,891,"2017-09-30","LILO of Arasur - Karamadai at Shenbagapudur S/S","Double Circuit","State Sector","TANTRANSCO",75.0,220.0],
    [893,892,"2017-09-30","LILO of Sankhari-Jangral at Veloda (Sankhari)","Multiple Circuits with Double Circuit","State Sector","GETCO",61.0,220.0],
    [894,893,"2017-09-30","LILO of Tappar-Hadala line at Vondh S/s","Double Circuit","State Sector","GETCO",4.0,220.0],
    [895,894,"2017-09-30","LILO of Thiruvarur - Kadalangudi at Kumbakonam","Double Circuit","State Sector","TANTRANSCO",46.0,220.0],
    [896,895,"2017-09-30","LILO of Orai-Mainpuri at Mainpuri (Balance Portion)","Double Circuit","Private Sector","SEUPPTCL",90.0,400.0],
    [897,896,"2017-10-31","LILO of Both ckt. of Mundra UMPP - Limbdi at Bachau (Triple)","Double Circuit","Central Sector","PGCIL",45.0,400.0],
    [898,897,"2017-10-31","LILO of one ckt. Gooty - Tumkur (Vasantnarsapur) at Tumkur line (Q) at Tumkur Pool","Double Circuit","Central Sector","PGCIL",1.0,400.0],
    [899,898,"2017-10-31","Karuvalur - Shenbagapudur line","Single Circuit","State Sector","TANTRANSCO",33.0,230.0],
    [900,899,"2017-10-31","LILO of Ulundurpet - Villupuram line at Cuddalore","Double Circuit","State Sector","TANTRANSCO",69.0,230.0],
    [901,900,"2017-10-31","Aligarh - Sikandra Rau line","Double Circuit","State Sector","UPPTCL",35.0,220.0],
    [902,901,"2017-10-31","Jajji - Rai line","Double Circuit","State Sector","HVPNL",102.0,220.0],
    [903,902,"2017-10-31","LILO of 2nd Ckt. of Bansagar - Satna line at Kotar","Double Circuit","State Sector","MPPTCL",11.0,220.0],
    [904,903,"2017-10-31","LILO of one ckt. of Satna (MPPTCL) - Chhaterpur line at Satna (PGCIL)","Double Circuit","State Sector","MPPTCL",4.0,220.0],
    [905,904,"2017-10-31","Shirpur Power Plant - Amalner line","Double Circuit","State Sector","MSETCL",70.0,220.0],
    [906,905,"2017-10-31","Ataur-Indirapuram line","Double Circuit","Private Sector","WUPPTCL",31.0,400.0],
    [907,906,"2017-10-31","Ind - Barath (Power Plant (Shahjbahal) - Jharsuguda (Sundargarh)line","Double Circuit","Private Sector","IBPIL",124.0,400.0],
    [908,907,"2017-10-31","LILO of one ckt. of Sikar- Neemrana line at Babai s/s (NRSS-XXXVITL - TBCB)","Double Circuit","Private Sector","ESSEL",3.0,400.0],
    [909,908,"2017-10-31","Sterlite TPP (Vedanta)- Jharsuguda (Sundergarh) (Balance portion from LILO-I point to Jharsuguda)","Double Circuit","Private Sector","VEDANTA",41.0,400.0],
    [910,909,"2017-11-30","Chittorgarh (New) - Chittorgarh (RVPN) (Q) - (GEC- I)","Double Circuit","Central Sector","PGCIL",97.0,400.0],
    [911,910,"2017-11-30","Kurukshetra - Jind line (Q)","Double Circuit","Central Sector","PGCIL",206.0,400.0],
    [912,911,"2017-11-30","Khalsti- Leh (Part of Alusteng - Drass - Kargil - Khalsti-Leh)","Single Circuit","Central Sector","PGCONSULTANCY",62.0,220.0],
    [913,912,"2017-11-30","Bareilly (400) - Pilibhit","Single Circuit","State Sector","UPPTCL",39.0,220.0],
    [914,913,"2017-11-30","Jamnagar - Hadala","Double Circuit","State Sector","GETCO",139.0,220.0],
    [915,914,"2017-11-30","LILO of both circuit Nyara-Thebda line at Kalawad S/s","Multiple Circuits","State Sector","GETCO",21.0,220.0],
    [916,915,"2017-11-30","LILO of both circuits of Madanpur - Baddi at Pinjore","Multiple Circuits","State Sector","HVPNL",23.0,220.0],
    [917,916,"2017-11-30","LILO of Haldarwa-Zaghadia Line to Jhanor","Double Circuit","State Sector","GETCO",14.0,220.0],
    [918,917,"2017-11-30","LILO of Myvadi - Othakkalmandapam feeder at Anaikadavu 400 KV SS","Double Circuit","State Sector","TANTRANSCO",1.0,220.0],
    [919,918,"2017-11-30","Malegaon-Kalwan","Double Circuit","State Sector","MSETCL",98.0,220.0],
    [920,919,"2017-12-31","Aurangabad (PG) - Padghe (PG) line","Double Circuit","Central Sector","PGCIL",570.0,765.0],
    [921,920,"2017-12-31","Chittorgarh - Ajmer line","Double Circuit","Central Sector","PGCIL",422.0,765.0],
    [922,921,"2017-12-31","Ajmer (New) - Ajmer (RVPN) (Quad) line (GEC-I)","Double Circuit","Central Sector","PGCIL",131.0,400.0],
    [923,922,"2017-12-31","Padghe (PG) - Padghe (Kudus) line (Q) line","Double Circuit","Central Sector","PGCIL",32.0,400.0],
    [924,923,"2017-12-31","Vapi (PG) - Kala - Kudus (balance Portion) line","Double Circuit","Central Sector","PGCIL",149.0,400.0],
    [925,924,"2017-12-31","Kalivanthapattu - Ottiyambakkam (Sholinganallur)","Double Circuit","State Sector","TANTRANSCO",55.0,400.0],
    [926,925,"2017-12-31","LILO of one ckt. of Vadavi-Zerda line at Veloda (Sankhari) S/s","Double Circuit","State Sector","GETCO",31.0,400.0],
    [927,926,"2017-12-31","Ramgarh (Jaisalmer)-Akal (Jaisalmer )","Double Circuit","State Sector","RVPNL",198.0,400.0],
    [928,927,"2017-12-31","Veeranam - Abishekapatty (PGCIL)","Single Circuit","State Sector","TANTRANSCO",31.0,230.0],
    [929,928,"2017-12-31","Akola - Anjangaon line","Double Circuit","State Sector","MSETCL",106.0,220.0],
    [930,929,"2017-12-31","Chaibasa -Ramchandrapur","Double Circuit","State Sector","JUSNL",80.0,220.0],
    [931,930,"2017-12-31","Darbhanga - Samastipur (New)","Double Circuit","State Sector","BSPTCL",47.0,220.0],
    [932,931,"2017-12-31","LILO of B.Bagewadi - Bijapur line at Kudgi 400kV STPP","Multiple Circuits","State Sector","KPTCL",80.0,220.0],
    [933,932,"2017-12-31","LILO of Both ckt. of Biharsharif - Begusarai at BTPS Extn.","Double Circuit","State Sector","BSPTCL",4.0,220.0],
    [934,933,"2017-12-31","LILO of one ckt of Akrimota - Nakhatrana line at Bhachunda","Double Circuit","State Sector","GETCO",53.0,220.0],
    [935,934,"2017-12-31","LILO on Babhaleshwar - Alephata at UTSL C-Gen Plant line","Double Circuit","State Sector","MSETCL",10.0,220.0],
    [936,935,"2017-12-31","LILO on existing Phaltan - Walchandnagar at CSSK Bhavaninagar line","Double Circuit","State Sector","MSETCL",2.0,220.0],
    [937,936,"2017-12-31","Motipur(BSPTCL) - Darbhanga(DMTCL)","Double Circuit","State Sector","BSPTCL",218.0,220.0],
    [938,937,"2017-12-31","Maheshwaram(PG) - Mehboob Nagar (MTL -TBCB)","Double Circuit","Private Sector","SGL",197.0,400.0],
    [939,938,"2018-01-31","Dulhasti - Kishenpur","Double Circuit","Central Sector","PGCIL",115.0,400.0],
    [940,939,"2018-01-31","LIIO of Both ckt. of Rourkela - Raigarh (2nd line) at Jharsaguda (Sundargarh)","Multiple Circuits","Central Sector","PGCIL",130.0,400.0],
    [941,940,"2018-01-31","Julurupadu (QM) - Suryapet S/s","Double Circuit","State Sector","TSTRANSCO",219.0,400.0],
    [942,941,"2018-01-31","LILO of Guddadahalli (Munirabad) - Guttur (Davangeere) at Dhoni","Double Circuit","State Sector","KPTCL",54.0,400.0],
    [943,942,"2018-01-31","LILO of one ckt. of KTPS - Khammam line at KTPS-VI","Double Circuit","State Sector","TSTRANSCO",1.0,400.0],
    [944,943,"2018-01-31","LILO of Vadinar - Hadala at Kalawad","Double Circuit","State Sector","GETCO",16.0,400.0],
    [945,944,"2018-01-31","Jaipur North (400 kV GSS) - Manoharpur (Turnkey) and extended to LILO of S/C VKIA-Kukus","Double Circuit","State Sector","RVPNL",80.0,220.0],
    [946,945,"2018-01-31","LILO of Gadag - Lingapur at Gadag (Doni)","Double Circuit","State Sector","KPTCL",11.0,220.0],
    [947,946,"2018-01-31","LILO of one ckt. 220KV Nakodar - Rehanajattan line at 220KV Hoshiarpur","Double Circuit","State Sector","PSTCL",52.0,220.0],
    [948,947,"2018-01-31","LILO of Somanahalli S/S-Yerandanahalli at Jigani 220kV s/s","Multiple Circuits with Double Circuit","State Sector","KPTCL",12.0,220.0],
    [949,948,"2018-01-31","Pratapgarh - Chittorgarh (Balance Portion)","Double Circuit","State Sector","RVPNL",61.0,220.0],
    [950,949,"2018-01-31","Sarnath - Azamgarh - II","Single Circuit","State Sector","UPPTCL",60.0,220.0],
    [951,950,"2018-02-28","Mukatsar - Malout","Double Circuit","State Sector","PSTCL",47.0,220.0],
    [952,951,"2018-02-28","Pothencode - Kattakkada","Double Circuit","State Sector","KSEB",57.0,220.0],
    [953,952,"2018-02-28","Vasanthanarasapura - Antharasanahally","Double Circuit","State Sector","KPTCL",38.0,220.0],
    [954,953,"2018-02-28","Vyankatpura - Waghodia (765kV PGCIL) line","Double Circuit","State Sector","GETCO",29.0,220.0],
    [955,954,"2018-02-28","LILO of Muradnagar -Muzzafarnagar at Ataur","Double Circuit","Private Sector","WUPPTCL",15.0,400.0],
    [956,955,"2018-02-28","LILO of one ckt. of Khandwa - Rajgarh at Khargone TPP (KTL - TBCB)","Double Circuit","Private Sector","SGL",14.0,400.0],
    [957,956,"2018-02-28","LILO of Orai - Mainpur at Bah","Double Circuit","Private Sector","SEUPPTCL",92.0,400.0],
    [958,957,"2018-02-28","Both ckts of IInd LILO D/C portion of Simhadri - Vijayawada 400kV line at Vimagiri-i (AP) shall be LILOed at Vimagiri-II (PG)","Double Circuit","Central Sector","PGCIL",28.0,400.0],
    [959,958,"2018-02-28","Both ckts of one LILO D/C portion of Simhadri - Vijayawada line at Vimagiri -I (AP) shall be LILOed at Vimagiri-II (PG) - (D/Cportion (1.8Km) and Multi Ckt. portion (13.2Km)","Double Circuit","Central Sector","PGCIL",61.0,400.0],
    [960,959,"2018-02-28","Extn. Kudankulam APP - Tirunveli (Q)","Double Circuit","Central Sector","PGCIL",132.0,400.0],
    [961,960,"2018-02-28","LILO of Bellary - Tumkur (Vasantnarsapur) line (Q) at Tumkur Pool.","Double Circuit","Central Sector","PGCIL",220.0,400.0],
    [962,961,"2018-02-28","LILO of Both Ckt Cuddapah - Hindupur line (Q) at NP Kunta S/S","Double Circuit","Central Sector","PGCIL",18.0,400.0],
    [963,962,"2018-02-28","LILO of Gooty - Tumkur (Vasantanarsapur) at Tumkur Pool (Ckt.-II)","Double Circuit","Central Sector","PGCIL",2.0,400.0],
    [964,963,"2018-02-28","LILO of Vindhyachal - Jabalpur line (Q) (II Ckt.) at Rewa PS","Double Circuit","Central Sector","PGCIL",116.0,400.0],
    [965,964,"2018-02-28","Nabinagar-II - Gaya (Q)","Double Circuit","Central Sector","PGCIL",184.0,400.0],
    [966,965,"2018-02-28","Orai - Orai line (Q)","Double Circuit","Central Sector","PGCIL",84.0,400.0],
    [967,966,"2018-02-28","Punatsangchu-I - Alipurduar","Double Circuit","Central Sector","PGCIL",128.0,400.0],
    [968,967,"2018-02-28","Sasaram - Deltonganj line","Double Circuit","Central Sector","PGCIL",392.0,400.0],
    [969,968,"2018-02-28","Kargil - Khalsti Line","Single Circuit","Central Sector","PGCIL",97.0,220.0],
    [970,969,"2018-02-28","Kishanganga - Amargarh line","Double Circuit","Central Sector","PGCIL",85.0,220.0],
    [971,970,"2018-02-28","Jaipur STPP - Nirmal SS","Double Circuit","State Sector","TSTRANSCO",289.0,400.0],
    [972,971,"2018-02-28","Julurupadu - KTPS (Stage-VII)","Double Circuit","State Sector","TSTRANSCO",78.0,400.0],
    [973,972,"2018-02-28","Aurangabad-II - Jalna MIDC (Negewadi)","Double Circuit","State Sector","MSETCL",77.0,220.0],
    [974,973,"2018-02-28","Kalwa - Borivali","Multiple Circuits","State Sector","MSETCL",63.0,220.0],
    [975,974,"2018-02-28","LILO of Bamnauli - Naraina at PPK-III","Double Circuit","State Sector","DTL",1.0,220.0],
    [976,975,"2018-02-28","LILO of GHTP - Talwandi Sabo at Maur","Double Circuit","State Sector","PSTCL",18.0,220.0],
    [977,976,"2018-02-28","LILO of Howrah - Foundry Park at N. Chanditala.","Multiple Circuits","State Sector","WBSETCL",36.0,220.0],
    [978,977,"2018-02-28","LILO of Indore - Indore - II (Jaitpura) line at Mangliya S/s","Double Circuit","State Sector","MPPTCL",1.0,220.0],
    [979,978,"2018-02-28","LILO of Jeerat - Kasba at Barasat","Multiple Circuits","State Sector","WBSETCL",10.0,220.0],
    [980,979,"2018-02-28","LILO of Katapalli - Bolangir at Bargarh (New)","Double Circuit","State Sector","OPTCL",1.0,220.0],
    [981,980,"2018-02-28","LILO of one Ckt. Malanpur - Mehgaon line at CWRTL (Adani) S/s","Double Circuit","State Sector","MPPTCL",26.0,220.0],
    [982,981,"2018-02-28","LILO of RTPS - Lingasugur at Mallat (Manvi)","Double Circuit","State Sector","KPTCL",6.0,220.0],
    [983,982,"2018-02-28","LILO Urla - Khedamara (Bhilai) at Borjhara","Multiple Circuits","State Sector","CSPTCL",1.0,220.0],
    [984,983,"2018-02-28","Mukatsar - Kotkapura Ckt.-I","Single Circuit on Double Circuit","State Sector","PSTCL",39.0,220.0],
    [985,984,"2018-03-31","LILO of Agra - Meerut at Aligarh","Single Circuit","Central Sector","PGCIL",22.0,765.0],
    [986,985,"2018-03-31","LILO of Kanpur - Jhatikara at Aligarh","Single Circuit","Central Sector","PGCIL",22.0,765.0],
    [987,986,"2018-03-31","LILO of one ckt. of Satna- Gwalior 765KV 2xS/C line at Orai","2xSingle Circuit","Central Sector","PGCIL",73.0,765.0],
    [988,987,"2018-03-31","Orai - Aligarh line","Double Circuit","Central Sector","PGCIL",664.0,765.0],
    [989,988,"2018-03-31","Dehradun - Abdullapur line (Q)","Double Circuit","Central Sector","PGCIL",179.0,400.0],
    [990,989,"2018-03-31","Kameng - Balipara line","Double Circuit","Central Sector","PGCIL",114.0,400.0],
    [991,990,"2018-03-31","LILO of Neelamangla - Hoddy 400 kV S/C LINE at Yelahanka","Double Circuit","Central Sector","PGCIL",20.0,400.0],
    [992,991,"2018-03-31","Tirunelveli PS - Tuitcorin PS (Quad) 1and2 line","Double Circuit","Central Sector","PGCIL",48.0,400.0],
    [993,992,"2018-03-31","Bikaner -Sikar (PG)","Double Circuit","State Sector","RVPNL",420.0,400.0],
    [994,993,"2018-03-31","LILO in Ist and 2nd Ckt. of MTPS - III - Thiruvalam at Dharmapuri","Double Circuit","State Sector","TANTRANSCO",2.0,400.0],
    [995,994,"2018-03-31","LILO of both ckt. 400kV RTPP - Chittoor TMDC line at 400kV Kalikiri S/S","Double Circuit","State Sector","APTRANSCO",81.0,400.0],
    [996,995,"2018-03-31","LILO of Chekkanurani - Kayather at Kinnimangalam","Double Circuit","State Sector","TANTRANSCO",12.0,400.0],
    [997,996,"2018-03-31","LILO of Meja - Rewa Road at Masuli (Allahabad)","Double Circuit","State Sector","UPPTCL",65.0,400.0],
    [998,997,"2018-03-31","LILO of Parbati - II HEP - Parbati-III Pooling station at Sainj","Double Circuit","State Sector","HPPTCL",1.0,400.0],
    [999,998,"2018-03-31","Phagi (Jaipur south-765 kV)-Ajmer (Ckt. - I)","Double Circuit","State Sector","RVPNL",106.0,400.0],
    [1000,999,"2018-03-31","Wanakbori S/y -Wanakbori S/y (existing)","Double Circuit","State Sector","GETCO",2.0,400.0],
    [1001,1000,"2018-03-31","Yermarus TPS - Bellary Pooling Station (BPS)","Double Circuit","State Sector","KPTCL",285.0,400.0],
    [1002,1001,"2018-03-31","Veeranam - Kodikurichi","Single Circuit","State Sector","TANTRANSCO",24.0,230.0],
    [1003,1002,"2018-03-31","Veeranam - Kodikurichi line at Kundah","Double Circuit","State Sector","TANTRANSCO",24.0,230.0],
    [1004,1003,"2018-03-31","Amargarh (Delina) - Zainkote (2nd Ckt.)","Single Circuit","State Sector","JKPDD",43.0,220.0],
    [1005,1004,"2018-03-31","Darbhanga(DMTCL) - Supaul/Laukahi(BSPTCL)","Double Circuit","State Sector","BSPTCL",176.0,220.0],
    [1006,1005,"2018-03-31","Gwalior (PG) - Gwalior (MP) - 2nd circuiting","Double Circuit","State Sector","MPPTCL",3.0,220.0],
    [1007,1006,"2018-03-31","Kairan-Chamera - II (PG)","Double Circuit","State Sector","HPPTCL",4.0,220.0],
    [1008,1007,"2018-03-31","Kumbhargaon (Nanded) - Krishnoor line ckt.-II","Double Circuit","State Sector","MSETCL",16.0,220.0],
    [1009,1008,"2018-03-31","LILO of 1st ckt. Saharanpur - Khodri line at Sarsawa","Double Circuit","State Sector","UPPTCL",14.0,220.0],
    [1010,1009,"2018-03-31","LILO of 1st ckt. Sarojni Nagar - Unnao at Kanpur Road","Double Circuit","State Sector","UPPTCL",9.0,220.0],
    [1011,1010,"2018-03-31","LILO of both ckt. Tebhda - Rajkot line at Kalavad S/s","Double Circuit","State Sector","GETCO",21.0,220.0],
    [1012,1011,"2018-03-31","LILO of Chinhat - Raebareli (PG) line at CG City Lko","Double Circuit","State Sector","UPPTCL",3.0,220.0],
    [1013,1012,"2018-03-31","LILO of Gorakhpur (PG) - Basti at Bansi","Double Circuit","State Sector","UPPTCL",95.0,220.0],
    [1014,1013,"2018-03-31","LILO of Gr. Noida (400) - Sec.129 at Noida Sector - 148","Double Circuit","State Sector","UPPTCL",1.0,220.0],
    [1015,1014,"2018-03-31","LILO of Jamnagar - Jetpur line-II at Sikka","Double Circuit","State Sector","GETCO",117.0,220.0],
    [1016,1015,"2018-03-31","LILO of one ckt Samaguri - Sarusajai line at Sonapur S/S","Double Circuit","State Sector","AEGCL",27.0,220.0],
    [1017,1016,"2018-03-31","LILO of one ckt. Vyankatpura - Achhalia line at Kawant","Double Circuit","State Sector","GETCO",167.0,220.0],
    [1018,1017,"2018-03-31","LILO of Zainkote - Dalina at Amargarh","2xDouble Circuit","State Sector","JKPDD",12.0,220.0],
    [1019,1018,"2018-03-31","LILO on 220 kV Deepnagar - Amalner at Viroda","Double Circuit","State Sector","MSETCL",20.0,220.0],
    [1020,1019,"2018-03-31","LILO on Vita - Pandharpur line for Varkule - Malwadi Solar (M/s. Giriraj Solar)","Double Circuit","State Sector","MSETCL",19.0,220.0],
    [1021,1020,"2018-03-31","Ludhiana - Doraha","Double Circuit","State Sector","PSTCL",28.0,220.0],
    [1022,1021,"2018-03-31","Magarwada (PG) - Magarwada","Double Circuit","State Sector","DANDD",2.0,220.0],
    [1023,1022,"2018-03-31","Magarwada - Ringanwada","Double Circuit","State Sector","DANDD",12.0,220.0],
    [1024,1023,"2018-03-31","Morena (Adani) - Morena (MP)","Double Circuit","State Sector","MPPTCL",49.0,220.0],
    [1025,1024,"2018-03-31","Nabha -Bhawanigarh","Single Circuit on Double Circuit","State Sector","PSTCL",40.0,220.0],
    [1026,1025,"2018-03-31","Nakodar - Rehana","Double Circuit","State Sector","PSTCL",71.0,220.0],
    [1027,1026,"2018-03-31","Neebkarori - Mainpuri line","Double Circuit","State Sector","UPPTCL",70.0,220.0],
    [1028,1027,"2018-03-31","Partur - Nagewadi line","Double Circuit","State Sector","MSETCL",126.0,220.0],
    [1029,1028,"2018-03-31","Sitapur - Nighasan line","Single Circuit","State Sector","UPPTCL",109.0,220.0],
    [1030,1029,"2018-03-31","LILO of Both ckt Uri - Wagoora at Amargarh (NRSS-XXIX TL - TBCB)","Multiple Circuits","Private Sector","SGL",14.0,400.0],
    [1031,1030,"2018-03-31","Vindhyachal STPS - IV and V - Vindhyachal pool (Quad.) (C-WRTL-TBCB)","Double Circuit","Private Sector","APL",57.0,400.0],
    [1032,1031,"2018-03-31","Tashiding - Legship","Double Circuit","Private Sector","SEPL",17.0,220.0],
    [1033,1032,"2018-04-30","Parli - Solapur (PPTL - TBCB)","Double Circuit","Central Sector","PGCIL",236.0,765.0],
    [1034,1033,"2018-04-30","Parli (New) - Parli (PG) (Q) (PPTL -TBCB)","Double Circuit","Central Sector","PGCIL",36.0,400.0],
    [1035,1034,"2018-04-30","Kalpaka - Maradam line","Double Circuit","State Sector","APTRANSCO",230.0,400.0],
    [1036,1035,"2018-04-30","LILO of 2nd Ckt. VTS- Malkaram to Suryapet","Double Circuit","State Sector","TSTRANSCO",4.0,400.0],
    [1037,1036,"2018-04-30","Ataur - Mandola Vihar line","Double Circuit","State Sector","UPPTCL",33.0,220.0],
    [1038,1037,"2018-04-30","LILO of 2nd Ckt. Birsinghpur - Amarkantak line at Shahdol S/s","Double Circuit","State Sector","MPPTCL",11.0,220.0],
    [1039,1038,"2018-04-30","LILO of 2nd Ckt. of Itarsi (MP) - Hoshangabad (PG) at Itarsi (PG) line","Double Circuit","State Sector","MPPTCL",1.0,220.0],
    [1040,1039,"2018-04-30","Sarangapur (Allahabad)PG - Phulpur line","Single Circuit","State Sector","UPPTCL",68.0,220.0],
    [1041,1040,"2018-04-30","Sohawal PG - Barabanki line","Double Circuit","State Sector","UPPTCL",138.0,220.0],
    [1042,1041,"2018-04-30","Sasan UMPP - Vindhyachal PS (Q) (C-WRTL- TBCB)","Single Circuit","Private Sector","APL",6.0,765.0],
    [1043,1042,"2018-05-31","LILO of Wardha - Parli at Warora PS (PWTL-TBCB)","Double Circuit","Central Sector","PGCIL",196.0,400.0],
    [1044,1043,"2018-05-31","Banda - Orai","Double Circuit","State Sector","UPPTCL",217.0,400.0],
    [1045,1044,"2018-05-31","LILO of one ckt. of Kishanpur - New wanpoh at Baglihar HEP","Double Circuit","State Sector","JKPDD",8.0,400.0],
    [1046,1045,"2018-05-31","Phagi (Jaipur South) - Ajmer Ckt-II","Double Circuit","State Sector","RVPNL",106.0,400.0],
    [1047,1046,"2018-05-31","Arasur - Gobi","Single Circuit","State Sector","TANTRANSCO",48.0,230.0],
    [1048,1047,"2018-05-31","Karaikudy - Sembatty","Single Circuit","State Sector","TANTRANSCO",136.0,230.0],
    [1049,1048,"2018-05-31","Koyambedu 230kV AIS - Guindy 230 kV GIS","Single Circuit","State Sector","TANTRANSCO",8.0,230.0],
    [1050,1049,"2018-05-31","Balapur - Malegaon line (Ckt-II)","Double Circuit","State Sector","MSETCL",36.0,220.0],
    [1051,1050,"2018-05-31","Fatehpur PG - Sarh","Double Circuit","State Sector","UPPTCL",150.0,220.0],
    [1052,1051,"2018-05-31","LILO of Amawan PG - Sarojni Nagar at Bachrawan","Double Circuit","State Sector","UPPTCL",49.0,220.0],
    [1053,1052,"2018-05-31","LILO of Bhauti - Orai at Sikandara","Double Circuit","State Sector","UPPTCL",62.0,220.0],
    [1054,1053,"2018-05-31","Nanded (Kumbhargaon) - Jalkot line","Double Circuit","State Sector","MSETCL",107.0,220.0],
    [1055,1054,"2018-05-31","Nanded (Kumbhargaon) - Nanded (Waghala) Ckt.-II","Double Circuit","State Sector","MSETCL",5.0,220.0],
    [1056,1055,"2018-05-31","Raipur - Doma","Double Circuit","State Sector","CSPTCL",118.0,220.0],
    [1057,1056,"2018-05-31","Yelanhanka CCPP - Yelanhanka(KPTCL)","Double Circuit","State Sector","KPTCL",1.0,220.0],
    [1058,1057,"2018-05-31","Gwalior-Morena (Quad) (C-WRTL-TBCB)","Double Circuit","Private Sector","APL",96.0,400.0],
    [1059,1058,"2018-06-30","Gadarwara - Warora PS (PWTL-TBCB)","Double Circuit","Central Sector","PGCIL",627.0,765.0],
    [1060,1059,"2018-06-30","Warora PS - Parli (PPTL-TBCB)","Double Circuit","Central Sector","PGCIL",694.0,765.0],
    [1061,1060,"2018-06-30","LILO of Exiting Neyveli TS-II - Pondycherry at NNTPS Gen. Yard","Double Circuit","Central Sector","PGCIL",7.0,400.0],
    [1062,1061,"2018-06-30","LILO of 400kV Gajwel - Yeddumallaram (Shankarpally) Ckt.-II at Narsapur S/S","Double Circuit","State Sector","TSTRANSCO",5.0,400.0],
    [1063,1062,"2018-06-30","LILO of one ckt. Kosamba - Choraina at Sanand-II GIDC","Double Circuit","State Sector","GETCO",89.0,400.0],
    [1064,1063,"2018-06-30","Barauni TPS Exte. - Hazipur","Double Circuit","State Sector","BSPTCL",214.0,220.0],
    [1065,1064,"2018-06-30","Budidampadu (PG) - Budidampadu","Single Circuit","State Sector","TSTRANSCO",1.0,220.0],
    [1066,1065,"2018-06-30","Darbhanga (Essel) - Darbhanga (BSPTCL)","Double Circuit","State Sector","BSPTCL",5.0,220.0],
    [1067,1066,"2018-06-30","Khaperkheda-II -Khaperkheda-I (Reorientation work of one ckt.)","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [1068,1067,"2018-06-30","Legship - New Malli","Double Circuit","State Sector","SIKKIM",20.0,220.0],
    [1069,1068,"2018-06-30","LILO of Both ckt Badod -Kota - Modak at Suwasara S/s","Double Circuit","State Sector","MPPTCL",18.0,220.0],
    [1070,1069,"2018-06-30","LILO of Kasor - Vartej and Karamsad - Vartej at Pachchaam","Multiple Circuits","State Sector","GETCO",40.0,220.0],
    [1071,1070,"2018-06-30","LILO of Khara (HPS) - Shamli at Saharanpur (PG)","Double Circuit","State Sector","UPPTCL",8.0,220.0],
    [1072,1071,"2018-06-30","LILO of Sahibabad - Noida Sec-62 at Indirapuram","Double Circuit","State Sector","UPPTCL",7.0,220.0],
    [1073,1072,"2018-06-30","LILO of Simbhaoli - Shatabdinagar at Hapur (765)","Double Circuit","State Sector","UPPTCL",23.0,220.0],
    [1074,1073,"2018-06-30","Madhepura - Laukahi(BSPTCL)","Double Circuit","State Sector","BSPTCL",124.0,220.0],
    [1075,1074,"2018-06-30","Saharanpur (PG) -Sarsawa","Double Circuit","State Sector","UPPTCL",22.0,220.0],
    [1076,1075,"2018-07-31","LILO of Farakka - Jeerat line at Sagahdighi","Double Circuit","Central Sector","PGCIL",38.0,400.0],
    [1077,1076,"2018-07-31","Anta-Chhabra TPS","Single Circuit","State Sector","RVPNL",100.0,400.0],
    [1078,1077,"2018-07-31","Chittorgarh-Bhilwara","Double Circuit","State Sector","RVPNL",100.0,400.0],
    [1079,1078,"2018-07-31","Gani/ Panyam - Kurnool (GEC-II)","Double Circuit","State Sector","APTRANSCO",33.0,400.0],
    [1080,1079,"2018-07-31","LILO of Jaipur - Nirmal at Sundilla LI (Ckt.-I)","Double Circuit","State Sector","TSTRANSCO",28.0,400.0],
    [1081,1080,"2018-07-31","Guindy - Porur GIS (Cable)","Single Circuit","State Sector","TANTRANSCO",8.0,220.0],
    [1082,1081,"2018-07-31","Hapur (765) - Simbhaoli","Double Circuit","State Sector","UPPTCL",57.0,220.0],
    [1083,1082,"2018-07-31","Kayathar - Tuticorin","Double Circuit","State Sector","TANTRANSCO",113.0,220.0],
    [1084,1083,"2018-07-31","LILO of Amreli - Dhasa line at Botad","Double Circuit","State Sector","GETCO",100.0,220.0],
    [1085,1084,"2018-07-31","LILO of Bhugaon - Warora-I at Warora","Multiple Circuits","State Sector","MSETCL",40.0,220.0],
    [1086,1085,"2018-07-31","LILO of Harduaganj - Jahangirabad Ckt.-I at Rukhi","Double Circuit","State Sector","UPPTCL",69.0,220.0],
    [1087,1086,"2018-07-31","LILO of Loni - Muradnagar line at Ator","Double Circuit","State Sector","UPPTCL",12.0,220.0],
    [1088,1087,"2018-07-31","LILO of Narendra-Haveri at Bidnal (GEC-I)","Double Circuit","State Sector","KPTCL",31.0,220.0],
    [1089,1088,"2018-07-31","LILO of Shoolagiri - Karimanagalam at Uddanapalli","Double Circuit","State Sector","TANTRANSCO",1.0,220.0],
    [1090,1089,"2018-07-31","Mungeli - Kawardha","Double Circuit","State Sector","CSPTCL",77.0,220.0],
    [1091,1090,"2018-07-31","Veeranam-Tirunelveli (PG)(GEC-I)","Single Circuit on Double Circuit","State Sector","TANTRANSCO",31.0,220.0],
    [1092,1091,"2018-07-31","Champa (Pool) - Dharamiaygarh (Quad) (C-WRTL - TBCB)","Single Circuit","Private Sector","APL",51.0,765.0],
    [1093,1092,"2018-07-31","Suratgarh TPS- Bikaner","Double Circuit","Private Sector","APL",279.0,400.0],
    [1094,1093,"2018-08-31","Farakka - Baharampur (Twin HTLS)","Double Circuit","Central Sector","PGCIL",164.0,400.0],
    [1095,1094,"2018-08-31","LILO-In of Cuddapah - Hindupur at N.P. Kunta","Double Circuit","Central Sector","PGCIL",18.0,400.0],
    [1096,1095,"2018-08-31","Srikakulam - Garividi (QM) (PSITL - TBCB)","Double Circuit","Central Sector","PGCIL",288.0,400.0],
    [1097,1096,"2018-08-31","Akal -Jodhpur (New)","Double Circuit","State Sector","RVPNL",447.0,400.0],
    [1098,1097,"2018-08-31","Anta -Kota (PG) (Extension)","Double Circuit","State Sector","RVPNL",45.0,400.0],
    [1099,1098,"2018-08-31","LILO of Chabra TPS -Dahra at Anta (Ckt. -II)","Double Circuit","State Sector","RVPNL",1.0,400.0],
    [1100,1099,"2018-08-31","LILO of Jaipur - Nirmal at Sundilla LI (Ckt.-II)","Double Circuit","State Sector","TANTRANSCO",28.0,400.0],
    [1101,1100,"2018-08-31","Alipurduar - Alipurduar (PG)","Double Circuit","State Sector","WBSETCL",13.0,220.0],
    [1102,1101,"2018-08-31","Begusarai-Purnea line","Double Circuit","State Sector","BSPTCL",372.0,220.0],
    [1103,1102,"2018-08-31","Deepalpur - Rai Khewra at RGEC Kundli S/s","Multiple Circuits","State Sector","HVPNL",22.0,220.0],
    [1104,1103,"2018-08-31","Gavasad - Bhayali (DFCC) line","Double Circuit","State Sector","GETCO",47.0,220.0],
    [1105,1104,"2018-08-31","Gorakhpur - Hata","Double Circuit","State Sector","UPPTCL",53.0,220.0],
    [1106,1105,"2018-08-31","Hatkoti - Gumma","Double Circuit","State Sector","HPPTCL",52.0,220.0],
    [1107,1106,"2018-08-31","Jodhpur (New) - Barli (TK)","Double Circuit","State Sector","RVPNL",90.0,220.0],
    [1108,1107,"2018-08-31","Kishanganj (New) - Madhepura","Double Circuit","State Sector","BSPTCL",284.0,220.0],
    [1109,1108,"2018-08-31","Korba - Vishrampur (2nd Ckt.)","Double Circuit","State Sector","CSPTCL",155.0,220.0],
    [1110,1109,"2018-08-31","LILO of 2nd ckt. YTPP - Abdullahpur line at Rampur Kamboyan","Double Circuit","State Sector","HVPNL",100.0,220.0],
    [1111,1110,"2018-08-31","LILO of Bhanjanagar - Meramundali at Narasinghpur","Double Circuit","State Sector","OPTCL",10.0,220.0],
    [1112,1111,"2018-08-31","LILO of Rishikesh-Dehradun at Harrawala","Double Circuit","State Sector","PTCUL",1.0,220.0],
    [1113,1112,"2018-08-31","Mohangadda - Sarsawa","Double Circuit","State Sector","UPPTCL",22.0,220.0],
    [1114,1113,"2018-08-31","Radhanpur - Sankhari line","Double Circuit","State Sector","GETCO",96.0,220.0],
    [1115,1114,"2018-08-31","Stringing of 2nd Circuit of LILO of Korba - Vishrampur at Churri","Double Circuit","State Sector","CSPTCL",17.0,220.0],
    [1116,1115,"2018-08-31","Raigarh (Kotra) - Champa (Pool) (Quad) (C-WRTL-TBCB)","Single Circuit","Private Sector","APL",97.0,765.0],
    [1117,1116,"2018-08-31","Sipat STPS - Bilaspur (Quad) (STL-TBCB)","Single Circuit","Private Sector","APL",24.0,765.0],
    [1118,1117,"2018-08-31","Samba - Amargarh line (NRSS-XXIX TL - TBCB)","Double Circuit","Private Sector","SGL",547.0,400.0],
    [1119,1118,"2018-09-30","Tumkur (Pavagada) Pool - Hiriyur","Double Circuit","Central Sector","PGCIL",218.0,400.0],
    [1120,1119,"2018-09-30","(JandK) Drass - Kargil (Part of Alusteng-Drass-Kargil-Khalsti-Leh)","Single Circuit","Central Sector","PGCONSULTANCY",60.0,220.0],
    [1121,1120,"2018-09-30","IB - Lapanga","Double Circuit","State Sector","OPTCL",42.0,400.0],
    [1122,1121,"2018-09-30","Manali - Korattur","Double Circuit","State Sector","TANTRANSCO",6.0,400.0],
    [1123,1122,"2018-09-30","STPP (Jaipur) - Sundilla LI S/S","Double Circuit","State Sector","TSTRANSCO",28.0,400.0],
    [1124,1123,"2018-09-30","Construction of 220/220kV MC line for shifting of existing 220kV B1 B2 and B3 B4 lines at proposed HAL premises near Bidarehalldakaval village limits","Multiple Circuits","State Sector","KPTCL",12.0,220.0],
    [1125,1124,"2018-09-30","Domjur - N. Chanditala","Double Circuit","State Sector","WBSETCL",17.0,220.0],
    [1126,1125,"2018-09-30","Goindwal Sahib - Bottianwala","Double Circuit","State Sector","PSTCL",129.0,220.0],
    [1127,1126,"2018-09-30","Jayanagar (OPTCL) - Jayanagar (PGCIL)","Double Circuit","State Sector","OPTCL",17.0,220.0],
    [1128,1127,"2018-09-30","Karukadom - Kothamangalam","Multiple Circuits","State Sector","KSEB",14.0,220.0],
    [1129,1128,"2018-09-30","Keunjhar - Keunjhar PG","Double Circuit","State Sector","OPTCL",15.0,220.0],
    [1130,1129,"2018-09-30","LILO of Existing 220 kV Ajmer - KSG at at 400 kV GSS Ajmer","Double Circuit","State Sector","RVPNL",11.0,220.0],
    [1131,1130,"2018-09-30","LILO of one ckt. of STPS - Ratangarh at Halasar","Double Circuit","State Sector","RVPNL",7.0,220.0],
    [1132,1131,"2018-09-30","LILO of Shivalakha - Nanikhakhar at Kukma","Double Circuit","State Sector","GETCO",33.0,220.0],
    [1133,1132,"2018-09-30","LILO of SIDCUL Puhana at Pirankaliya (Imlikhera)","Double Circuit","State Sector","PTCUL",11.0,220.0],
    [1134,1133,"2018-09-30","Moga - Mehal Kalan","Double Circuit","State Sector","PSTCL",105.0,220.0],
    [1135,1134,"2018-09-30","Morena - Sabalgarh with LILO of one ckt. of line at Morena","Double Circuit","State Sector","MPPTCL",139.0,220.0],
    [1136,1135,"2018-09-30","Rajpura - Devigarh","Double Circuit","State Sector","PSTCL",74.0,220.0],
    [1137,1136,"2018-09-30","Sikandarabad - Rookhi (Siyana)","Double Circuit","State Sector","UPPTCL",116.0,220.0],
    [1138,1137,"2018-09-30","Singanayakanahalli - DG Plant Yelanhanka Station (UG Cable)","Double Circuit","State Sector","KPTCL",12.0,220.0],
    [1139,1138,"2018-09-30","Teesta LDP -III - Teesta LDP-IV","Single Circuit","State Sector","WBSETCL",21.0,220.0],
    [1140,1139,"2018-09-30","Mahan -Sipat","Double Circuit","Private Sector","EPTCL",673.0,400.0],
    [1141,1140,"2018-10-31","Jharsuguda - Dharamjaygarh line","Double Circuit","Central Sector","PGCIL",296.0,765.0],
    [1142,1141,"2018-10-31","LILO of Kurnool - Thirvualam line at Cuddapah","Double Circuit","Central Sector","PGCIL",190.0,765.0],
    [1143,1142,"2018-10-31","Salem PS - Madhugiri PS line","Single Circuit","Central Sector","PGCIL",243.0,765.0],
    [1144,1143,"2018-10-31","Cuddapah - Hindupur line (Q)","Double Circuit","Central Sector","PGCIL",338.0,400.0],
    [1145,1144,"2018-10-31","LILO of Both Ckt of Bamnauli - Samaypur at Tughlakabad","Multiple Circuits","Central Sector","PGCIL",114.0,400.0],
    [1146,1145,"2018-10-31","LILO-Out of Cuddapah - Hindupur line (Q) (Both Ckts.) at NP Kunta s/s","Double Circuit","Central Sector","PGCIL",19.0,400.0],
    [1147,1146,"2018-10-31","LILO of Sterlite - Meramundali at Lapanga 4oo kV s/s","Double Circuit","State Sector","OPTCL",14.0,400.0],
    [1148,1147,"2018-10-31","Sterlite - Lapanga line","Double Circuit","State Sector","OPTCL",37.0,400.0],
    [1149,1148,"2018-10-31","TMDC Podili - Sattapenalli line","Double Circuit","State Sector","APTRANSCO",215.0,400.0],
    [1150,1149,"2018-10-31","Neyveli 230/110 kV s/s - Eachangadu 230kV Feeder","Single Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [1151,1150,"2018-10-31","NNTPS - Neyveli 230/110kV s/s","Double Circuit","State Sector","TANTRANSCO",2.0,230.0],
    [1152,1151,"2018-10-31","Ajmer (400 kV) - Bherunda (TK)","Double Circuit","State Sector","RVPNL",100.0,220.0],
    [1153,1152,"2018-10-31","Aligarh - Atrauli line","Double Circuit","State Sector","UPPTCL",77.0,220.0],
    [1154,1153,"2018-10-31","Khandwa - Chhanera line","Double Circuit","State Sector","MPPTCL",78.0,220.0],
    [1155,1154,"2018-10-31","LILO of one Ckt. of Hadala - Sartanpar line at Wankaner on M/C towers","Double Circuit","State Sector","GETCO",6.0,220.0],
    [1156,1155,"2018-10-31","LILO of one Ckt. of Vita - Miraj at Alkud s/s","Double Circuit","State Sector","MSETCL",27.0,220.0],
    [1157,1156,"2018-10-31","Mendhigiri - Alkud s/s","Double Circuit","State Sector","MSETCL",110.0,220.0],
    [1158,1157,"2018-11-30","Angul - Jharsauguda","Double Circuit","Central Sector","PGCIL",590.0,765.0],
    [1159,1158,"2018-11-30","Silchar - Melriat (New)","Double Circuit","Central Sector","PGCIL",287.0,400.0],
    [1160,1159,"2018-11-30","LILO of Jodhpur -Merta at Pooling station Badla","Double Circuit","State Sector","RVPNL",405.0,400.0],
    [1161,1160,"2018-11-30","LILO of Uravakonda-Jammalamadugu to the proposed at Talaricheruvu","Double Circuit","State Sector","APTRANSCO",2.0,400.0],
    [1162,1161,"2018-11-30","Dhod-Danta Ramgarh","Single Circuit","State Sector","RVPNL",31.0,220.0],
    [1163,1162,"2018-11-30","Madhugiri - Pavagada","Double Circuit","State Sector","KPTCL",120.0,220.0],
    [1164,1163,"2018-12-31","Vindhyachal PS - Jabalpur PS (PJTL -TBCB)","Double Circuit","Central Sector","PGCIL",749.0,765.0],
    [1165,1164,"2018-12-31","Julwaniya - Sendhwa (GEC-I)","Double Circuit","State Sector","MPPTCL",71.0,220.0],
    [1166,1165,"2018-12-31","Kheralu - Dharewada (DFCC) line","Double Circuit","State Sector","GETCO",53.0,220.0],
    [1167,1166,"2018-12-31","LILO of 220 kV Maath (400) - Meetau (Hathras ) line at Maath (220)","Double Circuit","State Sector","UPPTCL",3.0,220.0],
    [1168,1167,"2018-12-31","LILO of both Ckt. of Indore-II (Jaitpura)- Ujjain line at Indore (PGCIL)765kV S/S","Double Circuit","State Sector","MPPTCL",24.0,220.0],
    [1169,1168,"2018-12-31","LILO of Gokarna-Sagardighi line at Sagardighi 220kV GIS (ACSR Zebra)","Double Circuit","State Sector","WBSETCL",11.0,220.0],
    [1170,1169,"2018-12-31","LILO of one circuit of 220 kV D/C Kadana - Godhara line at 220 kV Zalod S/S","Double Circuit","State Sector","GETCO",124.0,220.0],
    [1171,1170,"2018-12-31","LILO of one ckt. Daultabad-IMT Manesar line at Gurgaon Sec.- 85","Double Circuit","State Sector","HVPNL",2.0,220.0],
    [1172,1171,"2018-12-31","Jharsuguda (Sundargarh) - Raipur (OGP-IITL - TBCB)","Double Circuit","Private Sector","SGL",610.0,765.0],
    [1173,1172,"2018-12-31","Neemrana (PG) - Dhanonda (HVPNL) (GPTL - TBCB)","Double Circuit","Private Sector","SGL",93.0,400.0],
    [1174,1173,"2019-01-31","Salem - Madhugiri (PNMTL-TBCB)","Single Circuit","Central Sector","PGCIL",219.0,765.0],
    [1175,1174,"2019-01-31","Biharshariff (Ckt. III and IV) - Kahalgaon (NTPC)","Double Circuit","Central Sector","PGCIL",26.0,400.0],
    [1176,1175,"2019-01-31","(JnK) Alusteng-Drass ( (Part of Alusteng - Drass -Kargil - Khalsti-Leh)","Single Circuit","Central Sector","PGCONSULTANCY",115.0,220.0],
    [1177,1176,"2019-01-31","Hindupur - Uravakonda Quad Moose line","Double Circuit","State Sector","APTRANSCO",258.0,400.0],
    [1178,1177,"2019-01-31","Jaisalmer -2 -Barmer line","Double Circuit","State Sector","RVPNL",234.0,400.0],
    [1179,1178,"2019-01-31","Teesta -III - Kishanganj line (Executing Agency -TVPTL)","Double Circuit","State Sector","SIKKIM",427.0,400.0],
    [1180,1179,"2019-01-31","LILO of Myvady - Pugalur at Kurukathi","Double Circuit","State Sector","TANTRANSCO",62.0,230.0],
    [1181,1180,"2019-01-31","LILO of one ckt. Indravati - Theruvali at Kashipur","Double Circuit","State Sector","OPTCL",6.0,220.0],
    [1182,1181,"2019-02-28","Tanda (NTPC) - Tanda (New) line","Double Circuit","State Sector","UPPTCL",42.0,220.0],
    [1183,1182,"2019-02-28","LILO of 220 kV S/C KTPS - Modak line","Double Circuit","Private Sector","APL",5.0,220.0],
    [1184,1183,"2019-02-28","LILO of Kota - Badod lineat Ranpur GSS","Double Circuit","Private Sector","APL",5.0,220.0],
    [1185,1184,"2019-02-28","Banaskanta - Chittorgarh line","Double Circuit","Central Sector","PGCIL",604.0,765.0],
    [1186,1185,"2019-02-28","Bhuj Pool - Banaskanta line","Double Circuit","Central Sector","PGCIL",578.0,765.0],
    [1187,1186,"2019-02-28","Banaskanta - Sankhari line","Double Circuit","Central Sector","PGCIL",43.0,400.0],
    [1188,1187,"2019-02-28","Cuddapah - Madhugiri (QM) (PSITL - TBCB)","Double Circuit","Central Sector","PGCIL",486.0,400.0],
    [1189,1188,"2019-02-28","LILO of Farakka - Jeerat line at Baharampur","Single Circuit","Central Sector","PGCIL",3.0,400.0],
    [1190,1189,"2019-02-28","LILO of Subhashgram - Jeerat at Rajarhat","Single Circuit","Central Sector","PGCIL",8.0,400.0],
    [1191,1190,"2019-02-28","LILO of Agra - Bharatpur at Agra line","Single Circuit","Central Sector","PGCIL",111.0,220.0],
    [1192,1191,"2019-02-28","NLC - Karaikal line","Double Circuit","Central Sector","PGCIL",190.0,220.0],
    [1193,1192,"2019-02-28","LILO of both Ckt. of Suryapet - Shankarpally(ckt-II) Kethireddypalli (Manikonda) SS","Double Circuit","State Sector","TSTRANSCO",42.0,400.0],
    [1194,1193,"2019-02-28","LILO of both Ckts of Nagda - Rajgarh at Badnawar","Double Circuit","State Sector","MPPTCL",16.0,400.0],
    [1195,1194,"2019-02-28","LILO of one ckt of 400 kV D/C Kosamba - Chorania line at 400 kV Pachchham S/s","Double Circuit","State Sector","GETCO",46.0,400.0],
    [1196,1195,"2019-02-28","LILO of one ckt. Ukai - Kosamba at Vav S/s","Double Circuit","State Sector","GETCO",62.0,400.0],
    [1197,1196,"2019-02-28","LILO of Rewa (Allahabad) - Meja lie at Masauli","Double Circuit","State Sector","UPPTCL",65.0,400.0],
    [1198,1197,"2019-02-28","Pithampur - Badnawar DCDS (Quad Moose ) line","Double Circuit","State Sector","MPPTCL",71.0,400.0],
    [1199,1198,"2019-02-28","Shri Singaji TPS - Pithampur DCDS (QM) line","Double Circuit","State Sector","MPPTCL",281.0,400.0],
    [1200,1199,"2019-02-28","Kamudhi - Kavanoor Ckt-II","Double Circuit","State Sector","TANTRANSCO",56.0,230.0],
    [1201,1200,"2019-02-28","Bahraich - Gonda (400) Ckt-II","Double Circuit","State Sector","UPPTCL",74.0,220.0],
    [1202,1201,"2019-02-28","Chandrapur-II - Chandrapur MIDC (Tadali)","Multiple Circuits","State Sector","MSETCL",80.0,220.0],
    [1203,1202,"2019-02-28","Gaurichak - Bihta (New) line","Double Circuit","State Sector","BSPTCL",82.0,220.0],
    [1204,1203,"2019-02-28","Inter-connector between Sailana - Ratlam switching (GEC-I)","Double Circuit","State Sector","MPPTCL",67.0,220.0],
    [1205,1204,"2019-02-28","LILO of Badarpur TPS - Mehrauli at Tughlakabad","Double Circuit","State Sector","DTL",3.0,220.0],
    [1206,1205,"2019-02-28","LILO of both ckts. Sec.-72 - Roj-ka-Meo line on M/C and D/C towers at Gurugram Sec.-69 S/S","Double Circuit","State Sector","HVPNL",3.0,220.0],
    [1207,1206,"2019-02-28","LILO of one Ckt. Jabalpur - Amarkantak at Gorabazar JBP","Double Circuit","State Sector","MPPTCL",12.0,220.0],
    [1208,1207,"2019-02-28","LILO of Parli - Osmanabad line at Parli (PG)","Double Circuit","State Sector","MSETCL",5.0,220.0],
    [1209,1208,"2019-02-28","Okhla - Tughlakabad","Double Circuit","State Sector","DTL",3.0,220.0],
    [1210,1209,"2019-02-28","Rewa Road Allahabad - Pahari Chitrakoot line","Double Circuit","State Sector","UPPTCL",182.0,220.0],
    [1211,1210,"2019-02-28","Sirohi-Pindwara line","Single Circuit","State Sector","RVPNL",23.0,220.0],
    [1212,1211,"2019-03-31","Dharmapuri (Salem New) - Somanahalli","Double Circuit","Central Sector","PGCIL",243.0,400.0],
    [1213,1212,"2019-03-31","Kota - Jaipur (South)","Double Circuit","Central Sector","PGCIL",360.0,400.0],
    [1214,1213,"2019-03-31","Mundra UMPP - Bhuj Pool line","Double Circuit","Central Sector","PGCIL",196.0,400.0],
    [1215,1214,"2019-03-31","Gr. Noida (765) - Noida Sec-148 line","Double Circuit","State Sector","UPPTCL",94.0,400.0],
    [1216,1215,"2019-03-31","LILO of Azamgarh - Sultanpur at Tanda TPS Extn.","Double Circuit","State Sector","UPPTCL",133.0,400.0],
    [1217,1216,"2019-03-31","LILO of Bhilai - Seoni at Balaghat / Kirnapur","Double Circuit","State Sector","MPPTCL",7.0,400.0],
    [1218,1217,"2019-03-31","LILO of both Ckts. of Mundra-Zerda at Charanka S/S (ACSR Twin Moose Conductor )","Double Circuit","State Sector","GETCO",26.0,400.0],
    [1219,1218,"2019-03-31","Badnawar - Kanwan line (GEC-I)","Double Circuit","State Sector","MPPTCL",62.0,220.0],
    [1220,1219,"2019-03-31","Gowribidnur - Mittemari Line","Double Circuit","State Sector","KPTCL",93.0,220.0],
    [1221,1220,"2019-03-31","Hata - Deoria line","Double Circuit","State Sector","UPPTCL",79.0,220.0],
    [1222,1221,"2019-03-31","LILO of 2nd ckt. Nagda - Neemuch line at Daloda s/s","Double Circuit","State Sector","MPPTCL",20.0,220.0],
    [1223,1222,"2019-03-31","LILO of Both ckt of Tebhda - Nyara line at Moti Gop S/S (M/C line AL-59)","Double Circuit","State Sector","GETCO",57.0,220.0],
    [1224,1223,"2019-03-31","LILO of Dautabad -Mau line at Hub Gurgaon S/s","Double Circuit","State Sector","HVPNL",13.0,220.0],
    [1225,1224,"2019-03-31","LILO of one ckt. Gandhinagar TPS - Chhatral line at Vadavi (AL-59)","Double Circuit","State Sector","GETCO",25.0,220.0],
    [1226,1225,"2019-03-31","LILO of one Ckt. Muradnagar - Sahibabad line at Pratap Vihar","Double Circuit","State Sector","UPPTCL",7.0,220.0],
    [1227,1226,"2019-03-31","LILO of Pehowa - Kaul at Bhadson","Double Circuit","State Sector","HVPNL",74.0,220.0],
    [1228,1227,"2019-03-31","LILO of Single ckt. of Mobha - Mangrol at Amod","Double Circuit","State Sector","GETCO",16.0,220.0],
    [1229,1228,"2019-03-31","LILO on Ambazari - Amravati at Karanja s/s","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [1230,1229,"2019-03-31","LILO on Khadka-Amalner at Kekatnimbhora","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [1231,1230,"2019-03-31","Mokha-Chromeni line","Single Circuit","State Sector","GETCO",6.0,220.0],
    [1232,1231,"2019-03-31","Nerul-Seawood TSS (U/G Cable Ckt -I)","Single Circuit","State Sector","MSETCL",1.0,220.0],
    [1233,1232,"2019-03-31","Bilaspur - Rajnandgaon (hexa) (STL-TBCB)","Double Circuit","Private Sector","APL",324.0,765.0],
    [1234,1233,"2019-03-31","Raipur Pool - Rajnandgaon (hexa) (RRWTL-TBCB)","Double Circuit","Private Sector","APL",80.0,765.0],
    [1235,1234,"2019-03-31","Rajnandgaon - New Pooling Station Warora (RRWTL - TBCB)","Double Circuit","Private Sector","APL",532.0,765.0],
    [1236,1235,"2019-03-31","Kishanganj(PG) - Darbhanga (DMTCL) (ATL - TBCB)","Double Circuit","Private Sector","KPTL",418.0,400.0],
    [1237,1236,"2019-04-30","Bhadla (PG) - Bhadla (RVPN) line","Double Circuit","Central Sector","PGCIL",53.0,400.0],
    [1238,1237,"2019-04-30","LILO of one ckt. Jhanor - Navsari at Vav S/s","Double Circuit","State Sector","GETCO",20.0,400.0],
    [1239,1238,"2019-04-30","Banda-Chitrakoot Line","Double Circuit","State Sector","UPPTCL",226.0,220.0],
    [1240,1239,"2019-04-30","Gorakhpur (PG)-Gola line","Double Circuit","State Sector","UPPTCL",82.0,220.0],
    [1241,1240,"2019-04-30","Hapur(765) - Faridnagar line","Single Circuit","State Sector","UPPTCL",11.0,220.0],
    [1242,1241,"2019-04-30","Kalikiri - Madanapalli line","Double Circuit","State Sector","APTRANSCO",60.0,220.0],
    [1243,1242,"2019-04-30","LILO of Gr .Noida -Noida Sec-129 at Noida Sec-148","Double Circuit","State Sector","UPPTCL",1.0,220.0],
    [1244,1243,"2019-04-30","LILO of one Ckt. of Badshahpur Pali at Sec.-65 Gurgaon","Double Circuit","State Sector","HVPNL",3.0,220.0],
    [1245,1244,"2019-04-30","Sultanpur-Sangipur LILO Section at Amethi","Double Circuit","State Sector","UPPTCL",18.0,220.0],
    [1246,1245,"2019-05-31","Barmer-Bhinmal line","Double Circuit","State Sector","RVPNL",288.0,400.0],
    [1247,1246,"2019-05-31","Jangaon - Tippapur LI","Double Circuit","State Sector","TSTRANSCO",138.0,400.0],
    [1248,1247,"2019-05-31","Kayathar - Thennampatty","Double Circuit","State Sector","TANTRANSCO",48.0,400.0],
    [1249,1248,"2019-05-31","Bareilly (400) - Pilibhit Ckt.-II","Single Circuit","State Sector","UPPTCL",39.0,220.0],
    [1250,1249,"2019-05-31","Bhanjanagar - Aska","Double Circuit","State Sector","OPTCL",57.0,220.0],
    [1251,1250,"2019-05-31","LILO of both Ckt. of 220kV Mobha - Mangrol line at 220kV Amod (Balanced portion)","Double Circuit","State Sector","GETCO",46.0,220.0],
    [1252,1251,"2019-05-31","LILO of Gr. Noida (400) - Noida Sec-148 line at R.C. Green","Double Circuit","State Sector","UPPTCL",9.0,220.0],
    [1253,1252,"2019-05-31","LILO of Hathras - Gokul at Mathura","Double Circuit","State Sector","UPPTCL",120.0,220.0],
    [1254,1253,"2019-05-31","Sohawal - Tanda","Double Circuit","State Sector","UPPTCL",232.0,220.0],
    [1255,1254,"2019-06-30","LILO of Lonikhand (MSETCL)- Kalwa at Navi Mumbai","Single Circuit","Central Sector","PGCIL",16.0,400.0],
    [1256,1255,"2019-06-30","Julurupadu - Jangaon","Double Circuit","State Sector","TSTRANSCO",349.0,400.0],
    [1257,1256,"2019-06-30","Guindy - R.A.Puram (UG Cable)","Single Circuit","State Sector","TANTRANSCO",8.0,230.0],
    [1258,1257,"2019-06-30","Bareilly - C.B. Ganj","Single Circuit","State Sector","UPPTCL",24.0,220.0],
    [1259,1258,"2019-06-30","Bareilly -Dohna","Single Circuit","State Sector","UPPTCL",10.0,220.0],
    [1260,1259,"2019-06-30","Betul - Gudgaon (GEC-I)","Double Circuit","State Sector","MPPTCL",94.0,220.0],
    [1261,1260,"2019-06-30","Hadala - Khorana","Double Circuit","State Sector","GETCO",37.0,220.0],
    [1262,1261,"2019-06-30","Kumbhari (PGCIL) - Bale","Double Circuit","State Sector","MSETCL",58.0,220.0],
    [1263,1262,"2019-06-30","LILO of Noida Sec-20-BTPS line at Botanical Garden","Double Circuit","State Sector","UPPTCL",3.0,220.0],
    [1264,1263,"2019-06-30","LILO of one Ckt. Bastara - Kaul at Bhadson","Double Circuit","State Sector","HVPNL",60.0,220.0],
    [1265,1264,"2019-07-31","Ajmer (new) - Bikaner line","Double Circuit","Central Sector","PGCIL",526.0,765.0],
    [1266,1265,"2019-07-31","Chilkaluraipeta - Narasaraopeta (QM) (PSITL - TBCB)","Double Circuit","Central Sector","PGCIL",60.0,400.0],
    [1267,1266,"2019-07-31","LILO of One ckt. of Bhadla (RVPN) - Bikaner (RVPN) line at Bikaner (New)","Double Circuit","Central Sector","PGCIL",18.0,400.0],
    [1268,1267,"2019-07-31","Nabinagar-II - Patna line (Q)","Double Circuit","Central Sector","PGCIL",282.0,400.0],
    [1269,1268,"2019-07-31","Kishanganga - Wagoora line","Double Circuit","Central Sector","PGCIL",232.0,220.0],
    [1270,1269,"2019-07-31","LILO of Arambag - Durgapur at N. Chanditala","Double Circuit","State Sector","WBSETCL",97.0,400.0],
    [1271,1270,"2019-07-31","Rampura - Jagalur (Hiremallanahole)","Double Circuit","State Sector","KPTCL",130.0,400.0],
    [1272,1271,"2019-07-31","Jagalur (Hiremallanahole) - Thallak","Double Circuit","State Sector","KPTCL",55.0,220.0],
    [1273,1272,"2019-07-31","LILO of Mainpuri- Sikandrarao at Jawarharpur TPS","Single Circuit","State Sector","UPPTCL",22.0,220.0],
    [1274,1273,"2019-07-31","LILO of Malda (PG) - Dalkhola (PG) at Gozol","Double Circuit","State Sector","WBSETCL",6.0,220.0],
    [1275,1274,"2019-07-31","LILO of one ckt of Indravati - Thervali line at Jaypatna","Double Circuit","State Sector","OPTCL",32.0,220.0],
    [1276,1275,"2019-07-31","Sahupuri -Raja ka Talab","Single Circuit","State Sector","UPPTCL",65.0,220.0],
    [1277,1276,"2019-07-31","Aligarh - Prithala (GPTL - TBCB)","Double Circuit","Private Sector","SGL",99.0,400.0],
    [1278,1277,"2019-08-31","Shoolagiri - Hosur S/s","Single Circuit","State Sector","TANTRANSCO",19.0,230.0],
    [1279,1278,"2019-08-31","Shoolagiri - Uddanapalli","Single Circuit","State Sector","TANTRANSCO",18.0,230.0],
    [1280,1279,"2019-08-31","Deoria - Rasra","Single Circuit","State Sector","UPPTCL",83.0,220.0],
    [1281,1280,"2019-08-31","LILO of 220 kV Baghpat - Muradnagar-II at Mandola Vihar","Double Circuit","State Sector","UPPTCL",20.0,220.0],
    [1282,1281,"2019-08-31","LILO of 220kV Dunara - Laitpur TPS Ckt-II at Babina","Double Circuit","State Sector","UPPTCL",15.0,220.0],
    [1283,1282,"2019-08-31","LILO of one ckt. Paras - Balapur at Malkapur s/s","Multiple Circuits","State Sector","MSETCL",144.0,220.0],
    [1284,1283,"2019-08-31","Mator PG (400) - Partapur (Jagriti Vihar) line","Single Circuit","State Sector","UPPTCL",28.0,220.0],
    [1285,1284,"2019-08-31","Moti Paneli - Open wind line with AL-59 Conductor","Double Circuit","State Sector","GETCO",28.0,220.0],
    [1286,1285,"2019-08-31","Nakodar - Ladhowal","Double Circuit","State Sector","PSTCL",70.0,220.0],
    [1287,1286,"2019-08-31","Satna - Chhatarpur (2nd ckt)","Single Circuit","State Sector","MPPTCL",160.0,220.0],
    [1288,1287,"2019-08-31","Vasanthanarasapura - Madhugiri line","Double Circuit","State Sector","KPTCL",89.0,220.0],
    [1289,1288,"2019-08-31","LILO of One Circuit of 765 kV Aurangabad - Padghe D/C (hexa) line at Pune (C-WRTL - TBCB","Double Circuit","Private Sector","APL",129.0,765.0],
    [1290,1289,"2019-09-30","Bhadla - Bikaner line","Double Circuit","Central Sector","PGCIL",340.0,765.0],
    [1291,1290,"2019-09-30","Edamon (KSEB) - Muvattupuzha (PG) Quad) line (1st Ckt.)","Double Circuit","Central Sector","PGCIL",149.0,400.0],
    [1292,1291,"2019-09-30","B3 - B4 - Brindavan Alloyas line","Double Circuit","State Sector","KPTCL",1.0,220.0],
    [1293,1292,"2019-09-30","Badnera - Ner line","Single Circuit + Double Circuit","State Sector","MSETCL",43.0,220.0],
    [1294,1293,"2019-09-30","Boksampalli - KIA Motors Switching Station and 220/33kV S/S Ammavaripalli in Anantapur District","Double Circuit","State Sector","APTRANSCO",35.0,220.0],
    [1295,1294,"2019-09-30","Charla - Meerut line","Single Circuit","State Sector","UPPTCL",5.0,220.0],
    [1296,1295,"2019-09-30","LILO of both ckts. Palla - Palli at Sector- 46 Faridabad S/S","Double Circuit","State Sector","HVPNL",9.0,220.0],
    [1297,1296,"2019-09-30","LILO of Nannur - Regumanugadda line at 220/11kV Brahmmanakokur s/s","Double Circuit","State Sector","APTRANSCO",27.0,220.0],
    [1298,1297,"2019-09-30","LILO of Tadikonda - Ongole line to 220/132kV Prathipadu","Double Circuit","State Sector","APTRANSCO",4.0,220.0],
    [1299,1298,"2019-09-30","Partapur (Jagriti Vihar) - Hapur","Double Circuit","State Sector","UPPTCL",53.0,220.0],
    [1300,1299,"2019-09-30","Sattenapalli - Guntur","Double Circuit","State Sector","APTRANSCO",96.0,220.0],
    [1301,1300,"2019-09-30","Shevgaon - Pathardi line at Amrapur S/S","Double Circuit","State Sector","MSETCL",4.0,220.0],
    [1302,1301,"2019-10-31","Singrauli - Allahabad line","Single Circuit","Central Sector","PGCIL",155.0,400.0],
    [1303,1302,"2019-10-31","LILO of Wanakbori -Soja line at Dehgam (PG) S/S","Double Circuit","State Sector","GETCO",13.0,400.0],
    [1304,1303,"2019-10-31","Charor -Banala","Double Circuit","State Sector","HPPTCL",36.0,220.0],
    [1305,1304,"2019-10-31","Govindpur - Dumka","Double Circuit","State Sector","JUSNL",203.0,220.0],
    [1306,1305,"2019-10-31","LILO of Gokarna - Krishnanagar at Rejinagar","Double Circuit","State Sector","WBSETCL",9.0,220.0],
    [1307,1306,"2019-10-31","LILO of Gurur - Barsoor at Narayanpur","Double Circuit","State Sector","CSPTCL",1.0,220.0],
    [1308,1307,"2019-10-31","LILO of Hebbal - Hoody Sc line to proposed ITI S/s","Single Circuit","State Sector","KPTCL",5.0,220.0],
    [1309,1308,"2019-10-31","LILO of Mopka - Bharatpur and Mopka - Siltara at Dherdehi 220 kV S/S (Bilaspur)(on Multi circuit tower)","Double Circuit","State Sector","CSPTCL",128.0,220.0],
    [1310,1309,"2019-10-31","LILO of one ckt. of KTPS- Manuguru - proposed Pump House-1 at B.G. Kottur line","Double Circuit","State Sector","TSTRANSCO",1.0,220.0],
    [1311,1310,"2019-10-31","LILO of Sultanpur - Sangipur First Ckt. at Amethi","Double Circuit","State Sector","UPPTCL",7.0,220.0],
    [1312,1311,"2019-10-31","Patna (PG) - Khagaul (BSPTCL)","Double Circuit","State Sector","BSPTCL",26.0,220.0],
    [1313,1312,"2019-10-31","Soja - Joumang (DFCC) line","Double Circuit","State Sector","GETCO",44.0,220.0],
    [1314,1313,"2019-10-31","Unnao - Phoolbagh (Kanpur ) line","Double Circuit","State Sector","UPPTCL",57.0,220.0],
    [1315,1314,"2019-11-30","400 kV S/C New Purnear - Gokarna line and 400 kV S/C New Purnear - Farakka line (part of Rajarhat - Purnea line)","Single Circuit","Central Sector","PGCIL",302.0,400.0],
    [1316,1315,"2019-11-30","Common point A of Thervaikandigai - Manali (8a)","Double Circuit","State Sector","TANTRANSCO",54.0,400.0],
    [1317,1316,"2019-11-30","Julurupadu - Manuguru TPP","Double Circuit","State Sector","TSTRANSCO",225.0,400.0],
    [1318,1317,"2019-11-30","NCTPS - Alamathy Common Point - B (8b1)","Double Circuit","State Sector","TANTRANSCO",4.0,400.0],
    [1319,1318,"2019-11-30","Periapanachery - Porur (UG Cable)","Single Circuit","State Sector","TANTRANSCO",7.0,230.0],
    [1320,1319,"2019-11-30","Bongaigaon TPS - Rangia (Salakati)","Double Circuit","State Sector","AEGCL",324.0,220.0],
    [1321,1320,"2019-11-30","GCR Chandrapur - Sicom line","Double Circuit","State Sector","MSETCL",13.0,220.0],
    [1322,1321,"2019-11-30","LILO of both Ckt. of Badnagar- Ratlam At Badnawar 400 kV S/S","Double Circuit","State Sector","MPPTCL",28.0,220.0],
    [1323,1322,"2019-11-30","LILO of Ratlam-Daloda line at Jaora (GEC-I) (one ckt.)","Double Circuit","State Sector","MPPTCL",4.0,220.0],
    [1324,1323,"2019-11-30","LILO of T.K. Halli - Madhuvanahally - proposed 220/66 kV SFC S/s at Shivanasamudra (Hebbani Village)","Double Circuit","State Sector","KPTCL",9.0,220.0],
    [1325,1324,"2019-11-30","LILO of Vapi - Khadoli line at Vaghchhipa s/s","Double Circuit","State Sector","DNH",5.0,220.0],
    [1326,1325,"2019-11-30","LILO on both ckt Parli - Harangul line at Parli (PG)","Double Circuit","State Sector","MSETCL",25.0,220.0],
    [1327,1326,"2019-11-30","Second circuiting of Ratlam - Daloda line (GEC-I)","Double Circuit","State Sector","MPPTCL",37.0,220.0],
    [1328,1327,"2019-11-30","Prithala - Kadarpur HTLS line (GPTL - TBCB)","Double Circuit","Private Sector","SGL",58.0,400.0],
    [1329,1328,"2019-12-31","Edaomon (KSEB) - Muvattupuzha (PG) (Quad) line (2nd Ckt.)","Double Circuit","Central Sector","PGCIL",148.0,400.0],
    [1330,1329,"2019-12-31","Madhugiri - Yelhanka line (Quad) line (1st Ckt.)","Double Circuit","Central Sector","PGCIL",66.0,400.0],
    [1331,1330,"2019-12-31","Re-conductoring of New Purnea - Purnea line","Double Circuit","Central Sector","PGCIL",2.0,220.0],
    [1332,1331,"2019-12-31","LILO of Raita - Jagdalpur at Kurud","Double Circuit","State Sector","CSPTCL",2.0,400.0],
    [1333,1332,"2019-12-31","TPS-II - Neyveli 230kV S/S","Double Circuit","State Sector","TANTRANSCO",10.0,230.0],
    [1334,1333,"2019-12-31","2nd Ckt. of 220 kV Tilwani - Miraj line (From loc no 4 to 43)","Single Circuit on Double Circuit","State Sector","MSETCL",13.0,220.0],
    [1335,1334,"2019-12-31","DCDS Barsoor - Jagdalpur line","Double Circuit","State Sector","CSPTCL",177.0,220.0],
    [1336,1335,"2019-12-31","Hatia (JUSNL) - Namkum (PGCIL)","Double Circuit","State Sector","JUSNL",65.0,220.0],
    [1337,1336,"2019-12-31","Kavanoor - Karaikudi (Existing)","Double Circuit","State Sector","TANTRANSCO",176.0,220.0],
    [1338,1337,"2019-12-31","LILO of 220 kV KTS- Lower Sileru-I line at 220/11kV VK Ramavaram LI SS","Double Circuit","State Sector","TSTRANSCO",3.0,220.0],
    [1339,1338,"2019-12-31","LILO of both ckt. Fatehabad - Rania line at 220kV Mehna Khera","Double Circuit","State Sector","HVPNL",92.0,220.0],
    [1340,1339,"2020-01-31","Chilkaluripeta - Cudappah (PSITL - TBCB)","Double Circuit","Central Sector","PGCIL",577.0,765.0],
    [1341,1340,"2020-01-31","Vemagiri - Chilkaluripeta (PSITL -TBCB)","Double Circuit","Central Sector","PGCIL",558.0,765.0],
    [1342,1341,"2020-01-31","Nirmal - Dichpally at Jangaon (QM) line","Double Circuit","State Sector","TSTRANSCO",120.0,400.0],
    [1343,1342,"2020-01-31","Balimela - Malkangiri 2nd Ckt.","Single Circuit","State Sector","OPTCL",21.0,220.0],
    [1344,1343,"2020-01-31","LILO of existing KTS - Shapurnagar at Waddekothapally (Jangaon District)","Single Circuit","State Sector","TSTRANSCO",17.0,220.0],
    [1345,1344,"2020-01-31","LILO of existing KTS-Shapurnagar proposed line at Jangaon","Single Circuit","State Sector","TSTRANSCO",45.0,220.0],
    [1346,1345,"2020-01-31","LILO of existing Waddekothapally - Bhongir (Both Ckts.) to proposed at Jangaon (Jangaon District)","Multiple Circuits","State Sector","TSTRANSCO",104.0,220.0],
    [1347,1346,"2020-01-31","LILO of Savarkundla - Sagapara line at Gariyadhar S/s","Double Circuit","State Sector","GETCO",15.0,220.0],
    [1348,1347,"2020-01-31","Makhu - Rashiana","Double Circuit","State Sector","PSTCL",92.0,220.0],
    [1349,1348,"2020-01-31","Sabalgarh - Sheopurline (1st Ckt.)","Double Circuit","State Sector","MPPTCL",106.0,220.0],
    [1350,1349,"2020-01-31","Shivarampally - Asifnagar 2nd ckt.","Single Circuit","State Sector","TSTRANSCO",4.0,220.0],
    [1351,1350,"2020-01-31","Ghatampur - Kanpur line","Double Circuit","Private Sector","APL",98.0,400.0],
    [1352,1351,"2020-02-29","Madhugiri - Yelhanka line (Quad) line (2nd Ckts) line","Double Circuit","Central Sector","PGCIL",65.0,400.0],
    [1353,1352,"2020-02-29","Sector-148 t Sector-123 Noida","Double Circuit","State Sector","UPPTCL",40.0,400.0],
    [1354,1353,"2020-02-29","Tervaikandigai - Korattur common point to Kovilpathagai OH-UG Junction Point (Portion of Thervaikandigai - Korattur 400 kV S/C line)","Double Circuit","State Sector","TANTRANSCO",19.0,400.0],
    [1355,1354,"2020-02-29","Abdullapur (PG) - Rajokheri","Double Circuit","State Sector","HVPNL",44.0,220.0],
    [1356,1355,"2020-02-29","LILO of Bareilly - Shahjahanpur line at Faridpur","Double Circuit","State Sector","UPPTCL",8.0,220.0],
    [1357,1356,"2020-02-29","LILO of both ckts of Rangala Rajpur - Palwal at Prithala","Multiple Circuits","State Sector","HVPNL",25.0,220.0],
    [1358,1357,"2020-02-29","Neemuch - Ratangarh line (GEC-I)","Double Circuit","State Sector","MPPTCL",88.0,220.0],
    [1359,1358,"2020-02-29","(PMDP - Kashmir) LILO of Zainkote - Delina at Kunzar (Sterlite S/S)","Double Circuit","State Sector","JKPDD",20.0,220.0],
    [1360,1359,"2020-02-29","Zainakote - Alusteng (Portion of Zainkote -Alusteng - Mirbazar 220 kV D/C line)","Double Circuit","State Sector","JKPDD",92.0,220.0],
    [1361,1360,"2020-02-29","Alipurduar (PG) - Siliguri (PG) (ATL - TBCB)","Double Circuit","Private Sector","KPTL",231.0,400.0],
    [1362,1361,"2020-03-31","Bikaner - Moga (PG) line","Double Circuit","Central Sector","PGCIL",734.0,765.0],
    [1363,1362,"2020-03-31","Vadavi-Halvad (Pkg 1) ( Vadavi to AP-41)","Double Circuit","State Sector","GETCO",149.0,400.0],
    [1364,1363,"2020-03-31","Ulundurpet 230 kV SS to the proposed Sankarapuram 230 kV SS","Single Circuit on Double Circuit","State Sector","TANTRANSCO",58.0,230.0],
    [1365,1364,"2020-03-31","LILO of 220kV Vapi - Tarapur line at 220kV Sarigam","Multiple Circuits","State Sector","GETCO",13.0,220.0],
    [1366,1365,"2020-03-31","LILO of one ckt. of 220KV Humbran - Ferozpur Road (Ludhiana) at 220KV Ladowal","Double Circuit","State Sector","PSTCL",25.0,220.0],
    [1367,1366,"2020-03-31","Khandwa Pool - Indore (KTL - TBCB)","Double Circuit","Private Sector","SGL",180.0,765.0],
    [1368,1367,"2020-03-31","Hiriyur - Mysore line (Ckt-I)","Double Circuit","Private Sector","PGCIL",206.0,400.0],
    [1369,1368,"2020-03-31","Kadarpur - Sohna Road (GPTL - TBCB)","Double Circuit","Private Sector","SGL",21.0,400.0],
    [1370,1369,"2020-03-31","Khargone TPP - Khandwa Pool (Q) (KTL - TBCB)","Double Circuit","Private Sector","SGL",50.0,400.0],
    [1371,1370,"2020-03-31","LILO of Gurgaon - Manesar at Sohna Road (GPTL - TBCB)","Double Circuit","Private Sector","SGL",2.0,400.0],
    [1372,1371,"2020-04-30","Tehri Pooling Station - Meerut (Remaining part)","Single Circuit","Central Sector","PGCIL",1.0,765.0],
    [1373,1372,"2020-04-30","Hiriyur - Mysore line (Ckt.-II)","Double Circuit","Central Sector","PGCIL",206.0,400.0],
    [1374,1373,"2020-04-30","Neyveli - Kadalangudi line","Single Circuit","State Sector","TANTRANSCO",77.0,230.0],
    [1375,1374,"2020-04-30","Jagalur (Hiremallanahole) - Kudligi","Double Circuit","State Sector","KPTCL",83.0,220.0],
    [1376,1375,"2020-04-30","Kothipura (Ramanagara) - Tubinakere","Double Circuit","State Sector","KPTCL",142.0,220.0],
    [1377,1376,"2020-05-31","Baharampur (PG) -Bheramerar (Bangladesh) line (2nd Ckt.) - India Portion","Double Circuit","Central Sector","PGCIL",172.0,400.0],
    [1378,1377,"2020-05-31","LILO of Meramundali - Duburi Ckt-I at Goda","Single Circuit","State Sector","OPTCL",12.0,220.0],
    [1379,1378,"2020-05-31","LILO of one Ckt. of Bhopal - Hoshangabad at Adampur","Double Circuit","State Sector","MPPTCL",6.0,220.0],
    [1380,1379,"2020-06-30","Charging of Tehri Pooling - Meerut line (2nd Ckt.)","Single Circuit","Central Sector","PGCIL",1.0,765.0],
    [1381,1380,"2020-06-30","LILO of 220 kV Sarni - Pandhurna line at Betul (PGCIL)","Double Circuit","State Sector","MPPTCL",78.0,220.0],
    [1382,1381,"2020-06-30","LILO of 2nd Ckt. of PGCIL Jalandhar - Kotla Jangan (nakodar) line at Kartarpur","Double Circuit","State Sector","PSTCL",1.0,220.0],
    [1383,1382,"2020-06-30","LILO of both ckt. Nagda - Neemuch at Mandsaur (LILO from loc.No. 211) S/s (GEC-I)","Direct Current Distribution System","State Sector","MPPTCL",56.0,220.0],
    [1384,1383,"2020-06-30","LILO of one Ckt. of 220kV KTS-Lower Sileru-I line - 400/220kV Asupaka S/S","Double Circuit","State Sector","TSTRANSCO",1.0,220.0],
    [1385,1384,"2020-06-30","LILO of Ratlam - Daloda 220kV line at Jaora (2nd Ckt.)","Double Circuit","State Sector","MPPTCL",4.0,220.0],
    [1386,1385,"2020-06-30","LILO of Sikandararao - Jawaharpur TPSat Kashganj","Double Circuit","State Sector","UPPTCL",88.0,220.0],
    [1387,1386,"2020-06-30","PGCIL Bhadson - Salempur","Double Circuit","State Sector","HVPNL",13.0,220.0],
    [1388,1387,"2020-06-30","Rudrapur (Brahmwari) - Ghansali (Srinagar) line","Double Circuit","State Sector","PTCUL",150.0,220.0],
    [1389,1388,"2020-07-31","NNTPS Sw. Yd. - Ariyalur (Villupuram ) Line","Double Circuit","Central Sector","PGCIL",147.0,400.0],
    [1390,1389,"2020-07-31","Rajarhat - Purnea line (Triple Snowbird) (Balance Portion)","Double Circuit","Central Sector","PGCIL",420.0,400.0],
    [1391,1390,"2020-07-31","LILO in 230 kV Othakalmandapam - Palladam at the proposed Edayarpalayam 400 kV SS","Double Circuit","State Sector","TANTRANSCO",4.0,230.0],
    [1392,1391,"2020-07-31","LILO in the existing 230 kV Neyveli TS-I Tiruvannamalai at Sankarapuram 230 kV SS","Double Circuit","State Sector","TANTRANSCO",64.0,230.0],
    [1393,1392,"2020-07-31","Bolangir (OPTCL) - Bolangir (PGCIL)","Double Circuit","State Sector","OPTCL",3.0,220.0],
    [1394,1393,"2020-07-31","Dwarka - Pappan Kalan-I (underground XLPE Cable)","Double Circuit","State Sector","DTL",3.0,220.0],
    [1395,1394,"2020-07-31","Gonda - Sohawal (PG)","Double Circuit","State Sector","UPPTCL",41.0,220.0],
    [1396,1395,"2020-07-31","Lahal - bhudhil line","Single Circuit","State Sector","HPPTCL",2.0,220.0],
    [1397,1396,"2020-07-31","LILO of both Ckts. of Badshahpur - Sector -77 at Sohna Road Gurugram","Double Circuit","State Sector","HVPNL",3.0,220.0],
    [1398,1397,"2020-07-31","LILO of Kadakola - Chamarajanagara line to the proposed line at Begur","Multiple Circuits","State Sector","KPTCL",100.0,220.0],
    [1399,1398,"2020-07-31","LILO of one Ckt of Ashta- Dewas line at 220 kV S/S Chapda S/S","Double Circuit","State Sector","MPPTCL",68.0,220.0],
    [1400,1399,"2020-07-31","LILO of Pandharpur - Malinagar at Bhalwani S/S","Double Circuit","State Sector","MSETCL",20.0,220.0],
    [1401,1400,"2020-07-31","Termination of one d/c of Achhalia- Jambuva line at Vyankatpura s/s","Double Circuit","State Sector","GETCO",72.0,220.0],
    [1402,1401,"2020-07-31","Upgradation of 132kV Malegaon - Manmad SCSC line to 220kV line using same corridor/ROW","Double Circuit","State Sector","MSETCL",65.0,220.0],
    [1403,1402,"2020-07-31","New Kohima -New Mariani (Twin Moose ACSR) (K-MTL - TBCB)","Double Circuit","Private Sector","KPTL",236.0,400.0],
    [1404,1403,"2020-08-31","Banaskantha PS - Banaskantha (PG) line","Double Circuit","Central Sector","PGCIL",132.0,400.0],
    [1405,1404,"2020-08-31","Chhata- Vrindawan Line","Single Circuit","State Sector","UPPTCL",35.0,220.0],
    [1406,1405,"2020-08-31","Daltonganj (PG)- Garhwa","Double Circuit","State Sector","JUSNL",183.0,220.0],
    [1407,1406,"2020-08-31","Godda - Dumka line","Double Circuit","State Sector","JUSNL",142.0,220.0],
    [1408,1407,"2020-08-31","Godda - Lalmatia","Double Circuit","State Sector","JUSNL",44.0,220.0],
    [1409,1408,"2020-08-31","Jasidih - Dumka","Double Circuit","State Sector","JUSNL",149.0,220.0],
    [1410,1409,"2020-08-31","Jasidih - Giridih line","Double Circuit","State Sector","JUSNL",154.0,220.0],
    [1411,1410,"2020-08-31","Kaithal (PGCIL) - Neemwala","Double Circuit","State Sector","HVPNL",64.0,220.0],
    [1412,1411,"2020-08-31","LILO of both ckt of Nagda - Neemuch 220 KV line at Mandsore(Sitamau) 400 kV S/s (Ckt II)","Direct Current Distribution System","State Sector","MPPTCL",47.0,220.0],
    [1413,1412,"2020-08-31","LILO of one Ckt of existing STPS - Ratangarh line at 220kV GSS Rawatsar","Double Circuit","State Sector","RVPNL",85.0,220.0],
    [1414,1413,"2020-08-31","Maath(400)- Vrindawan Line","Single Circuit","State Sector","UPPTCL",44.0,220.0],
    [1415,1414,"2020-08-31","Mandsaur (Sitamau) - Marut Shakti Pool (GEC-I)","Direct Current Distribution System","State Sector","MPPTCL",93.0,220.0],
    [1416,1415,"2020-09-30","Raigarh (HVDC stn) - Pugalur (HVDC stn) HVDC Bipole Link","BIPOLE","Central Sector","PGCIL",3531.0,800.0],
    [1417,1416,"2020-09-30","Pugalur HVDC - Arasur line (Q)","Double Circuit","Central Sector","PGCIL",118.0,400.0],
    [1418,1417,"2020-09-30","Pugalur HVDC - Pugalur line (Q)","Double Circuit","Central Sector","PGCIL",100.0,400.0],
    [1419,1418,"2020-09-30","LILO of chittoor - Krishnapatnam at Rachagunneri S/S","Double Circuit","State Sector","APTRANSCO",127.0,400.0],
    [1420,1419,"2020-09-30","Neyveli 230/110 kV SS to the existing Thiruvannamalai and Cuddalore feeders","Double Circuit","State Sector","TANTRANSCO",6.0,230.0],
    [1421,1420,"2020-09-30","Asoj - IOCL line with ACSR Zebra conductor","Double Circuit","State Sector","GETCO",66.0,220.0],
    [1422,1421,"2020-09-30","Baghpat (220) - Baghpat (400) (2nd line)","Double Circuit","State Sector","UPPTCL",15.0,220.0],
    [1423,1422,"2020-09-30","Kamalapuram LISS - V.K.Ramavaram line","Double Circuit","State Sector","TSTRANSCO",28.0,220.0],
    [1424,1423,"2020-09-30","LILO of Ataur - Muradnagar-II line at Madhuban Bapudham","Double Circuit","State Sector","UPPTCL",24.0,220.0],
    [1425,1424,"2020-09-30","LILO of FGPP - BBMB Samaypur line at Sector58 S/s","Double Circuit","State Sector","HVPNL",5.0,220.0],
    [1426,1425,"2020-09-30","LILO of one ckt. Nuna Majra - Daultabad at Sec.-107 Gurugram","Double Circuit","State Sector","HVPNL",4.0,220.0],
    [1427,1426,"2020-09-30","LILO of Wanakbori - Asoj and Wanakbori - Vyankatpura line on M/C tower with ACSR Zebra conductor and OPGW at Selvaliya S/S","Double Circuit","State Sector","GETCO",23.0,220.0],
    [1428,1427,"2020-09-30","Madakkathara - Malaparamba line","Double Circuit","State Sector","KSEB",97.0,220.0],
    [1429,1428,"2020-09-30","Shalimarbagh - Sanjay Gandhi Transport Nagar","Multiple Circuits","State Sector","DTL",8.0,220.0],
    [1430,1429,"2020-09-30","Shujalpur - Narsinghgarh Line","Direct Current Distribution System","State Sector","MPPTCL",51.0,220.0],
    [1431,1430,"2020-10-31","LILO of both ckt. Jhakri Abdullapur at (Gumma) Pragati Nagar","Double Circuit","State Sector","HPPTCL",3.0,400.0],
    [1432,1431,"2020-10-31","LILO of one circuit of Akal - Jodhpur (new) line at Jaisalmer-2 (GEC-I)","Double Circuit","State Sector","RVPNL",14.0,400.0],
    [1433,1432,"2020-10-31","Sagardighi TPS - Gokarna line","Double Circuit","State Sector","WBSETCL",89.0,400.0],
    [1434,1433,"2020-10-31","Thennampatty - SEPC IPP","Double Circuit","State Sector","TANTRANSCO",104.0,400.0],
    [1435,1434,"2020-10-31","LILO in the existing 230 kV Pasumalai - Alagarkoil at the proposed Samayanallur 230 kV SS","Double Circuit","State Sector","TANTRANSCO",9.0,230.0],
    [1436,1435,"2020-10-31","Kanwan - Dhar line (GEC-I)","Direct Current Distribution System","State Sector","MPPTCL",63.0,220.0],
    [1437,1436,"2020-10-31","LILO of Jhalawar - Chhabra line at 220 KV GSS Aklera","Double Circuit","State Sector","RVPNL",98.0,220.0],
    [1438,1437,"2020-11-30","LILO of Parulia - Dtps at Durgapur steel TPS","Double Circuit","Central Sector","DVC",14.0,220.0],
    [1439,1438,"2020-11-30","Bemetara - Mungeli line 2nd circuit","Single Circuit","State Sector","CSPTCL",40.0,220.0],
    [1440,1439,"2020-11-30","Gurur - Kurud (Bangoli)","Double Circuit","State Sector","CSPTCL",74.0,220.0],
    [1441,1440,"2020-11-30","Jambuva - Waghodia ( PGCIL) line with AL-59 Conductor","Double Circuit","State Sector","GETCO",68.0,220.0],
    [1442,1441,"2020-11-30","Konnakuzhy - Chalakudy line","Double Circuit","State Sector","KSEB",22.0,220.0],
    [1443,1442,"2020-11-30","LILO of both Purnea (PG) - Begusarai at Khagaria (New)","Double Circuit","State Sector","BSPTCL",14.0,220.0],
    [1444,1443,"2020-11-30","LILO of Jadla - Jamsher at 220 KV S/S Banga","Double Circuit","State Sector","PSTCL",11.0,220.0],
    [1445,1444,"2020-11-30","LILO of Vallabhipur - Vartej line at Maglana S/s","Double Circuit","State Sector","GETCO",9.0,220.0],
    [1446,1445,"2020-11-30","Palanpur - Amarigadh (DFCC) line","Double Circuit","State Sector","GETCO",80.0,220.0],
    [1447,1446,"2020-11-30","Snail -Hatkoti","Double Circuit","State Sector","HPPTCL",13.0,220.0],
    [1448,1447,"2020-12-31","Ramgarh - Bhadla line (Ckt-I)","Double Circuit","State Sector","RVPNL",160.0,400.0],
    [1449,1448,"2020-12-31","Badod - Nalkheda (Susner ) (GEC)","Direct Current Distribution System","State Sector","MPPTCL",105.0,220.0],
    [1450,1449,"2020-12-31","Bhatia - Bhogat line (AL-59)","Double Circuit","State Sector","GETCO",26.0,220.0],
    [1451,1450,"2020-12-31","Brahmapuram - Thuthiyoor line","Multiple Circuits","State Sector","KSEB",8.0,220.0],
    [1452,1451,"2020-12-31","Devanahalli Hardware park - Devanahali HW park S/S","Multiple Circuits","State Sector","KPTCL",12.0,220.0],
    [1453,1452,"2020-12-31","LILO of Muzaffarnagar - Nanauta line at Badhaikalan","Double Circuit","State Sector","UPPTCL",10.0,220.0],
    [1454,1453,"2020-12-31","LILO of one Ckt. of Ukai - Achhaliya line no.3 at Virpor (Package -2)","Double Circuit","State Sector","GETCO",27.0,220.0],
    [1455,1454,"2020-12-31","LILO of Second Ckts. from BAIL (Begur - Hoskote at Devanahlli H/W Park","Single Circuit","State Sector","KPTCL",18.0,220.0],
    [1456,1455,"2020-12-31","Shirsuphal - Shirsai line","Single Circuit","State Sector","MSETCL",3.0,220.0],
    [1457,1456,"2020-12-31","Thuthiyoor - Kaloor (UG Cable)","Double Circuit","State Sector","KSEB",14.0,220.0],
    [1458,1457,"2020-12-31","Imphal - New Kohima (Twin Moose ACSR) (K-MTL - TBCB)","Double Circuit","Private Sector","KPTL",272.0,400.0],
    [1459,1458,"2021-01-31","Tehri Gen. - Tehri Pooling Station","Single Circuit","Central Sector","PGCIL",13.0,400.0],
    [1460,1459,"2021-01-31","Ramgarh - Bhadla line (Ckt-II)","Double Circuit","State Sector","RVPNL",160.0,400.0],
    [1461,1460,"2021-01-31","Cuddalore - Veerapuram (SP Koil) Via Neyveli","Double Circuit","State Sector","TANTRANSCO",348.0,230.0],
    [1462,1461,"2021-01-31","LILO of existing 230 kV Shoolagiri - Vinnamangalam line at the proposed Tirupattur 230 kV SS","Double Circuit","State Sector","TANTRANSCO",12.0,230.0],
    [1463,1462,"2021-01-31","Chelari - Nallalam","Multiple Circuits","State Sector","KSEB",25.0,220.0],
    [1464,1463,"2021-01-31","LILO on 220 kV Deoli (PG) - Ghatodi line for 220kV Yavatmal","Double Circuit","State Sector","MSETCL",21.0,220.0],
    [1465,1464,"2021-01-31","Subashgram (PG) - Baruipur","Double Circuit","State Sector","WBSETCL",64.0,220.0],
    [1466,1465,"2021-01-31","Surajmaninagar - P. K. Bari line (NER-II TL-TBCB)","Double Circuit","Private Sector","SGL",155.0,400.0],
    [1467,1466,"2021-02-28","Ranchi - Medinipur line (PM-JTL-TBCB)","Double Circuit","Central Sector","PGCIL",538.0,765.0],
    [1468,1467,"2021-02-28","LILO of both ckts. of Chandithala - Kharagpur at Medinipur (PM-JTL-TBCB)","Double Circuit","Central Sector","PGCIL",148.0,400.0],
    [1469,1468,"2021-02-28","Tumkur (Pavagada) PS - Devanahally (KPTCL) line - (Q)","Double Circuit","Central Sector","PGCIL",312.0,400.0],
    [1470,1469,"2021-02-28","LILO of both Ckts. of Mamidipalli- Dindi TMDC line to Maheshwaram S/S on M/C","Multiple Circuits","State Sector","TSTRANSCO",13.0,400.0],
    [1471,1470,"2021-02-28","Madakkathara - Areekode line","Double Circuit","State Sector","KSEB",176.0,400.0],
    [1472,1471,"2021-02-28","Nagda - Ujjain line (GEC-I)","Direct Current Distribution System","State Sector","MPPTCL",53.0,400.0],
    [1473,1472,"2021-02-28","LILO of Thingalur - Ingur 230kV line at the proposed Erode GIS S/S","Double Circuit","State Sector","TANTRANSCO",28.0,230.0],
    [1474,1473,"2021-02-28","2nd Ckt. Stringing of 220kV Tlwani - Miraj line (Balance work)","Single Circuit + Double Circuit","State Sector","MSETCL",9.0,220.0],
    [1475,1474,"2021-02-28","Aluva - Kothamangalam line","Double Circuit","State Sector","KSEB",68.0,220.0],
    [1476,1475,"2021-02-28","Bahraich - Sohawal 400 (PG) line","Single Circuit","State Sector","UPPTCL",109.0,220.0],
    [1477,1476,"2021-02-28","Gajner - Chhatargarh line (GEC-I)","Double Circuit","State Sector","RVPNL",166.0,220.0],
    [1478,1477,"2021-02-28","Georai - Thapti Tanda s/s","Double Circuit","State Sector","MSETCL",110.0,220.0],
    [1479,1478,"2021-02-28","LILO of 220kV Kalapaka - Dairyfarm to proposed 220/132/33kV S/S Simhachalam on MC Towers","Double Circuit","State Sector","APTRANSCO",24.0,220.0],
    [1480,1479,"2021-02-28","LILO of 220kV Narwana - Mund line at 400kV PGCIL Jind","Double Circuit","State Sector","HVPNL",168.0,220.0],
    [1481,1480,"2021-02-28","LILO of Firozabad (220) -Agra(PG) at Firozabad(400)","Double Circuit","State Sector","UPPTCL",22.0,220.0],
    [1482,1481,"2021-02-28","LILO of Himmatpura - jagraon at Ajitwal","Double Circuit","State Sector","PSTCL",3.0,220.0],
    [1483,1482,"2021-02-28","LILO of one Ckt. of 220kV Ukai- Achhaliya line no. 2 at 220kV Virpor s/s on D/C and M/C Tower (Package-1) with AL-59 Condu. and OPGW","Double Circuit","State Sector","GETCO",42.0,220.0],
    [1484,1483,"2021-02-28","Makhu - Algaon","Double Circuit","State Sector","PSTCL",101.0,220.0],
    [1485,1484,"2021-02-28","Rachagunneru - Naidupeta line","Double Circuit","State Sector","APTRANSCO",30.0,220.0],
    [1486,1485,"2021-02-28","Silchar (PG) - Misa (PG) (Q) line (NER-II TL-TBCB)","Double Circuit","Private Sector","SGL",357.0,400.0],
    [1487,1486,"2021-03-31","Additional 400KV D/C line at P.K.Bari s/s and Silchar S/S end for termination of P.K. Bari - Silchar 400KV D/C line","Double Circuit","Central Sector","PGCIL",22.0,400.0],
    [1488,1487,"2021-03-31","Darbhanga - Sitamarhi (New) line (Ckt.-I) (Triple Snowbird) (ERSS XXITL - TBCB)","Double Circuit","Central Sector","PGCIL",80.0,400.0],
    [1489,1488,"2021-03-31","LILO of both Ckts. of Nabinagar-II - Gaya (Q) line at Chandauti (ERSS XXITL- TBCB)","Double Circuit","Central Sector","PGCIL",6.0,400.0],
    [1490,1489,"2021-03-31","LILO of North Trichur - Cochin line at North Trichur HDVC Station (Q)","Double Circuit","Central Sector","PGCIL",1.0,400.0],
    [1491,1490,"2021-03-31","Re-Conducting of Rangpo -New Siliguri line","Double Circuit","Central Sector","PGCIL",220.0,400.0],
    [1492,1491,"2021-03-31","Wardha - Aurangabad line (up-gradable on 1200 kV)","Double Circuit","Central Sector","PGCIL",696.0,400.0],
    [1493,1492,"2021-03-31","Pugalur - North Trichur (Kerala) HVDC Bipole Link","High-Voltage Direct Current","Central Sector","PGCIL",288.0,320.0],
    [1494,1493,"2021-03-31","LILO Agra(South)-Fahtehabad(Agra) at Firozabad","Double Circuit","State Sector","UPPTCL",26.0,400.0],
    [1495,1494,"2021-03-31","LILO of Gorakhpur (PG) - Lucknow (PG) line Ckt.-IV at Basti","Double Circuit","State Sector","UPPTCL",60.0,400.0],
    [1496,1495,"2021-03-31","LILO of one ckt. of Satna (PGCIL) - Bina (PGCIL) at Sagar (GEC-I)","Direct Current Distribution System","State Sector","MPPTCL",50.0,400.0],
    [1497,1496,"2021-03-31","LILO of Somanahalli - Kolar SC line to Mylasandra (New Electric City)","Single Circuit","State Sector","KPTCL",2.0,400.0],
    [1498,1497,"2021-03-31","Nagda (400kV) S/S - Ujjain (400kV) S/S (Ckt-II)","Direct Current Distribution System","State Sector","MPPTCL",53.0,400.0],
    [1499,1498,"2021-03-31","Nagda - Mandsaur (GEC-I)","Direct Current Distribution System","State Sector","MPPTCL",137.0,400.0],
    [1500,1499,"2021-03-31","Tanda (TPS) - Bhaukhari (Basti) line","Double Circuit","State Sector","UPPTCL",88.0,400.0],
    [1501,1500,"2021-03-31","Yurembam - Thoubal via Nambol","Double Circuit","State Sector","ED, Manipur",90.0,400.0],
    [1502,1501,"2021-03-31","Akal- Jaisalmer-2 line (GEC-I)","Double Circuit","State Sector","RVPNL",114.0,220.0],
    [1503,1502,"2021-03-31","Brahmapuram - Kaloor line","Double Circuit","State Sector","KSEB",23.0,220.0],
    [1504,1503,"2021-03-31","Chichali - Udaipura","Single Circuit","State Sector","MPPTCL",47.0,220.0],
    [1505,1504,"2021-03-31","Deroli Ahir - Narnaul","Double Circuit","State Sector","HVPNL",26.0,220.0],
    [1506,1505,"2021-03-31","Dichpally 400kV - Banswada 220kV","Double Circuit","State Sector","TSTRANSCO",168.0,220.0],
    [1507,1506,"2021-03-31","Dwarka - Budella","Double Circuit","State Sector","DTL",12.0,220.0],
    [1508,1507,"2021-03-31","HDVC Kolar - T. Gollahali (Thimmasandra) line","Double Circuit","State Sector","KPTCL",58.0,220.0],
    [1509,1508,"2021-03-31","Jammalamadugu - Chakrayapet","Double Circuit","State Sector","APTRANSCO",172.0,220.0],
    [1510,1509,"2021-03-31","Jammalamadugu - Tirumalayapalli","Double Circuit","State Sector","APTRANSCO",34.0,220.0],
    [1511,1510,"2021-03-31","Kalikiri - Kalikiri line","Double Circuit","State Sector","APTRANSCO",8.0,220.0],
    [1512,1511,"2021-03-31","Kamavarapukota - Nuziveedu","Double Circuit","State Sector","APTRANSCO",90.0,220.0],
    [1513,1512,"2021-03-31","Kudagi - Tapping point of NTPC (part of Kudagi-Vajramatti line)","Double Circuit","State Sector","KPTCL",153.0,220.0],
    [1514,1513,"2021-03-31","Kumbhargaon - Krishnoor line (Ckt-I)","Double Circuit","State Sector","MSETCL",16.0,220.0],
    [1515,1514,"2021-03-31","LILO of Arambag - Rishra at N. Chanditala","Double Circuit","State Sector","WBSETCL",31.0,220.0],
    [1516,1515,"2021-03-31","LILO of Baraut (220)- Shamli at Nirpura line","Double Circuit","State Sector","UPPTCL",26.0,220.0],
    [1517,1516,"2021-03-31","LILO of Bina - Gwalior at Pichhore","Single Circuit","State Sector","MPPTCL",1.0,220.0],
    [1518,1517,"2021-03-31","LILO of Both ckt. of Badod - Ujjain at Ujjain","Direct Current Distribution System","State Sector","MPPTCL",24.0,220.0],
    [1519,1518,"2021-03-31","LILO of Both ckt Pulivendula - Hindupur at Gollapuram","Double Circuit","State Sector","APTRANSCO",156.0,220.0],
    [1520,1519,"2021-03-31","LILO of both ckts. Nagda - Ujjain at Ujjain","Direct Current Distribution System","State Sector","MPPTCL",43.0,220.0],
    [1521,1520,"2021-03-31","LILO of Chikkodi - Ghataprabha at Mughalkod","Double Circuit","State Sector","KPTCL",12.0,220.0],
    [1522,1521,"2021-03-31","LILO of Chormar - Fathebad line at Hukmawali","Single Circuit","State Sector","HVPNL",41.0,220.0],
    [1523,1522,"2021-03-31","LILO of Kashipur - Pantnagar line at 220kV S/S Jafarpur","Double Circuit","State Sector","PTCUL",8.0,220.0],
    [1524,1523,"2021-03-31","LILO of Pandharpur - Malinagar line at 220 kV Bhalawani S/S (Ckt-II)","Double Circuit","State Sector","MSETCL",20.0,220.0],
    [1525,1524,"2021-03-31","LILO of Pendurthy - Garividi at Garividi","Double Circuit","State Sector","APTRANSCO",120.0,220.0],
    [1526,1525,"2021-03-31","LILO of Podili - Nellore at Atmakur","Double Circuit","State Sector","APTRANSCO",80.0,220.0],
    [1527,1526,"2021-03-31","LILO of Rasra (220)- Gazipur at Rasra","Double Circuit","State Sector","UPPTCL",26.0,220.0],
    [1528,1527,"2021-03-31","LILO to Existing 220kV Podili - Nellore line at Prakasam District","Multiple Circuits","State Sector","APTRANSCO",20.0,220.0],
    [1529,1528,"2021-03-31","Pallikkara - Aluva line","Double Circuit","State Sector","KSEB",23.0,220.0],
    [1530,1529,"2021-03-31","Pithampur -Depalpur","Direct Current Distribution System","State Sector","MPPTCL",75.0,220.0],
    [1531,1530,"2021-03-31","(PMDP - Kashmir) Extension of Mirbazar - Alusteng line upto New Wanpoh","Double Circuit","State Sector","JKPDD",8.0,220.0],
    [1532,1531,"2021-03-31","R.K. Puram- Ridge Valley Ckt-I","Single Circuit","State Sector","DTL",5.0,220.0],
    [1533,1532,"2021-03-31","R.K. Puram - Ridge Valley Ckt-II","Single Circuit","State Sector","DTL",5.0,220.0],
    [1534,1533,"2021-03-31","R.K. Puram-Trauma Centre Ckt-I","Single Circuit","State Sector","DTL",5.0,220.0],
    [1535,1534,"2021-03-31","R.K. Puram- Trauma Centre Ckt-II","Single Circuit","State Sector","DTL",5.0,220.0],
    [1536,1535,"2021-03-31","Agra (UP)-Greater Noida (WUPPTCL)(GTL-TBCB)","Single Circuit","Private Sector","APL",159.0,765.0],
    [1537,1536,"2021-03-31","Fatehgarh PS/S - Bhadla (PG) (initially to be operated at 400 ","Double Circuit","Private Sector","APL",292.0,765.0],
    [1538,1537,"2021-03-31","Ghatampur TPS-Agra (UP) (GTL-TBCB)","Single Circuit","Private Sector","APL",229.0,765.0],
    [1539,1538,"2021-03-31","LILO of 765kV Anpara D - Unnao SC (Quad) line at Obra - CTPS","Double Circuit","Private Sector","APL",17.0,765.0],
    [1540,1539,"2021-03-31","Roza - Badaun","Double Circuit","Private Sector","APL",171.0,400.0],
    [1541,1540,"2021-03-31","LlLO of C.B.Ganj - Badaun at Badaun (OBTL-TBCB)","Single Circuit","Private Sector","APL",2.0,220.0],
    [1542,1541,"2021-03-31","LlLO of Chandausi - Badaun at Badaun (OBTL-TBCB)","Single Circuit","Private Sector","APL",37.0,220.0],
    [1543,1542,"2021-04-30","Ajmer (PG) - Phagi line","Double Circuit","Central Sector","PGCIL",268.0,765.0],
    [1544,1543,"2021-04-30","Darbhanga - Sitamarhi (New) line (Ckt-II) line","Double Circuit","Central Sector","PGCIL",80.0,400.0],
    [1545,1544,"2021-04-30","Sitamarhi (New) - Motihari line (Triple Snowbird) (ERSS XXITL-TBCB)","Double Circuit","Central Sector","PGCIL",171.0,400.0],
    [1546,1545,"2021-04-30","2nd ckt stringing of 220 kV Valve - Jamde SCDC line","Single Circuit","State Sector","MSETCL",13.0,220.0],
    [1547,1546,"2021-05-31","New Mariani - Misa","Double Circuit","Central Sector","PGCIL",2.0,400.0],
    [1548,1547,"2021-05-31","LILO of 400 kV Aligarh-Sikandrabad at Harduaganj TPS Line","Double Circuit","State Sector","UPPTCL",61.0,400.0],
    [1549,1548,"2021-05-31","LILO of 220kV Gonda- Basti line at Bhaukhari","Double Circuit","State Sector","UPPTCL",26.0,220.0],
    [1550,1549,"2021-05-31","LILO of Joda-TTPS line at Telkoi","Double Circuit","State Sector","OPTCL",29.0,220.0],
    [1551,1550,"2021-05-31","LILO of onc Ckt. of 220kV Undi-Eluru (Gudivada) line to proposed S/S at Akiveedu in West Godavari District","Single Circuit","State Sector","APTRANSCO",3.0,220.0],
    [1552,1551,"2021-05-31","Maradam (from 400kV Maradam) - Pydibhimavaram line","Double Circuit","State Sector","APTRANSCO",46.0,220.0],
    [1553,1552,"2021-06-30","Jigmeling - Alipurdauar line (Q) (India Side)","Double Circuit","Central Sector","PGCIL",326.0,400.0],
    [1554,1553,"2021-06-30","LILO of Sagardighi - Subhasgram line at Jeerat","Single Circuit","Central Sector","PGCIL",2.0,400.0],
    [1555,1554,"2021-06-30","Akkaram-Markook","Double Circuit","State Sector","TSTRANSCO",18.0,220.0],
    [1556,1555,"2021-06-30","Greater Noida (765) - Integrated township Gr. Noida line","Double Circuit","State Sector","UPPTCL",80.0,220.0],
    [1557,1556,"2021-06-30","LILO of Nirmal - Renzal at Mupkal","Single Circuit","State Sector","TSTRANSCO",1.0,220.0],
    [1558,1557,"2021-06-30","LILO of one Ckt. of Mamidipally - Shadnagar at Kothur S/S","Double Circuit","State Sector","TSTRANSCO",1.0,220.0],
    [1559,1558,"2021-06-30","LILO of one Ckt. of Shamshabad - Kethireddypalli (Manikonda) at Kothur S/S","Double Circuit","State Sector","TSTRANSCO",19.0,220.0],
    [1560,1559,"2021-06-30","Manuguru - BTPS","Double Circuit","State Sector","TSTRANSCO",46.0,220.0],
    [1561,1560,"2021-06-30","(PMDP - Jammu) LILO of Hiranagar - Bishnah at Jatwal Grid station","Double Circuit","State Sector","JKPDD",4.0,220.0],
    [1562,1561,"2021-06-30","Rajgarh (B) - Susner (Nalkheda)","Direct Current Distribution System","State Sector","MPPTCL",124.0,220.0],
    [1563,1562,"2021-06-30","Ramadugu - Rampur","Double Circuit","State Sector","TSTRANSCO",70.0,220.0],
    [1564,1563,"2021-06-30","Ujjain - Susner (Nalkheda) (GEC)","Direct Current Distribution System","State Sector","MPPTCL",160.0,220.0],
    [1565,1564,"2021-07-31","Julurupadu - Pedagopathi line","Double Circuit","State Sector","TSTRANSCO",90.0,220.0],
    [1566,1565,"2021-07-31","Kethireddypally (Manikonda) - Kankamamidi line","Double Circuit","State Sector","TSTRANSCO",9.0,220.0],
    [1567,1566,"2021-07-31","LILO of both Ckts. Durshed-Sirchilla line at Ramadugu","Double Circuit","State Sector","TSTRANSCO",48.0,220.0],
    [1568,1567,"2021-07-31","LILO of Ckt.-I Mainpuri (PG) - Neebkarori line at Farrukhabad","Double Circuit","State Sector","UPPTCL",16.0,220.0],
    [1569,1568,"2021-07-31","LILO of Dindi - Maheshwaram at Madugula","Double Circuit","State Sector","TSTRANSCO",6.0,220.0],
    [1570,1569,"2021-07-31","LILO of Hiranagar-Bishnah line at Samba","Double Circuit","State Sector","JKPDD",11.0,220.0],
    [1571,1570,"2021-07-31","LILO of Oglapur - Durshad at Huzurabad","Double Circuit","State Sector","TSTRANSCO",20.0,220.0],
    [1572,1571,"2021-07-31","LILO of Regumangadda - Gudipalligattu at Yelluru Water Grid s/s","Double Circuit","State Sector","TSTRANSCO",7.0,220.0],
    [1573,1572,"2021-07-31","LILO of RSS -Bheemgal Feeder at Rampur s/s","Double Circuit","State Sector","TSTRANSCO",2.0,220.0],
    [1574,1573,"2021-07-31","LILO of RSS -Nagaram at Ramagundam Fertillizers and Chemicals Limited (RFCL)","Double Circuit","State Sector","TSTRANSCO",22.0,220.0],
    [1575,1574,"2021-07-31","LILO of RSS -Nrimal at Jagityal line","Double Circuit","State Sector","TSTRANSCO",3.0,220.0],
    [1576,1575,"2021-07-31","LILO of Shamshabad-Yeddumailaram line and Shadnagar-Shankerpally line to proposed at Kethireddypally","Double Circuit","State Sector","TSTRANSCO",14.0,220.0],
    [1577,1576,"2021-07-31","LILO of Thein-Hiranagar at Kathua-II (Ghatti)","Double Circuit","State Sector","JKPDD",5.0,220.0],
    [1578,1577,"2021-07-31","LILO of Vemnur-Nirmal to 220kv Jagityal s/s","Double Circuit","State Sector","TSTRANSCO",3.0,220.0],
    [1579,1578,"2021-07-31","LILO of Yelluru - Gudipalligattu at Gouridevipally","Single Circuit","State Sector","TSTRANSCO",4.0,220.0],
    [1580,1579,"2021-07-31","Maheshwaram 400/220 kV SS to Fabcity 220kV SS","Double Circuit","State Sector","TSTRANSCO",47.0,220.0],
    [1581,1580,"2021-07-31","Malayammma - Kunnamangalam","Multiple Circuits","State Sector","KSEB",15.0,220.0],
    [1582,1581,"2021-07-31","Mitha - Katosan TSS line","Double Circuit","State Sector","GETCO",33.0,220.0],
    [1583,1582,"2021-07-31","Narketpally - Udaya Samudram (LIS)","Double Circuit","State Sector","TSTRANSCO",18.0,220.0],
    [1584,1583,"2021-07-31","Narsapur -Meenajipet line","Double Circuit","State Sector","TSTRANSCO",48.0,220.0],
    [1585,1584,"2021-07-31","Nirmal -Renzal line","Double Circuit","State Sector","TSTRANSCO",136.0,220.0],
    [1586,1585,"2021-07-31","Nirmal s/s - Existing 220/132kV Nirmal s/s","Double Circuit","State Sector","TSTRANSCO",9.0,220.0],
    [1587,1586,"2021-07-31","Radhanesda - Vav (Khimanvas) line with AL-59 Conductor","Double Circuit","State Sector","GETCO",73.0,220.0],
    [1588,1587,"2021-07-31","Rampur -Rajeshwar Rao Peta s/s","Double Circuit","State Sector","TSTRANSCO",72.0,220.0],
    [1589,1588,"2021-07-31","Shahjahanpur PG (400)- Azizpur line","Double Circuit","State Sector","UPPTCL",49.0,220.0],
    [1590,1589,"2021-07-31","Sitapuram -Huzurnagar line","Double Circuit","State Sector","TSTRANSCO",59.0,220.0],
    [1591,1590,"2021-07-31","Sundilla - Annaram line","Double Circuit","State Sector","TSTRANSCO",58.0,220.0],
    [1592,1591,"2021-07-31","Sundilla - Medigadda line","Double Circuit","State Sector","TSTRANSCO",148.0,220.0],
    [1593,1592,"2021-07-31","LILO of both ckt. of Ranchi - Maithon-RB line at Dhanbad (NKTL-TBCB)","Double Circuit","Private Sector","APL",5.0,400.0],
    [1594,1593,"2021-07-31","Vindhyachal - Varansai line","Double Circuit","Central Sector","PGCIL",379.0,765.0],
    [1595,1594,"2021-07-31","Edayarpalayam (TANTRANSCO)- Udumulpet line (Q)","Double Circuit","Central Sector","PGCIL",94.0,400.0],
    [1596,1595,"2021-07-31","Palatana - Surajmaninagar","Double Circuit","Central Sector","PGCIL",24.0,400.0],
    [1597,1596,"2021-07-31","Pugalur HVDC-Edayarpalayam (TANTRANSCO) line (Q)","Double Circuit","Central Sector","PGCIL",105.0,400.0],
    [1598,1597,"2021-07-31","LILO of Gorakhpur (PG) - Lucknow (PG) line Ckt.-III at Basti","Double Circuit","State Sector","UPPTCL",47.0,400.0],
    [1599,1598,"2021-07-31","LILO of Ibrahim Patti (PGCIL) - Kasaramau (Mau) at Rasra","Double Circuit","State Sector","UPPTCL",74.0,400.0],
    [1600,1599,"2021-07-31","Dharmapuri (Palavadi) - Udanapally 230 kV S","Double Circuit","State Sector","TANTRANSCO",115.0,230.0],
    [1601,1600,"2021-07-31","Thiruvalam - Singarapet Feeder (Loc1 to 4)","Double Circuit","State Sector","TANTRANSCO",2.0,230.0],
    [1602,1601,"2021-07-31","2nd ckt. Stringing on existing line from Malyalpally - Jagityal line","Single Circuit","State Sector","TSTRANSCO",58.0,220.0],
    [1603,1602,"2021-07-31","400/220 kV Janagaon s/s -220/132/33 Janagaon s/s","Double Circuit","State Sector","TSTRANSCO",7.0,220.0],
    [1604,1603,"2021-07-31","Asupaka - Aswaroapet line","Double Circuit","State Sector","TSTRANSCO",40.0,220.0],
    [1605,1604,"2021-07-31","Dhanonda- Deroli Ahir","Double Circuit","State Sector","HVPNL",57.0,220.0],
    [1606,1605,"2021-07-31","Dindi - Nagarkurnool","Single Circuit","State Sector","TSTRANSCO",79.0,220.0],
    [1607,1606,"2021-07-31","Gajwel - Akkaram (TMDC)","Double Circuit","State Sector","TSTRANSCO",14.0,220.0],
    [1608,1607,"2021-08-31","Fatehgarh-II PS - Bhadla-II section (PGCIL-RTM)","Double Circuit","Central Sector","PGCIL",374.0,765.0],
    [1609,1608,"2021-08-31","Ramgarh - Ranchi (PG) (Bypassing Gola SS) (Balance portion)","Single Circuit","Central Sector","DVC",95.0,220.0],
    [1610,1609,"2021-08-31","LILO of ckt-II of Kursi Rd PG- Unnao line at Hardoi Rd (Jehata)","Double Circuit","State Sector","UPPTCL",25.0,400.0],
    [1611,1610,"2021-08-31","LILO of ckt-I of 400 kV DC Kursi Rd PG- Unnao line at Hardoi Rd(Jehata)","Double Circuit","State Sector","UPPTCL",34.0,400.0],
    [1612,1611,"2021-08-31","Telangana STPP - Narsapur","Double Circuit","State Sector","TSTRANSCO",354.0,400.0],
    [1613,1612,"2021-08-31","Telangana STPP - Ramadugu","Double Circuit","State Sector","TSTRANSCO",104.0,400.0],
    [1614,1613,"2021-08-31","LILO of 220 kV Uran- JNPT MUSS line at 220 kV JNPT SEZ S/S","Single Circuit","State Sector","MSETCL",5.0,220.0],
    [1615,1614,"2021-08-31","LILO of one Ckt. of Budhipadar-Basundhara at Lephripara s/s","Double Circuit","State Sector","OPTCL",9.0,220.0],
    [1616,1615,"2021-08-31","LILO of one ckt of Rengali-Barkote line at Deogarh","Single Circuit","State Sector","OPTCL",25.0,220.0],
    [1617,1616,"2021-08-31","LILO of Sector- 72 -Ranglarajpur line at Sohna Road","Double Circuit","State Sector","HVPNL",9.0,220.0],
    [1618,1617,"2021-08-31","LILO of Vadavi - Chhatral line at Santej S/s","Double Circuit","State Sector","GETCO",51.0,220.0],
    [1619,1618,"2021-08-31","Melasandra (New elctronic city) - Yerandanahalli","Multiple Circuits","State Sector","KPTCL",27.0,220.0],
    [1620,1619,"2021-08-31","Mylasandra - Somanahalli-Naganthapura-HSR Layout","Multiple Circuits","State Sector","KPTCL",20.0,220.0],
    [1621,1620,"2021-08-31","Nirmal - Indravelly (Utnoor) proposed line at Adilabad District","Double Circuit","State Sector","TSTRANSCO",199.0,220.0],
    [1622,1621,"2021-08-31","Second Ckt. stringing Padegaon - Sawangi line","Single Circuit on Double Circuit","State Sector","MSETCL",15.0,220.0],
    [1623,1622,"2021-08-31","Solapur (PG) - Narangwadi","Double Circuit","State Sector","MSETCL",148.0,220.0],
    [1624,1623,"2021-08-31","Bikaner (PG) - Khetri S/S","Double Circuit","Private Sector","APL",481.0,765.0],
    [1625,1624,"2021-09-30","Khetri - Jhatikara line (CKt-I)","Double Circuit","Central Sector","PGCIL",146.0,765.0],
    [1626,1625,"2021-09-30","Medinipur - Jeerat (New) (PM-JTL-TBCB)","Double Circuit","Central Sector","PGCIL",338.0,765.0],
    [1627,1626,"2021-09-30","Bhadla-II PS-Bhadla (PG) line (CKt-I)","Double Circuit","Central Sector","PGCIL",48.0,400.0],
    [1628,1627,"2021-09-30","Jeerat (New) - Jeerat (WBSETCL) (PM-JTL-TBCB)","Double Circuit","Central Sector","PGCIL",51.0,400.0],
    [1629,1628,"2021-09-30","Khetri - Sikar (PG) line","Double Circuit","Central Sector","PGCIL",156.0,400.0],
    [1630,1629,"2021-09-30","LILO of both Ckt. of Kishanganj - Patna 400kV (Q) line at Saharsa (Ckt-I)","Double Circuit","Central Sector","PGCIL",75.0,400.0],
    [1631,1630,"2021-09-30","LILO the existing 230 kV Alundur - Thanjavur at the proposed Thuvankudy","Multiple Circuits","State Sector","TANTRANSCO",30.0,230.0],
    [1632,1631,"2021-09-30","Chhatarpur - Tikamgarh 220 KV Line","Direct Current Distribution System","State Sector","MPPTCL",92.0,220.0],
    [1633,1632,"2021-10-31","Khetri - Jhatikara line (Ckt-II)","Double Circuit","Central Sector","PGCIL",146.0,765.0],
    [1634,1633,"2021-10-31","LILO of both Ckt. 765kV D/C (op. at 400kV) Fatehgarh (TBCB) - Bhadla (PG) at Fateharh-II PS (Loop in of Ckt-I)","Double Circuit","Central Sector","PGCIL",40.0,765.0],
    [1635,1634,"2021-10-31","LILO of both Ckts. of Ajmer - Bikaner line at Bhadla-II PS (PGCIL-RTM)","Double Circuit","Central Sector","PGCIL",527.0,765.0],
    [1636,1635,"2021-10-31","LILO of both Ckt. of Kishanganj - Patna (Q) line at Saharsa (CKt-II)","Double Circuit","Central Sector","PGCIL",75.0,400.0],
    [1637,1636,"2021-10-31","Pugalur HVDC - Thiruvalam line (Q)","Double Circuit","Central Sector","PGCIL",782.0,400.0],
    [1638,1637,"2021-10-31","Chatra - Latehar","Double Circuit","State Sector","JUSNL",218.0,220.0],
    [1639,1638,"2021-10-31","Halvad - Sadla line with AL-59 conductor","Double Circuit","State Sector","GETCO",76.0,220.0],
    [1640,1639,"2021-10-31","Julwaniya - Kukshi line","Direct Current Distribution System","State Sector","MPPTCL",133.0,220.0],
    [1641,1640,"2021-10-31","Kattakkada-Vizhinjam","Double Circuit","State Sector","KSEB",39.0,220.0],
    [1642,1641,"2021-10-31","LILO of 220 kV D/C Wagoora-Mirbazar line at Lassipora","Double Circuit","State Sector","JKPDD",10.0,220.0],
    [1643,1642,"2021-10-31","LILO of both Ckts. Kansari -Deodar line at Bhildi S/S M/C Tower","Multiple Circuits","State Sector","GETCO",10.0,220.0],
    [1644,1643,"2021-10-31","Raebareli-Amethi Line","Double Circuit","State Sector","UPPTCL",89.0,220.0],
    [1645,1644,"2021-11-30","LILO of both Ckts. of (op.at 400 kV) Fatehgarh (TBCB)- Bhadla (PG) at Fatehgarh-II PS (Loop in of Ckt-II)","Double Circuit","Central Sector","PGCIL",39.0,765.0],
    [1646,1645,"2021-11-30","Anpara D - Unnao","Single Circuit","State Sector","UPPTCL",426.0,765.0],
    [1647,1646,"2021-11-30","Julurupadu - Kamalapuram line","Double Circuit","State Sector","TSTRANSCO",79.0,400.0],
    [1648,1647,"2021-11-30","LILO of Mundra - Hadala line at Halvad","Double Circuit","State Sector","GETCO",89.0,400.0],
    [1649,1648,"2021-11-30","LILO Firozabad (400) (TBCB) - Agra PG (765) line at Tundla","Double Circuit","State Sector","UPPTCL",1.0,220.0],
    [1650,1649,"2021-11-30","LILO of Shahjahanpur - Nighasan line at Gola (220)","Double Circuit","State Sector","UPPTCL",7.0,220.0],
    [1651,1650,"2021-11-30","Sitamarhi(New) - Motipur","Double Circuit","State Sector","BSPTCL",140.0,220.0],
    [1652,1651,"2021-11-30","TTPS - Govindpur TL","Double Circuit","State Sector","JUSNL",181.0,220.0],
    [1653,1652,"2021-12-31","Bhadla-II PS-Bhadla (PG) (Twin HTLS) (Ckt.-II) (PGCIL-RTM)","Double Circuit","Central Sector","PGCIL",49.0,400.0],
    [1654,1653,"2021-12-31","Kahalgaon - Durgapur line (Bypassing of Farakka-Kahalgaon (Ckt.-3 and 4 and Farakka -Durgapur","Double Circuit","Central Sector","PGCIL",6.0,400.0],
    [1655,1654,"2021-12-31","Bajoli Holi - Lahal","Double Circuit","State Sector","HPPTCL",36.0,220.0],
    [1656,1655,"2021-12-31","LILO of 220kV Gachibowli - Miyapur line at Rayadurg GIS (UG Cable)","Double Circuit","State Sector","TSTRANSCO",7.0,220.0],
    [1657,1656,"2021-12-31","LILO of 220kV Gachibowli - Shapurnagar line at Rayadurg GIS (UG Cable)","Double Circuit","State Sector","TSTRANSCO",9.0,220.0],
    [1658,1657,"2021-12-31","LILO of existing Hiriyur -Gowribidanur line to the proposed 220kV at Sira S/S","Double Circuit","State Sector","KPTCL",25.0,220.0],
    [1659,1658,"2021-12-31","Ghatampur TPS-Hapur (WUPPTCL) line","Single Circuit","Private Sector","APL",411.0,765.0],
    [1660,1659,"2021-12-31","Khandwa Pool - Dhule Line (KTL - TBCB)","Double Circuit","Private Sector","SGL",383.0,765.0],
    [1661,1660,"2022-01-31","Kethireddypally-Rayadurg (GIS)","Double Circuit","State Sector","TSTRANSCO",83.0,400.0],
    [1662,1661,"2022-01-31","LILO of both Ckts. of Lonikand-II -Girvali line at Karjat S/S","Multiple Circuits","State Sector","MSETCL",25.0,400.0],
    [1663,1662,"2022-01-31","Patratu (JUSNL)- Bero (New Ranchi)","Double Circuit","State Sector","JUSNL",98.0,400.0],
    [1664,1663,"2022-01-31","Soja - Zerda line (Pkg-1) with Twin AL-59 conductor","Double Circuit","State Sector","GETCO",134.0,400.0],
    [1665,1664,"2022-01-31","LILO of 220kV Fatehabad (PGCIL) - Chormar line with (MC at 220kV Hukmawali S/S (Loop in Portion)","Double Circuit","State Sector","HVPNL",41.0,220.0],
    [1666,1665,"2022-01-31","LILO of 220kV Nanauta -Shamli line at Shamli (400) (GIS)","Double Circuit","State Sector","UPPTCL",12.0,220.0],
    [1667,1666,"2022-01-31","LILO of existing 220kV S/C Lingpur-Kushatagi and 220kV Lingapur-Sindhanur lines to the proposed 220/110/11kV Gangavathi (Sulekal) s/s","Multiple Circuits","State Sector","KPTCL",52.0,220.0],
    [1668,1667,"2022-01-31","LILO of Sasaram - Sahupuri at Karmnasa (New)","Double Circuit","State Sector","BSPTCL",1.0,220.0],
    [1669,1668,"2022-01-31","Patratu - Ratu (Burmu ) line","Double Circuit","State Sector","JUSNL",63.0,220.0],
    [1670,1669,"2022-01-31","Satgachia - Rishra","Double Circuit","State Sector","WBSETCL",15.0,220.0],
    [1671,1670,"2022-01-31","Sitamarhi (New) - Raxaul (New) (Twin Moose)","Double Circuit","State Sector","BSPTCL",177.0,220.0],
    [1672,1671,"2022-02-28","LILO of 2nd Ckt. of Teesta-III - Kishanganj line at Rangpo (Q) - Twin HTLS Conductor","Double Circuit","Central Sector","PGCIL",24.0,400.0],
    [1673,1672,"2022-02-28","LILO of One Ckt of Bamnauli - Jhattikara at Dwarka-I","Double Circuit","Central Sector","PGCIL",17.0,400.0],
    [1674,1673,"2022-02-28","Navsari (PG) - Bhestan line","Double Circuit","Central Sector","PGCIL",37.0,220.0],
    [1675,1674,"2022-02-28","Ariyalur - Thiruvalam PGCIL","Double Circuit","State Sector","TANTRANSCO",347.0,765.0],
    [1676,1675,"2022-02-28","North Chennai PS - Ariyalur","Double Circuit","State Sector","TANTRANSCO",548.0,765.0],
    [1677,1676,"2022-02-28","LILO of Ckt.-I of Unchahar (NTPC) - Fatehpur PGCIL line at Raebareli","Double Circuit","State Sector","UPPTCL",65.0,400.0],
    [1678,1677,"2022-02-28","Bakhtiyarpur (New) - Hathidah (New)","Double Circuit","State Sector","BSPTCL",62.0,220.0],
    [1679,1678,"2022-02-28","Bakhtiyarpur (New) - Sheikhpura (New)","Double Circuit","State Sector","BSPTCL",86.0,220.0],
    [1680,1679,"2022-02-28","Basni-NPH (Jodhpur) Line Ckt-I","Double Circuit","State Sector","RVPNL",7.0,220.0],
    [1681,1680,"2022-02-28","Bidadi GI S/s - 220/66/11 kV Vrushabhavathi Valley S/s (UG cable)","Single Circuit","State Sector","KPTCL",23.0,220.0],
    [1682,1681,"2022-02-28","Guttur S/S - Proposed 220/66 kV S/S at Guttur","Double Circuit","State Sector","KPTCL",2.0,220.0],
    [1683,1682,"2022-02-28","Hindupur (400) - Hindupur (220)(GEC-I)","Single Circuit","State Sector","APTRANSCO",16.0,220.0],
    [1684,1683,"2022-02-28","Honnali - Benkikere (Channagiri)","Double Circuit","State Sector","KPTCL",97.0,220.0],
    [1685,1684,"2022-02-28","LILO of 220kV Gachibowli - Erragadda line-400/220/132kV Rayadurg GIS ( UG Cable)","Double Circuit","State Sector","TSTRANSCO",7.0,220.0],
    [1686,1685,"2022-02-28","LILO of 220kV Sitapur (220) -Shahjahanpur (220) S/C line at Shahjahanpur (400) PG","Single Circuit","State Sector","UPPTCL",7.0,220.0],
    [1687,1686,"2022-02-28","LILO of Gaya (PG) - Sonenagar at both Bodhgaya (BSPTCL) and Chadauti (New)","Double Circuit","State Sector","BSPTCL",41.0,220.0],
    [1688,1687,"2022-02-28","LILO of Korba (E) - Siltara at DSPM","Double Circuit","State Sector","CSPTCL",3.0,220.0],
    [1689,1688,"2022-02-28","Manyatha-(GIS in premises of existing HBR Layout","Double Circuit","State Sector","KPTCL",10.0,220.0],
    [1690,1689,"2022-03-31","LILO of both Ckts. of 765kV D/C (op at 400kV) Fatehgarh (TBCB) - Bhadla (PG) line at Fatehgarh-II PS (Loop Out Portion) (PGCIL-RTM)","Double Circuit","Central Sector","PGCIL",80.0,765.0],
    [1691,1690,"2022-03-31","LILO of both ckts of Bawana - Mandola at Maharanibagh","Double Circuit","Central Sector","PGCIL",120.0,400.0],
    [1692,1691,"2022-03-31","Jassa Singh - HMEL 400kV Switching Station at Village Behman","Double Circuit","State Sector","PSTCL",34.0,400.0],
    [1693,1692,"2022-03-31","LILO of 400kV Talwandi Sabo-Moga Ckts. at Switching Station at Behman Jassa Singh","Double Circuit","State Sector","PSTCL",32.0,400.0],
    [1694,1693,"2022-03-31","LILO of both Ckts. of Fedra (Pachchham) - Dholera SIR AA line at Dholera Solar Park S/S","Multiple Circuits","State Sector","GETCO",39.0,400.0],
    [1695,1694,"2022-03-31","LILO of ckt. III and IV (Quad) Patna - Balia at Naubatpur (New)","Double Circuit","State Sector","BSPTCL",6.0,400.0],
    [1696,1695,"2022-03-31","Rasipalayam - Dharmapuri (Palavadi)","Double Circuit","State Sector","TANTRANSCO",379.0,400.0],
    [1697,1696,"2022-03-31","Wanakbori-Soja line (Pkg-2) with Twin AL-59 conductor","Double Circuit","State Sector","GETCO",94.0,400.0],
    [1698,1697,"2022-03-31","220kV cable terminating tower (Loc No-11 VTP line) to the proposed 220/66kv GIS Exora S/S (UG Cable)","Double Circuit","State Sector","KPTCL",3.0,220.0],
    [1699,1698,"2022-03-31","Amreli - Babara line (AL-59)","Double Circuit","State Sector","GETCO",53.0,220.0],
    [1700,1699,"2022-03-31","Basni-NPH (Jodhpur) line (Ckt.-II)","Double Circuit","State Sector","RVPNL",7.0,220.0],
    [1701,1700,"2022-03-31","Bhaukhari (400) - Dulhipar (220) line","Double Circuit","State Sector","UPPTCL",108.0,220.0],
    [1702,1701,"2022-03-31","Bihta (New) - Bihta","Double Circuit","State Sector","BSPTCL",34.0,220.0],
    [1703,1702,"2022-03-31","Bihta-Sipara (New)","Double Circuit","State Sector","BSPTCL",84.0,220.0],
    [1704,1703,"2022-03-31","Bolangir - Kesinga line","Double Circuit","State Sector","OPTCL",164.0,220.0],
    [1705,1704,"2022-03-31","Chitradurga - Hiriyur S/S","Double Circuit","State Sector","KPTCL",46.0,220.0],
    [1706,1705,"2022-03-31","Fedra (Pachchham) - Dholera AA line with Twin AL-59 Conductor","Double Circuit","State Sector","GETCO",67.0,220.0],
    [1707,1706,"2022-03-31","Gaunsgarh - Ladhowal","Double Circuit","State Sector","PSTCL",34.0,220.0],
    [1708,1707,"2022-03-31","Itarsi (PGCIL) - Budhni","Direct Current Distribution System","State Sector","MPPTCL",60.0,220.0],
    [1709,1708,"2022-03-31","Jeheta (400)- Hardoi Rd (220) Interconnector","Double Circuit","State Sector","UPPTCL",20.0,220.0],
    [1710,1709,"2022-03-31","Kapadwanj - Mehmdabad line","Double Circuit","State Sector","GETCO",93.0,220.0],
    [1711,1710,"2022-03-31","Kottayam - Ettumanoor","Double Circuit","State Sector","KSEB",12.0,220.0],
    [1712,1711,"2022-03-31","Kottayam - Thuravoor (Kottayam Dist Alapuzha Dist)","Double Circuit","State Sector","KSEB",51.0,220.0],
    [1713,1712,"2022-03-31","LILO line on M/C towers from existing 220KV Belagavi-Chikkodi line to the AEQUS S/S","Double Circuit","State Sector","KPTCL",23.0,220.0],
    [1714,1713,"2022-03-31","LILO of 220kV Sikar -Dhod line at GSS PGCIL Sikar","Double Circuit","State Sector","RVPNL",16.0,220.0],
    [1715,1714,"2022-03-31","LILO of Ara (PG) - Pusauli (PG) at Dumraon GIS","Double Circuit","State Sector","BSPTCL",81.0,220.0],
    [1716,1715,"2022-03-31","LILO of Begusarai - Biharsarif at Mokama line","Double Circuit","State Sector","BSPTCL",13.0,220.0],
    [1717,1716,"2022-03-31","LILO of both Ckts. Otha - Sagapara line at Talaja","Double Circuit","State Sector","GETCO",40.0,220.0],
    [1718,1717,"2022-03-31","LILO of Narendrapur - Therubali line at Gunupur S/S","Double Circuit","State Sector","OPTCL",27.0,220.0],
    [1719,1718,"2022-03-31","LILO of one Ckt. of Hadala-Sartanpar line at propsed 220kV Ghiyavad on M/C tower","Double Circuit","State Sector","GETCO",17.0,220.0],
    [1720,1719,"2022-03-31","LILO of PL -AM - Kottayam at Kottayam","Multiple Circuits","State Sector","KSEB",8.0,220.0],
    [1721,1720,"2022-03-31","Muktsar - Sandhwan line","Single Circuit on Double Circuit","State Sector","PSTCL",39.0,220.0],
    [1722,1721,"2022-03-31","Nagamangala- Anchepalya","Double Circuit","State Sector","KPTCL",100.0,220.0],
    [1723,1722,"2022-03-31","Pallivasal - Aluva line","Double Circuit","State Sector","KSEB",166.0,220.0],
    [1724,1723,"2022-03-31","PGCIL Station at Beerenahalli (Hiriyur) to existing Hiriyur s/s","Single Circuit","State Sector","KPTCL",15.0,220.0],
    [1725,1724,"2022-03-31","Sandhour- Kup Kalan line (Raiway)","Double Circuit","State Sector","PSTCL",11.0,220.0],
    [1726,1725,"2022-04-30","LILO of Kishanganj (POWERGRID) - Darbhanga (DMTCL) (QUAD) line at Saharsa (New)","Double Circuit","Central Sector","PGCIL",78.0,400.0],
    [1727,1726,"2022-04-30","LILO of Nabinagar -II - Patna (PG) at Jakkanpur (New)","Double Circuit","State Sector","BSPTCL",33.0,400.0],
    [1728,1727,"2022-04-30","Vellalavidhuthi 400 kV SS - Nemmeli Thippayakudy 230 kV SS","Single Circuit","State Sector","TANTRANSCO",23.0,230.0],
    [1729,1728,"2022-04-30","Biharsharif - Asthawan (New)","Double Circuit","State Sector","BSPTCL",40.0,220.0],
    [1730,1729,"2022-04-30","Dindi -Existing Kondamallepally line","Double Circuit","State Sector","TSTRANSCO",66.0,220.0],
    [1731,1730,"2022-04-30","Eklahare - Pimpalgaon","Double Circuit","State Sector","MSETCL",88.0,220.0],
    [1732,1731,"2022-04-30","Kodungallur - Irinjalakuda","Double Circuit","State Sector","KSEB",28.0,220.0],
    [1733,1732,"2022-04-30","LILO of 220kV Roza-Budaun at Datagang (220) line","Double Circuit","State Sector","UPPTCL",14.0,220.0],
    [1734,1733,"2022-04-30","LILO of 2nd Ckts. of 220kV Kunihar- Panchkula line","Double Circuit","State Sector","HPPTCL",4.0,220.0],
    [1735,1734,"2022-04-30","LILO of Lakhwar- Dehradun at Vyasi","Double Circuit","State Sector","PTCUL",71.0,220.0],
    [1736,1735,"2022-04-30","LILO of One ckt 220 kV Sohawal (PG) -New Tanda line at Ayodhya (220)","Double Circuit","State Sector","UPPTCL",26.0,220.0],
    [1737,1736,"2022-04-30","LILO of one ckt. Fatehpur-Unchahar at Malwan","Double Circuit","State Sector","UPPTCL",64.0,220.0],
    [1738,1737,"2022-04-30","Passian-Dhablan line (Railway) line","Double Circuit","State Sector","PSTCL",8.0,220.0],
    [1739,1738,"2022-04-30","Pirana (PG) - Barejadi line","Double Circuit","State Sector","GETCO",46.0,220.0],
    [1740,1739,"2022-04-30","Saharsa (New) - Khagaria (New)","Double Circuit","State Sector","BSPTCL",72.0,220.0],
    [1741,1740,"2022-04-30","Sector 69-Sector72 Ckt.-II","Double Circuit","State Sector","HVPNL",2.0,220.0],
    [1742,1741,"2022-04-30","Extn. ofESSAR-Lakadia/Bhachau (Tripple snow bird) line upto Jamkhambaliya PS","Double Circuit","Private Sector","APL",37.0,400.0],
    [1743,1742,"2022-05-31","Badaun-Sambhal Line","Double Circuit","State Sector","UPPTCL",90.0,400.0],
    [1744,1743,"2022-05-31","Gokarna - New Chanditala","Double Circuit","State Sector","WBSETCL",360.0,400.0],
    [1745,1744,"2022-05-31","Indore (PGCIL) - Ujjian (GEC-I)","Direct Current Distribution System","State Sector","MPPTCL",91.0,400.0],
    [1746,1745,"2022-05-31","Barabanki - Satrikh Road line","Double Circuit","State Sector","UPPTCL",49.0,220.0],
    [1747,1746,"2022-05-31","Benkikere S/s - proposed Hosadurga line","Double Circuit","State Sector","KPTCL",82.0,220.0],
    [1748,1747,"2022-05-31","LILO of 220kV Sambhal -Chandausi line at Sambhal (400)","Double Circuit","State Sector","UPPTCL",32.0,220.0],
    [1749,1748,"2022-05-31","LILO of both Ckts. 220kV Tharad-Deodar line at Mera s/s with AL-59 Conductor line","Multiple Circuits","State Sector","GETCO",40.0,220.0],
    [1750,1749,"2022-05-31","Muzaffarpur (PG) - Gouraul line","Double Circuit","State Sector","BSPTCL",20.0,220.0],
    [1751,1750,"2022-05-31","Pandiabili PGCIL - Pratapsasan line","Double Circuit","State Sector","OPTCL",61.0,220.0],
    [1752,1751,"2022-05-31","Rajarhat (PGCIL) - Barasat 220kV s/s","Double Circuit","State Sector","WBSETCL",17.0,220.0],
    [1753,1752,"2022-06-30","Reconfiguration of BhujPS- Lakadia PS as to establish Bhuj-II-Lakadia line as well as Bhuj-II-Bhuj-II line","Double Circuit","Central Sector","PGCIL",106.0,765.0],
    [1754,1753,"2022-06-30","MTPS - Ramgarh (Bypassing Gola SS)","Single Circuit","Central Sector","DVC",211.0,220.0],
    [1755,1754,"2022-06-30","MTPS- Ranchi (PG) (Bypassing Gola SS)","Single Circuit","Central Sector","DVC",232.0,220.0],
    [1756,1755,"2022-06-30","Ashta (400kV)- Ujjain (400kV) line","Direct Current Distribution System","State Sector","MPPTCL",180.0,400.0],
    [1757,1756,"2022-06-30","Hadala-Shapar line with (Twin AL-59) conductor","Double Circuit","State Sector","GETCO",129.0,400.0],
    [1758,1757,"2022-06-30","Sembatty-Checkanurani","Single Circuit on Double Circuit","State Sector","TANTRANSCO",16.0,230.0],
    [1759,1758,"2022-06-30","Dehan - Hamirpur","Double Circuit","State Sector","HPPTCL",116.0,220.0],
    [1760,1759,"2022-06-30","Kalapaka -HPCL-I and II","Double Circuit","State Sector","APTRANSCO",22.0,220.0],
    [1761,1760,"2022-06-30","LILO of Ara (PG) - Khagaul (BSPTCL) at Naubatpur (New)","Double Circuit","State Sector","BSPTCL",27.0,220.0],
    [1762,1761,"2022-06-30","LILO of both Ckt. of 220kV RTPP Salempur at 220kV S/S at Bakana (Ckt.-I)","Double Circuit","State Sector","HVPNL",15.0,220.0],
    [1763,1762,"2022-06-30","LILO of both Ckt. of 220kV RTPP Salempur at 220kV S/S at Bakana (Ckt.-II)","Double Circuit","State Sector","HVPNL",15.0,220.0],
    [1764,1763,"2022-06-30","LILO of both Ckts. pf 220kV Bhimasar-Chardava line at proposed 220kV Vankada (Nichi Mandal) with AL-59 conductor with OPGW","Multiple Circuits","State Sector","GETCO",5.0,220.0],
    [1765,1764,"2022-06-30","LILO of KTPS V-Lower Sileru-II - proposed Pump House-1 at B.G. Kottur","Double Circuit","State Sector","TSTRANSCO",33.0,220.0],
    [1766,1765,"2022-06-30","LILO of VTS Ckt.-I Kamavarapukota at Nuziveedu line","Single Circuit","State Sector","APTRANSCO",2.0,220.0],
    [1767,1766,"2022-06-30","LILO on 220kV ONGC-Panvel S/S at 220kV Panvel TSS","Double Circuit","State Sector","MSETCL",2.0,220.0],
    [1768,1767,"2022-06-30","LILO point -PGCIL Indore at Indore (NZ) line","Direct Current Distribution System","State Sector","MPPTCL",21.0,220.0],
    [1769,1768,"2022-06-30","Naubatpur (New) - Bhusaula (New)","Double Circuit","State Sector","BSPTCL",32.0,220.0],
    [1770,1769,"2022-06-30","Naubatpur (New) - Bihta (BSPTCL)","Double Circuit","State Sector","BSPTCL",40.0,220.0],
    [1771,1770,"2022-06-30","Rewa 220 - Rewa UMSP 220kV line","Direct Current Distribution System","State Sector","MPPTCL",77.0,220.0],
    [1772,1771,"2022-06-30","Shapar - Babara line (AL-59)","Double Circuit","State Sector","GETCO",139.0,220.0],
    [1773,1772,"2022-06-30","Sheiikhopursarai-Asthawan (New)","Double Circuit","State Sector","BSPTCL",35.0,220.0],
    [1774,1773,"2022-06-30","Sunda-Hatkoti","Double Circuit","State Sector","HPPTCL",50.0,220.0],
    [1775,1774,"2022-06-30","Vijayapura proposed -Aaheri line","Double Circuit","State Sector","KPTCL",124.0,220.0],
    [1776,1775,"2022-06-30","Dharamjaygarh Pool section B - Raigarh (Tamnar) Pool line (G-TTPL-TBCB)","Double Circuit","Private Sector","SGL",137.0,765.0],
    [1777,1776,"2022-06-30","Jaunpur -Obra (Twin)","Double Circuit","Private Sector","APL",334.0,400.0],
    [1778,1777,"2022-07-31","Lakadia PS -Bhuj II line (A portion of Reconfiguration of Bhuj PS - Lakadia PS Bhuj-II-Lakadia (Bhuj-Bhuj II) (Loop out portion )","Double Circuit","Central Sector","PGCIL",106.0,765.0],
    [1779,1778,"2022-07-31","Rampur -Sambhal line","Double Circuit","Central Sector","PGCIL",149.0,400.0],
    [1780,1779,"2022-07-31","Re-conductoring of Maithon RB - Maithon line","Double Circuit","Central Sector","PGCIL",63.0,400.0],
    [1781,1780,"2022-07-31","Amrapur - Thaptitanda line","Double Circuit","State Sector","MSETCL",145.0,220.0],
    [1782,1781,"2022-07-31","Badhana - Dadri Toe Jhajjar","Double Circuit","State Sector","HVPNL",30.0,220.0],
    [1783,1782,"2022-07-31","Dwarka -PPK -II U/G","Double Circuit","State Sector","DTL",11.0,220.0],
    [1784,1783,"2022-07-31","Karmnasa (New) - Pusauli (BSPTCL) (TM)","Double Circuit","State Sector","BSPTCL",73.0,220.0],
    [1785,1784,"2022-07-31","LILO of 220kv Sambhal -Gajraula line at Sambhal (400)","Double Circuit","State Sector","UPPTCL",91.0,220.0],
    [1786,1785,"2022-07-31","LILO of Budhipadar - Tarkera at Bamra","Single Circuit","State Sector","OPTCL",11.0,220.0],
    [1787,1786,"2022-07-31","LILO of Nagda -Daloda line at Nagda (220kV) line","Direct Current Distribution System","State Sector","MPPTCL",2.0,220.0],
    [1788,1787,"2022-07-31","Raxaul (New) - Gopalganj (TM/ Single Zebra)","Double Circuit","State Sector","BSPTCL",130.0,220.0],
    [1789,1788,"2022-07-31","Saharsa (New) - Begusarai","Double Circuit","State Sector","BSPTCL",187.0,220.0],
    [1790,1789,"2022-07-31","Tughlakabad - R.K.Puram (U/G Cable)","Double Circuit","State Sector","DTL",26.0,220.0],
    [1791,1790,"2022-07-31","Lakadia PS - Banaskantha PS","Double Circuit","Private Sector","APL",351.0,765.0],
    [1792,1791,"2022-07-31","LILO of 2nd Ckts. of Zebra -Ranchodpura 400 kV D/C line at Banaskantha (PG) PS","Double Circuit","Private Sector","SGL",35.0,400.0],
    [1793,1792,"2022-08-31","Jeerat (New) - Subhasgram (PM-JTL-TBCB)","Double Circuit","Central Sector","PGCIL",214.0,400.0],
    [1794,1793,"2022-08-31","Guna-Shivpuri line","Double Circuit","Central Sector","PGCIL",203.0,220.0],
    [1795,1794,"2022-08-31","Damaracherla - Miryalaguda (Ckt.-I)","Double Circuit","State Sector","TSTRANSCO",16.0,220.0],
    [1796,1795,"2022-08-31","Jalandhar (PGCIL) - Kartarpur","Double Circuit","State Sector","PSTCL",12.0,220.0],
    [1797,1796,"2022-08-31","LILO of 220kV Gonda (400) - Bahraich line at Balrampur (220)","Double Circuit","State Sector","UPPTCL",99.0,220.0],
    [1798,1797,"2022-08-31","LILO of 220kV Hardoi - Sahjahanpur (PG) at Mallawan (220)","Double Circuit","State Sector","UPPTCL",86.0,220.0],
    [1799,1798,"2022-08-31","LILO of 220kV Jahangirpur (765)-IITGNL line at Jewar (220)","Double Circuit","State Sector","UPPTCL",14.0,220.0],
    [1800,1799,"2022-08-31","LILO of 220kV Sarojini Nagar - Bachhrawan line at Vijnor (220)","Double Circuit","State Sector","UPPTCL",9.0,220.0],
    [1801,1800,"2022-08-31","LILO on 220kV Badnera - Dhamangaon line for 150MW Solar plant of M/s Avadhaa at Dhamangaon Dist Amravati","Single Circuit","State Sector","MSETCL",19.0,220.0],
    [1802,1801,"2022-08-31","Wadakkanchery - Kunnamkulam","Multiple Circuits","State Sector","KSEB",45.0,220.0],
    [1803,1802,"2022-09-30","Bina - Guna line","Double Circuit","Central Sector","PGCIL",214.0,400.0],
    [1804,1803,"2022-09-30","Bhind -Morena line","Double Circuit","Central Sector","PGCIL",109.0,220.0],
    [1805,1804,"2022-09-30","Guna - Guna line","Double Circuit","Central Sector","PGCIL",53.0,220.0],
    [1806,1805,"2022-09-30","Parulia - Burdwan line","Double Circuit","Central Sector","DVC",207.0,220.0],
    [1807,1806,"2022-09-30","Barnala - Handiaya Rly. S/Stn. (Railway Deptt.)","Double Circuit","State Sector","PSTCL",2.0,220.0],
    [1808,1807,"2022-09-30","LILO from existing 200kV HSR -Hoody line (proposed GIS) at Shobha Dream Acres line","Double Circuit","State Sector","KPTCL",1.0,220.0],
    [1809,1808,"2022-09-30","LILO of 220kV Meerut - Amroha at Chandpur line","Double Circuit","State Sector","UPPTCL",51.0,220.0],
    [1810,1809,"2022-09-30","LILO of 220 kV Panki (220) - Bhauti (PG) Kanpur (400) line at Kidwai Nagar Govindnagar (Kanpur) line","Double Circuit","State Sector","UPPTCL",6.0,220.0],
    [1811,1810,"2022-09-30","LILO on existing 220kV Ahemadnagar - Bhose line for 400 kV Karjat S/s","Double Circuit","State Sector","MSETCL",72.0,220.0],
    [1812,1811,"2022-09-30","Modipuram-II Bagpat PG line","Double Circuit","State Sector","UPPTCL",77.0,220.0],
    [1813,1812,"2022-09-30","Rajarhat (PG) - Newtown- II C 220kV DC/CKt. UG Cable line","Double Circuit","State Sector","WBSETCL",23.0,220.0],
    [1814,1813,"2022-09-30","LILO of Bhachau - EPGL (Tiple) line at Lakadia PS","Double Circuit","Private Sector","APL",77.0,400.0],
    [1815,1814,"2022-10-31","Ingur - Arasur (PGCIL)","Single Circuit","State Sector","TANTRANSCO",54.0,230.0],
    [1816,1815,"2022-10-31","RA Puram-Mylapore Feeder UG Cable","Single Circuit","State Sector","TANTRANSCO",4.0,230.0],
    [1817,1816,"2022-10-31","LILO of 220kV Chorania - Sadla line and 220kV Sadla- Gondal line at 220kV Shapar s/s","Multiple Circuits","State Sector","GETCO",5.0,220.0],
    [1818,1817,"2022-10-31","Panchgaon 400 kV - Panchgaon 220 kV","Double Circuit","State Sector","HVPNL",1.0,220.0],
    [1819,1818,"2022-10-31","Vairag- Avaada Solar Park","Single Circuit","State Sector","MSETCL",26.0,220.0],
    [1820,1819,"2022-10-31","Bhuj PS - Lakadia PS","Double Circuit","Private Sector","APL",215.0,765.0],
    [1821,1820,"2022-10-31","North Karanpura - Chandwa (Jharkhand) NKSTPP line (NKTL -TBCB)","Multiple Circuits","Private Sector","APL",26.0,400.0],
    [1822,1821,"2022-10-31","North Karanpura - Chandwa (Jharkhand) PS line (NKTL -TBCB)","Double Circuit","Private Sector","APL",50.0,400.0],
    [1823,1822,"2022-11-30","Diversion of Dhauliganga - Bareilly 400 kV D/C line (operated at 220kV) at Bareilly end from Bareilly (UP) to Bareilly (PG) line (one ckt charged)","Double Circuit","Central Sector","PGCIL",8.0,400.0],
    [1824,1823,"2022-11-30","LILO of both ckt.of 400 kV D/C Dhauliganga - Bareilly (PG) line at Jauljivi ( 2 Ckts charged)","Double Circuit","Central Sector","PGCIL",3.0,400.0],
    [1825,1824,"2022-11-30","Disconnection of 220 kV LILO arrangement of Dhauliganga - Bareilly at Pithoragarh and connecting it to Jauljivi (one ckt charged","Double Circuit","Central Sector","PGCIL",24.0,220.0],
    [1826,1825,"2022-11-30","LILO of Karad - Lonikand at Jejuri","Double Circuit","State Sector","MSETCL",22.0,400.0],
    [1827,1826,"2022-11-30","Varanasi (PG)-Jaunpur Line","Double Circuit","State Sector","UPPTCL",145.0,400.0],
    [1828,1827,"2022-11-30","Bareilly (400) - Amaria line","Double Circuit","State Sector","UPPTCL",77.0,220.0],
    [1829,1828,"2022-11-30","Gajwel - Siddipet line (on Galvanized Towers with Mosse ACSR)","Double Circuit","State Sector","TSTRANSCO",65.0,220.0],
    [1830,1829,"2022-11-30","LILO of Balimela-Malkangir line at Kalimela","Double Circuit","State Sector","OPTCL",72.0,220.0],
    [1831,1830,"2022-11-30","LILO on 220kV Girwali - Hingoli line at 220kV Kurunda S/S","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [1832,1831,"2022-11-30","Rasra (400) - Bhadaura (Gazipur) line","Double Circuit","State Sector","UPPTCL",111.0,220.0],
    [1833,1832,"2022-12-31","Re-conductring of the NP Kunta-Kolar (Twin Moose) section with high capacity conductors (like twin HTLS equivalent or QM)","Single Circuit","Central Sector","PGCIL",131.0,400.0],
    [1834,1833,"2022-12-31","Disconnection of 220kv LILO arrangement of Dhauliganga -Bareilly at Pithoragarh and connecting it to Jaulivi (balance one Ckt. charged)","Double Circuit","Central Sector","PGCIL",24.0,220.0],
    [1835,1834,"2022-12-31","LILO of one ckt of Khandwa (PGCIL) - Rajgarh (PGCIL) at Chhegaon","Direct Current Distribution System","State Sector","MPPTCL",3.0,400.0],
    [1836,1835,"2022-12-31","Yadadri TPP switchyard - Damaracherla S/S","Double Circuit","State Sector","TSTRANSCO",10.0,400.0],
    [1837,1836,"2022-12-31","230 kV D/C line on tower with Zebra conductor for rerouting the existing 230kV PUSHEP - Arasur and Shenbagapudur- arasur feeders in between loc. 306-309","Double Circuit","State Sector","TANTRANSCO",2.0,230.0],
    [1838,1837,"2022-12-31","220kV D/C line from 765kV S/stn. PGCIL Bhiwani to 220kV S/stn HVPNL Bhiwani","Double Circuit","State Sector","HVPNL",29.0,220.0],
    [1839,1838,"2022-12-31","220kV SCDC line from 220kV Ner S/S - 100MW Solar power plant by M/s. Avaada MH Solar Pvt. Ltd.","Single Circuit","State Sector","MSETCL",14.0,220.0],
    [1840,1839,"2022-12-31","2nd Circuit stringing of 220kV Darbhanga (400/220)-Samastipur (New) line","Double Circuit","State Sector","BSPTCL",46.0,220.0],
    [1841,1840,"2022-12-31","Ambetha- Devdha","Double Circuit","State Sector","GETCO",20.0,220.0],
    [1842,1841,"2022-12-31","Damaracherla - Miryalaguda (Ckt.-II)","Double Circuit","State Sector","TSTRANSCO",16.0,220.0],
    [1843,1842,"2022-12-31","LILO of Kharghar -Kalwa (TIFFII-(Trombay section) at Pawne S/S by underground cable","Double Circuit","State Sector","MSETCL",1.0,220.0],
    [1844,1843,"2022-12-31","LILO of one Ckt. 220kV D/C FGPP- Pallaline at 220kV S/S Sector-78 Faridabad","Double Circuit","State Sector","HVPNL",4.0,220.0],
    [1845,1844,"2022-12-31","LILO of one Ckt of 220kV D/C Amreli - Babara line at proposed 220kV Patkhilori","Double Circuit","State Sector","GETCO",43.0,220.0],
    [1846,1845,"2022-12-31","Muzaffarpur (PG) - Chhapra (New)","Double Circuit","State Sector","BSPTCL",129.0,220.0],
    [1847,1846,"2022-12-31","Raebareli (400) - Sangipur line","Double Circuit","State Sector","UPPTCL",26.0,220.0],
    [1848,1847,"2022-12-31","Diversion of Dhauliganga -Bareilly 400kV D/C (operated at 220kV) at Bareilly end from Bareilly to Bareilly (PG) line (balance one Ckt Charged)","Double Circuit","Central Sector","PGCIL",8.0,400.0],
    [1849,1848,"2022-12-31","LILO of both Ckt. of 400kV D/C Dhauliganga -Bareilly (PG) line at Jaulijvi (Balance 2 Ckts Charged)","Double Circuit","Central Sector","PGCIL",3.0,400.0],
    [1850,1849,"2023-01-31","UT Chandigarh s/s -Punchkula (PG) s/s line under establishment of 220kV GIS at UT Chandigarh along with 220 kV D/C line from Chandigarh GIS to 400/220kV Punchkula (PG) s/s (Only Ckt.-1)","Double Circuit","Central Sector","PGCIL",24.0,220.0],
    [1851,1850,"2023-01-31","Bus Extn. from Old Switchyard - New Switchyard for evacuation arrangement for 1x660MW Generation of Bhusawal","Double Circuit","State Sector","MSETCL",1.0,400.0],
    [1852,1851,"2023-01-31","Lahal GISS - Chamera (PS) (Both Ckts.)","Double Circuit","State Sector","HPPTCL",71.0,400.0],
    [1853,1852,"2023-01-31","LILO of 400kV HNPCL- Kamavarapukota TMDC line to proposed 400/220/11 kV Guddigudem S/S","Double Circuit","State Sector","APTRANSCO",41.0,400.0],
    [1854,1853,"2023-01-31","Kethireddypally - Chandanvally s/s","Double Circuit","State Sector","TSTRANSCO",25.0,220.0],
    [1855,1854,"2023-01-31","Koradi-II - Uppalwadi UG and O/H line","Double Circuit","State Sector","MSETCL",14.0,220.0],
    [1856,1855,"2023-01-31","LILO of Budhipadar - Tarkera at Kuanramunda","Double Circuit","State Sector","OPTCL",32.0,220.0],
    [1857,1856,"2023-01-31","LILO of Hiranagar-Gladni at Chowadhi","Single Circuit","State Sector","JKPDD",1.0,220.0],
    [1858,1857,"2023-01-31","LILO of one Ckt. of Bhopal -Ashta line at 220kv Bairagarh line","Direct Current Distribution System","State Sector","MPPTCL",7.0,220.0],
    [1859,1858,"2023-01-31","LILO of VTS- 3 and 4 -Piduguralla","Double Circuit","State Sector","APTRANSCO",1.0,220.0],
    [1860,1859,"2023-01-31","LILO on 220kV MC/DC towers from 220kV Narendra-Haveri line to proposed S/S (for a distance of 2.418 kms)","Double Circuit","State Sector","KPTCL",19.0,220.0],
    [1861,1860,"2023-01-31","Mundayad - Thalasseri line","Double Circuit","State Sector","KSEB",43.0,220.0],
    [1862,1861,"2023-01-31","Pulivendula - Mutyalacheruvu","Double Circuit","State Sector","APTRANSCO",109.0,220.0],
    [1863,1862,"2023-01-31","Lakadia - Vadodara Transmission line","Double Circuit","Private Sector","SGL",670.0,765.0],
    [1864,1863,"2023-02-28","Lower Subhansiri - Biswanath Chariyali line -I","Double Circuit","Central Sector","PGCIL",354.0,400.0],
    [1865,1864,"2023-02-28","NTPC Limited -Bhadla-II (On D/C Tower)","Single Circuit","Central Sector","NTPC Ltd.",25.0,400.0],
    [1866,1865,"2023-02-28","NTPC ltd 300MW Power Plant -Common (PS) of NTPCs 250MW and 300MW Solar Project","Single Circuit","Central Sector","NTPC Ltd.",1.0,400.0],
    [1867,1866,"2023-02-28","NTPC ltd -Tuticorin-II (GIS)","Single Circuit","Central Sector","NTPC Ltd.",18.0,230.0],
    [1868,1867,"2023-02-28","NTPC Ltd 300MW Power Plant-Bhadla-II (PS)","Single Circuit","Central Sector","NTPC Ltd.",19.0,220.0],
    [1869,1868,"2023-02-28","NTPC Ltd (90MW) Power Plant -Common (PS) of NTPCs (150MW) and (90MW) Solar Project at Devikoot-Fatehgarh-II (PS)","Single Circuit","Central Sector","NTPC Ltd.",2.0,220.0],
    [1870,1869,"2023-02-28","Solar Project at Devikoot(150MW) -Fatehgharh-II (PS)","Single Circuit","Central Sector","NTPC Ltd.",2.0,220.0],
    [1871,1870,"2023-02-28","Various DTLs from Solar Park-Pavagada (PS)","Double Circuit","State Sector","KSPDCL",87.0,400.0],
    [1872,1871,"2023-02-28","Basin Bride - Pulianthope (UG Cable)","Single Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [1873,1872,"2023-02-28","Extn. of new EGT supply Laying of 230kV XLPE AI UG cable for a route length of 1Km from CTT tower - Metering point inside consumer premises","Single Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [1874,1873,"2023-02-28","Tondiarpet SS to Pulianthope GIS SS (UG Cable)","Double Circuit","State Sector","TANTRANSCO",5.0,230.0],
    [1875,1874,"2023-02-28","Vellalaviduthi 400 kV SS - Thuvakudy 230 kV SS","Single Circuit","State Sector","TANTRANSCO",48.0,230.0],
    [1876,1875,"2023-02-28","Chatra - Pakribarwadih","Double Circuit","State Sector","JUSNL",120.0,220.0],
    [1877,1876,"2023-02-28","Chibramau- Farrukhabad line","Double Circuit","State Sector","UPPTCL",52.0,220.0],
    [1878,1877,"2023-02-28","Galiveedu PSS-1-NP Kunta (CKt.-I)","Double Circuit","State Sector","APSPCL",9.0,220.0],
    [1879,1878,"2023-02-28","Galiveedu PSS-1- NP Kunta (Ckt.-II)","Double Circuit","State Sector","APSPCL",9.0,220.0],
    [1880,1879,"2023-02-28","Galiveedu PSS-3-NP Kunta (Ckt-1)","Double Circuit","State Sector","APSPCL",3.0,220.0],
    [1881,1880,"2023-02-28","Galiveedu PSS-3-NP Kunta (Ckt.II)","Double Circuit","State Sector","APSPCL",3.0,220.0],
    [1882,1881,"2023-02-28","LILO of Jaunpur -Gajokhar at Junpur LIne","Double Circuit","State Sector","UPPTCL",59.0,220.0],
    [1883,1882,"2023-02-28","LILO of Jetpur - Sardargadh line at Shapur s/s","Double Circuit","State Sector","GETCO",12.0,220.0],
    [1884,1883,"2023-02-28","LILO of one Ckt of Azamgarh-II -Bhadoi line at Machhlisahar (Jaunpur)","Double Circuit","State Sector","UPPTCL",78.0,220.0],
    [1885,1884,"2023-02-28","LILO of Sarnath - Sahupuri at Bhadaura","Double Circuit","State Sector","UPPTCL",154.0,220.0],
    [1886,1885,"2023-02-28","LILO on Lalpar - Sartanpar line at Wankaner (M/C tower by replacement of existing 132kV towers) (AL-59)","Double Circuit","State Sector","GETCO",76.0,220.0],
    [1887,1886,"2023-02-28","NP Kunta PSS2-NP Kunta (CKt.-1)","Double Circuit","State Sector","APSPCL",2.0,220.0],
    [1888,1887,"2023-02-28","NP Kunta Pss2-NP Kunta (Ckt-2)","Double Circuit","State Sector","APSPCL",2.0,220.0],
    [1889,1888,"2023-02-28","NP Kunta PSS3-NP Kunta (Ckt-1)","Double Circuit","State Sector","APSPCL",5.0,220.0],
    [1890,1889,"2023-02-28","NP Kunta PSS3-NP Kunta (Ckt-2)","Double Circuit","State Sector","APSPCL",5.0,220.0],
    [1891,1890,"2023-02-28","NP Kunta PSS4 -NP Kunta (Ckt-1)","Double Circuit","State Sector","APSPCL",7.0,220.0],
    [1892,1891,"2023-02-28","NP Kunta PSS4 -NP Kunta (Ckt-2)","Double Circuit","State Sector","APSPCL",7.0,220.0],
    [1893,1892,"2023-02-28","Tibber -Sohal line","Double Circuit","State Sector","PSTCL",7.0,220.0],
    [1894,1893,"2023-02-28","Adani Generation Switchyar-Fatehgarh (PS)","Double Circuit","Private Sector","AREPRL",1.0,400.0],
    [1895,1894,"2023-02-28","Avaada Energy Private Limited -Bikaner (PS)","Single Circuit","Private Sector","AVAADA",14.0,400.0],
    [1896,1895,"2023-02-28","Ayana Renewable Power One Pvt. Ltd. Plant- Bikaner (PS)","Single Circuit","Private Sector","AYANA",10.0,400.0],
    [1897,1896,"2023-02-28","Ayana Renewable Power Three Power Plant Common (PS) of Ayana Renewable Power One and Three Pvt. Ltd. -Bikaner (PS)","Single Circuit","Private Sector","AYANA",1.0,400.0],
    [1898,1897,"2023-02-28","Common Pooling Point of both Azure Bikaner 500MW Plants -Bikaner","Single Circuit","Private Sector","AZURE",3.0,400.0],
    [1899,1898,"2023-02-28","RENEW (Jharkhand Four) PowerPlant- Common (PS) of RENEW (Jharkhand Four) -Bikaner (PS)","Single Circuit","Private Sector","RENEWSOLARENERGY",13.0,400.0],
    [1900,1899,"2023-02-28","ReNew Solar Power Plant Switchyard -Bikaner","Single Circuit","Private Sector","RENEWSOLARPOWER",4.0,400.0],
    [1901,1900,"2023-02-28","Betam Wind Energy-Tuticorin-II","Single Circuit","Private Sector","BWEPL",18.0,230.0],
    [1902,1901,"2023-02-28","Green Infra Renewable- Tuticorin-II","Single Circuit","Private Sector","GREENINFRA",35.0,230.0],
    [1903,1902,"2023-02-28","GRT Jewllers (India) Private Limited-Tuticorin-II (GIS)","Single Circuit","Private Sector","GRT",7.0,230.0],
    [1904,1903,"2023-02-28","JSW Future Energy Ltd-Tuticorin-II","Single Circuit","Private Sector","JSWFuture",23.0,230.0],
    [1905,1904,"2023-02-28","Mytrah Wind Farms-Tirunelveli (PS)","Double Circuit","Private Sector","MYTRAH",16.0,230.0],
    [1906,1905,"2023-02-28","Orange Sironj - Tuticorin-II","Single Circuit","Private Sector","ORANGE",29.0,230.0],
    [1907,1906,"2023-02-28","Sprng Renewable-Pugalur","Single Circuit","Private Sector","SPRNG",4.0,230.0],
    [1908,1907,"2023-02-28","ABC Bhadla Solar Power Plant -Bhadla-II P(S)","Single Circuit","Private Sector","ABCSolar",12.0,220.0],
    [1909,1908,"2023-02-28","ACME Bhadla Solar Power Plant-Bhadla","Single Circuit","Private Sector","ACME",10.0,220.0],
    [1910,1909,"2023-02-28","ACME Solar Holdings Ltd. Power Plant - Bhadla -II (PS)","Single Circuit","Private Sector","ACME",10.0,220.0],
    [1911,1910,"2023-02-28","Adani Green Energy Nine Solar Power Project-Fatehgarh-II (Scope od ISTS)","Single Circuit","Private Sector","AHEJL",45.0,220.0],
    [1912,1911,"2023-02-28","Adani Grren Energy Seven Ltd. Plant -Fatehgarh-II (PS)","Single Circuit","Private Sector","AHEJL",25.0,220.0],
    [1913,1912,"2023-02-28","Alfanar -Energy Private Limited (AEPL-Kotda Madh) - Bhuj (PS)","Single Circuit","Private Sector","ALFANAR",66.0,220.0],
    [1914,1913,"2023-02-28","AREPRL Solar Park-Bhadla","Double Circuit","Private Sector","AREPRL",35.0,220.0],
    [1915,1914,"2023-02-28","Avaada Energy Pvt Ltd Solar Power Plant - Bhadla-II (PS)","Single Circuit","Private Sector","AVAADA",22.0,220.0],
    [1916,1915,"2023-02-28","Avikiran Solar India Private Limited -Bhuj PS","Single Circuit","Private Sector","AVIKIRAN",83.0,220.0],
    [1917,1916,"2023-02-28","Avikiran Surya India Pvt. Solar Power Plant- Bikaner PS","Single Circuit","Private Sector","AVIKIRAN",10.0,220.0],
    [1918,1917,"2023-02-28","Azure 130MW Plant-Bhadla","Single Circuit","Private Sector","AZURE",14.0,220.0],
    [1919,1918,"2023-02-28","AZURE Solar PV Plant -Bhadla-2-Bhadla","Single Circuit","Private Sector","AZURE",21.0,220.0],
    [1920,1919,"2023-02-28","AZURE Solar PV Plant Bhadla -Bhadla","Single Circuit","Private Sector","AZURE",4.0,220.0],
    [1921,1920,"2023-02-28","Chhugar PS -Dayapar/Ratadiaya (PS)","Single Circuit","Private Sector","AWEKL",37.0,220.0],
    [1922,1921,"2023-02-28","CLP India Private Limited -Jam Khambhaliya (PS)","Single Circuit","Private Sector","APRAAVA",43.0,220.0],
    [1923,1922,"2023-02-28","Construction 220kV S/C each from Jaisalmer I Project and Jaisalmer-II Project upto Common point of Jaisalmer -I Project and Jaisalmer-II Project-II -Fatehgarh-II","Single Circuit","Private Sector","RENEWSOLARENERGY",17.0,220.0],
    [1924,1923,"2023-02-28","Construction 220kV S/C line from Jaisalmer I Project and Jaislamer II Project upto common point Common point of Jaisalmer -I Project and Jaisalmer II Project -Fatehgarh -II","Double Circuit","Private Sector","RENEWSOLARENERGY",7.0,220.0],
    [1925,1924,"2023-02-28","Dayapar / Ratadiya PS-Bhuj (with Capacity of at least 725 MW at Nominal Voltage)","Double Circuit","Private Sector","AWEKL",37.0,220.0],
    [1926,1925,"2023-02-28","EDEN Cite ISTS RAj Power Plant -Fatehgarh-II (New ) (PS)","Single Circuit","Private Sector","EDEN",13.0,220.0],
    [1927,1926,"2023-02-28","Essel Solar Park- Bhadla","Double Circuit","Private Sector","ESUCRL",76.0,220.0],
    [1928,1927,"2023-02-28","Green Infra Wind Energy Ltd. (GIWEL) -(Bhuj) - Bhuj (PS)","Single Circuit","Private Sector","GIWEL",64.0,220.0],
    [1929,1928,"2023-02-28","Green Infra Wind Energy Ltd. (GIWEL-Roha)- Bhuj(PS)","Single Circuit","Private Sector","GIWEL",65.0,220.0],
    [1930,1929,"2023-02-28","Hero Solar Generation Switchyard-Bhadla","Single Circuit","Private Sector","HEROSOLAR",10.0,220.0],
    [1931,1930,"2023-02-28","IWISL -Bhuj (PS)","Double Circuit","Private Sector","INOX",77.0,220.0],
    [1932,1931,"2023-02-28","IWISL (Dayapar)-Bhuj (PS)","Double Circuit","Private Sector","CONTINUUM",73.0,220.0],
    [1933,1932,"2023-02-28","Jaisalmer-3 Plant - Fatehgarh-II","Single Circuit","Private Sector","RENEWSOLARENERGY",19.0,220.0],
    [1934,1933,"2023-02-28","Jaisalmer-4 Project-Fatehgarh-II (PS)","Single Circuit","Private Sector","RENEWSOLARPOWER",8.0,220.0],
    [1935,1934,"2023-02-28","Mahindra Susten 250MW Solar Project-Bhadla","Single Circuit","Private Sector","MAHINDRA",16.0,220.0],
    [1936,1935,"2023-02-28","Mahindra Susten Solar Power Project- Bhadla-II","Single Circuit","Private Sector","MAHINDRA",19.0,220.0],
    [1937,1936,"2023-02-28","Mahoba Solar Power Plant Switch YArd -Bhadla","Single Circuit","Private Sector","AREHL",16.0,220.0],
    [1938,1937,"2023-02-28","Mahoba Solar (UP) Private Limeted Power Project-Fatehgarh-II (New) PS","Double Circuit","Private Sector","AREHL",72.0,220.0],
    [1939,1938,"2023-02-28","Mahoba Solar (UP) Private Limited-Bhadla","Single Circuit","Private Sector","AREHL",16.0,220.0],
    [1940,1939,"2023-02-28","Murchbana/Mokhra PS - Dayapar/Ratadiya (PS)","Single Circuit","Private Sector","AWEKL",37.0,220.0],
    [1941,1940,"2023-02-28","Netra-Bhuj (PS)","Single Circuit","Private Sector","NETRA",81.0,220.0],
    [1942,1941,"2023-02-28","OKWPL - Bhachau (PS)","Double Circuit","Private Sector","OSTRO",69.0,220.0],
    [1943,1942,"2023-02-28","POWERICA Ltd. -Jam Khambaliya (PS)","Single Circuit","Private Sector","POWERICA",1.0,220.0],
    [1944,1943,"2023-02-28","ReNew Power Limited -Hiriyur","Single Circuit","Private Sector","RENEWPOWER",78.0,220.0],
    [1945,1944,"2023-02-28","ReNew Wind Energy (AP2) Private Limited- Bhuj (PS)","Single Circuit","Private Sector","RENEW",73.0,220.0],
    [1946,1945,"2023-02-28","RPVPL- Bhachau","Double Circuit","Private Sector","RENEWPOWER",48.0,220.0],
    [1947,1946,"2023-02-28","RUMS Ltd. Switchyard -Rewa (PS)","3xDouble Circuit","Private Sector","RUMSL",10.0,220.0],
    [1948,1947,"2023-02-28","SBER Eleven Solar Power Project -Bikaner","Single Circuit","Private Sector","SBSR",11.0,220.0],
    [1949,1948,"2023-02-28","SBE Renewables Ten Private Ltd Power Project-Fatehgarh-II (PS)","Double Circuit","Private Sector","SBERTPL",57.0,220.0],
    [1950,1949,"2023-02-28","SBESS-Indore (PG)","Single Circuit","Private Sector","AWEMPL",70.0,220.0],
    [1951,1950,"2023-02-28","SEI Sunshine PSS_Shivpuri (MPPTCL)","Double Circuit","Private Sector","SEISUNSHINE",4.0,220.0],
    [1952,1951,"2023-02-28","SESPL -Bhuj-II","Single Circuit","Private Sector","SRIJAN",20.0,220.0],
    [1953,1952,"2023-02-28","Sherisha Rooftop Solar SPV Four Private Ltd.- Raipur (Capacity at least200MW at Nominal Voltage)","Single Circuit","Private Sector","SHERISHA",1.0,220.0],
    [1954,1953,"2023-02-28","Sitac-Bhuj-II","Single Circuit","Private Sector","SITAC",60.0,220.0],
    [1955,1954,"2023-02-28","Tata Power Green Energy Ltd Solar Power Plant-Bikaner-I (PS)","Single Circuit","Private Sector","TATAGREEN",19.0,220.0],
    [1956,1955,"2023-02-28","Tata Power Renewable Energy Limited-Bhadla","Single Circuit","Private Sector","TATARENEW",46.0,220.0],
    [1957,1956,"2023-02-28","TPREL 500 MW Solar Power Project Chhayan- Bhadla","Single Circuit","Private Sector","TATARENEW",46.0,220.0],
    [1958,1957,"2023-03-31","LILO of 765kV Gr. Noida (765kV)- Hapur(765) line at Meerut","Single Circuit","Central Sector","PGCIL",70.0,765.0],
    [1959,1958,"2023-03-31","LILO of 400kV Bareilly (PGCIL) - Moradabad line (Ckt-1) at Rampur s/s (under Mohanlalgani Intrastate Project )","Double Circuit","Central Sector","PGCIL",5.0,400.0],
    [1960,1959,"2023-03-31","Mohindergarh - Bhiwani line","Double Circuit","Central Sector","PGCIL",122.0,400.0],
    [1961,1960,"2023-03-31","Reconducting of Kolhapur (PG)- Kolhapur (MSETCL) (Ckt-1) under TS Strengthening beyond Kolhapur for export of power from Solar and Wind Energy Zones in Southern Region","Double Circuit","Central Sector","PGCIL",40.0,400.0],
    [1962,1961,"2023-03-31","Simbhavali -Meerut line","Double Circuit","Central Sector","PGCIL",57.0,400.0],
    [1963,1962,"2023-03-31","(Assam) Rangia - Amingaon line","Double Circuit","Central Sector","PGCONSULTANCY",198.0,220.0],
    [1964,1963,"2023-03-31","(Assam) Tinsukia - Behiating (new Dibrugarh)","Double Circuit","Central Sector","PGCONSULTANCY",336.0,220.0],
    [1965,1964,"2023-03-31","(Nagaland) New Kohima - Mokokchung (PG)","Double Circuit","Central Sector","PGCONSULTANCY",276.0,220.0],
    [1966,1965,"2023-03-31","Re-conducting of Alipurduar - Solakati 220kV line with Single GTLS conductor under NERSS-XII","Double Circuit","Central Sector","PGCIL",202.0,220.0],
    [1967,1966,"2023-03-31","(Sikkim) Rangpo (PG) - Samardong","Double Circuit","Central Sector","PGCONSULTANCY",5.0,220.0],
    [1968,1967,"2023-03-31","UT Chandigarh S/s - Panchkula (PG) s/s line under Establishment of 220/22 kV GIS at UT Chandigarh along with 220 kV D/C line from Chandigarh GIS-400/220 kV Panchkula (PG) s/s (Ckts-II )","Double Circuit","Central Sector","PGCIL",24.0,220.0],
    [1969,1968,"2023-03-31","Kalaburagi (Ferozabad) MC tower of 400kV YTPS -BPS line near Merched Village at Kalaburagi","Double Circuit","State Sector","KPTCL",234.0,400.0],
    [1970,1969,"2023-03-31","Kamuthi - Newly constructed Ottapidara","Double Circuit","State Sector","TANTRANSCO",143.0,400.0],
    [1971,1970,"2023-03-31","LILO of both circuits of 400kV Khammam - Mamidipally to Choutuppal S/S","Double Circuit","State Sector","TSTRANSCO",33.0,400.0],
    [1972,1971,"2023-03-31","Manali - Pulianthoppe","Double Circuit","State Sector","TANTRANSCO",19.0,400.0],
    [1973,1972,"2023-03-31","LILO of Existing Paramathi - Alundur at Valayapatty","Double Circuit","State Sector","TANTRANSCO",60.0,230.0],
    [1974,1973,"2023-03-31","LILO of T. Sipcot -Savasapuram 230kV Feeder - the Ottapidaram","Double Circuit","State Sector","TANTRANSCO",12.0,230.0],
    [1975,1974,"2023-03-31","Aug. of 1st Ckt from Rajpura - Mandi Gobindgarh 1 with HTLS","Single Circuit","State Sector","PSTCL",32.0,220.0],
    [1976,1975,"2023-03-31","Aug. of 2nd Ckts from Rajpura-Mandi Gobindgarh 1 with HTLS","Single Circuit","State Sector","PSTCL",32.0,220.0],
    [1977,1976,"2023-03-31","Balotra -HRRL (Refinery) HPCL Rajasthan Refinery Ltd line from 220kV GSS RVPNL Balotra","Single Circuit","State Sector","RVPNL",29.0,220.0],
    [1978,1977,"2023-03-31","Bhiwadi -DFCCIL TSS Mundana (Deposit work of DFCCIL Railway)","Double Circuit","State Sector","RVPNL",6.0,220.0],
    [1979,1978,"2023-03-31","Boner - Aligarh (400) line","Single Circuit","State Sector","UPPTCL",18.0,220.0],
    [1980,1979,"2023-03-31","Jagalur (Hiremallanahole) - Chitradurga","Double Circuit","State Sector","KPTCL",72.0,220.0],
    [1981,1980,"2023-03-31","Jodhpur (400 kV GSS) - Banar","Double Circuit","State Sector","RVPNL",21.0,220.0],
    [1982,1981,"2023-03-31","Kalaburagi (Ferozabad) Line1 from proposed Kalaburagi s/s (Ferozabad) - Existing line at Shahabad (Sedam)","Double Circuit","State Sector","KPTCL",34.0,220.0],
    [1983,1982,"2023-03-31","Kalaburagi (Ferozabad) line 2 from proposed 400/220 kV Kalaburagi s/s - Existing 220kV S/C line from Shahapur-Kapnoor line at Shahapppur","Double Circuit","State Sector","KPTCL",7.0,220.0],
    [1984,1983,"2023-03-31","LILO from Kothipura - Tubinakere at Channapatna","Double Circuit","State Sector","KPTCL",7.0,220.0],
    [1985,1984,"2023-03-31","LILO line on M/C Towers from 220kV RTPS - Sedam - Ramasamudra S/S","Multiple Circuits","State Sector","KPTCL",37.0,220.0],
    [1986,1985,"2023-03-31","LILO of 220kV Muzaffarnagar - Modipuram (220) at Khatauli (220)","Double Circuit","State Sector","UPPTCL",2.0,220.0],
    [1987,1986,"2023-03-31","LILO of both circuits of Malkaram - Narketpally to Choutuppal SS (Multi circuit towers)","Multiple Circuits","State Sector","TSTRANSCO",61.0,220.0],
    [1988,1987,"2023-03-31","LILO of Jetpur-Visavadar line at Bhesan s/s","Double Circuit","State Sector","GETCO",5.0,220.0],
    [1989,1988,"2023-03-31","LILO of Khagaul (BSPTCL) - Sipara (BSPTCL) at Jakkanpur (New)","Single Circuit","State Sector","BSPTCL",50.0,220.0],
    [1990,1989,"2023-03-31","LILO of KTPP-Howrah at Proposed Food Park (GIS) s/s","Double Circuit","State Sector","WBSETCL",2.0,220.0],
    [1991,1990,"2023-03-31","LILO of Moradabad (400) - Rampur (220) at Rampur (765) line","Double Circuit","State Sector","UPPTCL",17.0,220.0],
    [1992,1991,"2023-03-31","LILO of VSS - Kakinada line at Parawada in Visakhapatnam District","Double Circuit","State Sector","APTRANSCO",1.0,220.0],
    [1993,1992,"2023-03-31","Malout - Abohar","Single Circuit on Double Circuit","State Sector","PSTCL",30.0,220.0],
    [1994,1993,"2023-03-31","Maszid Moth - Tughlakabad (U/G) Cable","Double Circuit","State Sector","DTL",14.0,220.0],
    [1995,1994,"2023-03-31","Samardong - Dikchu Pool line","Double Circuit","State Sector","SIKKIM",45.0,220.0],
    [1996,1995,"2023-03-31","Verpal-Dhukhniwaran line","Double Circuit","State Sector","PSTCL",6.0,220.0],
    [1997,1996,"2023-04-30","Sholinganallur (Ottiyambakkam) - Omega","Double Circuit","State Sector","TANTRANSCO",66.0,230.0],
    [1998,1997,"2023-04-30","Jangaon -Devannapet line","Double Circuit","State Sector","TSTRANSCO",109.0,220.0],
    [1999,1998,"2023-04-30","LILO of Duburi - Balasore at Dhamra","Double Circuit","State Sector","OPTCL",70.0,220.0],
    [2000,1999,"2023-04-30","Saharanpur PG (400) - Deoband line","Double Circuit","State Sector","UPPTCL",50.0,220.0],
    [2001,2000,"2023-04-30","Tajpur- Goraul line","Double Circuit","State Sector","BSPTCL",102.0,220.0],
    [2002,2001,"2023-04-30","AGEL - Bhuj-II line","Single Circuit","Private Sector","ADANIGREEN",79.0,220.0],
    [2003,2002,"2023-05-31","Laying of 400 KV 1X2500 Sq.mm XLPE UG cable from perumbakkam junction to Pallikarunai OH/UG Junction in the Sholinghanallur to Guindy 400 KV Feeder for aroute length of 8.546 Km under turnkey basis","Single Circuit","State Sector","TANTRANSCO",8.0,400.0],
    [2004,2003,"2023-05-31","Soja -Zerda line (Pkg-2) with Twin AL-59 Conductor","Double Circuit","State Sector","GETCO",135.0,400.0],
    [2005,2004,"2023-05-31","Erection of 230KV SC on DC tower with ZEBRA conductor from Pudukottai 230 LV SS to Vellalaviduthy 400/230 KV SS.","Single Circuit","State Sector","TANTRANSCO",51.0,230.0],
    [2006,2005,"2023-05-31","220KV DC/SC (2-Phase) line from the existing 220/11KV LIS SS Settypalli to proposed 220/25KV RTSS Veldurthy","Double Circuit+Single Circuit","State Sector","APTRANSCO",6.0,220.0],
    [2007,2006,"2023-05-31","220KV Pallantla-Guddigudem DC Line at Loc.No.54 to 400/220/11KV Guddigudem SS","Double Circuit","State Sector","APTRANSCO",25.0,220.0],
    [2008,2007,"2023-05-31","2-Phase Single Circuit Transmission line on D/C towers from 220 kV S/s Jafferpur to TSS Rudraupur for M/s IRCON","Single Circuit","State Sector","PTCUL",10.0,220.0],
    [2009,2008,"2023-05-31","Hindupur (400) - Pampanur Tanda (220)(GEC-I)","Double Circuit","State Sector","APTRANSCO",140.0,220.0],
    [2010,2009,"2023-05-31","LILO of 220kV Phulpur- Jhunsi 400kV Machhalishahar","Single Circuit","State Sector","UPPTCL",99.0,220.0],
    [2011,2010,"2023-05-31","LILO of Bina - Ganjbasoda 220 KV Line at Bina (MPPTCL) 400KV S/s","Direct Current Distribution System","State Sector","MPPTCL",25.0,220.0],
    [2012,2011,"2023-05-31","LILO of Howarh-KTPP at Jangalpur 220 kV GIS","Double Circuit","State Sector","WBSETCL",1.0,220.0],
    [2013,2012,"2023-05-31","LILO on 220 kV Nalasopara- Boisar line at Palghar","Double Circuit","State Sector","MSETCL",5.0,220.0],
    [2014,2013,"2023-05-31","LILO Pallantla -Pattiseema line at Guddigudem line","Double Circuit","State Sector","APTRANSCO",23.0,220.0],
    [2015,2014,"2023-06-30","Bikaner-II PS-Khetri 400kV line (phase II part F)","Multiple Circuits","Central Sector","PGCIL",1102.0,400.0],
    [2016,2015,"2023-06-30","Khetri-Bhiwadi 400kV line (Twin HTLS) (PHASE II Part F)","Double Circuit","Central Sector","PGCIL",251.0,400.0],
    [2017,2016,"2023-06-30","Re-conductoring of BTPS- Salakati 220kv line with Single HTLS Conductor","Double Circuit","Central Sector","PGCIL",8.0,220.0],
    [2018,2017,"2023-06-30","Dindi S/s -Yedula s/s","Double Circuit","State Sector","TSTRANSCO",111.0,400.0],
    [2019,2018,"2023-06-30","220kV DC line from 220kV Wani s/s to 132kV Pandharkawda","Double Circuit","State Sector","MSETCL",65.0,220.0],
    [2020,2019,"2023-06-30","220 kV Pilipokhar Agra (400) - I.O.C.L. Mathura D/C line","Double Circuit","State Sector","UPPTCL",84.0,220.0],
    [2021,2020,"2023-06-30","Bhari (proposed) - Daheru Railway TSS line","Double Circuit","State Sector","PSTCL",26.0,220.0],
    [2022,2021,"2023-06-30","Existing 220/132kV Fabcity - Amazon (Fabcity) S/S","Double Circuit","State Sector","TSTRANSCO",4.0,220.0],
    [2023,2022,"2023-06-30","LILO of Pulukurthy- Bheemghanpur line to KTPP SS","Double Circuit","State Sector","TSTRANSCO",46.0,220.0],
    [2024,2023,"2023-06-30","Warangal(New)- Warangal(Existing)","Double Circuit","Private Sector","APL",95.0,400.0],
    [2025,2024,"2023-07-31","Removal of LILO of one Ckt. of Bhadla-Bikaner  at Bikaner  and Extension of this LILO section from Bikaner  to Bikaner-PS -Bikaner ","Double Circuit","Central Sector","PGCIL",68.0,400.0],
    [2026,2025,"2023-07-31","220kV Budaun  - Dataganj DC line","Double Circuit","State Sector","UPPTCL",55.0,220.0],
    [2027,2026,"2023-07-31","220kV TMDC from 400kV Hindupur S/S - 220kV S/S Gollapuram","Double Circuit","State Sector","APTRANSCO",59.0,220.0],
    [2028,2027,"2023-07-31","Diversion of existing STPS-Asansol Transmission line","Double Circuit","State Sector","WBSETCL",5.0,220.0],
    [2029,2028,"2023-07-31","LILO of Durgapur - Asansole Tr. Line at proposed Mongalpur 220kV GIS","Mixed Circuit","State Sector","WBSETCL",9.0,220.0],
    [2030,2029,"2023-07-31","Hyderabad - Kurnool","Double Circuit","Private Sector","APL",335.0,765.0],
    [2031,2030,"2023-08-31","Reconductoring of Kolhapur - Kolhapur  400kv D/C line  under TS strengthening beyond Kolhapur for export of power from Solar and Wind Energy","Double Circuit","nan","PGCIL",40.0,400.0],
    [2032,2031,"2023-08-31","LILO of one circuit of 220kV D/C BECL - Botad line at proposed 220kV Vallabhipur with ACSR Zebra conductor with OPGW","Double Circuit","Central Sector","GETCO",11.0,220.0],
    [2033,2032,"2023-08-31","Strengthening of existing 220kV Antharasanahalli-Nelamangala SC line by replacing Drake by HTLS conductor","Single Circuit","Central Sector","KPTCL",59.0,220.0],
    [2034,2033,"2023-08-31","Rewa UMSP - Sidhi 220kV DCDS line","Direct Current Double Sided","Central Sector","MPPTCL",126.0,220.0],
    [2035,2034,"2023-08-31","LILO of 220kV Sirohi - Bhinmal line at 220kV GSS Reodar line","Double Circuit","Central Sector","RVPNL",50.0,220.0],
    [2036,2035,"2023-08-31","220kV 1000Sq.mm XPLE Cable from 220kV SS Maheswaram- 220/33kV Amazon  SS ","Double Circuit","Central Sector","TSTRANSCO",1.0,220.0],
    [2037,2036,"2023-08-31","LILO of 220 kV Agra PG- Sikandra line at Kirawali","Double Circuit","Central Sector","UPPTCL",4.0,220.0],
    [2038,2037,"2023-08-31","LILO of 220 kV Hapur- Simbhaoli line at Simbhaoli","Double Circuit","Central Sector","UPPTCL",39.0,220.0],
    [2039,2038,"2023-09-30","Fatehgarh-III  - Jaisalmer-II ","Double Circuit","Central Sector","PGCIL",100.0,400.0],
    [2040,2039,"2023-09-30","Sitamarhi   - Dhalkebar  ","Double Circuit","Central Sector","PGCIL",78.0,400.0],
    [2041,2040,"2023-09-30","Jammalamadugu - Porumamilla YSR Kadapa District","Double Circuit","State Sector","APTRANSCO",200.0,220.0],
    [2042,2041,"2023-09-30","Creation of 220kV D/C Mund-IOCL line","Double Circuit","State Sector","HVPNL",68.0,220.0],
    [2043,2042,"2023-09-30","Narlapur SS - Yedula SS","Double Circuit","State Sector","TSTRANSCO",55.0,400.0],
    [2044,2043,"2023-09-30","LILO of Salivagu- Bheemghanpur line to KTPP SS","Double Circuit","State Sector","TSTRANSCO",42.0,220.0],
    [2045,2044,"2023-09-30","LILO of 220kV Gorakhpur - Mahrajganj DC line at Annand Nagar","Double Circuit","State Sector","UPPTCL",70.0,220.0],
    [2046,2045,"2023-09-30","LILO of 220kV Sitapur  - Nighasan  SC line at Kanduni","Double Circuit","State Sector","UPPTCL",59.0,220.0],
    [2047,2046,"2023-09-30","Maharajganj - Gorakhpur PG  line","Double Circuit","State Sector","UPPTCL",175.0,220.0],
    [2048,2047,"2023-09-30","Warangal  - Chilakaluripeta","Double Circuit","Private Sector","APL",392.0,765.0],
    [2049,2048,"2023-09-30","Warangal  - Hyderabad","Double Circuit","Private Sector","APL",268.0,765.0],
    [2050,2049,"2023-09-30","Masaya Solar Energy Private Limeted- Khandwa 220kV S/C Line","Single Circuit","Private Sector","MASAYA",14.0,220.0],
    [2051,2050,"2023-09-30","TPL- Jam Khambhaliya PS line","Single Circuit","Private Sector","TORRENT",28.0,220.0],
    [2052,2051,"2023-10-31","LILO of one Ckt. on Monopole of Ataur  - Indirapuram  D/C Quad Moose on Noida under TB - 202111 ","Double Circuit","Central Sector","PGCIL",21.0,400.0],
    [2053,2052,"2023-10-31","LILO of both Clts. of 220 kV D/C Thavar -Tharad line at proposed 220kV Ghodasr  with Al-59 conductor with OPGW","Mixed Circuit","State Sector","GETCO",23.0,220.0],
    [2054,2053,"2023-10-31","Construction from the existing Chintamani S/s - the proposed Srinivasapura S/s at Srinivasapura","Double Circuit","State Sector","KPTCL",48.0,220.0],
    [2055,2054,"2023-10-31","220kV Deoli  -Ghatodi line upto Yawatmal LILO point","Double Circuit","State Sector","MSETCL",99.0,220.0],
    [2056,2055,"2023-10-31","LILO of Karaikudi - Pugalur feeder-I at Vellalaviduthi","Double Circuit","State Sector","TANTRANSCO",167.0,400.0],
    [2057,2056,"2023-10-31","Erection of 230kV Dc line on DC towers with Zebra conductor by making LILO of 230 kV MTPS- Salem Feeder at the New Karuppur 230/110kV s/s","Double Circuit","State Sector","TANTRANSCO",25.0,230.0],
    [2058,2057,"2023-10-31","Erection of 230kV S/C line on D/C tower from Vellalaviduthi 400kV S/S  - Thuvakudy 230kV S/S","Single Circuit","State Sector","TANTRANSCO",46.0,230.0],
    [2059,2058,"2023-10-31","Erection of 230 kV S/C line on DC tower from Vellalaviduthi 400 kV S/S - Nemmeli Thippayajudy 230 kV S/S","Single Circuit","State Sector","TANTRANSCO",23.0,230.0],
    [2060,2059,"2023-10-31","Vellalaviduthi - existing Pudukottaai 230 kV SS","Single Circuit on Double Circuit","State Sector","TANTRANSCO",21.0,230.0],
    [2061,2060,"2023-10-31","Vellaviduthi S/S  and 230 kV S/C line on D/C tower for Loc A - Mondipatty 230kV s/s","Single Circuit","State Sector","TANTRANSCO",92.0,230.0],
    [2062,2061,"2023-10-31","Yedula-Vattem QMDC line","Double Circuit","State Sector","TSTRANSCO",30.0,400.0],
    [2063,2062,"2023-10-31","220kV Shahjahanpur  - Gola  DC line","Double Circuit","State Sector","UPPTCL",115.0,220.0],
    [2064,2063,"2023-10-31","Bhadohi - Raja Ka Talab DC line","Double Circuit","State Sector","UPPTCL",3.0,220.0],
    [2065,2064,"2023-10-31","Kursi Road  - Kanduni line","Double Circuit","State Sector","UPPTCL",91.0,220.0],
    [2066,2065,"2023-10-31","LILO of 220kV Parichha  - Orai Ckt.II at Moth line","Double Circuit","State Sector","UPPTCL",11.0,220.0],
    [2067,2066,"2023-10-31","LILO of Modipuram- Faridnagar at Modipuram-II line","Double Circuit","State Sector","UPPTCL",12.0,220.0],
    [2068,2067,"2023-10-31","Warora  - Warangal ","Double Circuit","Private Sector","ADANI",665.0,765.0],
    [2069,2068,"2023-10-31","Kharghar -Vikhroli D/C and M/C line with bays at Kharghar and Vikhroli  along with 400kV Bus Extn. at Kharghar","Double Circuit on Mixed Circuit","Private Sector","ADANI",43.0,400.0],
    [2070,2069,"2023-10-31","LILO of both Ckts. of Pugalur-Pugalur   at Karur PS","Double Circuit","Private Sector","ADANI",9.0,400.0],
    [2071,2070,"2023-10-31","Koppal PS - Narendra  Trans. Ltd.","Double Circuit","Private Sector","RENEW",276.0,400.0],
    [2072,2071,"2023-11-30","400kV D/C Muradnagar-II – Simbhawali Line under Meerut Simbhawali :INTRASTATE Project","Double Circuit","Central Sector","PGCIL",142.0,400.0],
    [2073,2072,"2023-11-30","220 kV D/C  Kalawad - Kangasiyali Line","Double Circuit","State Sector","GETCO",114.0,220.0],
    [2074,2073,"2023-11-30","Ramanagara _MCMV Line: Construction of 220-66 kV MC line from 220 kV Bidadi S/s 18.188 kms","Mixed Circuit","State Sector","KPTCL",75.0,220.0],
    [2075,2074,"2023-11-30","220/ 110 kV MCMV line from kanhirode to Mundayad","Double Circuit","State Sector","KSEB",18.0,220.0],
    [2076,2075,"2023-11-30","LILO of Gwalior - Datiya 220kV line at Gwalior 765kV S/s","Direct Current Double Sided","State Sector","MPPTCL",6.0,220.0],
    [2077,2076,"2023-11-30","LILO  of 230 kV Sriperumpudur – Korattur feederfor extension of new EHT supply for a initial demand of 40000 KVA to M/s.Ctrls Data Centers Ltd.,-  SIDCO Ambathur Industrial Estate, Chennai","DC","State Sector","TANTRANSC O",3.0,230.0],
    [2078,2077,"2023-11-30","Erection of 230 kV SC line on DC towers with Zebra conductor from Nemmeli Thippiyakudy 230 kV SS to Karaikudi 230 kV SS","SC","State Sector","TANTRANSC O",104.0,230.0],
    [2079,2078,"2023-11-30","220 kV Harduaganj - Khair Line","Double Circuit","State Sector","UPPTCL",77.0,220.0],
    [2080,2079,"2023-11-30","LILO of 220 kV Auraiya  - Sikandara  Ckt II @ Saifai  Line","Double Circuit","State Sector","UPPTCL",30.0,220.0],
    [2081,2080,"2023-11-30","220 kV Gr. Noida  - YEIDA Sec-24 Line","Mixed Circuit","State Sector","UPPTCL",54.0,220.0],
    [2082,2081,"2023-11-30","220 kV Gr. Noida  - YEIDA Sec-18 Line","Mixed Circuit","State Sector","UPPTCL",45.0,220.0],
    [2083,2082,"2023-11-30","220 kV Gonda-Basti -II Line","Single Circuit","State Sector","UPPTCL",78.0,220.0],
    [2084,2083,"2023-11-30","220 kV Azamgarh-II-Bhadohi Line","Double Circuit","State Sector","UPPTCL",72.0,220.0],
    [2085,2084,"2023-12-31","Fatehgarh-III  -Fatehgarh-II 400kV D/c line  under Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan  under phase-II- Part A SPV Name: POWERGRID Ramgarh Transmission Limited","Double Circuit","Central Sector","PGCIL",88.0,400.0],
    [2086,2085,"2023-12-31","400KV D/C Lower Subhansiri - Biswanath Chariyali line - II under Part C of North East / Northern Western Interconnector -I Project","Double Circuit","Central Sector","PGCIL",371.0,400.0],
    [2087,2086,"2023-12-31","Reconductoring of Parli  – Parli CKT-I 400KV D/C Line with Twin HTLS  Conductor & Associated Line Upgradation Activities Under Western Region Expansion Scheme-XXX ","Single Circuit","Central Sector","PGCIL",5.0,400.0],
    [2088,2087,"2023-12-31","765KV Rampur-Ghatampur line under CKT-2 LILO OF 765 KV Ghatampur- Hapur  Line on 765 KV GIS S/S RAMPUR  :INTRASTATE Project ","Single Circuit","Central Sector","PGCIL",116.0,765.0],
    [2089,2088,"2023-12-31","LILO of 220kV Pallantla-Pattisema DC line at Guddigudem","Double Circuit","State Sector","APTRANSCO",24.0,220.0],
    [2090,2089,"2023-12-31","Hindupur - Penukonda","Double Circuit","State Sector","APTRANSCO",50.0,220.0],
    [2091,2090,"2023-12-31","Amnour - Digha","Double Circuit","State Sector","BSPTCL",48.0,220.0],
    [2092,2091,"2023-12-31","220 kV DC line from 400 kV Jejuri Substation to location no. 28 of existing 220 kV Jejuri-Lonand circuit","LILO","State Sector","MSETCL",14.0,220.0],
    [2093,2092,"2023-12-31","Provision of 220 KV 2nd Ckt. Using special arrangement for connecting 400 kv S/s Dhanansu with 220 Kv S/s Gounsgarh regading power evacuation from 400 kv S/s Dhanansu","Single Circuit","State Sector","PSTCL",2.0,220.0],
    [2094,2093,"2023-12-31","Udangudi - Ottapidaram  line","Double Circuit","State Sector","TANTRANSCO",141.0,400.0],
    [2095,2094,"2023-12-31","230 kV SC line on DC towers with Zebra conductor from Loc.No:153 of existing 230 kV Chekkanurani - Sembatty feeder to proposed 230 kV Samayanallur SS.","Single Circuit","State Sector","TANTRANSCO",5.0,230.0],
    [2096,2095,"2023-12-31","220KV  line from 220KV Chandanvally SS to 220KV Amazon ","Double Circuit","State Sector","TSTRANSCO",3.0,220.0],
    [2097,2096,"2023-12-31","Jeerat - Krishnanagar 220 kV D/C connectivity","Double Circuit","State Sector","WBSETCL",114.0,220.0],
    [2098,2097,"2023-12-31","Babai-Bhiwani D/C Transmission Line","Double Circuit","Private Sector","TATA POWER",222.0,400.0],
    [2099,2098,"2024-01-31","LILO of MTPS-A  to Durgapur line at Barjora S/S","Single Circuit","Central Sector","DVC",9.0,220.0],
    [2100,2099,"2024-01-31","Ckt-2 of Re-conductoring of Siliguri – Bongaigaon 400kV D/c line with Twin HTLS conductor under North Eastern Region Strengthening Scheme-XII ","Single Circuit","Central Sector","PGCIL",218.0,400.0],
    [2101,2100,"2024-01-31","LILO of Krishnapatnam - Manubolu  Quad Moose line at Sembcorp  400KV GIS Substation","Double Circuit","State Sector","APTRANSCO",7.0,400.0],
    [2102,2101,"2024-01-31","220KV DC/SC line from 220KV SWS Inaparajupalli to M/s Shree Cement Ltd.","Single Circuit","State Sector","APTRANSCO",2.0,220.0],
    [2103,2102,"2024-01-31","Rachaganneri-Racherla","Double Circuit","State Sector","APTRANSCO",107.0,220.0],
    [2104,2103,"2024-01-31","Sullurpeta-Racherla","Double Circuit","State Sector","APTRANSCO",39.0,220.0],
    [2105,2104,"2024-01-31","220 kV D/C Vadavi - Sanand DFCC Line","Double Circuit","State Sector","GETCO",62.0,220.0],
    [2106,2105,"2024-01-31","220 kV Double Circuit Transmission Line from 220/132 kV GIS Sub-Station Mazra to 220/33 GIS Sub-Station Karian.","Double Circuit","State Sector","HPPTCL",36.0,220.0],
    [2107,2106,"2024-01-31","LILO of Both ckt of 220kV D/C Sohna Road-Rangala Rajpur at 220kV s/stn. RojKaMeo","Mixed Circuit","State Sector","HVPNL",9.0,220.0],
    [2108,2107,"2024-01-31","220kV SCDC line from 220kV Phaltan MIDC to 220kV Mol- Manjarwadi Solar Project of M/s. T.S.Wind Farm Developer.","Single Circuit","State Sector","MSETCL",20.0,220.0],
    [2109,2108,"2024-01-31","LILO of one ckt of 400 KV Jalandhar Kurukshetra DC line at 400 KV Dhanansu.","Double Circuit","State Sector","PSTCL",8.0,400.0],
    [2110,2109,"2024-01-31","LILO of 220 KV Rajpura Mohali at 220 KV Switching Station for release of conncetion to M/s Ultratech.","Double Circuit","State Sector","PSTCL",2.0,220.0],
    [2111,2110,"2024-01-31","230KV,1X1200 sq mm XLPE Aluminium UG cable from new joint bay in Royapettah high road masilamani road to 230kv Mylapore GIS SS for a route length of 1.149 kms for the deviation of existing 230KV TNEB HQ GIS SS to Mylapore feeder","SC","State Sector","TANTRANSCO",1.0,230.0],
    [2112,2111,"2024-01-31","220 kV Jehata-Mallawan DC line","Double Circuit","State Sector","UPPTCL",158.0,220.0],
    [2113,2112,"2024-01-31","LILO of 220kV R.C. Green - Sector-148  line at Knowledge Park-5 Noida","Double Circuit","State Sector","UPPTCL",14.0,220.0],
    [2114,2113,"2024-01-31","LILO of 220kV R.C. Green - Gr. Noida line at Jalpura","Double Circuit","State Sector","UPPTCL",28.0,220.0],
    [2115,2114,"2024-01-31","Khavda PS GIS – Bhuj PS 765 kV D/C Line","Double Circuit","Private Sector","ADANI",218.0,765.0],
    [2116,2115,"2024-02-29","765KV Rampur-Hapur line under LILO OF 765 KV Ghatampur- Hapur  Line on 765 KV GIS S/S RAMPUR  :INTRASTATE Project ","Single Circuit","Central Sector","PGCIL",112.0,765.0],
    [2117,2116,"2024-02-29","Reconductoring of Parli  – Parli CKT-II 400KV D/C Line with Twin HTLS  Conductor & Associated Line Upgradation Activities Under Western Region Expansion Scheme-XXX ","Single Circuit","Central Sector","PGCIL",5.0,400.0],
    [2118,2117,"2024-02-29","Reconductoring of 400 kV Jodhpur   – Kankroli S/c  line with twin HTLS conductor under Scheme to relieve high loading of WR-NR Inter Regional Corridor ","Single Circuit","Central Sector","PGCIL",188.0,400.0],
    [2119,2118,"2024-02-29","220 KV Krishnagiri-Settypalli feeder  ","Single Circuit","State Sector","APTRANSCO",11.0,220.0],
    [2120,2119,"2024-02-29","LILO of both circuits of 220kV D/C Palanpur - Kheralu line at proposed 220kV Sisrana  with AL-59 conductor with OPGW","Mixed Circuit","State Sector","GETCO",51.0,220.0],
    [2121,2120,"2024-02-29","Alusteng-Harwan Transmission Line","Single Circuit","State Sector","JKPDD",14.0,220.0],
    [2122,2121,"2024-02-29","LILO on 220kV Kathapur- Lonikand -I line at 220kV Khed City","Double Circuit","State Sector","MSETCL",11.0,220.0],
    [2123,2122,"2024-02-29","LILO of Pugalur - Kalivanthapattu Line at Ariyalur","Double Circuit","State Sector","TANTRANSCO",14.0,400.0],
    [2124,2123,"2024-02-29","Erection of 230 KV DC line on DC/MC tower with Zebra conductor from LILO of Sanganeri – Abhishekapatti 230KV DC feeder between Tower No.70 – 71 to M/s.TP Solar Ltd","Double Circuit","State Sector","TANTRANSCO",6.0,230.0],
    [2125,2124,"2024-02-29","LILO of Motiram Adda  - Barahuan  Line @ 220kV Khorabar ","Double Circuit","State Sector","UPPTCL",6.0,220.0],
    [2126,2125,"2024-02-29","Pachora SEZ PP -Bhopal  400 kV D/c line","Double Circuit","Private Sector","G R INFRA",288.0,400.0],
    [2127,2126,"2024-03-31","LILO of 400kV Lucknow  - Sultanpur S/C Line at 400kV Substation Mohanlalganj, Lucknow  :INTRASTATE Project ","Single Circuit","Central Sector","PGCIL",14.0,400.0],
    [2128,2127,"2024-03-31","LILO of 400kV Sarojnai Nagar - Unnao  S/C Line at 400kV GIS Substation Mohanlalganj, Lucknow  :INTRASTATE Project ","Single Circuit","Central Sector","PGCIL",77.0,400.0],
    [2129,2128,"2024-03-31","Ckt-1 of Re-conductoring of Siliguri – Bongaigaon 400kV D/c line with Twin HTLS conductor under North Eastern Region Strengthening Scheme-XII ","Double Circuit","Central Sector","PGCIL",218.0,400.0],
    [2130,2129,"2024-03-31","Neemuch PS – Chhittorgarh  s/s 400 kV D/C line ","Double Circuit","Central Sector","PGCIL",233.0,400.0],
    [2131,2130,"2024-03-31","Neemuch PS- Mandsaur s/s 400 kV D/C line ","Double Circuit","Central Sector","PGCIL",236.0,400.0],
    [2132,2131,"2024-03-31","CKT-1 FOR RECONDUCTORING WORK  OF JHARSUGUDA/SUNDARGARH# – ROURKELA  400KV 2XD/C   ","Double Circuit","Central Sector","PGCIL",142.0,400.0],
    [2133,2132,"2024-03-31","CKT-3 FOR RECONDUCTORING WORK  OF JHARSUGUDA/SUNDARGARH# – ROURKELA  400KV 2XD/C    ","Double Circuit","Central Sector","PGCIL",96.0,400.0],
    [2134,2133,"2024-03-31","220KV Guddigudem-Purushothapatnam D/C line","Double Circuit","State Sector","APTRANSCO",47.0,220.0],
    [2135,2134,"2024-03-31","BTPP-Naubatpur Line ","Double Circuit","State Sector","BSPTCL",248.0,400.0],
    [2136,2135,"2024-03-31","BTPP-Dehri-on-sone ","Double Circuit","State Sector","BSPTCL",150.0,220.0],
    [2137,2136,"2024-03-31","400 kV D/C BHOGAT - KALAWAD LINE with Twin AL-59 cond. & 1 OPGW and 1 Earth Wire.","Double Circuit","State Sector","GETCO",250.0,400.0],
    [2138,2137,"2024-03-31","LILO of one circuit of 400 kV VADAVI - HALVAD LINE at 400 kV SANAND-II GIDC S/S with Twin AL-59 cond. & OPGW.","Double Circuit","State Sector","GETCO",85.0,400.0],
    [2139,2138,"2024-03-31","Balance work of 400 kV D/C VADINAR - AMRELI LINE  with ACSR Twin Moose condu. & Earth Wire, M/s Jyoti","Double Circuit","State Sector","GETCO",121.0,400.0],
    [2140,2139,"2024-03-31","LILO of 220 kV Gondal - Sadla line at Kamlapur with AL- 59 conductor","Double Circuit","State Sector","GETCO",46.0,220.0],
    [2141,2140,"2024-03-31","Panchkula  -  Panchkula Sector-32","Double Circuit","State Sector","HVPNL",43.0,220.0],
    [2142,2141,"2024-03-31","Take in arrangement of Madanpur-Kunihar line at Sector- 32 and take in arrangement from remaining portion of Madanpur-Kunihar line at  PGCIL,Naggal.","Double Circuit","State Sector","HVPNL",43.0,220.0],
    [2143,2142,"2024-03-31"," LILO of one ckt. Alusteng - New Wanpoh at Tailbal","Double Circuit","State Sector","JKPDD",7.0,220.0],
    [2144,2143,"2024-03-31"," Extension of Mirbazar - Alusteng line upto New Wanpoh","Double Circuit","State Sector","JKPDD",12.0,220.0],
    [2145,2144,"2024-03-31","Ghanagapura  to  Kalaburagi  line","Double Circuit","State Sector","KPTCL",72.0,220.0],
    [2146,2145,"2024-03-31","220kV Chintamani - Mittemari line:","Double Circuit","State Sector","KPTCL",100.0,220.0],
    [2147,2146,"2024-03-31"," Byrnihat  – Mawngap – New Shillong 220 kV D/c line","Double Circuit","State Sector","MeECL",258.0,220.0],
    [2148,2147,"2024-03-31","220kV line from 220kV S/s Nipaniya for Power supply of 54.5 MVA to Pump house of Shamgarh - Suwasra","Single Circuit","State Sector","MPPTCL",15.0,220.0],
    [2149,2148,"2024-03-31","LILO of Birsinghpur-Satna 220kV line at New S/s Manpur ","Double Circuit","State Sector","MPPTCL",37.0,220.0],
    [2150,2149,"2024-03-31","220KV DC Kalmeshwar-Warud  ","Double Circuit","State Sector","MSETCL",53.0,220.0],
    [2151,2150,"2024-03-31","220 kV DC line from 400 kV Kumbhargaon  - Kurunda - Pkg A ","Double Circuit","State Sector","MSETCL",67.0,220.0],
    [2152,2151,"2024-03-31","220KV DC Kalmeshwar-Warud  ","Double Circuit","State Sector","MSETCL",84.0,220.0],
    [2153,2152,"2024-03-31","220kV Wani Pandharkawda DC line ","Double Circuit","State Sector","MSETCL",51.0,220.0],
    [2154,2153,"2024-03-31","220kV Umred - Nagbhid DCDC line Part-I .","Double Circuit","State Sector","MSETCL",53.0,220.0],
    [2155,2154,"2024-03-31","220kV LILO of Narendrapur-Therubali at Aska New S/s","Double Circuit","State Sector","OPTCL",85.0,220.0],
    [2156,2155,"2024-03-31","•  S/C transmission line from PPS-1 to PGCIL Bhadla-II  •  S/C Transmission Line from PPS-2 to PGCIL Bhadla-II through 220 kV D/C dead end tower outside premises of PPS-1 without entering in PPS-1  •  S/C Transmission Line from PPS-3 to PGCIL Bhadla-II through 220 kV D/C dead end tower outside premises of PPS-4 without entering in PPS-4  •  S/C Transmission Line from PPS-4 to PGCIL Bhadla-II ","Single Circuit","State Sector","Rajasthan Solar Park Development Company Ltd.",121.0,220.0],
    [2157,2156,"2024-03-31","NCTPS Stage-III - North Chennai  line","Double Circuit","State Sector","TANTRANSCO",13.0,765.0],
    [2158,2157,"2024-03-31","LILO Mahabubabad - Warangal line to Ammavaripet","Double Circuit","State Sector","TSTRANSCO",64.0,220.0],
    [2159,2158,"2024-03-31","400 kV Panki - PTPS Line ","Double Circuit","State Sector","UPPTCL",1.0,400.0],
    [2160,2159,"2024-03-31","Stringing of 220 kV Sarnath - Gajokhar Line ","Double Circuit","State Sector","UPPTCL",30.0,220.0],
    [2161,2160,"2024-03-31","AGEL-PSS3 Khavda-I PS 400kV S/c line","Single Circuit","Private Sector","Adani Green Energy Limited",5.0,400.0],
    [2162,2161,"2024-03-31","AREHFL PSS1  – Khavda   PS 400kV S/c line ","Single Circuit","Private Sector","Adani Renewable Energy Holding Four Ltd. ",3.0,400.0],
    [2163,2162,"2024-03-31","AREHFL PSS2 – Khavda   PS 400kV S/c line ","Single Circuit","Private Sector","Adani Renewable Energy Holding Four Ltd. ",5.0,400.0],
    [2164,2163,"2024-03-31","SBE Renewables Sixteen Private Limited Power Plant – Fatehgarh-II PS 220kV S/c line","Single Circuit","Private Sector","Adani Renewable Energy Holding Sixteen Ltd",14.0,220.0],
    [2165,2164,"2024-03-31","AltraXergi Power Pvt. Ltd. Solar power plant – Fatehgarh- III PS 220 kV S/c high capacity line on D/c tower","Single Circuit","Private Sector","Altra Xergi Power Private Limited",5.0,220.0],
    [2166,2165,"2024-03-31","Common Pooling Station of Amp Energy Green Four & Five Solar Power Plant - Bhadla-II PS 220 kV S/c line","Single Circuit","Private Sector","AMP Energy Green Private Limited",12.0,220.0],
    [2167,2166,"2024-03-31","Ayana Renewable Power Six Pvt Ltd –Koppal PS 220kV S/c line","Single Circuit","Private Sector","Ayana Renewable Power Six Pvt Ltd",24.0,220.0],
    [2168,2167,"2024-03-31","Common PS  of  Power Project of 100 MW each for One Volt Energy Private Limited, Amplus Ages Private Limited and Grian Energy Private Limited) – Bikaner-II PS 220 kV S/c line","Single Circuit","Private Sector","Grian Energy Private Limited",3.0,220.0],
    [2169,2168,"2024-03-31","LILO of both circuits of Parli – Pune 400kV D/c line at Kallam PS","Mixed Circuit","Private Sector","INDIGRID",68.0,400.0],
    [2170,2169,"2024-03-31","JSW Renew Energy Limited – Karur 230kV S/c line ","Single Circuit","Private Sector","JSW Neo Energy Limited",4.0,230.0],
    [2171,2170,"2024-03-31","JSW Renew Energy Limited – Tuticorin-II 230kV S/c line","Single Circuit","Private Sector","JSW Renew Energy Ltd",20.0,230.0],
    [2172,2171,"2024-03-31","Generation PS of JSW Renew Energy Ltd.- Tuticorin-II 230kV S/c line .","Single Circuit","Private Sector","JSW Renew Energy Ltd",22.0,230.0],
    [2173,2172,"2024-03-31","Prerak Greentech Private Limited Project – Bikaner-II PS 220 kV S/c line on D/c tower","Single Circuit","Private Sector","Prerak Greentech Private Limited",11.0,220.0],
    [2174,2173,"2024-03-31","Renew Solar Power Pvt Ltd – Koppal PS 220kV S/c line","Single Circuit","Private Sector","Renew Solar Power Pvt Ltd",54.0,220.0],
    [2175,2174,"2024-03-31","ReNew Surya Aayan Private Limited solar power plant – Fatehgarh-III PS 220 kV S/c line on D/c tower","Single Circuit","Private Sector","ReNew Surya Aayan Private Limited",9.0,220.0],
    [2176,2175,"2024-03-31","ReNew Surya Ojas Private Limited generation switchyard – Koppal 220kV S/c","Single Circuit","Private Sector","ReNew Surya Ojas Pvt Ltd",24.0,220.0],
    [2177,2176,"2024-03-31","ReNew Surya Roshni Private Limited hybrid power plant – Fatehgarh-III PS 220 kV S/c high capacity line on D/c tower","Single Circuit","Private Sector","Renew Surya Roshni Private Limited",18.0,220.0],
    [2178,2177,"2024-03-31","ReNew Surya Vihaan Private Ltd. – Fatehgarh-III PS 220 kV S/c line","Single Circuit","Private Sector","Renew Surya Vihaan Private Limited",6.0,220.0],
    [2179,2178,"2024-03-31","Agar Unit - 4  - Pachora SEZ PP 220kV S/c line","Single Circuit","Private Sector","Rewa Ultra Mega Solar Ltd.",1.0,220.0],
    [2180,2179,"2024-03-31","Agar Unit-5  - Pachora SEZ PP 220kV S/c line","Single Circuit","Private Sector","Rewa Ultra Mega Solar Ltd.",32.0,220.0],
    [2181,2180,"2024-04-30","LILO of Ckt-I of 400kV Varanasi  - Biharshariff DC Line at 400kV Sahupuri","Double Circuit","State Sector","UPPTCL",52.0,400.0],
    [2182,2181,"2024-04-30","Extension of Shoolagiri Karimangalam line  to Udanapally 230 KV SS","Single Circuit","State Sector","TANTRANSCO",2.0,230.0],
    [2183,2182,"2024-04-30","UG Cable from Basin Bridge to TNEB Head Quarters","Single Circuit","State Sector","TANTRANSCO",6.0,230.0],
    [2184,2183,"2024-04-30","BTPP - Karmnasa GSS line ","Double Circuit","State Sector","BSPTCL",59.0,220.0],
    [2185,2184,"2024-04-30","LILO of both circuits of 220kV D/C Mota - Ambheta  line at proposed 220kV Mahuva","Mixed Circuit","State Sector","GETCO",44.0,220.0],
    [2186,2185,"2024-04-30","LILO of 220kV Sarna Wadala -Granthian at Gurdaspur","Double Circuit","State Sector","PSTCL",16.0,220.0],
    [2187,2186,"2024-05-31","LILO of 220kV VTS-Tallapally-1 at 220/132 kV SS Rentachintala","Double Circuit","State Sector","APTRANSCO",3.0,220.0],
    [2188,2187,"2024-05-31","BTPP - Dumraon  GSS","Double Circuit","State Sector","BSPTCL",129.0,220.0],
    [2189,2188,"2024-05-31","400/220 kV GIS of POWERGRID at Airendwala to 220/132/33 kV AIS of HPPTCL at Andheri Kala Amb Distt. Sirmaur","Double Circuit","State Sector","HPPTCL",11.0,220.0],
    [2190,2189,"2024-05-31","Kudligi  line from existing 220 kV Itagi SS to the proposed Station at Kudligi","Double Circuit","State Sector","KPTCL",65.0,220.0],
    [2191,2190,"2024-05-31","LILO of 220 KV Balimela Jayanagar Circuit III at 220/33 KV GSS Govindpali","Double Circuit","State Sector","OPTCL",2.0,220.0],
    [2192,2191,"2024-05-31","LILO of 220 kV line New Duburi - Paradeep Circuit I at 220/33 KV GSS Balichandrapur Palei","Double Circuit","State Sector","OPTCL",2.0,220.0],
    [2193,2192,"2024-06-30","LILO of CTPS  - Kalyaneswari line at RTPS","Double Circuit","Central Sector","DVC",52.0,220.0],
    [2194,2193,"2024-06-30","YTPP Switchyard - 400kV Dindi SS","Double Circuit","State Sector","TSTRANSCO",208.0,400.0],
    [2195,2194,"2024-06-30","LILO of Ckt.II of 400 KV DC Quad Varanasi   -Biharsharif at 400 kV Sahupuri SS ","Double Circuit","State Sector","UPPTCL",53.0,400.0],
    [2196,2195,"2024-06-30","Pusouli  - Dehri","Double Circuit","State Sector","BSPTCL",125.0,220.0],
    [2197,2196,"2024-06-30","Patan ","Double Circuit","State Sector","CSPTCL",45.0,220.0],
    [2198,2197,"2024-06-30","LILO of both circuits of Satna-Chhatarpur 220kV line at Ajaygarh ","Double Circuit","State Sector","MPPTCL",14.0,220.0],
    [2199,2198,"2024-06-30","LILO of 220 kV S/Stn Mansa - Sunam at 400 kV S/Stn Patran","Double Circuit","State Sector","PSTCL",85.0,220.0],
    [2200,2199,"2024-07-31","LILO of one Ckt. of 400kV Ludhiana PGCIL- Koldam at proposed 400kV s/s Ropar","Double Circuit","State Sector","PSTCL",14.0,400.0],
    [2201,2200,"2024-07-31","400kV Shamli - Aligarh Line","Double Circuit","State Sector","UPPTCL",482.0,400.0],
    [2202,2201,"2024-07-31","LILO of 230 kV Basin Bridge -TNEB Head Quarters feeder at Pulianthope 400 KV GIS SS ","Double Circuit","State Sector","TANTRANSCO",1.0,230.0],
    [2203,2202,"2024-07-31","220 kV Brandix - Atchuthapuram","Double Circuit","State Sector","APTRANSCO",7.0,220.0],
    [2204,2203,"2024-07-31","220kV DC line from 400kV Kamavarapukota to 220kV SS Bhimadole SS","Double Circuit","State Sector","APTRANSCO",37.0,220.0],
    [2205,2204,"2024-07-31","220 kV D/C Choraniya - Salejada line","Double Circuit","State Sector","GETCO",136.0,220.0],
    [2206,2205,"2024-07-31","Conversion of 220 kV Bidnal-Soundatti- Mahalingapura S/C line - 220 kV Bidnal - Mahalingapur D/C line","Double Circuit","State Sector","KPTCL",125.0,220.0],
    [2207,2206,"2024-07-31","LILO of 2nd circuit of 220kV Bidnal -Mahalinapur DC Line at Soundatti SS","Double Circuit","State Sector","KPTCL",21.0,220.0],
    [2208,2207,"2024-07-31","Sagar - Begamganj 220 kV line  ","Double Circuit","State Sector","MPPTCL",125.0,220.0],
    [2209,2208,"2024-07-31","220 kV Koradi-II to Butibori-III DCMC line","Double Circuit","State Sector","MSETCL",109.0,220.0],
    [2210,2209,"2024-07-31","Connecting 220 kV PGCIL Ludhiana-Doraha SC line with 220 kV Lalton Kalan-Dhandari Kalan forming PGCIL Ludhiana- Dhandari Kalan SC line ","Single Circuit","State Sector","PSTCL",10.0,220.0],
    [2211,2210,"2024-07-31","Darshan Nagar GIS to Sohawal ","Single Circuit","State Sector","UPPTCL",1.0,220.0],
    [2212,2211,"2024-07-31","LILO of KTPP- Jangalpur 220 kV D/C line at Food Park 220 kV Substation","Double Circuit","State Sector","WBSETCL",2.0,220.0],
    [2213,2212,"2024-08-31","Fatehgarh II- Bhadla II 765kV D/C Line  Under Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan  under phase- II- Part B (SPV Name POW","Double Circuit","Central Sector","PGCIL",405.0,765.0],
    [2214,2213,"2024-08-31","LILO of Kayathar - Thennampatti 400 kV line Virudhunagar 765/400 KV SS","Double Circuit","State Sector","TANTRANSCO",140.0,400.0],
    [2215,2214,"2024-08-31","LILO of 220 kv ongole-Racherlpadu line at 220 kv ss Kandukur","Double Circuit","State Sector","APTRANSCO",7.0,220.0],
    [2216,2215,"2024-08-31","Devanahalli Hardware Park  from 400 kV DWHP to CTT for Double LILO of 220 kV Nelamanagal -Hoody DC line ","Mixed Circuit","State Sector","KPTCL",21.0,220.0],
    [2217,2216,"2024-08-31","LILO on 220kV Bhigwan Kurkumb line at 400kV Karjat s/s","Double Circuit","State Sector","MSETCL",34.0,220.0],
    [2218,2217,"2024-08-31","Damaracherla -Huzurnagar line","Double Circuit","State Sector","TSTRANSCO",77.0,220.0],
    [2219,2218,"2024-08-31","220 kV Modipuram-II - Shamli Line","Double Circuit","State Sector","UPPTCL",150.0,220.0],
    [2220,2219,"2024-08-31","LILO of KTPP-Howrah 220 kV D/C Line at Proposed Food Park 220/132 KV GIS S/S","Mixed Circuit","State Sector","WBSETCL",2.0,220.0],
    [2221,2220,"2024-09-30","LILO of Mylsandra-Yeradanahalli at Keonics ","Double Circuit","State Sector","KPTCL",7.0,220.0],
    [2222,2221,"2024-09-30","LILO of 220 kV Shendra- Chitepimpalgaon line at 220 kV Shendra DMIC GIS s/s ","Double Circuit","State Sector","MSETCL",12.0,220.0],
    [2223,2222,"2024-09-30","400 kV D/C Gadag PS-Narendra  line  Karnataka-Part-A Phase-I)","Double Circuit","Private Sector","RENEW",187.0,400.0],
    [2224,2223,"2024-09-30","LILO of Padghe -Ghatkopar/Vikroli 400 kV S/C line at Navi Mumbai GIS ","Single Circuit","Private Sector","STERLITE",38.0,400.0],
    [2225,2224,"2024-09-30","Padghe  - Kharghar 400 kV D/C  line ","Double Circuit","Private Sector","STERLITE",140.0,400.0],
    [2226,2225,"2024-09-30","Vapi-II-Sayali 220 kV D/C line ","Double Circuit","Private Sector","STERLITE",45.0,220.0],
    [2227,2226,"2024-10-31","Sikar II - Aligarh 765kV D/C line  under phase-II- Part D)","Double Circuit","Central Sector","PGCIL",513.0,765.0],
    [2228,2227,"2024-10-31","Sikar II - Neemrana 400kV D/C line   under phase-II- Part C)","Double Circuit","Central Sector","PGCIL",270.0,400.0],
    [2229,2228,"2024-10-31","LILO of 400kV VTS-IV Sattenapalli TMDC line at Thallayapalem and Temporary diversion of PGCIL VTS/Nunna-Nellore 3 and 4 Ckts. to avoid aerial passage over 400/220kV GIS Thallayapalem","Double Circuit","State Sector","APTRANSCO",2.0,400.0],
    [2230,2229,"2024-10-31","Vemagiri - Kamavarapukota","Double Circuit","State Sector","APTRANSCO",116.0,400.0],
    [2231,2230,"2024-10-31","LILO of Talegaon -Kalwa at Vikroli ","Double Circuit","State Sector","MSETCL",24.0,400.0],
    [2232,2231,"2024-10-31","220kV D/C line from 220kv Meerpur Kurali to TSS Rundhi as a deposit work of Indian Railway","Double Circuit","State Sector","HVPNL",25.0,220.0],
    [2233,2232,"2024-10-31","Jerur- Karjat line","Double Circuit","State Sector","MSETCL",101.0,220.0],
    [2234,2233,"2024-10-31","LILO of Badaun- C.B. Ganj line at Badaun Road","Double Circuit","State Sector","UPPTCL",1.0,220.0],
    [2235,2234,"2024-10-31","Bongaigaon  - Nangalbibra  line","Double Circuit","Private Sector","STERLITE",246.0,400.0],
    [2236,2235,"2024-10-31","Xeldem - Mapusa  line ","Double Circuit","Private Sector","STERLITE",106.0,400.0],
    [2237,2236,"2024-10-31","LILO of Apta-Kalwa/Taloja at Navi Mumbai ","Double Circuit","Private Sector","STERLITE",5.0,220.0],
    [2238,2237,"2024-10-31","Xeldem  - Xeldem  Transmission line","Double Circuit","Private Sector","STERLITE",45.0,220.0],
    [2239,2238,"2024-11-30","220 kV Krishnagiri- Nansuralla Line","Single Circuit","State Sector","APTRANSCO",24.0,220.0],
    [2240,2239,"2024-11-30","Jammalamadugu  to proposed Bethamcherla  in Kurnool District","Double Circuit","State Sector","APTRANSCO",151.0,220.0],
    [2241,2240,"2024-11-30","Banka-Goradih Transmission line","Double Circuit","State Sector","BSPTCL",65.0,220.0],
    [2242,2241,"2024-11-30","220 kV U/G cable from Kashmiri Gate SS to 220 kV Timarpur  SS","Double Circuit","State Sector","DTL",10.0,220.0],
    [2243,2242,"2024-11-30","Sonepat to GIS Rai line ","Double Circuit","State Sector","HVPNL",51.0,220.0],
    [2244,2243,"2024-11-30","LILO of 220 kV Allipura-Ragalapadu line at Somasamudra SS","Double Circuit","State Sector","KPTCL",12.0,220.0],
    [2245,2244,"2024-11-30","LILO of Somanahalli-hoody line at Keonics ","Double Circuit","State Sector","KPTCL",14.0,220.0],
    [2246,2245,"2024-11-30","220 kV D/C Surpura-Banar line ","Double Circuit","State Sector","RVPNL",20.0,220.0],
    [2247,2246,"2024-11-30","LILO of 220 kV Durgapur -DPL unit-8 line at AB Zone 220 kV Substation.","Double Circuit","State Sector","WBSETCL",8.0,220.0],
    [2248,2247,"2024-12-31","Bhadla II - Sikar II 765 kV D/C line  under phase-II- Part C)","Double Circuit","Central Sector","PGCIL",618.0,765.0],
    [2249,2248,"2024-12-31","Chandwa - Latehar  line","Double Circuit","State Sector","JUSNL",83.0,400.0],
    [2250,2249,"2024-12-31","LILO of 400 kV Rajwest-Kankani line at 400 kV Pachpadra GSS","Double Circuit","State Sector","RVPNL",72.0,400.0],
    [2251,2250,"2024-12-31","LILO of existing 220 kV Madanapalli-Palamaner line to 220 kV Punganur S/S","Double Circuit","State Sector","APTRANSCO",5.0,220.0],
    [2252,2251,"2024-12-31","LILO of both circuits of 220 kV D/C Jambuva - Karamsad line at Dhuvaran CCPP","Double Circuit","State Sector","GETCO",18.0,220.0],
    [2253,2252,"2024-12-31","LILO of 220 kV D/C Bajoli Holi to Lahal Transmission Line at 220/66 kV Heiling S/S","Double Circuit","State Sector","HPPTCL",1.0,220.0],
    [2254,2253,"2024-12-31","LILO of Sec -72 Gurugram  to Sec -72 Gurugram  ckt - IV at 220 kV Sec 15-II Gurugram220kV Sec 15-II Gurugram","Double Circuit","State Sector","HVPNL",16.0,220.0],
    [2255,2254,"2024-12-31","Powerloom metta to Parambayi","Mixed Circuit","State Sector","KSEB",1.0,220.0],
    [2256,2255,"2024-12-31","LILO of both circuits of Sidhi - Hindalco 220 kV line at Bargawan  S/s ","Double Circuit","State Sector","MPPTCL",8.0,220.0],
    [2257,2256,"2024-12-31","LILO of 220 kV Jalna - Chikhali line at 220 kV Nagewadi S/s","Double Circuit","State Sector","MSETCL",3.0,220.0],
    [2258,2257,"2024-12-31","LILO of 220 kV Balotra-Boranada line at 400 kV Pachpadra GSS","Double Circuit","State Sector","RVPNL",18.0,220.0],
    [2259,2258,"2025-02-28","LILO of CKT-II of Patna  - Barh  at Bakhtiyarpur SS","Double Circuit","State Sector","BSPTCL",21.0,400.0],
    [2260,2259,"2025-02-28","LILO of Kamavarapukota  - Nuziveedu line at Kamavarapukota SS ","Single Circuit","State Sector","APTRANSCO",3.0,220.0],
    [2261,2260,"2025-02-28","Kurud-Rajim line ","Double Circuit","State Sector","CSPTCL",33.0,220.0],
    [2262,2261,"2025-02-28","Ghangapura  SS to Sindagi  SS in Vijayapura Dist","Double Circuit","State Sector","KPTCL",112.0,220.0],
    [2263,2262,"2025-02-28","Halabarga SS to Santhpur SS","Double Circuit","State Sector","KPTCL",57.0,220.0],
    [2264,2263,"2025-02-28","Narsapur - Bowrampet line","Mixed Circuit + Double Circuit","State Sector","TSTRANSCO",149.0,220.0],
    [2265,2264,"2025-02-28","Bachhrawan-Sirsira  line","Double Circuit","State Sector","UPPTCL",161.0,220.0],
    [2266,2265,"2025-02-28","Shatabdinagar- NCRTC RSS line","Double Circuit","State Sector","UPPTCL",5.0,220.0],
    [2267,2266,"2025-02-28","Unnao- Ajgain TSS Line","Single Circuit","State Sector","UPPTCL",12.0,220.0],
    [2268,2267,"2025-03-31","765 kV D/C Kurnool III  - Kurnool  line Part-A and Part-B","Double Circuit","Central Sector","PGCIL",226.0,765.0],
    [2269,2268,"2025-03-31","400 kV D/C Banaskantha - Sankhari Line  under Project - Transmission Network Expansion in Gujarat to increase its ATC from ISTS Part-C","Single Circuit","Central Sector","PGCIL",44.0,400.0],
    [2270,2269,"2025-03-31","Navsari   -Magarwada  400 kV D/C Line under Project - Transmission Network Expansion in Gujarat to increase its ATC from ISTS Part-B","Double Circuit","Central Sector","PGCIL",192.0,400.0],
    [2271,2270,"2025-03-31","Raipur Pool - Dhamtari 400 kV D/C line under Project WRES-XXVII ","Double Circuit","Central Sector","PGCIL",176.0,400.0],
    [2272,2271,"2025-03-31","400 kV Vemagiri-Kamavarapukota TMDC line from 400 kV Sub-Station Kamavarapukota from Loc No. AP 1/0 to Loc.No.AP 42/0  ","Double Circuit","State Sector","APTRANSCO",71.0,400.0],
    [2273,2272,"2025-03-31","LILO of 400kV Shamli-Aligarh Line at THDC Khurja Power Plant","Double Circuit","State Sector","UPPTCL",23.0,400.0],
    [2274,2273,"2025-03-31","LILO of Ottiyambakkam - Omega 2 at proposed 230/110 kV Mambakkam SS ","Double Circuit","State Sector","TANTRANSCO",5.0,230.0],
    [2275,2274,"2025-03-31","LILO of Ottiyambakkam - Omega 2 at proposed 230/110kV Mambakkam SS  for a route length of 19.918 km ","Double Circuit","State Sector","TANTRANSCO",40.0,230.0],
    [2276,2275,"2025-03-31","220 kV AP Carbides - Settipalli D/C Line in Kurnool Dist","Double Circuit","State Sector","APTRANSCO",57.0,220.0],
    [2277,2276,"2025-03-31","220 kV D/C Wagra - Bharuch TSS  line","Double Circuit","State Sector","GETCO",30.0,220.0],
    [2278,2277,"2025-03-31","LILO of both circuit of 220 kV PTPS-Jind D/C line at 220 kV Nain SS","Mixed Circuit","State Sector","HVPNL",32.0,220.0],
    [2279,2278,"2025-03-31","LILO of one ckt of 220kV D/C Samaypur-Palwal at 220kV Harfali","Double Circuit","State Sector","HVPNL",19.0,220.0],
    [2280,2279,"2025-03-31","400/220 kV BTPS to Somasamudra S/s for a distance of 20.387 Kms","Double Circuit","State Sector","KPTCL",41.0,220.0],
    [2281,2280,"2025-03-31","LILO of both circuit of 220KV B.Bagewadi-","Mixed Circuit","State Sector","KPTCL",39.0,220.0],
    [2282,2281,"2025-03-31","220KV DC Kalmeshwar-Warud Phase-III","Double Circuit","State Sector","MSETCL",45.0,220.0],
    [2283,2282,"2025-03-31","220 kV Kumbhargaon - Kurunda line ","Double Circuit","State Sector","MSETCL",57.0,220.0],
    [2284,2283,"2025-03-31","220 kV line from 400 kV Solapur PG to 220 kV Bale S/S ","Double Circuit","State Sector","MSETCL",27.0,220.0],
    [2285,2284,"2025-03-31","Balance work of 220 kV SC Karad- Koyna line ","Single Circuit","State Sector","MSETCL",4.0,220.0],
    [2286,2285,"2025-03-31","LILO of 220 kV M/C Tarapur-Borivali and Boisar- Ghodbandar line at Kudus ","Mixed Circuit","State Sector","MSETCL",126.0,220.0],
    [2287,2286,"2025-03-31","220 kV D/C Baram-Jauljivi Line","Double Circuit","State Sector","PTCUL",25.0,220.0],
    [2288,2287,"2025-03-31","KPS2-Lakadia 765kV D/C line ","Double Circuit","Private Sector","ADANI",355.0,765.0],
    [2289,2288,"2025-03-31","765kV D/C KPS1 to KPS2 GIS ","Double Circuit","Private Sector","MEGHA",41.0,765.0],
    [2290,2289,"2025-03-31","ACME Solar Holdings limited PS at Jaisalmer- Fatehgarh  line ","Single Circuit","Private Sector","ACME",16.0,400.0],
    [2291,2290,"2025-03-31","AGEL  - KPS-1  400 kV S/c line ","Single Circuit","Private Sector","ADANIGREEN",10.0,400.0],
    [2292,2291,"2025-03-31","AGEL  - KPS-1  400 kV S/c line ","Single Circuit","Private Sector","ADANIGREEN",8.0,400.0],
    [2293,2292,"2025-03-31","AGEL -KPS-1 ","Single Circuit","Private Sector","ADANIGREEN",11.0,400.0],
    [2294,2293,"2025-03-31","Adani Renewable Energy Holding Four Limited Power Plant -Bhadla-II PS 400 kV S/c line ","Single Circuit","Private Sector","AREHFL",11.0,400.0],
    [2295,2294,"2025-03-31","RGESL PSS-4 at Solapur Konhali-Limbi Chincholi  Solapur S/S ","Single Circuit","Private Sector","Renew Green Energy Solutions",13.0,400.0],
    [2296,2295,"2025-03-31","SRPL  -KPS-1  400 kV S/c line ","Single Circuit","Private Sector","Sarjan Realities",14.0,400.0],
    [2297,2296,"2025-03-31","AREH4L 500 MW Power Plant S/s -Fatehgarh-II PS 220 kV D/c line ","Single Circuit","Private Sector","AREHFL",24.0,220.0],
    [2298,2297,"2025-03-31","RSRPL at Gadag - Gadag SS  ","Single Circuit","Private Sector","Renew Surya Roshni",30.0,220.0],
    [2299,2298,"2025-03-31","Renew Surya Vihaan Private Limited Solar Power Plant at Jaisalmer-PGCIL Fatehgarh-III PS","Single Circuit","Private Sector","Renew Surya Vihaan",13.0,220.0],
    [2300,2299,"2025-03-31","M/s Sembcorb Green Infra Private Limited generation pooling Station at Koppa-Gadag PS  line ","Single Circuit","Private Sector","Sembcorp Green Infra",54.0,220.0],
    [2301,2300,"2025-03-31","Serentica Renewables India Private Limited  PS -Bikaner II PS  ","Single Circuit","Private Sector","Serentica Renewables India",8.0,220.0],
    [2302,2301,"2025-03-31","Serentica Renewables India 1 Private Limited  PS at Koppal to Koppal PS  ","Single Circuit","Private Sector","Serentica Renewables India 1",5.0,220.0],
    [2303,2302,"2025-03-31","Vena Energy Vidyuth Private Limited PS at Koppal-Gadag  line ","Single Circuit","Private Sector","Vena Energy Vidyuth",58.0,220.0],
    [2304,2303,"2025-01-31","RIL  GIS Jam Khabaliya  PS line ","Double Circuit","Central Sector","PGCIL",90.0,400.0],
    [2305,2304,"2025-01-31","LILO of CKT-I of Patna  - Barh  at Bakhtiyarpur SS","Double Circuit","State Sector","BSPTCL",21.0,400.0],
    [2306,2305,"2025-01-31","LILO of Pudhansandhai - Pugalur 230 kV Feeder at Nallur SS","Double Circuit","State Sector","TANTRANSCO",12.0,230.0],
    [2307,2306,"2025-01-31","Tajpur - Samastipur line ","Double Circuit","State Sector","BSPTCL",41.0,220.0],
    [2308,2307,"2025-01-31","Thakurganj-Kishanganj line ","Double Circuit","State Sector","BSPTCL",95.0,220.0],
    [2309,2308,"2025-01-31","220 kV D/C Motigop Babarzar line  - ","Double Circuit","State Sector","GETCO",5.0,220.0],
    [2310,2309,"2025-01-31","LILO of both circuits of Sidhi - Hindalco line at Bargawan 220 kV S/s  ","Double Circuit","State Sector","MPPTCL",9.0,220.0],
    [2311,2310,"2025-01-31","LILO of 220kV Eklahare - Navsari line  at 220 kV Reliance Life science GIS SS","Single Circuit","State Sector","MSETCL",1.0,220.0],
    [2312,2311,"2025-01-31","Pachpadra - HRRL  line Ckt-I and Ckt-II","Double Circuit","State Sector","RVPNL",30.0,220.0],
    [2313,2312,"2025-01-31","LILO of STPS - J K NAGAR line at 220 kV Asansol SS","Double Circuit","State Sector","WBSETCL",63.0,220.0],
    [2314,2313,"2025-04-30","LILO of Kobra (West)-Khedamara (Bhilai) S/c line at Dhardehi (Bilaspur) S/s","Single Circuit","State Sector","CSPTCL",14.0,400.0],
    [2315,2314,"2025-04-30","Manali-Korattur S/c Line (Manali to Manjambakkam gantry point-OH line and Manjambakkam gantry point to Koratur-UG Cable)","Single Circuit","State Sector","TANTRANSCO",16.0,400.0],
    [2316,2315,"2025-04-30","Kushtagi-Yelburga line","Double Circuit","State Sector","KPTCL",58.0,220.0],
    [2317,2316,"2025-04-30","Nagewadi- Bhokardhan line","Double Circuit","State Sector","MSETCL",90.0,220.0],
    [2318,2317,"2025-04-30","Nuapada (Cuttack)-Pratapsason line","Double Circuit","State Sector","OPTCL",92.0,220.0],
    [2319,2318,"2025-04-30","Bhadohi-Sahupuri Line","Single Circuit","State Sector","UPPTCL",77.0,220.0],
    [2320,2319,"2025-04-30","LILO of one ckt. of 400 kV D/c Kalisindh-Anta Line at Sangod GSS (Intra state TBCB)","Double Circuit","Private Sector","ADANI",11.0,400.0],
    [2321,2320,"2025-05-31","LILO of Gokarna-New Chanditala line at Satgachia GIS","Double Circuit","State Sector","WBSETCL",21.0,400.0],
    [2322,2321,"2025-05-31","220 kV Nunna-Gunadala line (Monopole)","Double Circuit","State Sector","APTRANSCO",17.0,220.0],
    [2323,2322,"2025-05-31","LILO of Sector-65 - Palli line at 400 kV Kadarpur SS","Double Circuit","State Sector","HVPNL",26.0,220.0],
    [2324,2323,"2025-05-31","220 kV Shivajinagar to Ampyr Renewables Energy resources Solar power Park (at Bhamer and Bhadgaon Tal. Sakri Dist Dhule)","Single Circuit","State Sector","MSETCL",11.0,220.0],
    [2325,2324,"2025-05-31","220 kV Umred-Nagbhid line (Part-II)","Double Circuit","State Sector","MSETCL",49.0,220.0],
    [2326,2325,"2025-05-31","220 kV Uppalwadi-Pardi underground cable (circuit I)","Double Circuit","State Sector","MSETCL",13.0,220.0],
    [2327,2326,"2025-05-31","LILO of Virur-Gadchiroli line at 220 kV Konsari substation (by M/s Lloyds Metal and Energy Ltd.)","Double Circuit","State Sector","MSETCL",32.0,220.0],
    [2328,2327,"2025-05-31","Nayagarh GSS to Railway Traction Substation at Nayagarh","Single Circuit","State Sector","OPTCL",14.0,220.0],
    [2329,2328,"2025-05-31","Lilo of one ckt of Jamalpur-Dhandari Kalan line at Sherpur SS (by replacing 66 kV Existing multi circuit line to 220kV)","Double Circuit","State Sector","PSTCL",2.0,220.0],
    [2330,2329,"2025-05-31","220 kV Khair-Harduaganj Line","Double Circuit","State Sector","UPPTCL",77.0,220.0],
    [2331,2330,"2025-06-30","Ckt-1 of 765 kV D/C KPS2-KPS3 line under Project Establishment of Khavda Pooling Station-3 (KPS3) in Khavda RE Park (SPV Name POWERGRID KPS3 TRANSMISSION LIMITED)","Single Circuit","Central Sector","PGCIL",15.0,765.0],
    [2332,2331,"2025-06-30","400 kV D/C Jeypore (POWERGRID)-Jagdalpur (CSPTCL) line under Project Inter-regional ER-WR Interconnection (SPV Name ERWR Power Transmission Ltd.)","Double Circuit","Central Sector","PGCIL",136.0,400.0],
    [2333,2332,"2025-06-30","Kathalguri (NEEPCO)-Namsai (POWERGRID) 220 kV D/C line under Project System Strengthening Scheme for Eastern and North Eastern Regions (SPV Name POWERGRID ER NER Transmission Limited)","Double Circuit","Central Sector","PGCIL",142.0,220.0],
    [2334,2333,"2025-06-30","LILO of one ckt of Mohana-Samalkha line at Jajji SS","Double Circuit","State Sector","HVPNL",7.0,220.0],
    [2335,2334,"2025-06-30","Ghanagapura S/S Kalaburagi (Ferozabad) S/s to Kapnoor line","Double Circuit","State Sector","KPTCL",21.0,220.0],
    [2336,2335,"2025-06-30","LILO of one ckt of Mhaisal-Jath at Alkud SS (Jath to Alkud Portion)","Double Circuit","State Sector","MSETCL",22.0,220.0],
    [2337,2336,"2025-06-30","Keonjhar (PGCIL SS) to Turumunga GSS","Double Circuit","State Sector","OPTCL",34.0,220.0],
    [2338,2337,"2025-06-30","LILO of 220 kV Akal-Giral Line at 220 kV GSS Sheo","Double Circuit","State Sector","RVPNL",8.0,220.0],
    [2339,2338,"2025-06-30","LILO of 220 kV Balotra-HRRL Line at 400 kV GSS Pachpadra","Double Circuit","State Sector","RVPNL",10.0,220.0],
    [2340,2339,"2025-06-30","Juna Renewable Energy Private Limited Solar Power Plant (switchyard located in Village Kawani District-Bikaner Rajasthan)-Bikaner-II (ISTS) Pooling station 220 kV line","Single Circuit","Private Sector","Juna Renewable Energy",16.0,220.0]
]}